![Page 1: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/1.jpg)
CUSHMAN SHORELINE
MANAGEMENT PLAN UPDATE
Presented by:
Tacoma Power and Mason County
DEC. 9, 2017
![Page 3: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/3.jpg)
MEETING PURPOSE
Mason County’s new shoreline regulations
Updates to Tacoma Power’s Shoreline
Management Plan (SMP)
• Seeking preliminary input today.
• Comments can be provided in any format.
• We will provide a final draft, table of changes and comment
period in 2018.
Ongoing communication
with lessees about SMP
implementation
3
![Page 4: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/4.jpg)
KEY PERMITTING REMINDERS
Shoreline uses need these approvals:
• Applicable regulatory agency permits (as with all shoreline uses anywhere)
• Tacoma Power (land owner)
• Lake Cushman Maintenance Company
Reservoir fluctuations and permit timing:
• Drawn down typically between October and April
Allow ample time for permitting to ensure you meet your desired construction timing
4
![Page 5: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/5.jpg)
Mason County Shoreline Master Program
2017 Update
Kell Rowen
Senior Planner
(360) 427-9670 ext. 365
![Page 6: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/6.jpg)
Bulkheads
• Repair and replace • New bulkheads • Softshore armoring
![Page 7: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/7.jpg)
Docks
• Repair and replace • New Docks • Pre/Post-1988
![Page 8: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/8.jpg)
Shoreline Permits & Requirements
• Substantial Development or Shoreline Exemption • SEPA Checklist & Determination • Geotechnical Reports • Habitat Management Plans (HMP) or Biological
Evaluations (BE) • No more Mason Environmental Permits (MEP) • Building Permit
![Page 9: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/9.jpg)
Standard Buffers
• Residential • Rural • Conservancy
Shoreline Environmental Designations
![Page 10: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/10.jpg)
Common Line Setback
Adjacent neighboring structures Minimum setback 35’ Maximum setback 200’
![Page 11: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/11.jpg)
Common Line Setback
Adjacent structure and undeveloped lot
![Page 12: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/12.jpg)
Common Line Setback
Buffer averaging
![Page 15: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/15.jpg)
JURISDICTION
15
Mason County
![Page 16: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/16.jpg)
SMP AND SUSPG UPDATES
16
• Better achieve the SMP objectives
• Address situations not currently covered and/or clarify existing language
• Improve permitting process efficiency
• Better align with Mason County regulations
Reasons for updating the SMP and SUSPG:
![Page 17: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/17.jpg)
BULKHEADS
17
• Create geo-tech checklist. • Allow small, justified
bulkhead to protect a shoreline structure.
• Add language about toe
repairs. • Only one toe repair
allowed waterward of existing bulkhead footprint.
Changes being considered:
![Page 18: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/18.jpg)
DOCKS
18
• Require float rest alternative analysis before allowing concrete rest.
• Require anchor lines
to be within footprint of structure.
• Specify that anchoring
to trees and shoreline stumps is prohibited.
Changes being considered:
![Page 19: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/19.jpg)
BUOYS
19
• Allow buoy alternative AND shoreline structure. • Clarify distance from shore only as required to reach
appropriate depth during recreation season (not providing year-round moorage).
• Require permitted buoys to be marked for identification.
Changes being considered:
![Page 20: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/20.jpg)
Mooring Buoy Alternative: View while vessel is moored
System consists of a permanent anchor, anchor chain, removable non-floating line, optional small line recovery float.
Permanent Anchor
Anchor Chain
Non-floating anchor retrieval line shall be stored on dock
or vessel while vessel is moored.
Clip removed from chain once vessel is connected
Clip removed from dock once vessel is connected
20
![Page 21: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/21.jpg)
System consists of a permanent anchor, anchor chain, removable non-floating line, optional small line recovery float.
Permanent Anchor
Anchor Chain
Small line recovery float to prevent loss.
Non-floating anchor chain retrieval line clipped to dock.
Mooring Buoy Alternative: View while no vessel is moored
Anchor Chain Retrieval Line (removable)
21
![Page 22: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/22.jpg)
ALLOWABLE STRUCTURES, USES AND
ACTIVITIES
22
SMP: page 5-6 SUSPG: page 4-2
Changes being considered:
Lighting (Clarify): • Electrical prohibited (incl. 12 volt) • Solar/battery allowed
Log boom (Clarify): • Public considered • Private prohibited
Mooring buoy (Clarify): • Alternative allowed
Retaining walls (Add): • Considered
Outfalls (natural drainage) (Add): • Considered
![Page 23: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/23.jpg)
PROHIBITED ACTIVITIES
23
Changes being considered:
• Clarify buildings to include sheds
• Clarify slides and diving boards on fixed piers or adjacent upland prohibited
• Add private log booms
• Add private utilities
• Add signs/advertisements
SMP: page 5-7 SUSPG: pages 5-1, 5-2
![Page 24: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/24.jpg)
SAMPLE ALIGNMENTS CONSIDERED
• Reduce paths to 4 feet wide maximum.
• Define skirting prohibition; allow blocking with gaps.
• Align bulkhead repair and replacement section.
• Increase dock maximum overall length allowance to 60 feet.
24
![Page 25: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/25.jpg)
OTHER CHANGES CONSIDERED
• Remove “ownership change” from Prior Existing Use (Section 4.4 of SUSPG)
• SUSPG formatting changes:
– Better table of contents
– Add index
– Add checklists for drawings
– Geo-tech requirements
– Combine repetitive sections, etc.
• Update “Permitting Process” (Section 6 of SUSPG)
25
![Page 26: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/26.jpg)
SMP UPDATE PROCESS
Solicit initial input from shoreline lessees
Complete internal review and approval of proposed changes
Draft revised document
Public comment period
Submit to license oversight agencies for review and comment
Submit to FERC for approval
26
![Page 27: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/27.jpg)
RECAP OF LESSEE INVOLVEMENT
1. Seeking preliminary input today.
2. Comments can be provided in any format.
3. Tacoma will provide a final draft, table of changes and comment period in 2018.
27
![Page 28: CUSHMAN SHORELINE MANAGEMENT PLAN UPDATE · • Lake Cushman Maintenance Company Reservoir fluctuations and permit timing: • Drawn down typically between October and April Allow](https://reader034.vdocuments.us/reader034/viewer/2022051808/600c0050dd5988655065113e/html5/thumbnails/28.jpg)
Q&A WITH AGENCY REPRESENTATIVES
Tacoma Power
• Bret Forrester
• Wynnae Wright
• Kyrra Wilson
WDFW
• Josh Benton
28
Mason County
• Kell Rowen
• Stephen Scott