curriculum vitae - slr consulting · curriculum vitae werner petrick namibia rare earths –...

16
. 1 CURRICULUM VITAE WERNER PETRICK TECHNICAL DIRECTOR & ENVIRONMENTAL ASSESSMENT MANAGER Environmental Management Planning & Approvals, Africa QUALIFICATIONS B.Eng 1995 Civil Engineering Masters 2004 Environmental Management z EXPERTISE Environmental Management Environmental (and Social) Impact Assessments (EIA’s) Environmental Feasibility Studies Stakeholder Management Environmental Management Systems (EMS) Environmental Auditing Environmental Training and capacity building Mine Closure Werner has over 22 years of work experience. He started out as a Civil Engineer (first 3 years) but soon became involved with environmental related projects. The following 19 years (+) he has been working in the environmental field with experience in Environmental Impact Assessments (EIA’s), general environmental management and implementation, Environmental Management Systems (EMS), waste management, environmental compliance, training, stakeholder engagement and capacity building, mine closure and rehabilitation, environmental auditing and monitoring as well as due diligence. Werner’s experience is based on work conducted as a consultant (current position) as well as working for industry (i.e. implementing environmental requirements, etc.) Sectors of his experience include: exploration or production phases of large mining projects, power generation including renewable power initiatives and hybrid power plants, transmission lines, water supply & sanitation, petrochemical industry, linear infrastructure including roads and rail, port related projects, chemical handling and storage, large irrigation projects and other. With SLR he is a Technical Director and is managing the Environmental Assessment Team associated with activities in Namibia. PROJECTS Shell Namibia Upstream BV – EIA for proposed offshore well drilling (2017 -2018) Shell Namibia Upstream BV holds PEL 39, which is located adjacent to the southernmost Namibian offshore border with South Africa. Shell is proposing to drill one or possibly two exploration wells in the northern portion of the licence area. Werner was the Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, PPP and report review). Gecko Cobalt Mining - Environmental and Social Screening process (2018) Gecko Cobalt Mining (Pty) Ltd conducted reconnaissance drilling over a stretch of 24 km length over the cobalt and copper mineralisation in EPL 4346, located approximately 25 km northwest of Opuwo. Depending on the outcome of further exploration activities and the feasibility study, GCM and CR are proposing to apply for a ML to ultimately mine the ore and process it on site. Gecko appointed SLR (Namibia) to conduct an Internal Environmental (and Social) Screening exercise. Lead Environmental Assessment Practitioner managing an internal Environmental and Social Screening process.

Upload: others

Post on 01-Feb-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

.

1

CURRICULUM VITAE WERNER PETRICK

TECHNICAL DIRECTOR & ENVIRONMENTAL ASSESSMENT MANAGER

Environmental Management Planning & Approvals, Africa

QUALIFICATIONS

B.Eng 1995 Civil Engineering

Masters 2004 Environmental Management

z

EXPERTISE Environmental

Management

Environmental (and Social) Impact Assessments (EIA’s)

Environmental Feasibility Studies

Stakeholder Management

Environmental Management Systems (EMS)

Environmental Auditing

Environmental Training and capacity building

Mine Closure

Werner has over 22 years of work experience. He started out as a Civil Engineer (first 3 years) but soon became involved with environmental related projects. The following 19 years (+) he has been working in the environmental field with experience in Environmental Impact Assessments (EIA’s), general environmental management and implementation, Environmental Management Systems (EMS), waste management, environmental compliance, training, stakeholder engagement and capacity building, mine closure and rehabilitation, environmental auditing and monitoring as well as due diligence.

Werner’s experience is based on work conducted as a consultant (current position) as well as working for industry (i.e. implementing environmental requirements, etc.)

Sectors of his experience include: exploration or production phases of large mining projects, power generation including renewable power initiatives and hybrid power plants, transmission lines, water supply & sanitation, petrochemical industry, linear infrastructure including roads and rail, port related projects, chemical handling and storage, large irrigation projects and other.

With SLR he is a Technical Director and is managing the Environmental Assessment Team associated with activities in Namibia.

PROJECTS

Shell Namibia Upstream BV – EIA for proposed offshore well drilling (2017 -2018)

Shell Namibia Upstream BV holds PEL 39, which is located adjacent to the southernmost Namibian offshore border with South Africa. Shell is proposing to drill one or possibly two exploration wells in the northern portion of the licence area.

Werner was the Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, PPP and report review).

Gecko Cobalt Mining - Environmental and Social Screening process (2018)

Gecko Cobalt Mining (Pty) Ltd conducted reconnaissance drilling over a stretch of 24 km length over the cobalt and copper mineralisation in EPL 4346, located approximately 25 km northwest of Opuwo. Depending on the outcome of further exploration activities and the feasibility study, GCM and CR are proposing to apply for a ML to ultimately mine the ore and process it on site.

Gecko appointed SLR (Namibia) to conduct an Internal Environmental (and Social) Screening exercise.

Lead Environmental Assessment Practitioner managing an internal Environmental and Social Screening process.

.

.

2

CURRICULUM VITAE WERNER PETRICK

Manila Investments – Kombat Copper Mine EIA (2017 - 2018)

Manila Investments (Pty) Ltd holds Mining Licences 73B, 16, 9 (collectively the old Kombat Copper mine, which is currently under care and maintenance). The mine is a past-producing copper, lead and silver mine. Manila is considering implementing the following activities upon completion of the Environmental Impact Assessment process and acquiring the relevant permits and approvals for:

Open pit (surface) mining in ML 73B (also referred to as “Asis’’) and associated activities;

Processing of the ore at the existing process plant, currently being refurbished, and associated activities; and

Dewatering the “Asis Far West” (AFW) Shaft and conducting further underground exploration activities in ML 16.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, PPP and report review).

Swakop Uranium Waste Rock Dump Amendment and Incinerator - EIA amendment (2017 - 2018)

Swakop Uranium owns and operates the Husab Mine in the Erongo Region of Namibia; they propose amendment to their Waste Rock dump and also to implement a new on-site waste incinerator.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, PPP and report review).

EIB and NamPower Encroacher Bush Biomass Power Project – EIA (2017 - 2018)

European Investment Bank and NamPower: Environmental Impact Assessment (EIA) for the proposed Encroacher Bush Biomass Power Project in Namibia.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

Igneous Mining (Pty) Ltd – Application for Environmental Clearance (2016)

Igneous Mining (PTY) LTD Environmental is seeking a Clearance Certificate (ECC) Renewal for small scale mining activities on ML 135 in Sarusus Area, Skeleton Coast Park.

Lead Environmental Assessment Practitioner managing the ECC Renewal Process.

City of Windhoek

Gammams Waste Water Treatment Works Upgrade EIA

(2017)

The Gammams Waste Water Treatment Plant (GWWTP) located in the Wanaheda suburb of Windhoek, is the City of Windhoek’s (CoW) largest wastewater treatment plant. The CoW appointed SLR to develop an environmental Scoping Report (including Impact Assessment) for the planned GWWTP upgrade.

Lead Environmental Assessment Practitioner managing the completion of the EIA process, report compilation / review.

NAMPARKS Facility Amendments at Mudumu NP – EIA amendment (2016 - 2018)

NAMPARKS Environmental Scoping Report for Infrastructure Development: Amendment for the proposed addition of an Entrance Gate, Tourist Reception and Staff Housing at Mudumu National Park.

Lead Environmental Assessment Practitioner for the EIA amendment process required for infrastructure development. Report review.

Gecko Salt (Pty) Ltd Cape Cross Salt Project - EIA (2016 - 2018)

Gecko Salt (Pty) Ltd Environmental Impact Assessment for the proposed Cape Cross Salt Project.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and review reports.

.

.

3

CURRICULUM VITAE WERNER PETRICK

Namibia Rare Earths – Proposed Lofdal Mine and linear infrastructure – EIA (2015 - 2016)

NRE holds the EPL at Lofdal located west of Khorixas, exploring for rare earth. They wish to apply for a mining license in 2016, for which an EIA would is required.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

Rössing Uranium – Impacts of the TSF on biota and desert ecology – Management of study (2015 - 2016)

Impacts of the TSF at Rössing Uranium and related dust dispersion on biota and desert ecology.

Managing the process and coordinating various specialists for input into the study (i.e. vegetation, air quality, biological soil crust, invertebrates and hyperspectral work). Compiling consolidated report summarising all the findings.

High Speed Railway Lines – Environmental Screening Process (2015 - 2016)

Feasibility studies for a railway line between Windhoek and Katutura, as well as a study for a railway line between Windhoek and Okahandja.

Lead Environmental Assessment Practitioner managing the environmental Screening process (including limited stakeholder engagement, managing specialists, etc.) and compiling reports.

Swakop Uranium Reagents – EIA for storage at the Manica facilities (2015)

Swakop Uranium is developing the Husab Mine in the Erongo Region of Namibia (70 km north-east of the Walvis Bay port). The reagents and chemicals that will be used in the processing plant will be imported through the port of Walvis Bay. It will be sourced in advance and stored in Manica warehouse facility (on a temporary basis – “phase 1 project”) and container yard in the industrial area of Walvis Bay.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports

Sand Miners Association of Swakopmund – EIA for sandmining in the Swakop River (2015)

The members of the Sand Miners Association have been mining sand from the Swakop River, within the Swakopmund Municipal boundaries, for many years. The sand they mine supplies Swakopmund, Long Beach and Walvis Bay with sand for construction purposes. The Sand Miners Association has had to look for an alternate source of sand for construction activities in their area and EIA had to be done.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

Swakop Uranium Reagents storage at a new facility in the Port of Walvis Bay – EIA (2015)

Swakop Uranium is developing the Husab Mine in the Erongo Region of Namibia (70 km north-east of the Walvis Bay port). The reagents and chemicals that will be used in the processing plant will be imported through the port of Walvis Bay. It will be sourced in advance and stored in a warehouse facility within the boundaries of NamPort’s harbour area (long term – “phase 2” project).

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

Namibia Rare Earths – Lofdal mine – Environmental baseline development (2015)

NRE holds the EPL at Lofdal located west of Khorixas, exploring for rare earth. They wish to apply for a mining license in 2016, for which an EIA would be required. The baseline environment needs to be described in detail to feed into such an EIA process.

Compile the environmental baseline project plan. Manage specialists and develop Baseline data/report with input from various specialists.

.

.

4

CURRICULUM VITAE WERNER PETRICK

Swakop Uranium – Husab Mine amendments - EIA (2015)

Swakop Uranium is developing the Husab Mine in the Erongo Region of Namibia (70 km north-east of the Walvis Bay port). The EMP needs to be implemented during construction Swakop Uranium and their contractors. It further needs to be rolled out into a management system for operations.

Lead Environmental Assessment Practitioner managing the various EIA processes and compiling reports. Provide guidance and support to Environmental Control Officer(s), training to ECOs and contractors. Develop EMS procedures and other relevant documentation.

B2Gold – Otjikoto Gold Mine landfill site - EIA (2013 – 2014)

B2Gold is developing the Otjikoto (gold mine) Project, located approximately 70 km north-east of Otjiwarongo in the Otjozondjupa Region of Namibia. B2 Gold proposed to develop a landfill site (waste disposal facility) on site to cater for non-hazardous waste. They also proposed to construct and operate an on-site (heavy fuel oil) Power Plant.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

B2Gold – Otjikoto Gold Mine development - EIA (2012 – 2013)

B2Gold applied for Mining Licence (ML 169) to developed the Otjikoto (gold mine) Project, located approximately 70 km north-east of Otjiwarongo in the Otjozondjupa Region of Namibia. As part of the ML application process, a detail EIA process needs to be conducted.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports. The Scoping phase was already completed by another company. SLR (in corporation with the other company) completed the EIA process – i.e. assessment phase. Develop Mine Closure Framework.

Arandis Power Plant - EIA amendment (2014)

Arandis Power proposed to construct and operate a ‘hybrid’ thermal/PV plant with the maximum output capacity of 120 MW.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

EPL’s for exploration activities – various EIA’s (2013 – 2015)

Various exploration companies planning to conduct exploration activities on the EPLs they hold. Prior the activities commencing, and EIA process needs to be conducted.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports. Also review of reports.

Commissiekraal Coal Mine – EIA Scoping Report (2015)

Development of the proposed Commissiekraal Coal Mine including services and

associated infrastructure in South Africa.

Compiled EIA Scoping Report.

.

.

5

CURRICULUM VITAE WERNER PETRICK

Various Mining and Exploration companies - various services (2012 – 2015)

Various Mining and exploration companies across Namibia sought assistance.

Provided various services and support to various mining and exploration companies, including amongst others external audits, training, rehabilitation planning, compiling EMS procedures and other relevant documents, compile environmental performance reports, etc.

Various Mining, Exploration and Infrastructure Projects – various services (2012 – 2015)

Various Mining and exploration projects as well as infrastructure projects across Namibia sought assistance with EIAs, EMPs and review processes.

Review process and reports for various projects managed by other SLR environmental practitioners, including amongst others rail sidings; Nanomill which will produce 150,000 tons rebar’s and billets per year from scrap steel; Okorusu Fluorspar Mine expansion; Offshore exploration drilling (Murphy); water and waste water treatment facilities EIA and EMPs; Dundee Precious Metal Tsumeb Hazardous Waste Site expansion; Walvis Bay Salt Holdings Expansion; and others.

Pietersite Mining License – EIA (2013)

Mining Pietersite (gemstone) on Mining License (ML) 57 in the Kunene Region, north-central Namibia.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

TransNamib – sulphuric acid transport – EIA (2014)

TransNamib plans to transport sulphuric acid by rail from Dundee Precious Metals (Tsumeb) to Rössing Uranium Mine and to Walvis Bay.

Lead Environmental Assessment Practitioner managing the EIA processes and compiling reports.

Rössing Uranium Z20 deposit – EIA (2012 – 2014)

It is envisaged that the Z20 uranium deposit would be mined as a satellite open pit as it contains uranium bearing alaskite rocks, utilising conventional blast, load and haul methodology. An infrastructure corridor would need to be established to link the Z20 site to the existing Rössing Uranium Mine across the Khan River.

Managing the EIA processes and compiling reports in a ‘joint venture’ with Aurecon.

Desalination Plant – Managing SEIA processes (2014)

A new Desalination Plant (located approximately 6 km north of Swakopmund, at the

premises of the existing Swakopmund Salt Works.) to supply water to the for Rössing

Uranium Mine. The plant will have a design capacity of 8,800 m³/day.

Managing the SEIA processes and compiling reports in a ‘joint venture’ with Aurecon.

Coal Storage at Walvis Bay Harbour – EIA (2012)

Environmental Screening/ fatal flaw analysis for the proposed expansion of coal storage at the Walvis Bay Harbour.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

.

.

6

CURRICULUM VITAE WERNER PETRICK

Arandis Power HFO and recycled oil power plant -

EIA (2012)

Arandis Power proposes to develop an independent power generation plant east of the town of Arandis, located in the Erongo Region, Namibia. Arandis Power is proposing a power station with a nominal output capacity of approximately 120MW which utilises reciprocating engines. Arandis Power will utilise a residual fuel known as heavy fuel oil (HFO) and recycled oil from a waste oil recycling plant.

Lead Environmental Assessment Practitioner managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

Langer Heinrich Uranium Mine – expansion projects – Specialist environmental support (2009 – 2012)

Langer Heinrich is an operational Uranium Mine in Namibia Naukluft National Park.

Specialist environmental support to ensure EIAs for expansion projects are correctly managed and implemented. Also to provide support, guidance and management in terms of environmental management implementation at the mine i.e. EMS development and implementation; mine closure and restoration strategy; environmental training; etc.).

Port Expansion Projects in SA – Project environmental management (2008 - 2009)

Port expansions and development (Port Elizabeth, Coega and Richards Bay).

Project Environmental Manager - managing the EIA process (including stakeholder engagement, managing specialists, etc.) and compiling reports.

Gautrain Rapid Rail Link - EIA (2006 - 2007)

Development of the Gautrain Rapid Rail Link.

Appointed (on contract basis) to provide specialist input into the very challenging EIA

processes and EMP development for the project. Also appointed as the

Environmental Manager for the Bombela Turnkey Contractor, the managing

contractor, for the Gautrain Rapid Rail Link Project.

MEMBERSHIPS

EAPAN Certified as a Lead Environmental Practitioner and a Reviewer under the Environmental Professionals of Namibia (Membership No. 114)

PUBLICATIONS

Paper on the integration of the EIA process with the project execution model through the University of Pretoria.

1

CURRICULUM VITAE

MARVIN NM SANZILA

ENVIRONMENTAL ASSESSMENT PRACTITIONER

Environmental Management, Impact Assessments, Permitting and Compliance, Namibia

Qualifications

BSc

2007 Natural Resources Cert 2014 Understanding and Auditing ISO 14001

Cert 2015 New Managers Development Programme

z EXPERTISE

Environmental Assessments and Project Management

ISO 14001: Environmental Management Systems; EMPs: Implementation and Coordination

Environmental Auditing

Stakeholder Management

Documentary- Film presenter and narrator

Marvin Sanzila joined SLR in March 2016 as an Environmental Assessments Practitioner and is a member of the Environmental Assessment Professionals of Namibia (EAPAN). Prior to this venture, Marvin was employed as an Environmental Compliance Coordinator for the Langer Heinrich Uranium (LHU) mining project. His role was to coordinate the environmental compliance program in order to ensure LHU successfully integrates environmental compliance across the business and retains its licence to operate. This involved overall coordination and implementation of the Environmental Management System and meeting the requirements of the ISO 14001.

Marvin has assisted various consultants in conducting Environmental Impact Assessments looking at project development stages, Legal requirements, Socio economic impacts, Assessment methodology and procedures. Most these consultants have now as well ventured with SLR sharing their experience and knowledge in environmental consulting.

Apart from Project Management and Environmental Assessments, Marvin has presented and narrated two films, one that emphasizes the role of the environmental Management Act no.7 of 2007 in the modern day Namibian development context and the other that looks at Namibia’s Wetlands and its potential for ecotourism. His diverse capabilities, skills and knowledge and growing passion for environmental management allows an opportunity for a dynamic Environmental Team.

PROJECTS

Alten Renewable Energy Group (Alten)

Environmental and Social Management Support for the proposed construction of the 37 MW Solar Power Plant in Mariental, Namibia (2018)

Environmental and Social Management Support Manager

Alten proposes the construction of a 37 MW Solor Power plant in Mariental. During the construction phase of the project, the Environmental and social management plans (ESMPs) will need to implemented in order for Alten to comply with the relevant local and international Environmental Regulations. SLR has been appointed to implement and coordinate the ESMPs.

2

CURRICULUM VITAE MARVIN NM SANZILA

Swakop Uranium PTY (LTD)

Swakop Uranium Internal Scoping Report for the proposed New Raw Water Pond (2017).

Environmental Practitioner for the Scoping (including assessment) process.

Swakop Uranium Projects and Processing Departments proposed to construct an additional raw water pond for the storage of Raw water supplied by NamWater. The additional pond is not only required to provide the plant with the required volumes of water, but also to ensure suitable volumes of water being stored during scheduled NamWater maintenance shutdown periods.

Shell Namibia Upstream B.V. :

EIA for proposed Deep Water Exploration Well Drilling in Petroleum Exploration Licence 39 (blocks 2913a and 2914b) off the coast of Southern Namibia (2017)

Project Assistant (Environmental Practitioner) for the Public Participatory Process (including Focus Group Meetings) of the EIA. Correspondence with Client and Project Management. Shell Namibia Upstream BV holds PEL 39, which is located adjacent to the southernmost Namibian offshore border with South Africa. Shell is proposing to drill one or possibly two exploration wells in the northern portion of the licence area.

European Investment Bank and NamPower: Environmental Impact Assessment (EIA) for the proposed Encroacher Bush Biomass Power Project in Namibia (2017)

Project Assistant

NamPower has partnered with the European Investment Bank (EIB) proposes to construct and operate a biomass power plant that will generate electricity by the combustion of wood from encroacher bush, growing in the surroundings of the proposed power plant area.

Tschudi Copper Mine: Environmental Audit Report- November 2017

Environmental Auditor

Environmental Audit for the EMP implementation of the Tschudi Mine in Tsumeb, Namibia

Namibian National Parks Programme Phase IV(NamParks IV)

Environmental considerations related to development of park management infrastructure in the Tsau //Khaeb national park in the /Karas Region (2017)

Environmental Practitioner (Project Manager)

On the 20th of June 2017, Lund Consulting Engineers cc (Lund) requested SLR Environmental Consulting (Namibia) (PTY) Ltd (SLR), to interpret the extent of environmental legal requirements for the proposed infrastructure development of NamParks Phase IV in the TKNP as detailed in the Concept Design Report. Design, site supervision and contract administration.

NamParks is supported by the Federal Republic of Germany through the Kreditanstalt für Wiederaufbau (KfW) Development Bank. The programme (NamParks) has been implemented into development phases (1 to 4). NamParks Phase 4 (NamParks IV) is currently focused on Park Management infrastructure development in the Tsau //Khaeb (Sperrgebiet) National Park (TKNP).

3

CURRICULUM VITAE MARVIN NM SANZILA

Earthmaps CC

Scoping Report and EMP for Earthmaps Consulting CC’s Exploration Activities on EPLs 6339 and 6340, North-West of Tsumeb in the Oshikoto Region (2017)

Environmental Practitioner (Project Manager) for the EIA process of the proposed project activity.

Earthmaps Consulting CC (Earthmaps) founded in 2004, is a local consulting service based in Swakopmund, Erongo Region with vast experience in minerals’ exploration and mining in Namibia and across Africa. Earthmaps holds the Exclusive Prospecting Licenses (EPLs) 6339 and 6340, located north-west (NW) of Tsumeb in the Oshikoto Region. Earthmaps required an environmental clearance certificate (ECC) from the Ministry of Environment and Tourism (MET): Department of Environmental Affairs (DEA) to conduct exploration activities in these EPLs.

Votorantim Metals Namibia (PTY) LTD

Scoping Report (including assessment) and EMP for Votorantim Metals Namibia (PTY) LTD’s Exploration Activities on EPL 6521, North-West of Otavi in the Otjozondjupa Region (2017)

Environmental Practitioner (Project Manager) for the EIA process of the proposed project activity.

Votorantim Metals Namibia (Pty) Ltd (Votorantim) is a wholly owned subsidiary of Votorantim Metais Zinco, a Brazilian mining company, specialising in zinc, lead and copper. Votorantim has successfully obtained an Exclusive Prospecting Licence (EPL) 6521 in the North-western side of Otavi in the Otjozondjupa Region.

Votorantim require an environmental clearance certificate (ECC) from the Ministry of Environment and Tourism (MET): Department of Environmental Affairs (DEA) to conduct exploration activities on EPL 6521.

Namibian National Parks Programme Phase NAMPARKS Phase II Scoping Report for Infrastructure Development: Amendment for the proposed Addition of Entrance Gate, Tourist Reception, Staff Housing at Mudumu. (2016)

Environmental Practitioner for the EIA process of the proposed project activity.

An environmental Scoping Report and Environmental Management Plan (EMP) for the infrastructure development in the North-Eastern Parks was completed in March 2008 and the Environmental Clearance Certificate (ECC) subsequently issued in 2008, following the submission to the MET: Department of Environmental Affairs (DEA). Infrastructure provisions for the Mudumu South in the approved Scoping Report only included a Park Entrance gate. It has come to terms that additional infrastructure is required at the Mudumu South.

SLR was consulted to undertake the EIA process for the proposed additional park infrastructure.

ErongoRed EIA for a new 44 kV powerline between Swakopmund reservoir and the Swakop River Plots (2016).

Environmental Practitioner (for the EIA process, including EIA write up, Public Participatory process, review of specialist report and project management).

EIA for the proposed upgrading of the 22 kV to 44 kV powerline. A new overhead powerline to be constructed.

4

CURRICULUM VITAE MARVIN NM SANZILA

Ministry of Agriculture, Water & Forestry (MAWF)

EIA process for the Zone Irrigation Project , North west of Nkurenkuru, Kavango Region

(2016, 2018)

Environmental Practitioner (EIA write up, process, review of specialist report and project management)

The Ministry of Agriculture, Water & Forestry (MAWF) through the Division of Agricultural Engineering (DAE) intends to develop an Irrigation Project as part of the

Government’s Green Scheme in the Zone Area located about 30 km northwest of Nkurenkuru in the Western region of Kavango. An EIA process is required for the project to obtain an ECC.

Namibia Construction PTY Ltd.

Scoping (Including Assessment) Report and EMP for Sand Mining project- 20km South West of Okahandja (2016)

Environmental Practitioner

Namibia Construction (Pty) Ltd is mining sand in the upper reaches of the Swakop River on Farm Osona 65, 20 km south-west of Okahandja town and 6 km East of Gross Barmen. Namibia Construction has been mining sand from this location in the Swakop River between 2011 to 2014 and resumed in 2015 after the river flow reinstated the river sand in the mined out areas. An EIA process was required as per EIA regulations and EMA

Tschudi Copper Mine Environmental Audit Report- November 2016

Environmental Auditor

Environmental Audit for the EMP implementation of the Tschudi Mine in Tsumeb, Namibia

Swakop Uranium PTY LTD

Scoping Report (including impact assessment) for the proposed amendment to the Husab Mine Linear Infrastructure - 33kV Overhead Powerline at the B2 Vehicle Staging Area (2016)

Environmental Practitioner (for the entire EIA process, including EIA write up, Public Participatory process, review of specialist report and project management.

Swakop Uranium proposes to erect a 33 kV overhead power line (±1.25 km in length) from the existing Erongo RED 22kV powerline to their B2 Vehicle staging area next to the B2 main road. And EIA process was required for the issue of the ECC.

Igneous Mining

Environmental Certificate Clearance (ECC) Renewal for small scale mining activities on ML 135 in Sarusus Area, Skeleton Cost Park (2016)

Environmental Practitioner for the ECC Renewal Process.

Igneous Mining’s environmental clearance certificate for ML 135 Small scale mining activities at Sarusus Area in the Skelton Coast Park is due for renewal. It’s with this background that the project still intends to keep the Mining lease until such time that the lease lapses. It has come to terms that Igneous Mining needs to apply for a renewal of their ECC.

Swakop Uranium PTY LTD

Swakop Uranium Internal Environmental Scoping Report for the proposed Sub-Economic Material Stockpiling Area (2016)

Environmental Practitioner

Swakop Uranium proposes a minor change and/or addition to the approved Husab Mine design plan and infrastructure specific to stockpiling of Sub Economic Material (SEM) with an average ore grade of 113 ppm. The SEM is proposed to be stockpiled on two dedicated “SEM stockpiles”, located next to the Waste Rock Dump (WRD) within the perimeters of Pit Zone 1 and Pit Zone 2. An internal screening process was required to assess the impacts associated with the project activity

5

CURRICULUM VITAE MARVIN NM SANZILA

Langer-Heinrich Uranium PTY Ltd

Environmental Compliance Coordinator (2014-2016)

Environmental Compliance Coordinator The primary purpose of this role is to coordinate the environmental compliance program at Langer Heinrich Uranium (LHU) in order to ensure LHU successfully integrate environmental compliance across the business and retains its licence to operate.

Coordinate and provide support to ensure impact /aspect and risk assessment registers are up to date

EMP implementation

Participate in environmental incident investigations

Training and awareness

Conduct assessment of company activities to ensure compliance with ISO /internal standards and facilitate or coordinate environmental audit programme

Document control

Environmental register

Co-ordination, communication & networking

Langer-Heinrich Uranium PTY Ltd.

Environmental Technician (September 2011-2013)

Environmental Technician

Roles:

Environmental Aspect and compliance monitoring

Incident management and data entry

EMP Compliance

Site-Contractors compliance to Environmental procedures, Environmental Management Plan,

Compliance to EMS ISO 14001; Environmental Internal Audits and Reports

Contribution to Monthly and Bi-Annual Environmental Reports

Waste management overall mining operation

Environmental Monitoring

Maintenance and Utilization of environmental Monitoring equipment

Training; Environmental awareness, Policy, Spill and Waste management

MAMOKOBO Video& Research, Ministry of Environment & Tourism.

Documentary Film; Eco-tourism and Namibia’s Wetlands: supporting livelihoods;

Presenter, Narrator. Filming Logistics and schedule planner

6

CURRICULUM VITAE MARVIN NM SANZILA

Risk Based Solutions cc

Scoping Report: InnoWind Energy Namibia (PTY) LTD for the proposed 10 MW Solar array Project, Walvis Bay, Erongo Region (March 2011)

Environmental Junior consultant (Project assistant )

Project development stages, Socio- economic (Regional and Local Positive and Negative social impacts, Assessment methodology and procedures.

Risk Based Solutions cc

Scoping Report: On Road Investment (PTY) LTD for mining of copper, zinc and gold at farm Elbe 10, EPL 4232 Okahandja, Otjozondjupa Region

(November 2010)

Environmental Junior consultant (Project assistant )

Project development stages, Socio- economic (Regional and Local Positive and Negative social impacts, Assessment methodology and procedures, Health and Safety

Risk Based Solutions cc

Scoping Report: Zhonghe Resources (Namibia) Development (PTY) LTD for proposed new uranium mine, EPL3602. Arandis area, Erongo region.

(October 2010)

Environmental Junior consultant (Project assistant )

Project development stages, Socio- economic (Regional and Local Positive and Negative social impacts, Assessment methodology and procedures.

Risk Based Solutions cc

Scoping Report: Logwood Investment (PTY) LTD for mining of Copper and Silver at Klein Aub, EPL 3663, Rehoboth District, Hardap Region (May 2010)

Environmental Junior consultant (Project assistant)

Project development stages, Socio- economic (Regional and Local Positive and Negative social impacts), Assessment methodology and procedures, Health and Safety

ASEC cc

Environmental Background and Environmental Management Plan for the development of Eros Load Centre 66/11KV Substation and upgrade of the Olympia Load Centre (March 2010)

Environmental Junior consultant (Project assistant)

Baseline Assessment

Identification of potential impacts

Environmental Management Plan

UNDP-MET, Versacon cc

Namibia Landscape Conservation Area Initiative” NAM-PLACE

(Sept 2009)

Assistant Coordinator

Development of Project Document for the “Namibia Landscape Conservation Area Initiative” NAM-PLACE.

Pre-Feasibility and Baseline Assessment of the project focal areas and verification of the proposed PLACA demonstration Sites

Project coordination and management

7

CURRICULUM VITAE MARVIN NM SANZILA

Versatile Environment Consulting cc

Namibia National Climate Change Policy and accompanying Strategic Action Plan

(Mar 2009)

Assistant Coordinator

Administrative support and coordination.

Versatile Environmental Consulting cc

(Feb 2009- Feb 2010)

Environmental Junior Consultant

Technical environmental services to Versacon cc:

Project development, management and coordination

Project and programme environmental assessment, EIA.

MAMOKOBO Video & Research, Ministry of Environment &Tourism (MET) – Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ)

Environmental Management Act Film(Feb 2009)

Project Coordinator Assistant

Marketing and Distribution of the Environmental Management Act no.7 of 2007 film “A Balancing Act”.

MAMOKOBO Video & Research, Ministry of Environment &Tourism (MET) – Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ)

Environmental Management Act no.7 0f 2007, supporting film ( A Balancing Act)

Sept 2008- Dec 2008

Film Presenter/ Narrator

Participate in public consultation meetings

Conduct live interviews with various stakeholders

Risk Based Solution cc

EIA for Northern Namibia Development Company (NNDC) PTY LTD proposed mining and ongoing exploration – EPL No. 2633

May - June 2008

Environmental Junior Consultant

Assessment of Environmental components (Fauna and flora Coastal Settings and the Kunene River Mouth settings, likely impact and management)

Review of the Legal Framework relevant to the project.

8

CURRICULUM VITAE MARVIN NM SANZILA

SAIEA- Millennium Challenge Account (MCA)

Strategic Environmental Impact Assessment of the construction of a new veterinary cordon fence along Namibia-Angola border (April 2008)

Consultant- Enumerator

Baseline data collection and impact assessment of the proposed veterinary cordon fence

SAIEA- Millennium Challenge Account (MCA)

Strategic Environmental Impact Assessment of the construction of a new veterinary cordon fence along Namibia-Angola border (April 2008)

Consultant- Enumerator

Baseline data collection and impact assessment of the proposed veterinary cordon fence

Versatile Environment Consulting cc

Namibia National Climate Change Policy and accompanying Strategic Action Plan (Mar 2009)

Assistant Coordinator

Administrative support and coordination.

Versatile Environmental Consulting cc

EIA for a Seismic Survey in Block 1911, offshore Namibia (April 2007)

Environmental Junior Consultant

Review of international, regional and national agreements/ policies/ legislation relevant to project

Provision of information and data about coastal and marine regarding sensitivity, ecological importance and other relevant attributes of block 1911

Preparation and provision of information about the Kunene River mouth, key species, sensitivities and threats.

Versatile Environmental Consulting cc

EIA for proposed development of guano platforms near Sandwich Habour Walvis Bay (March 2007)

Environmental Junior Consultant

Review of policies, legislation and international conventions in the context of the project and biodiversity conservation

SAIEA

Trans-boundary issues of the Orange-Senqu river basin waters May 2007

Project Assistance

9

CURRICULUM VITAE MARVIN NM SANZILA

Versatile Environmental Consulting cc

Data gathering and gap analysis for modeling of the cumulative effects of offshore petroleum exploration and production activities on the marine environment in the BCLME region.

(February 2007)

Environmental Junior Consultant

Compilation of quantitative data on past, present, future petroleum industry activities and techniques for drilling in a GIS compatible format.

Identification and compilation of data on biological, physical and chemical elements most likely to be affected at sites of existing petroleum exploration and production activities.

Analysis of common impacts and project specific impact from oil/gas exploration

National Botanical Institute (NBRI), Namibia Biodiversity Database (NaBiD)

Facilitation of baseline biodiversity data through the Brown Hyena Research Project for conservation planning of the Sperrgebiet National Park (Feb 2006- Jan 2007)

Data Coordinator

Facilitation of baseline biodiversity data through the Brown Hyena Research Project for conservation planning of the Sperrgebiet National Park

Versatile Environmental Consulting cc

EIA for a Seismic Survey in Block 1911, offshore Namibia (April 2007)

Environmental Junior Consultant

Review of international, regional and national agreements/ policies/ legislation relevant to project

Provision of information and data about coastal and marine regarding sensitivity, ecological importance and other relevant attributes of block 1911

Preparation and provision of information about the Kunene River mouth, key species, sensitivities and threats.

Versatile Environmental Consulting cc

EIA for proposed development of guano platforms near Sandwich Habour Walvis Bay (March 2007)

Environmental Junior Consultant

Review of policies, legislation and international conventions in the context of the project and biodiversity conservation.

SAIEA Trans-boundary issues of the Orange-Senqu river basin waters May 2007

Project Assistance

10

CURRICULUM VITAE MARVIN NM SANZILA

Versatile Environmental Consulting cc Data gathering and gap analysis for modeling of the cumulative effects of offshore petroleum exploration and production activities on the marine environment in the BCLME region. (February 2007)

Environmental Junior Consultant

Compilation of quantitative data on past, present, future petroleum industry activities and techniques for drilling in a GIS compatible format.

Identification and compilation of data on biological, physical and chemical elements most likely to be affected at sites of existing petroleum exploration and production activities.

Analysis of common impacts and project specific impact from oil/gas exploration

National Botanical Institute (NBRI), Namibia Biodiversity Database (NaBiD)

Facilitation of baseline biodiversity data through the Brown Hyena Research Project for conservation planning of the Sperrgebiet National Park (Feb 2006- Jan 2007).

Data Coordinator

Ministry of Fisheries and Marine Resources (Marine Mammal Section)

Cape fur seal Project

Jan – Feb 2004

Assistant Fisheries Technician

1999 The Deep, Hull (1999 -2004)

A large aquarium designed by Sir Terry Farrell & Partners. Located on the River Humber the site is split into two areas the main attraction being the aquarium and the other being the business centre.

Design concept for a large entrance plaza, public spaces, car park and landscape to business centre.

Responsible for the landscape design of the main external spaces around the visitor centre as well as the layout for the car parks. Liaison with Sir Terry Farrell & Partners and engineers to create a high quality design / interactive visitor experience. Subsequent implementation of site works.

MEMBERSHIPS

ENVIRONMENTAL ASSESSMENT PROFESSIONALS OF NAMIBIA (EAPAN)

Professional Membership