Bureau Veritas - Project Management Assistance
September 2010
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
2/23
Our vision on Construction
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
3/23
3Bureau Veritas Project Management Assistance Presentation
Assessing condition and conformityof buildings to regulations andstandards throughout their life cycle
Permitting
Design review/ verification
Code compliance
Project ManagementAssistance
Technical control
Site safetycoordination
Quality Assurance /
Quality Control, Assistance to
Commissioning
Property conditionassessment
Maintenance auditsHealth & Safety Audits
Regulatory inspections
Technical duediligence
New
Construction
ExistingBuildings
Adding value to capital along property life cycle
GreenBuildingServices
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
4/23
4Bureau Veritas Project Management Assistance Presentation
COMMERCIAL PROPERTIES
Offices
Retail
Logistic
HOUSING / RESIDENTIAL
Houses / residential properties
PUBLIC-OWNED
Schools Hospitals
Public Buildings
Public Infrastructures
CHAIN FACILITIES
(all multi-site facilities selling services or products
under a brand)
Retail (commercial centres, malls)
Hospitality & Leisure Sector
(hotels)
Banks & Insurance agencies
Others networks (car dealers,
luxury shops, )
PRIVATE REAL
ESTATE
PRIVATE RETAIL &
BRAND NETWORKS
PUBLIC BUILDINGS& INFRASTRUCTURES
INDUSTRIAL FACILITIES(All market sectors):Plants & Factories, Logistic platforms, Warehouses,
Industrial manufacturers
Covering different type of assets and clients
Owners / Investors /Asset Managers
Property Managers Developers
Consultants
Owners
Retail / hotel operators
End-users (Construction& Property Departments)
Municipalities
Education
Healthcare
Public Administration
Assets
C
lients
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
5/23
5Bureau Veritas Project Management Assistance Presentation
Achieve compliance with regulations and/or specification
Avoid technical complications of construction by analyzing riskat every stage
Ensure the finished project will fulfill relevant functionalrequirements
Prove the insurability of the project
Monitor quality and functioning
Bureau Veritas, a partner of choice
Compliance and quality are monitored,from design phase through to project completion
as well as during the project life
KEY BENEFITS
BUREAU VERITAS HELPS ORGANISATIONS MANAGE ALLQUALITY, HEALTH & SAFETY AND ENVIRONMENTAL ISSUES
Authorities, developers, consultants and contractors involved in permitting, designing or executingconstruction work today are under pressure to comply with regulations as well as requiredspecifications requirements. It is particularly important for them to minimize the risk and/or to insurethemselves against future risk of defects.
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
6/23
6Bureau Veritas Project Management Assistance Presentation
through a full set of technical expertise
Multi-disciplinary approach
Geo-technique and foundations
Soil chemistry
Structural soundness
Leak proofing
Fire safety
Electricity
Lifts, escalators
HVAC
Water networks and quality
Asbestos, lead
Food refrigeration
Energy management
Environmental pollution
Carbon management
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
7/23
Project Management Assistance Solutions
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
8/23
8Bureau Veritas Project Management Assistance Presentation
Why Project Management Assistance?
Large capital projects become increasingly complex and risky, in a minefield ofperipheral conditions, legal obligations, schedules, cost and resources constraints
INSUFFICIENT TARGET
DEFINITION(INCLUDING DESIGN)
INSUFFICIENT CONSEQUENCES
UNPREDICTABLE EXTERNALINFLUENCES
In order to improve the probability of success, it is crucial to identify and fix atthe earliest stages potential quality and safety issues and minimise therisks of schedule delays, cost overruns or claims, from design to contractingto final inspections and commissioning.
Needs for reliability and dependability.
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
9/23
9Bureau Veritas Project Management Assistance Presentation
Our approach
THE TARGET TRIANGLE AND ITS OPTIMISATION
c IPM
LESS TIME LESS COSTS
HIGHER QUALITY
COSTSTIME
QUALITY
Because a construction project is a function of budget, schedule and quality in anuncertain environment, we can assist you in:
Appraising the right level of objectives from the start
Assessing adequate project process and controls to meet the objectives
Identifying project risks and corrective measures / actions to avoid / mitigate designfaults and construction defects, maximising hence project value
Bureau Veritas providesindependent professionaladvice and technicalexpertise to help you
monitor efficient contractorperformance to maintaintime, costs, quality andsafety controls throughoutthe construction projectduration.
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
10/23
10Bureau Veritas Project Management Assistance Presentation
Scope of services
Permitting Application Monitoring:
we help to ensure that project documents are in conformity with the Building Permitprocess requirements and applicable local building laws and codes
Design Verification:we perform independent review of design drawings and technical documents (calculationnotes, descriptions, etc.) to report about their conformity with project specifications andapplicable codes & standards chosen
Schedule, Quantity and Cost Monitoring:we provide an independent and periodic inspection on a set of predetermined tasksrelated to an estimated schedule, Bill of Quantities (BOQ) and costs to inform on thestatus of achievement or work progress and their consequences and help the Client toefficiently monitor time, quantity and costs throughout the project duration.
Quality Assurance / Quality Control (QA/QC):we review the Quality Plan and perform inspections throughout the construction processin order to assist the Project Owner in checking the effective implementation of theapproved Quality Plan
Construction Site Safety:we review project documents and perform inspections related to applicable local Healthand Safety standards and codes in order to inform the Client about the implementation ofthe Health and Safety measures on the construction site along the project duration
We assign a dedicated team with the expertise to quickly anticipate project needs and respondwith specific, immediate remedies to reduce delays and disruptions.
Our services can include one or several following items:
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
11/23
11Bureau Veritas Project Management Assistance Presentation
Other related services
In addition to Project Management Assistance, Bureau Veritas offers a wide range of relatedservices including (but not limited to):
Regulatory Technical Control / Code Compliance
Contract & Claims Management
Green Building Certification & Consultancy Construction Materials Conformity Assessment
Soil Audits
Handicap Accessibility Assessment
Fire Prevention
Technical Due Diligence
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
12/23
12Bureau Veritas Project Management Assistance Presentation
Typical project organisation (1/2)
Bureau Veritas is a strict Representative of its Clients
Absolute Independence from Design & Construction
Interests No Relations within the Clients Organisation
Sole Obligation to Project Results
Design
EngineersContractor 1 Contractor 2 Contractor n
Client
BV Project Manager
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
13/23
13Bureau Veritas Project Management Assistance Presentation
Project organisation (2/2)
Project Owner / Client
Contractors
BV Project
Manager
Clients ProjectManager
Design Engineers
Contractual
organisation
Functionalorganisation
There are no directcontractual relationswith the Designer or
the Contractor
BV project managerwill not give any
order to thecontractor or the
designer
DesignEngineer
GeneralContractor
BV Project Manager
Supervision
Client
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
14/23
Examples of Assignments
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
15/23
15Bureau Veritas Project Management Assistance Presentation
Shanghai World Expo 2010, China
Services provided:
QA/QC during construction;
Construction management and monitoring; Tender assistance;
Technical control during design and construction;
Health and safety plan review and site audit;
Indoor Air Quality testing, fire safety and electrical systems safetyaudits.
Context and Challenges:
China World Expo 2010 is one of the most visited event worldwide (70millions of visitors expected).
The pavilions (Italy, France, Spain, Sweden, Paris, Lille, Rhne-Alpes,Madrid, Monaco, UK) are designed by renowned foreign architects andmust be built according to the clients specifications, while respecting
Chinese construction standards and the Expo regulations within projecttime Frame
Examples ofAssignments
Customer benefits:
Construction conformity to specifications, standards & regulations
Respect of Quality, Costs and Schedule
Health and Safety Risk prevention
Project ManagementAssistance
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
16/23
16Bureau Veritas Project Management Assistance Presentation
Project Data Location: Paris, France 80,000 seats Erected for 98 world cup Project period: 1995-1998
Services Design & works technical audit
Construction site safety Documentation management Sanitary certification of water supply network
Examples ofAssignments
Stade de France
Customer Benefits Construction conformity Risk prevention & safety on site
Traceability through documentation management
Technical Audits, Health & Safety,Documentation Management
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
17/23
17Bureau Veritas Project Management Assistance Presentation
Examples ofAssignments
City of Poway, California, USA
Services provided:
Oversaw program development, design management, constructionmanagement, project scheduling, planning, and financial reporting.
Held a master service agreement with several consulting firms,streamlining service delivery and expediting projects to meet City needs.
Interfaced directly with client departments to ensure that end usersrequirements for each individual project were met.
Updated project status and contact information on the Citys web site to
enhance public outreach. Regularly kept the City informed on bond fund obligation status.
Context and Challenges:
Completing implementation of 40+ Capital Improvement Projects,totaling $65 million within a three-year time frame
Customer benefits: Achieved 92% of project funding obligation by the end of the three-yearperiod.
Timely administration of program helped City qualify for second taxallocation bond.
Prepared grant application that successfully garnered funding for majorroadway widening design project.
Maintained low change order rate (
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
18/23
18Bureau Veritas Project Management Assistance Presentation
Examples ofAssignments
Burj Khalifa - Dubai
Context
The BURJ KHALIFA (previously known as Burj Dubai) is the world tallestbuilding, located in DUBAI and already one of the major tourist attraction (a real skyscraper ). The building specifications are:
Number of Floors: 160
Height: over 828m
Built up Area: 479,830 m2
Hotel guest rooms: 160 units
Hotel residence: 144 units
Offices: 37 floors
Observatory: Level 123
Parking spaces: 3,000 cars
At the peak of construction activity in late 2009, more than 12,000 peopleworked on site
Services provided to ClientQA/QC management for the full site.
Health and safety management consultancy during construction.
Benefits for Client
Ensured required level of quality and safety during the construction phase
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
19/23
19Bureau Veritas Project Management Assistance Presentation
Berlin Central Station, Germany
Project Management
Services provided:
Project management full scope Risk, Contract and Claim management
Project data :
Total investment > 2.000 Mio.
Construction Period 12/1996 05/2006
Largest crossing station in Europe (300,000 travelers and
visitors a day, trains leaving the station in all directions every 90seconds)
Examples ofAssignments
Customer benefits: Construction conformity to specifications and required quality
Independence from Design & Construction Interests Sole Obligation to Project Results regarding Schedule andBudgets
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
20/23
20Bureau Veritas Project Management Assistance Presentation
Central Asturian University Hospital, Spain
Project ManagementAssistance
Services provided: Permit and license application assistance
Design Verification Contract management assistance
Assistance to commissioning
Project data :
Total Investment EUR 330 million
Construction Period 2006 2009
With1039 conventional beds and a total surface area
of some 180.000 sq m, the new hospital replaced 3older structures in Oviedo, Spain
Examples ofAssignments
Customer benefits:
Met required specifications regarding safety and quality Schedule and Cost Monitoring
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
21/23
21Bureau Veritas Project Management Assistance Presentation
SNCF Ventabren Viaduct, France
Project ManagementAssistance
Services provided: Quality Control
Safety Coordination on Site
Assistance to Commissioning
Project data :
Total Investment 33 millions EUR (217 MFF)
Construction Period 1996 1998
Ventabren is the longest viaduct on the Mediterranean HighSpeed Rail (TGV), near Aix-en-Provence.
Examples ofAssignments
Customer benefits: Met required specifications and standards regarding safety andquality
-
7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]
22/23
22Bureau Veritas Project Management Assistance Presentation
Design Review and Audits at Construction of a Logistic Centre
Ikea Logistic Center in Shanghai, ChinaExamples ofAssignments
Project data
Location: Shanghai, China
70,000m 35m free-height structure
Investment: US$ 28 M
Services provided: Technical design review
Construction audits
Customer benefits:
Ensure construction conformity
Assist commissioning and handover
-