    Our vision on Construction

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    3/23

    3Bureau Veritas Project Management Assistance Presentation

    Assessing condition and conformityof buildings to regulations andstandards throughout their life cycle

    Permitting

    Design review/ verification

    Code compliance

    Project ManagementAssistance

    Technical control

    Site safetycoordination

    Quality Assurance /

    Quality Control, Assistance to

    Commissioning

    Property conditionassessment

    Maintenance auditsHealth & Safety Audits

    Regulatory inspections

    Technical duediligence

    New

    Construction

    ExistingBuildings

    Adding value to capital along property life cycle

    GreenBuildingServices

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    4/23

    4Bureau Veritas Project Management Assistance Presentation

    COMMERCIAL PROPERTIES

    Offices

    Retail

    Logistic

    HOUSING / RESIDENTIAL

    Houses / residential properties

    PUBLIC-OWNED

    Schools Hospitals

    Public Buildings

    Public Infrastructures

    CHAIN FACILITIES

    (all multi-site facilities selling services or products

    under a brand)

    Retail (commercial centres, malls)

    Hospitality & Leisure Sector

    (hotels)

    Banks & Insurance agencies

    Others networks (car dealers,

    luxury shops, )

    PRIVATE REAL

    ESTATE

    PRIVATE RETAIL &

    BRAND NETWORKS

    PUBLIC BUILDINGS& INFRASTRUCTURES

    INDUSTRIAL FACILITIES(All market sectors):Plants & Factories, Logistic platforms, Warehouses,

    Industrial manufacturers

    Covering different type of assets and clients

    Owners / Investors /Asset Managers

    Property Managers Developers

    Consultants

    Owners

    Retail / hotel operators

    End-users (Construction& Property Departments)

    Municipalities

    Education

    Healthcare

    Public Administration

    Assets

    C

    lients

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    5/23

    5Bureau Veritas Project Management Assistance Presentation

    Achieve compliance with regulations and/or specification

    Avoid technical complications of construction by analyzing riskat every stage

    Ensure the finished project will fulfill relevant functionalrequirements

    Prove the insurability of the project

    Monitor quality and functioning

    Bureau Veritas, a partner of choice

    Compliance and quality are monitored,from design phase through to project completion

    as well as during the project life

    KEY BENEFITS

    BUREAU VERITAS HELPS ORGANISATIONS MANAGE ALLQUALITY, HEALTH & SAFETY AND ENVIRONMENTAL ISSUES

    Authorities, developers, consultants and contractors involved in permitting, designing or executingconstruction work today are under pressure to comply with regulations as well as requiredspecifications requirements. It is particularly important for them to minimize the risk and/or to insurethemselves against future risk of defects.

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    6/23

    6Bureau Veritas Project Management Assistance Presentation

    through a full set of technical expertise

    Multi-disciplinary approach

    Geo-technique and foundations

    Soil chemistry

    Structural soundness

    Leak proofing

    Fire safety

    Electricity

    Lifts, escalators

    HVAC

    Water networks and quality

    Asbestos, lead

    Food refrigeration

    Energy management

    Environmental pollution

    Carbon management

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    7/23

    Project Management Assistance Solutions

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    8/23

    8Bureau Veritas Project Management Assistance Presentation

    Why Project Management Assistance?

    Large capital projects become increasingly complex and risky, in a minefield ofperipheral conditions, legal obligations, schedules, cost and resources constraints

    INSUFFICIENT TARGET

    DEFINITION(INCLUDING DESIGN)

    INSUFFICIENT CONSEQUENCES

    UNPREDICTABLE EXTERNALINFLUENCES

    In order to improve the probability of success, it is crucial to identify and fix atthe earliest stages potential quality and safety issues and minimise therisks of schedule delays, cost overruns or claims, from design to contractingto final inspections and commissioning.

    Needs for reliability and dependability.

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    9/23

    9Bureau Veritas Project Management Assistance Presentation

    Our approach

    THE TARGET TRIANGLE AND ITS OPTIMISATION

    c IPM

    LESS TIME LESS COSTS

    HIGHER QUALITY

    COSTSTIME

    QUALITY

    Because a construction project is a function of budget, schedule and quality in anuncertain environment, we can assist you in:

    Appraising the right level of objectives from the start

    Assessing adequate project process and controls to meet the objectives

    Identifying project risks and corrective measures / actions to avoid / mitigate designfaults and construction defects, maximising hence project value

    Bureau Veritas providesindependent professionaladvice and technicalexpertise to help you

    monitor efficient contractorperformance to maintaintime, costs, quality andsafety controls throughoutthe construction projectduration.

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    10/23

    10Bureau Veritas Project Management Assistance Presentation

    Scope of services

    Permitting Application Monitoring:

    we help to ensure that project documents are in conformity with the Building Permitprocess requirements and applicable local building laws and codes

    Design Verification:we perform independent review of design drawings and technical documents (calculationnotes, descriptions, etc.) to report about their conformity with project specifications andapplicable codes & standards chosen

    Schedule, Quantity and Cost Monitoring:we provide an independent and periodic inspection on a set of predetermined tasksrelated to an estimated schedule, Bill of Quantities (BOQ) and costs to inform on thestatus of achievement or work progress and their consequences and help the Client toefficiently monitor time, quantity and costs throughout the project duration.

    Quality Assurance / Quality Control (QA/QC):we review the Quality Plan and perform inspections throughout the construction processin order to assist the Project Owner in checking the effective implementation of theapproved Quality Plan

    Construction Site Safety:we review project documents and perform inspections related to applicable local Healthand Safety standards and codes in order to inform the Client about the implementation ofthe Health and Safety measures on the construction site along the project duration

    We assign a dedicated team with the expertise to quickly anticipate project needs and respondwith specific, immediate remedies to reduce delays and disruptions.

    Our services can include one or several following items:

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    11/23

    11Bureau Veritas Project Management Assistance Presentation

    Other related services

    In addition to Project Management Assistance, Bureau Veritas offers a wide range of relatedservices including (but not limited to):

    Regulatory Technical Control / Code Compliance

    Contract & Claims Management

    Green Building Certification & Consultancy Construction Materials Conformity Assessment

    Soil Audits

    Handicap Accessibility Assessment

    Fire Prevention

    Technical Due Diligence

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    12/23

    12Bureau Veritas Project Management Assistance Presentation

    Typical project organisation (1/2)

    Bureau Veritas is a strict Representative of its Clients

    Absolute Independence from Design & Construction

    Interests No Relations within the Clients Organisation

    Sole Obligation to Project Results

    Design

    EngineersContractor 1 Contractor 2 Contractor n

    Client

    BV Project Manager

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    13/23

    13Bureau Veritas Project Management Assistance Presentation

    Project organisation (2/2)

    Project Owner / Client

    Contractors

    BV Project

    Manager

    Clients ProjectManager

    Design Engineers

    Contractual

    organisation

    Functionalorganisation

    There are no directcontractual relationswith the Designer or

    the Contractor

    BV project managerwill not give any

    order to thecontractor or the

    designer

    DesignEngineer

    GeneralContractor

    BV Project Manager

    Supervision

    Client

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    14/23

    Examples of Assignments

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    15/23

    15Bureau Veritas Project Management Assistance Presentation

    Shanghai World Expo 2010, China

    Services provided:

    QA/QC during construction;

    Construction management and monitoring; Tender assistance;

    Technical control during design and construction;

    Health and safety plan review and site audit;

    Indoor Air Quality testing, fire safety and electrical systems safetyaudits.

    Context and Challenges:

    China World Expo 2010 is one of the most visited event worldwide (70millions of visitors expected).

    The pavilions (Italy, France, Spain, Sweden, Paris, Lille, Rhne-Alpes,Madrid, Monaco, UK) are designed by renowned foreign architects andmust be built according to the clients specifications, while respecting

    Chinese construction standards and the Expo regulations within projecttime Frame

    Examples ofAssignments

    Customer benefits:

    Construction conformity to specifications, standards & regulations

    Respect of Quality, Costs and Schedule

    Health and Safety Risk prevention

    Project ManagementAssistance

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    16/23

    16Bureau Veritas Project Management Assistance Presentation

    Project Data Location: Paris, France 80,000 seats Erected for 98 world cup Project period: 1995-1998

    Services Design & works technical audit

    Construction site safety Documentation management Sanitary certification of water supply network

    Examples ofAssignments

    Stade de France

    Customer Benefits Construction conformity Risk prevention & safety on site

    Traceability through documentation management

    Technical Audits, Health & Safety,Documentation Management

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    17/23

    17Bureau Veritas Project Management Assistance Presentation

    Examples ofAssignments

    City of Poway, California, USA

    Services provided:

    Oversaw program development, design management, constructionmanagement, project scheduling, planning, and financial reporting.

    Held a master service agreement with several consulting firms,streamlining service delivery and expediting projects to meet City needs.

    Interfaced directly with client departments to ensure that end usersrequirements for each individual project were met.

    Updated project status and contact information on the Citys web site to

    enhance public outreach. Regularly kept the City informed on bond fund obligation status.

    Context and Challenges:

    Completing implementation of 40+ Capital Improvement Projects,totaling $65 million within a three-year time frame

    Customer benefits: Achieved 92% of project funding obligation by the end of the three-yearperiod.

    Timely administration of program helped City qualify for second taxallocation bond.

    Prepared grant application that successfully garnered funding for majorroadway widening design project.

    Maintained low change order rate (

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    18/23

    18Bureau Veritas Project Management Assistance Presentation

    Examples ofAssignments

    Burj Khalifa - Dubai

    Context

    The BURJ KHALIFA (previously known as Burj Dubai) is the world tallestbuilding, located in DUBAI and already one of the major tourist attraction (a real skyscraper ). The building specifications are:

    Number of Floors: 160

    Height: over 828m

    Built up Area: 479,830 m2

    Hotel guest rooms: 160 units

    Hotel residence: 144 units

    Offices: 37 floors

    Observatory: Level 123

    Parking spaces: 3,000 cars

    At the peak of construction activity in late 2009, more than 12,000 peopleworked on site

    Services provided to ClientQA/QC management for the full site.

    Health and safety management consultancy during construction.

    Benefits for Client

    Ensured required level of quality and safety during the construction phase

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    19/23

    19Bureau Veritas Project Management Assistance Presentation

    Berlin Central Station, Germany

    Project Management

    Services provided:

    Project management full scope Risk, Contract and Claim management

    Project data :

    Total investment > 2.000 Mio.

    Construction Period 12/1996 05/2006

    Largest crossing station in Europe (300,000 travelers and

    visitors a day, trains leaving the station in all directions every 90seconds)

    Examples ofAssignments

    Customer benefits: Construction conformity to specifications and required quality

    Independence from Design & Construction Interests Sole Obligation to Project Results regarding Schedule andBudgets

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    20/23

    20Bureau Veritas Project Management Assistance Presentation

    Central Asturian University Hospital, Spain

    Project ManagementAssistance

    Services provided: Permit and license application assistance

    Design Verification Contract management assistance

    Assistance to commissioning

    Project data :

    Total Investment EUR 330 million

    Construction Period 2006 2009

    With1039 conventional beds and a total surface area

    of some 180.000 sq m, the new hospital replaced 3older structures in Oviedo, Spain

    Examples ofAssignments

    Customer benefits:

    Met required specifications regarding safety and quality Schedule and Cost Monitoring

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    21/23

    21Bureau Veritas Project Management Assistance Presentation

    SNCF Ventabren Viaduct, France

    Project ManagementAssistance

    Services provided: Quality Control

    Safety Coordination on Site

    Assistance to Commissioning

    Project data :

    Total Investment 33 millions EUR (217 MFF)

    Construction Period 1996 1998

    Ventabren is the longest viaduct on the Mediterranean HighSpeed Rail (TGV), near Aix-en-Provence.

    Examples ofAssignments

    Customer benefits: Met required specifications and standards regarding safety andquality

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]

    22/23

    22Bureau Veritas Project Management Assistance Presentation

    Design Review and Audits at Construction of a Logistic Centre

    Ikea Logistic Center in Shanghai, ChinaExamples ofAssignments

    Project data

    Location: Shanghai, China

    70,000m 35m free-height structure

    Investment: US$ 28 M

    Services provided: Technical design review

    Construction audits

    Customer benefits:

    Ensure construction conformity

    Assist commissioning and handover

  • 7/31/2019 CTC - Project Management Assistance_Presentation V3 [Read-Only] [Compatibility Mode]