IMPLEMENT A TION OF PILOT PROJECT TO IMPROVE ENVIRONMENTAL CONDITIONS IN ESTERO DE PACO Javier Coloma Brotons September , 2014

Upload: adbwaterforall

Post on 03-Jun-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 1/30

IMPLEMENTATION OF PILOT PROJECT

TO IMPROVE ENVIRONMENTAL CONDITIONS IN

ESTERO DE PACO 

Javier Coloma Brotons

September, 2014

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 2/30

INTERVENTIONS OUTLINE

1. Wastewater treatment pilot

2. Flood gates management guidelines

3. Interceptors and combined sewer overflow management

4. Drainage and sewer lines management (MMDA and Maynilad)

5. Headwaters: coordination with MWSS and Manila Water6. Solid waste management improvement

7. Paco Market water and waste management

8. Others: dredging, stakeholder awareness, capacity building,

institutional arrangements

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 3/30

ESTERO DE PACO

BENEFICIARY AREA

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 4/30

CURRENT SITUATION

Before clean up After clean up

• Estero water still does not meet quality standards

• Need to reduce the pollutant load reaching the

Estero, rather than treating the water within it

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 5/30

1. WASTEWATER TREATMENT PILOT

• Main Goal: Show the way to improve water quality.

• Capture and treat sewage flowing into the

Estero and grey water received by drainage

network (black and grey waters)

•  Allow the water of the Estero flow into the

Pasig River, through flood gates operation.

• Improve the CSOs.

• Pilot easily replicable example. 

• USD 60,000 and minimum O&M expenses 

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 6/30

Proposed Site for the Wastewater

Management

SELECTED SITE: BARANGAY 672

• Objectives:

• show how intercepting and

treating discharges with a

low cost system can result

in good quality effluent

• prove its efficiency, and

feasibility for larger scale

replication 

• 58 houses, 7 existing septic tanks

• Direct discharge to estero

• Population: ~496 people

• Est. water consumption ~30m3/d

• Average BOD est.: 127 mg/l

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 7/30

1. WASTEWATER TREATMENT PILOT

Infrastructure• Condominial Sewerage System

• Solar-powered submersible pumps

• Anaerobic Baffled Reactor (ABR)

• Constructed Wetland (CW) 

• Combined sewer overflow (CSO)

construction and connection to sewer line 

• Complementedwith

• Training (masonry,

construction of CSS)

• O&M Workshop

community

association

barangay officials

River Warriors

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 8/30

ESTERO

DE PACO

ABR

CONSTRUCTED WETLAND

ANAEROBIC BAFFLED

REACTOR (ABR)

BOD: 127 mg/l

Flow: 30 m3/d

   G  r  e  y

  a  n   d   B   l  a  c   k

   W

  a   t  e  r

BOD: 127 mg/l

Flow: 30 m3 /d

Hydraulic retention time: 1.5 days

BOD: 38 mg/l

Flow: 24 m3 /d

BOD: 9 mg/l

Flow: 6 m3 /d

70% BOD removal

Size: 9 m (length) x 2 m (width) x 2.5 m (depth) 

75% BOD removal

Size: 19 m (length) x 2 m (width) 

Marsh plant: 3 -4 plants/m2

PILOT PROJECT

PROCESS

BOD: 38 mg/l

Flow: 6 m3 /d

CONDOMINIAL

SEWER SYSTEM

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 9/30

PILOT PROJECT LOCATION

ABRWETLAND

CSS

SUMP PIT

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 10/30

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 11/30

PILOT PROJECT

ABR

constructed wetland 

sump pit, 2 pumps, solar panel 

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 12/30

MOU SIGNING

MOU between PRRC and Barangay 672

• Turnover of pilot project to Barangay 672 and Kilusang

Pang-kapitbahay at Pang-kabuhayan, Inc.

• Financing mechanism for O&M and sustainability• Roles and responsibilities: Barangay, City Government,

PRRC, national government agencies, Maynilad

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 13/30

2. FLOOD GATE MANAGEMENT

Objective: to avoid water stagnancy

Flood gate operator:

Metro Manila Development Authority (MMDA)

Recommendation

• Flood gates should be opened if water level in

Estero de Paco is higher than in Pasig River.

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 14/30

3. INTERCEPTORS AND COMBINED SEWER

OVERFLOW MANAGEMENT 

Operators: Maynilad / MMDA

Recommendations:   Avoid overflowing in the CSO duringdays with no rain. 

Inspect the CSO weekly, esp. afterstorms. 

Clean the CSOs, avoid screensblocking. 

Improve design to ensure easiermaintenance. 

If overflowing is due to sewer pipe

clog, unclog immediately. 

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 15/30

4. SEWER AND DRAINAGE LINES

MANAGEMENT

Operators: Maynilad / MMDARecommendations:

    s

    e    w    e    rwastewater

from toilets,

bathroomsandkitchens 

     d    r    a

     i    n    a    g    edrainage is

for

rainwater.     c     l    o    g    g     i    n    g Avoid

clogging in

sewers anddrains toavoiddischarges 

     f    r    e    q    u

    e    n    c    yIf frequent

in the same

place:analyze thecause, 

come up

with asuitablesolution. 

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 16/30

CSO, SEWER AND DRAINAGE MGT.

INTERVENTIONS

Pilot new design of interceptorchambers

• Improve the CSO to avoid effluents

leaking in dry season

Connection of 50 households to

sewer system• Pilot financing scheme (similar to

wastewater pilot project)

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 17/30

5. HEADWATERS

• Large outfall discharge in the headwater , between

Osmena Highway and the railroad.

• Two barangays are connected to this pipe

(discharge 370 m3

/d)• Manila Water will connect outfall to its network.

Outfall

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 18/30

5. HEADWATERS

• Septic tank blocking the flowbetween Estero de Paco and

Estero Tripa de Gallina

• Septic tank will be removed

• Manila Water will connect

the outfall to its sewer

system by pumping.

• MWSS endorsed the plan.

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 19/30

6. SOLID WASTE MANAGEMENT

INITIAL ACTION PLAN

Operator: Manila LGU

• Solid waste management issues:

• Large quantities involved

• Small alleys not accessible to

collection trucks

• Inefficient waste collection,

transportation and disposal.

• Segregation will allow gettingrevenues from ‘valuables’:

• Organic matter, plastics, paper,

glass and metal.

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 20/30

6. SOLID WASTE MANAGEMENT PILOT

Improved collection system

• Containers for disposal,

collection and Recycling Points

• Collection schedule

• Transfer/Storage points

established for selected alleys.

• Routes for LGU’s garbage

trucks reviewed and discussed.

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 21/30

6. SOLID WASTE MANAGEMENT PILOT

Composting

• Collection of organic waste from

Paco Market

• vermi-composting at LukbanElementary School

• Compost to be taken by City Parks

administrator

MRF

• new MRF in Paco Market

• Segregation Bins

C

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 22/30

7. PACO MARKETStrategies for Wastewater and Solid Waste

Management Improvement

• Operator: Paco Market Admin

• Issues:

• Septic tank, which receiveswastewater from the fish section,

overflows to the estero

• Other discharges directed to the

drainage of the public market.

• Solid waste is not properly collected

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 23/30

Guidelines for maintenance:

• Inspected frequently, every three months.

• Check system :

• no overflowing,

• scum layer above 8 cm of scum baffle bottom

• sludge layer is below of 30 cm of the outlet.

• Ensure outlet pipe is not clogged.

• Remove sludge and scum build-up.

• Clear access to the septic tank.

• Connect the overflow to the sewerage system.

•  Avoid solid waste entering system

SEPTIC TANKS IN PACO MARKET

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 24/30

 

Wastewater

from Market

Anaerobic

Baffled

Reactor

Maynilad

Centralized

Treatment

Plant

Market

Sewer Line

• De-commissioning of existing septic tank

• Pre-treatment using screens and oil/grease removal

• Wastewater treatment using ABR

• Discharge of effluent to Maynilad sewer line

OPTION 1

Maynilad

Sewer Line

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 25/30

OPTION 2

•  ABS-CBN Foundation accept

equipment donation

• De-commissioning of old

septic tank

• New WWTP (SBR or CAS)

• Discharge effluent to Estero

or re-use • Issues• Complicated O&M

• Energy-intensive

• Sludge management

REMOVAL OF ISLAND AERATORS

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 26/30

REMOVAL OF ISLAND AERATORS

AND DREDGING OF ESTERO

• Issues

• Did not improve water quality

•Costly operation

• Created sludge

Need to dredge the estero

• Obstruction of water flow

Remove aerators to avoid

floods

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 27/30

STAKEHOLDER AWARENESS

Play:“The Monster in the Water” 

Mural painting

Paco Market (26 April 2014)

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 28/30

CAPACITY DEVELOPMENT

• Training at Escuela Taller Intramuros

• Waste Analysis and Characterization

• O&M Training for the pilot project

• Workshops

• Barangay Convention

• Wastewater and Waterways

Management Workshop

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 29/30

INSTITUTIONAL ARRANGEMENTS

ASSESSMENT

PLANNING

&COORDINATION

RESETTLEMENT

OF ISFs

CLEARING OF

EASEMENT

CLEARING &

CLEANING OF

WATERWAY

INFRASTRUCTURE& LANDSCAPING

COMMUNITY

ORGANIZATION

&TRAINING

COMMUNITYINFORMATION &

EDUCATION

SOLID WASTE

MANAGEMENT

WASTEWATER

MANAGEMENT URBAN

REDEVELOPMENT

MAINTENANCE

OF PEACE &

ORDER

INFRASTRUCTURE

MAINTENANCE

REGULAR CLEAN

UP & WATER

QUALITY

MONITORING

1

GENERAL GOALS: IMPROVEMENT IN WATER QUALITY, PHYSICAL ENVIRONMENT, URBAN

QUALITY OF LIFE, LOCAL ECONOMY, COMMUNITY INVOLVEMENT

2

37

4

5

6

8

9

10

11

12

13

MMDA, KBPIP,

PRRC, CEO, DPS, AFP

KBPIP, PRRC, River

Warriors, Barangay,

Block & Cluster

Leaders, Maynilad

PRRC, DPWH, LGU,

BarangayPRRC, KBPIP

14

PUBLIC

ADVOCACY,

MARKETING

KBPIP, PPRC,

River Warriors, AFP,PNP

 Adamson

Maynilad, Manila

Water, Sanitary

Inspector KBPIP, DPWH, PAGCOR

(Paco Market)

Homeowners

NHA, KBPIP, LIAC

MMDA, CEO, AFP

LGU, River Warriors,

NSWMC

MMDA

PPRC, KBPIP

PRRC, KBPIP,

River Warriors, PEEP,

City Engineering,

Residents

 AFP, River Warriors

PRRC, River Warriors,

Maynilad

8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons

http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 30/30

THANK YOU!