crystal ball project

21
Earth Wo Concret Plain Concrete Metals deckin Reinforcement concrete flat slabs and stairs flat slabs post tensioned slab on grade 150mm thick footings Masonr Concrete unit Fire rated Site Constru Excavvation Division # 1 Division # 2 Division # 3 Division # 4 ncrete average thick footing for roof for garage  

Upload: mido-rabee

Post on 05-Apr-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 1/23

Earth Wo

Concret

Plain Concrete

Metals

deckin

Reinforcement concrete

flat slabs and stairs flat slabs post tensioned

slab on grade

150mm thickfootings

Masonr

Concrete unit Fire rated

Site Constru

Excavvation

Division # 1

Division # 2

Division # 3

Division # 4

ncrete average thick footing

for roof for garage

 

Page 2: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 2/23

Wood & Pla

Toilet solid surface materialWood base 100 mm

height

Doors & Win

Steel doors with

steel frameAccess do

Cold applied

bituminousPolyethelyne

Finishes

20mm galvanized steel recessed

finished elev

Doors & Win

Semi Structural Glazin

Thermal & Moistur

Non steel structureeel structure elemen

Lath and Plaster

Revolvinq Door

Steel Structure

Division # 5

Division # 6

Division # 7

Division # 8

Page 3: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 3/23

Compartments Toilet Accessories

Reception counters Pantry counters

Counters

Division # 10

Furnitur

Specialiti

Finishes

Ceilling

Division # 9

Walls

ternal cement plaste

Bulk head Office side with Gyps

Page 4: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 4/23

W.B.S

Backfill

k

Reinforcement concrete

slab on steel beams

Under Slab

Tie Beams Column

Walls

concrete unit masonry

Walls

tion

Tie Beams

Page 5: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 5/23

Timber oak

stic

vanity top (corien)Oak veneered folding

wood panels

dows

rsWood Doors & Wood

Frames

Wood & Glass Doors

with Wood Frames

heet Sheet waterproofing Thermal Insulation

trims for artificial stone

tions

Aluminuim copping with

PVDF coatingTiles

dows

q Curtain Wall Glass Partitions Glass landing

Protection

Handrails & RaillingsMetal Fabrication

Page 6: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 6/23

Floor MatTends

Louvers Corner Guard Ditto for column

s

.Painting Concrete Hardener

Quarry CPorcelain

m board box

Page 7: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 7/23

Beams Solid Slabs

Page 8: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 8/23

Wood flooring for GYM at

first basement

Mirror

Flashing & Metal sheet

Aluminum Doors

Partitions Suspended Ceilinq

Aluminum Windows

Sky light

Page 9: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 9/23

SignageAccess Floor

Carpet

Road marking

ramic

Page 10: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 10/23

ADMINISTRATIVE BUILDING

The Scope of Work is ADMINISTRATIVE Buil

Civil, Finishing and MEP Works:

Three underground basements, ground floo

Basement Area = 3325 m2 concrete structu

Floor Area = 1,500 m2 pre-stressed structurWith Sky Light and Curtain Wall.

Project Start Date: 01/01/2010

Contract Project Duration: 16 Months

Contract Completion Date: 30/04/2011

Scope

Page 11: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 11/23

ing

r and three Typical floors and roof 

e system.

system.

f work

Page 12: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 12/23

ADMINISTRATIVE B

Page 13: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 13/23

Page 14: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 14/23

ILDING Layout

Page 15: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 15/23

Page 16: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 16/23

DIVISION 2 : SITE CONSTRUCTION

Earthwork 

1 Excavation in ordinary soil 40,000.00 m3 537,107.69

2 Backfill with compacted clean sand 2,200.00 m3 144,360.62

0.00

681,468.31 0.01

DIVISION 3: CONCRETE

Concrete and Reinforced Concrete

Plain Concrete1 Sloped concrete average Ihick 100 mm for roof  1,486.00 m2 38,453.11

2 Sloped Concrete average thick 100 mm for Garage 3,900.00 m2 162,194.40

3 Precast concrete bumpers at garage 169.00 No. 27,332.76

4 Plain Concrete for Isolated Footings 240.00 m3 69,436.06

5 Plain Concrete for Retaining walls 200.00 m3 56,744.62

6 Plain Concrete under tie beams 240.00 m2 8,817.23

7 Plain Concrete under slab on grade 50mm 3,240.00 m2 64,827.85

Reinforced Concrete 0.00

8 slab on grade 150mm thick  3,240.00 m2 248,022.68

9 R.C for isolated footings 650.00 m3 536,508.00

10 R.C for tie beams 105.00 m3 144,638.95

11 R.C for columns 470.00 m3669,684.92

12 R.C for shear walls 400.00 m3 584,676.92

13 R.C for retaining walls 770.00 m3 853,946.58

14 R.C for beams 290.00 m3 552,523.31

15 R.C for solid slabs 65.00 m3 80,127.04

16 R.C for flat slabs and stairs 2,250.00 m3 2,328,950.77

17 R.C for flat slabs post tensioned 1,200.00 m3 1,332,345.21

18 RC for decking slab on steel beams 30.00 m3 51,053.72

0.00

7,810,284.15 0.14

DIVISION 4 : MASONRY 

Stone Masonry

1 Concrete Unit Masonry size 200mm thick  202.00 m3 82,679.18

2 Concrete Unit Masonry size 100mm thick  1,408.00 m2 62,460.09

Fire rated concrete unit masonry 0.00

3 Concrete hollow blocks, size(400x200x200)mm,1HR fire 165.00 m3 65,302.43

4 Concrete hollow blocks, size(400x200x200)mm,1 1/2HR fire121.00 m3 47,888.45

5 Concrete hollow blocks, size(400x200x200)mm,2HR fire 60.00 m3 23,746.34

6 Concrete hollow blocks, size(400x200x100)mm,1HR fire 863.00 m2 48,970.60

7 Concrete hollow blocks, size(400x200x100)mm,1 1/2HR fire136.00 m2 7,717.27

0.00

338,764.36 0.01

DIVISION 5 : METALS

Steel Structure

1 Steel Structure grade 37 for glasses stairs, coridor & bridge83.00 ton 1,227,317.17

2

Non structure steel elements grade37 for raised flooring of 

700mm height in the electrical room at level(5 300)3.00 ton 44,360.86

Metal Fabrication 0.00

3 Ship steel ladder, 3000(3200)mm heigt with epoxy coated 2.00 no. 2,370.54

4

Galvanized steel checkered plate cover at transformer rooms & 

ring room16.00 m2 14,749.99

5 Galvanized steel checkered plate cover, at roof  3.00 m2 2,765.62

6 Galvanized steel drain couer 300mm width at garage 23.00 m 7,875.44

7 Stainless steel thresholder 60.00 m 5,794.64

Handrails and raillings 0.00

8

Stainless steel handrail, supported with structural clear

laminated-tempered glass, for stair no. (2)80.00 m 175,595.08

9

Stainless steel handrail, supported with structural clear

laminated-tempered glass, for corriddors & bridge120.00 m 300,267.58

10

Painted steel handrail at roof around air condition machine& 

terrace area157.00 m 55,136.47

11 Painted steel handrail,for stairs No. (1) & (3) 140.00 m 89,114.50

0.00

1,925,347.89 0.03

DIVISION 6:WOOD AND PLASTIC

1 Wood base 100mm height 1,467.00 m 74,568.74

2

Toilet solid surface material vanity top (corian),20.0101 thick-

including all accessories,ets.23.00 m 40,386.87

3

Oak veneered folding wood panels,as per detail NO.(10)

DWG.NO.(1-01-503)32.00 m2 102,167.83

0.00

217,123.43 0.00

percentage of

cost (%)

total amount of DIVISION 6:WOOD AND PLASTIC

total amount of DIVISION 5 : METALS

total amount of DIVISION 4 : MASONRY 

total amount of DIVISION 3: CONCRETE

total amount of DIVISION 2 : SITE CONSTRUCTION

cost

ADMINISTRATIVE BUILDING

ITE

M DESCRIPTIONB.O.Q.

QUANTITY UNIT

Page 17: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 17/23

DIVISION 7:THERMAL AND MOISTURE PROTECTION

Bituminous damp- proffing

1

Cold applied bituminous emulsion paint for foundation, tie beams

and column head, retaining walls from inner side3,350.00 m2 17,275.78

2

Polyethelyne sheetof 400 micron thick under

slab on grade3,240.00 m2 19,403.44

Sheet waterproofing

3

1.5mm thick P.V.C in between two layer of nonwoven geotextile

of 300 gm/m2 cover by 250 miccon thick of polyethelyne sheet

for deck roof at level(9500&9750)930.00 m2 105,287.45

torch applied membrane of 4mm thick  930.00 m2 40,610.95

4

Torch applied membrane of 4mm thick including polyproplyne

protection board of 3mm thick for out side retaining wals face2,570.00 m2 112,226.05

5 Two layer of coal tar epoxy for sump pit 45.00 m2 1,422.32

6 EPDM single-ply membrane roofing 1,486.00 m2 207,374.09

7 Elastomeric cement- based waterproofing for wet areas 254.00 m212,465.54

Thermal Insulation

1

Extruded polystyrene board, 50mm thick for roof, as per detail

no. (DA-7006)1,486.00 m2 75,533.61

2 Gravel for sheet 365.00 m2 4,552.95

Flashing and metal sheet

3 Metal flashing as per detail no 530.00 m 7,713.54

2 Polyster poder coated metal panels-panels charcoal gray 87.00 m2 56,282.84

5  Aluminum sandwitch panel for roof  131.00 m2 102,907.96

7

Galvanized steel rain gutter at roof for sandwitch panel as per

detail No.(A-01-801)30.00 m 6,931.38

769,987.90 0.01

DIVISION 8 : Doors & windows

Steel doors with steel frame

1 Type (2), Size (1000x2200)mm, 1 1/2Hr fire rated, HW2 14.00 No. 103,676.85

2 Type (2), Size (1000x2200)mm,HW2 2.00 No. 14,661.27

3 Type (3), Size (900x2200)mm, 1Hr fire rated,HW8 1.00 No. 3,346.47

4 Type (4), Size (1600x2200)mm,3/4Hr fire rated, HW7 1.00 No. 6,202.20

5 Type (5), Size (1000x2200)mm, 1Hr fire rated, HW7 1.00 No. 3,394.53

6 Type (5), Size (1000x2200)mm, 1Hr fire rated, HW8 1.00 No. 3,394.53

7 Type (5), Size (1200x2200)mm, 1Hr fire rated, HW7 3.00 No. 10,499.66

8 Type (5), Size (1200x2200)mm, 3/4Hr fire rated, HW7 2.00 No. 6,999.77

9 Type (5), Size (1200x2200)mm, 3/4Hr fire rated, HW16 7.00 No. 25,210.83

10 Type (5), Size (1200x2200)mm, 3/4Hr fire rated, HW17 1.00 No. 3,601.54

11 Type (6), Size (700x2200)mm, HW9 6.00 No. 18,553.93

12 Type (6), Size (700x2200)mm, 3/4Hr fire rated, HW9 2.00 No. 6,334.36

Steel doors with steel frame

1 Type (7), Size (1400x2200)mm,3/4Hr fire rated, HW3 1.00 No. 5,860.25

2 Type(8),size(900x2200)mm,3/4 Hr fire rated hw7 1.00 No. 3,596.93

3 Type(8),size(900x2200)mm,1 Hr fire rated hw7 1.00 No. 3,596.93

4 Type (8), Size (1400x2200)mm,1Hr fire rated, HW7 3.00 No. 19,701.77

5 Type (8), Size (1600x2200)mm, 1Hr fire rated, HW1 2.00 No. 21,317.24

6

Type (8), Size (1600x2200)mm, 1Hr fire rated, HW7,WITH

 ACCESS CARD CONTROL1.00 No. 6,325.12

7

Type (8), Size (1600x2200)mm, 1Hr fire rated, HW7,WITH AUTO

DAMPED LOUVERS

3.00 No. 25,507.50

8 Type (8), Size (1600x2200)mm, 3/4Hr fire rated, HW7 1.00 No. 6,202.20

9 Type (8), Size (1600x2200)mm, 1Hr fire rated, HW8 2.00 No. 9,517.26

10 Type (8), Size (1600x2200)mm, 1Hr fire rated, HW10 2.00 No. 12,136.39

Steel doors with steel frame

1 Type (8), Size (1600x2200)mm,3/4Hr fire rated, HW16 2.00 No. 12,709.38

2 Type (8), Size (1800x2200)mm,1Hr fire rated, HW7 3.00 No. 18,842.28

3 Type (8), Size (2000x2200)mm,1Hr fire rated, HW2 1.00 No. 8,910.06

4 Type (8), Size (2000x2200)mm,1Hr fire rated, HW7 4.00 No. 25,670.15

5

Type (8), Size (2000x2200)mm, 1Hr fire rated, HW7,WITH AUTO

DAMPED LOUVERS3.00 No. 26,555.52

6 Type (8), Size (2000x2200)mm, HW7 3.00 No. 18,870.00

7 Type (9), Size (600x2200)mm, HW8 1.00 No. 3,183.82

8 Type (9), Size (700x2200)mm, 1Hr fire rated, HW8 1.00 No. 3,279.93

9 Type (9), Size (800x2200)mm,HW4 4.00 No. 12,953.37

10 Type (9), Size (800x2200)mm, 1Hr fire rated, HW8 1.00 No. 3,315.05

11 Type (9), Size (900x2200)mm, 1Hr fire rated, HW2 1.00 No. 7,282.57

12 Type (9), Size (900x2200)mm, 1Hr fire rated, HW7 3.00 No. 10,039.42

Steel doors with steel frame

total amount of DIVISION 7:THERMAL AND MOISTURE PROTECTION

Page 18: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 18/23

1 Type (9), Size (900x2200)mm,1Hr fire rated, HW8 5.00 No. 16,732.36

2

Type (9), Size (900x2200)mm,1Hr fire rated, HW8 WITH ACCESS

CARD CONTROL1.00 No. 4,912.97

3

Type (9), Size (900x2200)mm,3/4Hr fire rated, HW11 WITH

 ACCESS CARD CONTROL 1.00 No.3,474.01

4

Type (9), Size (900x2200)mm,3/4Hr fire rated, HW11 WITH

 ACCESS CARD CONTROL4.00 No. 14,284.21

5 Type (9), Size (1000x2200)mm, HW17 1.00 No. 3,421.33

6 Type (9), Size (1000x2200)mm,1Hr fire rated HW8 2.00 No. 6,789.06

7

Type (9), Size (1000x2200)mm, 3/4Hr fire rated, HW17 WITH

 ACCESS CARD CONTROL3.00 No. 14,883.07

8

Type (9), Size (1000x2200)mm, 3/4Hr fire rated, HW8 WITH

 ACCESS CARD CONTROL1.00 No. 4,961.02

9 Type (14), Size (1300x2050)mm,HW9 2.00 No. 8,465.53

10 Type (14), Size (1300x2050)mm, 1Hr fire rated, HW9 1.00 No. 4,359.38

11

Type (15), Size (1500x2200)mm, 1Hr fire rated, HW10 access

door1.00 No. 6,041.40

 Access Door

12

 Access door panel size,(800x800)mm,as per detail(DA-8318),FPR 

steel ladder2.00 No. 3,096.02

Wood&Glass Doors with Wood Frams

1 Type (1), size (900x2200mm)HW3 1.00 No. 4,168.35

2 Type (1), size (1000x2200mm)HW3 1.00 No. 4,168.35

3 Type (1), size (900x2200mm)HW6 1.00 No. 3,487.22

4 Type (1), size (900x2200mm)HW8 5.00 No. 17,217.57

5 Type (3), size (800x2200mm)HW3 9.00 No. 36,932.90

6 Type (3), size (800x2200mm)HW12 9.00 No. 28,533.71

7 Type (3), size (900x2200mm)HW3 5.00 No. 20,841.75

8 Type (3), size (1000x2200mm)HW3 16.00 No. 66,693.61

9 Type (7), size (900x2200mm)HW3 1.00 No. 4,168.35

10 Type (7), size (900x2200mm)HW4 1.00 No. 3,441.48

11 Type (7), size (1000x2200mm)HW4 1.00 No. 3,524.65

12 Type (7), size (900x2200mm)HW11 1.00 No. 343.34

13 Type (9), size (700x2200mm)HW9 2.00 No. 6,188.34

14 Type (9), size (700x2200mm)HW3 1.00 No. 4,103.66

15 Type (9), size (700x2200mm)HW4 2.00 No. 6,753.58

 Aluminum Doors

1 Type (14),size (1300x2050)mm, HW9 1.00 No. 3,890.82

Wood & Glass doors with wood frames 0.00

2 Type (10),size (900x2200)mm, HW3 2.00 No. 7,911.57

3 Type (16),size (1600x2050)mm, HW5 1.00 No. 7,937.91

4 Type (17)size(1000x2800)mm, hw11 5.00 No. 24,312.98

 Aluminum Doors

5 Type (8), size (1600x2200)mm, 3/4 Hr fire rated HW 16 1.00 No. 5,112.68

6 Type (10), size (1000x2200)mm, HW 14 1.00 No. 3,195.18

7 Type (11), size (750x2200)mm, HW 14 1.00 No. 23,097.96

8 Type (11), size (1000x2200)mm, HW 15 2.00 No. 11,565.80

9 Type (11), size (1000x2200)mm, HW 18 1.00 No. 3,195.18

10 Type (12), size (1500x2950)mm, HW 14 1.00 No. 6,427.24

11 Type (13), size (200Qx2200)mm, HW 14, with access card control1.00 No. 15,632.22

12 Type (13), size (2450x2800)mm, HW 13, with access card control5.00 No. 96,026.02

13 Type (13), size (2450x2800)mm, HW 13 3.00 No. 29,890.07

 Aluminum Windows

1 Type (1), size (750x2050mm) 12.00 No. 13,872.74

2 Type (2), size (750x2800mm) 36.00 No. 56,849.65

3

Type (3), size (750x2800)mm, HW 1 be

canceled&replacemented by v.o#096.00 No. 13,989.19

4

Type (4), size (4200x1200mm) be

canceled&replacemented by v.o#091.00 No. 7,356.23

5

Type (5), size (1000x1200mm) be

canceled&replacemented by v.o#092.00 No. 3,503.77

Revolvinq Door

6 Frameless revolving door 2800 mm height 1.00 No. 325,312.98

Semi Structural Glazing Curtain Wall

7

Type {1)size.{ 8500x20500 )mm, as per DWG. No. (A-431701)

and specifications1.00 No. 419,065.05

8

Type(2)size, (17810x31000 mm.as perDWG. No. (A-01701)

and specifications1.00 No. 97,217.75

9

Type (3)size, (48650x3100)mm, as perDWG. No. (A-01701land

specifications1.00 No. 242,922.85

10

Type (4), Size (1550 x 19600)mm, as per DWG. No. (A-01-701)

and Specifications1.00 No. 43,627.06

11

Type (5), Size (1550 x 20500)mm, as per DWG. No. (A-01-701)

and Specifications1.00 No. 51,494.64

6

Type (6)size, (65100x31 00 )mm,as perdrawing No. (A-

01701)and specifications1.00 No. 319,586.74

7

Type (7)size, (29000x3100)m m, asperDWG.No. (A-01702)and

specifications1.00 No. 157,264.80

8

Type (8)size,(20800x16600 lmm,as perDWG. No. (A-D1702)and

specifications1.00 No. 659,717.18

Page 19: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 19/23

DIVISION 8 : Doors & windows

Semi Structural Glazing Curtain Wall

1

Type (9) size, (52280x16600)mm,as per DWG. No. (A-01702)

and specifications

1.00 No. 1,506,584.50

2

Type (10) size, (68630x166QOmm) as per DWG. No. (A01-

702) and specifications1.00 No. 2,131,673.40

3

Type (11) size, (31570x16600 mm}as perDWG. No..(A01-

702) and specifications1.00 No. 995,967.88

Glass partitions

4

Tembered clear glass panels-for entrance facades, as per

elevation no(1)&(2)dwg.107.00 m2 122,917.65

5

Clears glass panels with white fritting for office facades as per

details NO.(4,5&6) DWG. No. (1-01-502)1,287.00 m2 1,592,640.72

6

Back white glass panels for reception, as per elevation

no.(1)dwg.no(1-01-501)40.00 m2 68,352.74

7

Laminated glass with coloured inter layer, as per elevation(2)dwg

no.(1-01-501)40.00 m2 102,510.52

8Clear glass with coloured film, as per detail no(2) dwg no(1-01-806)

45.00 m2 103,388.40

9

Back painted glass panels-white,as per elevation

no.(1),dwg.no.(1-01-501)28.00 m2 43,706.54

10

Gloss lacquer painted M.D.F panels with glass timber and brushed

steel insets,as per detail no(7)dwg mo(1-01-503)83.00 m2 122,731.72

Sky Light

1

Laminated glass walkway panels in metal frames for landing at

stairs No.(2)27.00 m2 82,220.07

2 Laminated glass walkway panels in metal frames for passage134.00 m2 431,832.94

3 Treads glass 280mm width for stair No.(2) 156.00 m 180,792.96

Sky Light

4Metal Framed(sky light) structural sealent for roof,as per detailNO.(2)at Dwg.NO.(A-01-807)

131.00 m2 310,781.98

Mirror

5 Mirror ,size(600x900)mm,6mm thick  8.00 NO. 2,070.15

6 Mirror ,size(1600x1200)mm,6mm thick  2.00 NO. 1,295.70

7 Mirror ,size(2150x1200)mm,6mm thick  1.00 NO. 867.81

8 Mirror ,size(2350x1200)mm,6mm thick  4.00 NO. 3,718.92

9 Mirror ,size(2400x1200)mm,6mm thick  5.00 NO. 4,731.82

11,231,999.01 0.20

DIVISION 9 : FINISHES

Lath and Plaster

1 Internal cement plaster for walls 8,049.00 m2141,336.48

2 Internal cement plaster for ceiling 1,249.00 m2 21,931.83

3

 Artficial stone at elevation$including base coat (be

replaced by external cement plaster&external paint)1,000.00 m2 73,934.77

Tiles

4 Ceramic tiles size (200x200)mm, for floors 410.00 m2 28,039.76

5 Ceramic tiles size (200x200)mm, for walls 1,301.00 m2 76,951.31

6 Ceramic tiles size (400x400)mm, for walls 107.00 m2 7,416.91

7 Quarry tile size (300x300) mm for floors 744.00 m2 85,261.58

8 Porcelain tiles (400x400 mm) for flooring 1,109.00 m2 115,813.72

9

3mm thick wear composite vinyle with heavy duty protecting

layer on sand cement screed&compound45.00 m2 10,397.08

Nature Stone Tiles

10200 mm thkick cut to size,(1000x500 mm) french L-stone forflooring .

655.00 m2 476,403.30

11 L-stone wail cladding 215.00 m2 211,813.87

12 L-stone base 100 mm height 269.00 m 39,155.39

Bases

2 Ceramic base 100mm height 757.00 m 13,994.02

3  Vinyle base 100mm height 233.00 m 5,384.09

4 porcelain base 100 mm heigh 194.00 m 5,378.28

5 Cement base100 mm height 1,829.00 m 16,903.34

Natural Stone Claddinq

6 Polished black marble 900 mm hight at 220.00 m2 192,951.26

Carpet

7  Anti-staticheavy contract broadloon carpet,woven,on cushion 293.00 m2 59,844.12

8 Wall to wall antibacterial carpet 35.00 m2 7,148.62

9 S/s skirting 2.5 mm thick for entrance walls 32.00 m 4,436.09

Partitions

1

Painted (Paint measured separatly) plaster board, with runners

/studs and accessories,as per detail No.(11), dwg No. (1-01-503)1,242.00 m2 97,566.17

2

Perforated plasterboard acoustic panels, as per elevation (1 &2)

dwg. No. (1-01-501)108.00 m2 17,866.34

3

Stud partition wall with plasterboard finish, with runners /studs

and accessories,as per detail No.(S) dwg, No.fl-01-502)829.00 m2 81,211.39

4

Glass panels on colord MDF panels, as per detail No.(3),dwg.No.

(1-01-502)

45.00 m2 19,796.04

5

painted (Paint measured separatly) plasterboard with glass and

brushed steelinset, as per detail No. (11), dwg. No. (I-01-503)77.00 m2 47,180.55

6

Rockwall with wire mesh for. sound insulation between offices 70

mm thick with density 70 Kg/ m3, as per detail No. (6) dwg.

No.(A-01-806)600.00 m2 28,280.05

Suspended Ceilinq

7

Perforated metal tiles, size,(600x600x19)mm,as per detail No.

(DA-9540)3,742.00 M2 620,178.81

8 Moisture resistant gypsum board 303.00 M2 22,683.05

9 Gypsum boards ceiling, as per detail No. (DA-9203) 1,452.00 M2 103,327.54

Painting

1 Internal washable acrylic paint for walls 8,049.00 m2 133,897.72

2 Internal washable acrylic paint for ceiling 1,249.00 m2 21,931.83

3 Internal washable acrylic paint at gypsum board partitions1,168.00 m2 20,506.49

4 Washable acrylic paint for internal gypsum board ceiling 1,452.00 m2 26,841.90

5  Anti-carbonat paint at garage for wall 4,560.00 m2 147,499.86

6  Anti-carbonat paint at garage for ceiling 6,840.00 m2 221,249.80

Concrete Hardener

7

Concrete Hardener epoxy coating for stairs No. (1)&(3) be

replaced by granite 20mm thick)342.00 m2 18,964.27

8 concrete hardener epoxy-coating for flooring at garage 7,067.00 m2 359,221.05

9 Road marking epoxy paint on flooring at garage 141.00 m2 6,515.50

10 Concrete Hardener epoxy coating for garage ramps 672.00 m2 40,369.62

3,629,583.77 0.06total amount of DIVISION 9 : FINISHES

total amount of DIVISION 8 : Doors & windows

Page 20: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 20/23

DIVISION 10 : SPECIALTIES

Compartments

1

Hight pressure laminate (HPL) toilet partition,2200mm height

include doors,hardware and all accessorries,96.00 m 185,428.28

Toilet Accessories

2 Soap dispenser 44.00 No. 11,629.81

3 Electrical hllnd dryer 16.00 No. 31,718.01

4 Toilet paper holder 44.00 No. 4,249.45

5 Dufcrte cloth hook  58.00 No. 3,184.11

6 Towel dispenser 8.00 No. 9,940.53

7 Grab bar 16.00 No. 2,992.84

8 Waste receptcale 44.00 No. 14,915.59

9

 Vitreous china urinal partition as per dwg no(1-01-801),(1-01-

802)&(1-01-803)6.00 No. 4,158.83

LOUVERS

10 Aluminum louvers 3000 mm height at roof, as per detailmo.(5)dwg.no.(A-01-806)

36.00 M 146,973.05

11

 Aluminum louvers 3000 mm height at Generator room and HVAC

room,as per detail NO. (4)dwg.NO.(A-01-806)15.00 M 61,238.77

Corner Guard

12

Rubber corner guard fixed to wall, at garage, as per detail No.(DA

11138)65.00 No. 25,230.24

 Access Floor

1

150 mm height, raised floor system, for IT rooms, size (600x600

mm) tile with vinyle finish, as per detail No. (DA-9552)68.00 m2 39,340.69

2

150mm height, raised floor system, for it rooms, size (600x600

mm) tile with carpet finish, as per detail No. (DA-9552)

3,985.00 m2 2,048,754.28

3

450 mm height,raised f1oorsystem,for main data rooms,

size (600x600 mm)tile with vinylefinish, as perdetail No.

(DA-9552)78.00 m2 47,548.19

4

 Accessgate,1000 mmheight, as per detail on dwg.

No.(A-01-807)4.00 No. 325,312.98

2,962,615.66 0.05

DIVISION 12 : FURNITURE

Counters

1

Reception counterssizei(5350x1190)mm,as per detail on dwg.(I-

01-807)1.00 No. 32,900.97

2 counters size,(2500x1100)mm, as per detail on dwg.(i-01-808)1.00 No. 15,387.67

3 panty counters,as per detail as per detail on dwg no.(i-01-806)15.00 m 81,790.34

TENTS

4 Tents at roof, 3550 mm height as per dwg.MO.(A-01-601) 330.00 m2 152,490.46

Floor Mat

5

double wiper strip and aluminum scraper bar enterance mattwall

at reception, as shown on dwg. No.(l-01-207) F0627.00 m 74,858.95

357,428.40 1%

DIVISION 13 : SPECIAL COSTRUCTION

1,324,072.41 2%

DIVISION 15 : MECHANICAL

9,930,543.07 0.18

6,620,362.05 0.12

DIVISION 16 : ELECTRICAL

8,606,470.66 0.15

Total cost of Works 56,406,051.06 1.00

total amount of DIVISION 16 : ELECTRICAL WORKS

total amount of DIVISION 13 : SPECIAL COSTRUCTION

PART 2 : total amount of DIVISION 15 : MECHANICAL WORKS

PART 1 : total amount of DIVISION 15 : MECHANICAL WORK (HVAC)

total amount of DIVISION 12 : FURNITURE

total amount of DIVISION 10 : SPECIALTIES

Page 21: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 21/23

NO. ITEM CONTRACTOR A CONTRACTOR B CONTRACTOR C CONTRACTOR D

DIVISION 2 : SITE CONSTRUCTION

DIVISION 3 : CONCRETE

1 TOTAL OF CIVIL WORKS 9,340,927.70 8,491,752.46 7,217,989.59 8,067,164.83 0

DIVISION 4 : MASONRY

DIVISION 5 : METALS

DIVISION 6 : WOOD AND PLASTIC

DIVISION 7:THERMAL AND MOISTURE

PROTECTION

DIVISION 8 : Doors & windows

DIVISION 9 : FINISHES

DIVISION 10 : SPECIALTIES

DIVISION 12 : FURNITURE

2 ARCH. WORKS 22,504,492.94 20,361,207.90 21,432,850.42 23,576,135.46 0

DIVISION 13 : SPECIAL COSTRUCTION

DIVISION 15 : MECHANICAL PART 2

3 MECH. WORKS 6,752,769.29 8,341,656.18 7,547,212.73 7,944,434.46 0

DIVISION 15 : MECHANICAL PART 1

4 MECH. WORK (HVAC) 9,930,543.07 7,944,434.46 8,937,488.76 9,434,015.92 0

DIVISION 16 : ELECTRICAL

5 ELECTRICAL WORKS 9,897,441.26 8,606,470.66 8,176,147.13 7,745,823.60 0

TOTAL COST OF ALL WORKS 58,426,174.26 53,745,521.65 53,311,688.63 56,767,574.26 0 0

ADMINISTRATIVE BUILDING

Page 22: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 22/23

TOTAL OF CIVIL WORKS ARCH. WORKS MECH. WORKS MECH. WORK (HVAC) ELECTRICAL WORKS

DIVISION 2 : SITE CONSTRUCTION DIVISION 4 : MASONRY DIVISION 13 : SPECIAL COSTRUCTION DIVISION 15 : MECHANICAL PART 1 DIVISION 16 : ELECTRICAL

DIVISION 3 : CONCRETE DIVISION 5 : METALS DIVISION 15 : MECHANICAL PART 2

DIVISION 6 : WOOD AND PLASTIC

DIVISION 7:THERMAL AND MOISTURE PROTECTION

DIVISION 8 : Doors & windows

DIVISION 9 : FINISHES

DIVISION 10 : SPECIALTIES

DIVISION 12 : FURNITURE

Page 23: Crystal Ball Project

8/2/2019 Crystal Ball Project

http://slidepdf.com/reader/full/crystal-ball-project 23/23