crossroads powerpt 2015final

23
Investigating recent rill erosion at a site approaching geomorphic equilibrium Ryan Wells Little 5 Week 2015

Upload: ryan-wells

Post on 16-Jan-2017

203 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: crossroads powerpt 2015final

Investigating recent rill erosion at a site approaching geomorphic equilibrium

Ryan WellsLittle 5 Week 2015

Page 2: crossroads powerpt 2015final

Outline• Hortonian theory of overland flow• Field site• Derivation process for model formulas• Data collection• Results

Page 3: crossroads powerpt 2015final

Ref: Horton (1945)

Hortonian Theory

Page 4: crossroads powerpt 2015final

Past Studies:Disagreement

Ref: W.J. ElliotRef: Gyssels 2005

Page 5: crossroads powerpt 2015final

Opportunity: Geomorphic Reclamation at AML Site

Page 6: crossroads powerpt 2015final

Post Reclamation

Page 7: crossroads powerpt 2015final

Rill incising the cap material … generating an alluvial fan

Page 8: crossroads powerpt 2015final

Derivation Process• What’s controlling rill and gully formation?

Page 9: crossroads powerpt 2015final

Derivation Process: Dependent Variables

• τ

•ω = τ (2)

• τ = shear stress (Pa)• = unit weight of water (N/)• = depth of flow (m)• = hillslope (degrees)• ω = stream power (W/• = specific discharge (m/s)

Page 10: crossroads powerpt 2015final

Derivation Process:Predicting Specific Discharge

• (6)

• (7)• = discharge ()• = Cross sectional area of flow ()• = Mannings’s coefficient (s/)• = hydraulic radius (m)• = Slope (degrees)• = depth of flow (cm)• = width of flow (m)

Page 11: crossroads powerpt 2015final

Derivation Process:Predicting Depth

• (3)

• (4)

• (5)

• = discharge ()• = depth of flow (cm)• = width of flow (m)• = specific discharge (m/s)• = runoff coefficient (unitless)• = Catchment area ()• = Precipitation rate (cm/s)

Page 12: crossroads powerpt 2015final

Constraining Independent Variables

Page 13: crossroads powerpt 2015final

Precip. Rates• Rain gage installed

on site• Literature for

extreme rain events

Ref: Huff and Angel (1992)

Page 14: crossroads powerpt 2015final

www.soilmoisture.com

Runoff Coefficient

Page 15: crossroads powerpt 2015final
Page 16: crossroads powerpt 2015final

Hillslope

*Note 5x vertical exaggeration

Page 17: crossroads powerpt 2015final
Page 18: crossroads powerpt 2015final

Model Results

Page 19: crossroads powerpt 2015final

Shear Stress Model : 4 cm Rain/hr

Page 20: crossroads powerpt 2015final

Stream Power Model : 4 cm Rain/hr

Page 21: crossroads powerpt 2015final

Stream Power Model : 8 cm Rain/hr

Page 22: crossroads powerpt 2015final

Conclusions• Stream power appears to be the better variable

controlling rill/gully formation at Minnehaha

Page 23: crossroads powerpt 2015final

Future Work• Drones!• Identify additional gullies• Make a few more measurements about rill

dimensions• Play with critical resistance values more• Investigate other variables