CPM2 – OPEX ModelOPEX Model and Simulation

EJJV Consultancy Sdn. Bhd.

Page 2: Cpm2 - Opex Model_rev6

Current Conditions

OPEX is manual and scattered all over the place

OPEXProject A

Project C

Project B

Project E

Project G option 2

Project FProject G option 1

Page 3: Cpm2 - Opex Model_rev6

Current Conditions

1. Central Processing Platform (CPP)2. Integrated Wellhead and Central

Processing Platform (iCPP)3. Well Head Platform (WHP)4. Tarpon / Monopod5. Tripod6. 4 Legged WHP7. 6 Legged WHP8. 8 Legged WHP9. Floating Production Storage and

Offloading (FPSO) Vessel

10. Floating Storage and Offloading (FSO) Vessel

11. Mobile Offshore Production Unit (MOPU)

12. Offshore Pipeline13. Gas Pipeline14. Gas Injection Pipeline15. Gas Lift Pipeline16. Full Well Stream (FWS) (Dual Phase)

Pipeline17. Water Injection Pipeline18. Subsea wells

Too many types of asset need to be managed

Page 4: Cpm2 - Opex Model_rev6

Issues1. Incapable Of Supporting Quick Decision Making

2. Hard To Consolidate

3. Unfit For Agile Business Practices

4. Susceptible To Trivial Human Errors

5. Difficult To Troubleshoot Or Test

6. Not Designed For Collaborative Work

7. Scales Poorly

8. Obstructive To Regulatory Compliance

Page 5: Cpm2 - Opex Model_rev6

Seamless Excel transfer

Web based

Asset’s Cost library

Cost optimisation

Guaranteed Costing Integrity

Multi CurrencyMulti Regions

Features

Page 6: Cpm2 - Opex Model_rev6

Marine Rates

Chemical product

Guaranteed Costing Integrity

Multi-Region Rates

Pipeline maintenance

Aviation Rates

Global Inflation and Escalation

Page 7: Cpm2 - Opex Model_rev6

Asset Register for the Planned Maintenance

Page 8: Cpm2 - Opex Model_rev6

EJJV identified three broad categories for the opportunities, that had relative ease of implementation to deliver cost reductions

1. Cancellation or postponement of an activity,

2. Contract negotiation to achieve better cost savings and

3. Activity optimisation based on improved planning and cross functional coordination

Opportunities

Page 9: Cpm2 - Opex Model_rev6

BenefitsBenefits of having an integrated system than manual processing:

• Aid investment decisions

• Auditable approach to the analysis of operating costs

• Analysis of capital expenditure (CAPEX) and OPEX interaction

• Budgeting and benchmarking with various set of assets

• Integrated asset’s cost library

• Simulating their impact on cost

• Seek and measure improvements generated by change

Page 10: Cpm2 - Opex Model_rev6

Determining Unit Production Cost (UPC)

1. Run the OPEX

2. OPEX Overview

Business Case -1

Page 11: Cpm2 - Opex Model_rev6

3. View Economic Chart

UPC in • Year 2014 = $60.73USD / bbl• Year 2015 = $67.06 USD / bbl• Year 2016 = $64.05 USD / bbl• Year 2017 = $69.08 USD / bbl

Page 12: Cpm2 - Opex Model_rev6

Integrating Various Assets• Asset 1: CPP • Asset 2: WHP-A

• Asset 3: WHP-C • Asset 4: ORF

*Petronas Carigali Indonesia is keen to implement the CPM2 – OPEX on Kepodang

Kepodang

Business Case -2

Page 13: Cpm2 - Opex Model_rev6

CPP

WHP- A WHP- C+

ORF

SUM

Page 14: Cpm2 - Opex Model_rev6

Economic cut-offQ1 - 2024

Production Profile:116 MMScfd

Page 15: Cpm2 - Opex Model_rev6

Cost OptimisationCost optimisation on Maintenance, GA and Logistics by reducing its activities towards its lifetime

Kepodang

Business Case -3

Page 16: Cpm2 - Opex Model_rev6

1. Economic cut-offShift to Q4 2024

2. OPEX Cumulative reduced by 18%

3. NET Production increased by 5%

Page 17: Cpm2 - Opex Model_rev6

Implementation

Installation Populate Cost Data Bank

PMO

SKO

SBO

IO

Benchmarking

Select Asset

Prepare Options

Run the OPEX

Update Data

Maintenance

Page 18: Cpm2 - Opex Model_rev6

Online Demo

Page 19: Cpm2 - Opex Model_rev6

Implementation Schedule

Page 20: Cpm2 - Opex Model_rev6

1. Corporate Annual Software License (CASL)• Unlimited number of Projects • Unlimited User RM

120,000

2. Annual Maintenance Fee (AMF)RM 30,000

Commercial – Licenses

Page 21: Cpm2 - Opex Model_rev6

Commercial – On Site Support

3.0 ONSHORE / SITE - Job Function

Day rate in Malaysian Ringgit

Kuala Lumpur

Fabrication Yard In Peninsular in Malaysia

Fabrication Yard In Peninsular in Sabah / Sarawak

Offshore Peninsular Malaysia

Offshore Peninsular Sabah / Sarawak

 3.1Project Manager (Overall Custodian)The CP2M2 – OPEX Custodian / Champion. Participate in the Project Kick-Off Meeting; Systems Completion Workshop, Develop the OPEX Project Implementation Plan 

1200.00 1380.00 1380.00 1500.00 1500.00

3.2

CPM2 - OPEX ProgrammerInstallation of Software Prior to Client’s office mobilisation. System Setup and Configuration of Templates. Reports. This person will be responsible for CP2M2 OPEX system functionality overall in the project, do Audits, Support, Overlap for R/R. The Programmer shall be responsible for the System Configuration and if required Customisation.

950.00 1090.00 1090.50 1,125.00 1,125.00

 

3.3CPM2 – OPEX System Implementer Assist CP2M2 - OPEX Programmer at the configuration and data loading template phase, Oversee collection and Compilation of Asset Documentation, Train Personnel and Maintain the CP2M2 – OPEX at Client Office.

850.00 980.00 

980.00

  1065.00

  1065.00

 

3.4CPM2 – OPEX System Specialist and Trainer  Assist the System Implementer, Oversee collection and Compilation of Project / Asset Documentation Documentation, Train Personnel and Maintain the CP2M2 – OPEX System

680.00 780.00 780.00 850.00 850.00

Technical Clerks Update the CP2M2 – OPEX System by loading the required maintenance data, operational and expenditures related to Asset’s operation, compile the Operational and Expenditure’s Documentation.

250.00 250.00 250.00 315.00 315.00

Page 22: Cpm2 - Opex Model_rev6

Commercial – Relational Database Management System (RDBMS)

4.0 Relational Database Management System Microsoft SQL Server 2008 Unit Unit Price in RM

4.1 Client Access License / CAL up to 5 users Lot Included4.2 Additional 1 SQL User License Each 900

The above rates do not include travel/transportation, accommodation and/or meals.The above rates will be subject to EJJV Consultancy’s term and conditions which may include additional fees and/or charges. Configuration – Shall be deemed such that this is set-up and manipulation of the System / Software tools and capabilities to OPEX model workflow processes and contractual agreements and terminology, using the inbuilt functionality and features of the software. This includes but not limited to changes to scripts, vocabulary, reports, look-ups and templates  Customisation – Any work that is not covered in configuration activities and represents a functional change within the software, to program code and for stores procedures. Hardware – Unless the option of implementation is by Application Service Provider (ASP), all computer hardware, software and communication links shall be provided by CLIENT Tax – Our price does not include Taxes

Terms and Condition