course measurement & design
DESCRIPTION
2008 Road Race Management presentationTRANSCRIPT
![Page 1: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/1.jpg)
KeepingYour RaceOn Course
Design, Measurement,and Setup of theRunning Route
![Page 2: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/2.jpg)
How Long is a Marathon?
• 26.2 miles
• 42,195 meters
• 26 miles 385 yards
• My GPS told me 26.43 milesand I want a Boston waiver
![Page 3: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/3.jpg)
Elements of aGood Course
• Safe
• Simple
• Accurate
• Scenic (maybe)
![Page 4: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/4.jpg)
Safety
• Route Considerations Open/Closed to Traffic Direction of Runners Intersections/Side streets Other
• Curves, hills, businesses/churches• Planes, Trains & Boats
![Page 5: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/5.jpg)
Preliminary Design
• Avoid/minimize potential hazards Side street crossings Alternate Left-Right turns Multi-lane intersection crossings Busy roads or locations Runner lapping/crossing
![Page 6: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/6.jpg)
Preliminary Design
• Other design considerations Race size Business/Churches/Events Topography Weather Road width/condition Scenery/Points of Interest
![Page 7: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/7.jpg)
Preliminary Design
• Multi-distance events Usually held with marathon Simultaneous vs. separate start Amount of shared course
• Splits, aid stations, monitors
![Page 8: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/8.jpg)
Start and Finish
• Provide sufficient space forpre-race lineup and post-race activities (chute, refreshments, medals, medical, etc.)
• Potential timing mat interference
• Security
• Accessibility
![Page 9: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/9.jpg)
The Start
• Ensure a safe, fair start• Physical Layout
Minimize potential hazards• Turns• Bumps
Width• Determine your “funnel” distance• Chip mat “nozzle”
![Page 10: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/10.jpg)
The Start
• Staging runners Corrals/Waves Kids/Walkers Lane “False” start line Final instructions
![Page 11: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/11.jpg)
The Finish
• Physical Layout Minimize potential hazards
• Turns• Bumps
Depth/Length• Type of timing/scoring system• Post-finish activities
“To Go” marks
![Page 12: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/12.jpg)
The Course
Getting Your RunnersFrom Point A to Point B
![Page 13: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/13.jpg)
Course Design
• Accuracy is paramount Measured correctly Run as Measured
• Flexibility No “Magic” distance (5K-itis) Route changes
![Page 14: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/14.jpg)
Design Flexibility
• Making Lemonade out
of Lemons
![Page 15: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/15.jpg)
Course Design
• Pre-measurement considerations Desired distance Start/Finish locations Other
• Topography• Weather• Neighborhoods• Road width/condition
![Page 16: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/16.jpg)
Creativity:Solving the Puzzle
![Page 17: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/17.jpg)
Course Design
• Pre-measurement planning Mapping Software
• Google Earth, USATF Running Routes, Gmaps
• Car odometer Official Approval Test Run/Ride
![Page 18: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/18.jpg)
Course Design
• Types of Courses Loop Point to Point Out and Back Combinations Ultra-distance Cross country/Trails
• 1-day certification only
![Page 19: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/19.jpg)
Course Types
• Loop Advantages
• Start & Finish close to each other• Good viewing, esp. for Criterium-style
Disadvantages• Maximum road usage• Potential for course cutting• Often many intersections and side streets• Cars “trapped” inside loop
![Page 20: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/20.jpg)
LoopCourse
![Page 21: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/21.jpg)
Course Types
• Point to Point Advantages
• Minimize road use early in race• Hard to cheat (Rosie Ruiz)
Disadvantages• Pre- or Post-race
transportation logistics• Maximum road use
![Page 22: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/22.jpg)
Point to Point
Course
![Page 23: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/23.jpg)
Course Types
• Out and Back Advantages
• Minimal road use• Start and Finish can be the same (Chip mats)• Multiple duty aid stations, spectators, and
possibly split points• Runners can see the rest of the field
Disadvantages• Double runner density after turnaround• Maximum road use - closure usually required• Potential for course cutting
![Page 24: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/24.jpg)
Out andBack
Course
![Page 25: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/25.jpg)
Course Types
• Combinations Out-Loop-Back (“Lollipop”)
• Less road use• Start and Finish can be the same point
(Chip mats)• Multiple duty aid stations and split
points
![Page 26: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/26.jpg)
LollipopCourse
![Page 27: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/27.jpg)
LollipopCourse
Variation
![Page 28: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/28.jpg)
Course Types
• Combinations In-Loop-Back (“Keyhole”)
• Less road use• Start and Finish can be the same point
(Chip mats)• Multiple duty aid stations and split
points• Spectator friendly
![Page 29: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/29.jpg)
KeyholeCourse
![Page 30: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/30.jpg)
Course Types
• Combinations Multiple Loop
• Often used for ultras & racewalks• Multiple duty aid stations
and split points• Loop and Start/Finish certified
Combination of Loops• Figure 8
![Page 31: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/31.jpg)
Multiple Loop
Course
![Page 32: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/32.jpg)
Combination of LoopsCourse
![Page 33: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/33.jpg)
Combination of LoopsCourse
![Page 34: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/34.jpg)
Figure 8Course
![Page 35: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/35.jpg)
“T”Course
![Page 36: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/36.jpg)
Measurement & Certification
• Accuracy USATF Certified
• Sanctioned vs. Certified• Required for rankings, qualifying,
championships• Meaningful times• High cost to benefit ratio• Any distance can be certified• Ownership?
![Page 37: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/37.jpg)
A Big Surprise
![Page 38: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/38.jpg)
• D.I.Y. or outside measurer Typical costs Number of courses Equipment and expertise Guidance from RRTC and
State Certifier
• www.rrtc.net
Measurement & Certification
![Page 39: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/39.jpg)
Tools of the Trade
• Original Jones Counter
Original Jones Counter
![Page 40: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/40.jpg)
Tools of the Trade
PrototypeJones Counter
![Page 41: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/41.jpg)
Measurement & Certification
• Process Calibration
• Ride 300m course 4X before & after• Add 1.001 SCPF
Measure• Ride course 2X, adjust distance• Lay out splits
Document• Map & Certificate
![Page 42: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/42.jpg)
Measurement & Certification
• Work with your measurer Spell out requirements and
limitations• Fixed Start/Finish• Road Restrictions• Desired split marks & documentation
Course Map Photo disc
Listen to his/her suggestions
![Page 43: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/43.jpg)
Documentation
• A picture is worth a thousand words, especially at 5 A.M.
![Page 44: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/44.jpg)
• Work with your measurer Segmental Certification
• Useful for course changes, especially longer races
• Certified Intermediate Splits Record Requirements - Timing
Map Formats• Print, Web
Cost, deadlines, and payments
Measurement & Certification
![Page 45: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/45.jpg)
Measurement & Certification
• Course Certification Documents Certificate
• Unique alphanumeric course number - CT08023JRG
• Use this number in all race literature -Good Housekeeping Seal of Approval
• Lists drop/separation/distance• 10 year expiration
![Page 46: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/46.jpg)
Measurement & Certification
• Map Route, start/finish/turnaround detail Elevation profile optional
• Official All details including Course restrictions For race workers and course monitors Don’t go out without it!
• Simplified Route and mile marks Post online and at race site - runner’s packets Lead vehicle driver!
![Page 47: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/47.jpg)
Course Map
![Page 48: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/48.jpg)
3D Course Map
![Page 49: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/49.jpg)
Measurement & Certification
• USATF Approval Process Can take several
weeks from measurement to online posting
Course is certified as of paperwork postmark
Measurers
State Certifiers
East Vice Chair
Measurers
State Certifiers
West Vice Chair
RRTC Course Registrar
USATF NationalDatabase
![Page 50: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/50.jpg)
Measurement & Certification
• Validation Performed in case of records
• Independent USATF-assigned measurer• Pre or Post
Post - Paid by USATF Pre - Paid by race
• Records accepted immediately
• Documentation
![Page 51: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/51.jpg)
Course Setup
Running the right route,and the route right
![Page 52: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/52.jpg)
Course Setup
• Pre-Race checks 1 week 1-2 days Race morning
• Changes and/or detours• Confirm traffic control and water
stations• Course marking
![Page 53: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/53.jpg)
Course Setup
• Course marking Impossible to overdo! Paint/Chalk/Tape on Road
• Can be done ahead of time• Semi-permanent• Highly resistant to tampering• Visibility can be compromised by
weather
![Page 54: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/54.jpg)
Course Setup
• Course marking Signs
• Can sometimes be done ahead of time• Sponsorship potential• Must be removed afterward• Vulnerable to tampering• Requires upright object
“L” backet hangers Campaign-style
![Page 55: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/55.jpg)
Course Setup
• Course marking Cones
• Can only be done just before race• Must be removed afterward• Vulnerable to tampering and theft• Bulk creates storage & transport
challenges• May be necessary for restricted courses
![Page 56: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/56.jpg)
Course Setup
• Course marking Flags
• Can only be done just before race• Must be removed afterward• Vulnerable to tampering and theft• Large quantity required• Primarily for cross country• Can be used on roads in a pinch
![Page 57: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/57.jpg)
Course Setup
• Start & Finish Be certain of location
• Should be marked with survey nail and/or referenced from permanent object
Stencils for painting• Problems with extra-deep finish lines
Proper location of timing mats• OFF the course
![Page 58: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/58.jpg)
Course Setup
• Is your finish landmarkedthis well?
![Page 59: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/59.jpg)
Course Setup
• Intermediate Split Points Be certain of location
• Referenced from permanent object• Photo CD
Additional marking• Balloons• Clocks
Location relative to aid stations• Before is Better
![Page 60: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/60.jpg)
Course Setup
• Run as Measured! Required for Records
• Race video• Certified official in Lead Vehicle
Mark, mark, and mark some more!• Multiple methods• Course monitors as backup
Pre-race meeting
![Page 61: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/61.jpg)
Course Setup
• “Restricted” Courses Runners do not have full road width
• Distance requirement• Safety/Official restrictions• Out & Back courses
Avoid if possible• Requires enforcement and documentation• Certified official in Lead Vehicle
![Page 62: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/62.jpg)
Course Setup
• “Effectively Restricted” Courses Runners MAY not have full road
width• Out & Back courses• Safety/Official restrictions• Traffic
Measure as if unrestricted• Runners will go long, but times &
records will count
![Page 63: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/63.jpg)
Course Setup
• Restricted Courses Cone &
Barricades Course
Monitors
![Page 64: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/64.jpg)
Course Setup
• Restricted Courses Movable
ropes
![Page 65: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/65.jpg)
Course Crises
Preparing for when (not if) it all goes wrong
(And improving your odds that it won’t)
![Page 66: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/66.jpg)
Course Crises
Murphy’s Law governs all aspects of
Course Monitoring!If it can go wrong, it will.
![Page 67: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/67.jpg)
Even the best go wrong
sometimes
![Page 68: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/68.jpg)
Course Crises
• Inevitable course SNAFU causes Missed signs/markings Misdirection by monitors/lead vehicle Weather Obstructions
• Fire• Water• Vehicles
• Bridges• Suicide• Drug Bust
![Page 69: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/69.jpg)
Course Crises
• Missed signs Mark via Multiple Methods Post Course Maps prominently Tech meeting/course tours for elites Course monitors at critical
intersections Lead Vehicle
![Page 70: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/70.jpg)
Course Crises
• Misdirection Make sure vehicles & monitors have
course Maps Pre-race meeting
• Weather Alternate route Traffic greater concern than runners
![Page 71: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/71.jpg)
Course Crises
• Obstructions Pre-race drive-through
• Designate course supervisor Communication with authorities Pre-planned detours
• Segmental certification On-the-fly
• 2 Lead vehicles: Course & Pace• Have measurer on site
![Page 72: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/72.jpg)
Course Crises
• Prevention 5P Theory
• Proper Prior Planning Prevents Problems Examine all scenarios for problems
• Test run/ride• Do the pace math
Have a backup, and a backup backup Prepare for the worst,
hope for the best
![Page 73: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/73.jpg)
Course Crises
• Obstructions Pre-race drive-through
• Designate course supervisor Communication with authorities Pre-planned detours
• Segmental certification On-the-fly rerouting
• Have measurer on site
![Page 74: Course Measurement & Design](https://reader035.vdocuments.us/reader035/viewer/2022070319/55842ed6d8b42a785e8b504f/html5/thumbnails/74.jpg)
Design forDisaster