Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 1

Country Report Switzerland 2011

Manfred MärzendorferNPP Leibstadt Switzerland (KKL)

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 2

NPP‘s in Switzerland & quota on electricity production 2010

KKGKKB1+2

KKL

KKM

KKM 373 MW1972

KKG 985 MW1979

KKL 1165 MW1984

KKB 365 + 365 MW1969 + 1971

57 %Hydro

38 %Nuclear

5 %Other

PSI

63‘758 GWh

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 3

Swiss NPP – Net Production 2000 - 2010

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 4

Swiss NPP – Performance figures 2000 – 2010

Time availability(average)

Energy utilization(average)

UnplannedScrams (total)

Since 20 years no Scram in KKG!!

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 5

NPP Beznau

www.nok.ch → Kernenergie

AWARE LCD Display elements will be replaced by LCD-monitors with similar look and feel

(NEXIS)

Hydro Power Station will be replaced (reason for AUTANOVE)

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 6

NPP Beznau – I&C-Projects since 2009 (in progress)

Plant Process Computer (NEXIS)- Replacement of the 8.4 WDPF- based Process Information System incl.

AWARE & COMPRO with an Emerson Ovation 3.5 System from Westinghouse.

Upgrade of Teleperm XS- Upgrade of the reactor protection- & control-system from Siemens AREVA from

Release 2.38c to Release 3.6 including deterministic physical barrier regarding IT-Security

Independent Emergency Power Supply (AUTANOVE)- As part of a large plant modernization, the I&C for the independent emergency

power supply will take advantage of COMMON-Q (AC-160) safety system supplied by Westinghouse

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 7

NPP Gösgen

www.kkg.ch

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 8

NPP Gösgen – I&C-Projects since 2009 (completed)

Plant Process Computer (PRODIS)

- Modernization of Data Aquisition System KKG development- Modernization of NW-structure- Redesign Display Pictures

Turbine Control- Turbine control & protection Teleperm XS

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 9

NPP Gösgen – I&C-Projects since 2009 (in progress, planned)

Turbine Control- Bypass control (2011) Teleperm XS

Process Control System Modernization (LETA)

- Reactor control Teleperm XS- Reactor power limitation Teleperm XS- Feedwater control / Emergency feed control Teleperm XS- Neutron Flux Measurement (Incore)- Rod control & Rod position display

Plant Process Computer (PRODIS)

- Interface to digital I&C via MODBUS-Gateway

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 10

NPP Mühleberg

www.bkw-fmb.ch→ Energie → Kernkraft → Mühleberg

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 11

NPP Mühleberg – I&C-Projects since 2009 (completed)

Plant Process computer NIS (Siempelkamp) Plant Process Visualisation System

in the whole plant environment KKM development

Core Monitoring upgrade GE-H and GNF

Stability Monitor upgrade GSE Sweden

Radwaste Simatic S7 Fire alarm management Siemens

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 12

NPP Mühleberg – I&C-Projects since 2009 (completed)

Reactor protection System- Replacement of rotating MG-sets by static UPS-systems Gutor

Reactor Recirculation Pumps, Feedwater Pump C- Replacement of rotating MG-sets by static UPS-systems ABB ACS- Replacement of controls Procontrol P13

Enhancement of protection an control - for 6 kV bus E and start up transformer Siemens / Pfiffner

Replacement of recorders by paperless recorders Yokogawa Renewal of pressure transmitters for turbine A & B Rosemount

Replacement of fire protection system of SUSAN Siemens

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 13

NPP Leibstadt

www.kkl.ch

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 14

NPP Leibstadt – I&C-Projects since 2009 (completed)

PCS - Modernization step 1 (ANIS+ PROMOD) 800xA/AC800M- Additions & Expansions

- control & monitoring new Block Transformer auxiliaries- Integration of several new or modified systems (Profibus)

- Radwaste analog signals & alarms- Air Compressors etc.

Radwaste - Measurement and analog control (Teleperm C) Simatic S7

Transient Analysis & Recording- Replacement of GETARS/GETPAR Computers ANIS+ / OSI PI- Replacement of Formatters C3-TREK Server

IFTS- Replacement of relay control & conventional HSI Simatic S7

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 15

HVAC-Systems (non safety related):• Containment systems, Annulus systems• Reactor auxiliary building, Radwaste• Spent fuel building• Turbine building(14 Cabinets)

Demineralization plant Cooling tower makeup water plant(26 Cabinets)

Condensate polishing plant(7 Cabinets)

PCS - Modernization step 2 (ANIS+ NAMOD) 800xA/AC800M

NPP Leibstadt – I&C-Projects since 2009 (in progress)

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 16

Local Control Room – Demineralization / Cooling tower make up water

Simatic S1 / Teleperm C panels

Auxiliary Control Room Demineralization, Cooling tower make up water

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 17

Local Control Room – HVAC (will be taken out of service)

Operating Panel – Automation & binary control

Control Panel – pneumatic analog control

Automation & binary control cabinet

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 18

Local Control Room – Condensate polishing plant

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 19

Scope of modernization step MS2 (ANIS+ NAMOD) Process-Level

- Sensors (analog & binary) approx. 900- Drives (open loop control) approx. 700 (incl. Solenoid valves)- Drives (closed loop control) approx. 40

- Pneumatic control of HVAC approx. 70 pneumatic control loopsapprox. 50 pneumatic sensors

HSI-Level- 2 Operating-Stations (PPA) in Auxiliary Control Room („Water-House“)- 1 Large Screen Display in Auxiliary Control Room („Water-House“)- 1 to 5 Touchpanel in Condensate Polishing Plant local control position

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 20

ANIS+ - actual concept of platform (as plant information system)

Connection to MS2C/S-NW

C-NW1

+ several expansions and new plant parts

Data to and from „enterprise“-NW

Serial time stamped events from existing I&C

Hardwired analog and binary signals from existing I&C

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 21

Heating 10 (Combit)

Ventilation 10 (Combit)ZB22R116

S800

AC800M

S800

AC800M

S800

AC800M

Ventilation 20 (Combit)ZB22R117

S800

AC800M

S800

AC800M

S800

AC800M

CPP (Memostep)ZF10R035

S800

AC800M

S800

AC800M

Demineralization (Simatic)

S800

AC800M

S800

AC800M

CT-Make Up Water (Simatic)

S800

AC800M

S800

AC800M

S800

AC800M

S800

AC800M

TL1 TL2 UF, VF

TL1 TL2 UF, VF

UB1 UB2

UA1

UA1

VB1

VB1 VB2

VB2

Div. 10

Div. 20

S800

Cooling 10 (Combit)

UF10

S800

UF11

ZE12R105 ZB26R101-6

S800

Cooling 20(Combit)

UF12

S800

ZB26R101-6

Heating 20 (Combit)

ZE12R105UF13

ZM10R355

S800

AC800M

UV1

S800

AC800M

UW

S800

AC800M

UV2

S800

AC800M

UW

2 PBS in ZM3 Control Room

ZM10R355

CS21/22 CS31/32ZE14R212

ZE14R213

Connection to MS1 Client/Server-NW

Control-NW2Control-NW3

2x2 Connectivity-Server

ANIS+ - Network & Controller expansion for MS 2

18 redundant AC800M Controllers

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 22

ANIS+ - Modernization of process level (only one Division shown)

ProzessMM PP

MM PP

MCC

ProzessMM PP

MM PP

MCC

AC800M/S800in ZE

AC800M/S800 in ZM3

for UA und VB

MCRZM3-CR

Control-NW3Control-NW1

Example UA und VB

Combit (im ZE) Simatic (im ZM3) ED1000

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 23

NPP Leibstadt – I&C-Projects since 2009 (in progress)

Rod Control & Information System - Replacement of transponders and display

Flux Monitoring- Replacement of SRM- and IRM-Monitoring by a WRM-Solution NUMAC

New WRNM displays on reactor desk New WRNM cabinets in RSD

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 24

NPP Leibstadt – I&C-Projects since 2009 (in progress)

Security Systems (ERSIS)- Display and alarm management system Simatic S7/Rubin 3C- Intrusion supervision

- CCTV, perimeter supervision, access control, etc.- Alarm intercoms, etc.

Fire protection and alarm management (TEBRA)- Fire alarm management Simatic S7/WIN CC- Fire protection Sinteso FC20xx

(fire detectors, fire panels, extinguishing panels etc.)

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 25

Swiss Utilities – New Nuclear Power Plant Projects

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 26

Swiss Utilities – New Nuclear Power Plant Projects

General Licence Applications for 3 new NPP‘s submitted to the SFOE

- RESUN AG (Axpo / BKW) in December 2008:

- at NPP Beznau and NPP Mühleberg site

- KKN AG (Alpiq) in June 2008:

- at NPP Gösgen site

Conditional approval for all 3 sites published by SFOE in Nov. 2010

Fukushima

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 27

Consequences of Fukushima Daiichi accident (1)

Procedures for pending General Licence Applications suspended by Federal Council in March

ENSI issued 3 directives to NPPs to proof their design for - 10‘000 years earthquake- 10‘000 years flooding- Combination of earthquake and flooding

ENSI required a central storage for SAMG equipment which has to be- earthquake and flood proof- accessible by helicopter stationed in Switzerland- equipment has to be transportable by helicopter (if accessibility of plants in

emergency is not given) Additionally ENSI issued a further directive to investigate spent fuel

pool cooling (individual for each site)

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 28

Consequences of Fukushima Daiichi accident (2)

Before Fukushima rather pro-nuclear public opinion skips to anti-nuclear (amplified by the media)

May 22nd „people current against atom“ organized by anti nuclear organizations in the NPP Beznau vicinity

- About 20‘000 participants- Peaceful event

May 25th the federal council (Bundesrat) decides on nuclear future- Different scenarios will be considered (fast, slow or no phase out)

June 8th the parliament (Nationalrat) discusses on nuclear future

Outcome open, if „pro nuclear“

Referendum against new nuclear plants almost sure!!

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 29

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 30

Swiss Recommendations (1)

Design, Qualification, and Application of Digital I&C Systems- Investigating the best practices for the diversity and defence-in-depth analyses

performed for digital I&C systems and determining what constitutes an adequate diversity and defence-in-depth

- Selection and justification for level of diversity- Qualification of digital equipment and its programming. Type test of platforms.

Requirements for safety application. Does object oriented programming provide the required reliability?

- Hardware & Software Qualification Method for ASIC/CPLD/FPGA- TECDOC to establish engineering rules for plant computer system connecting

to outsiders with respect to security- Qualification of I&C components. Harmonisation of qualification and type test

of LOCA as well as non-LOCA, seismic and non-seismic, etc. qualified equipment

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 31

Swiss Recommendations (2)

Modernisation of I&C Systems and Components- I&C Modernization Strategies for Plant-Wide Simplification and Cost Reduction

I&C HW and SW Life-Cycle Related Issues- Configuration management guidelines for digital I&C systems- Dealing with short lifecycle of digital components

Human Factors and Reliability, Main Control Room (MCR) Design, Human System Interface (HSI)

- Upgrading existing control rooms: opportunities and limitations

Kernkraftwerk Leibstadt

23rd Meeting IAEA TWG-NPPCI – Vienna 24. – 26.05.2011 Slide 32

I thank you for your kind attention!