council 74 22 july 2015 11.1 attachment a extract from ... · 11.1 attachment b proposed vasse...

18
Council 74 22 July 2015 11.1 Attachment A Extract from proposed Vasse Development Area Development Guide Plan

Upload: others

Post on 06-Sep-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 74 22 July 2015 11.1 Attachment A Extract from proposed Vasse Development Area Development

Guide Plan

Page 2: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 75 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Local Planning Scheme No. 21

VASSE DEVELOPMENT AREA

DEVELOPER CONTRIBUTION AND STAGING PLAN

JULY 2015

This Developer Contribution and Staging Plan outlines developers’ responsibilities for contributing towards community infrastructure and facilities relating to the development of the Vasse Development Area. Adopted by the City pursuant to the City of Busselton Local Planning Scheme No. 21 ______________________ ________________ for City of Busselton Date

Page 3: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 76 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

CITY OF BUSSELTON

VASSE DEVELOPMENT AREA DEVELOPER CONTRIBUTION AND STAGING PLAN (DCSP)

JULY 2015

1. Introduction 1.1 This Developer Contribution and Staging Plan (DCSP) applies to the

development of the Vasse growth area and provides for developer contributions towards the provision of community infrastructure and facilities. Contributions take the form of a mix of actual works and cash contributions towards future works. The Vasse Development Area DCSP area is shown at Figure 1. The current version of the corresponding DGP, as of July 2015, is included as Figure 2.

1.2 The DCSP has been prepared to comply with the requirements of the City of

Busselton Local Planning Scheme No. 21 (‘the Scheme’). Clause 1.8.6 of Schedule 11 of the Scheme requires that; “Prior to the subdivision or development of land, the proponent is to prepare a developer contribution and staging plan to the satisfaction of the Council and Commission to ensure the proponent’s appropriate and timely contribution toward service infrastructure, distributor roads and community facilities on a progressive and staged basis”. The WAPC will be requested to impose a condition requiring the preparation and implementation of the DCSP on subdivision approvals which relate to those landholdings located within the DCSP area identified in Figure 1.

1.3 The land subject of this DCSP is currently zoned ‘Vasse Development’ or

‘Deferred Vasse Development’. The DCSP area now includes the original Vasse townsite, Lot 250 Kaloorup Road, which is located within the ‘Deferred Vasse Development’ zone and subject of a DGP in separate ownership, and Lots 9506 Heritage Drive and 27 Rendezvous Road, referred to locally as ‘Heron Lake’. The DCSP also now includes those 14 allotments constituting the ‘original Vasse townsite’ on Bussell Highway

1.4 Developer contributions are a mix of cash contributions required on a per lot

basis at clearance stage and requirements for ceding of land or development of infrastructure in association with specified stages of subdivision. Portions of the cash contributions may be reimbursed to developers following the delivery of infrastructure in accordance with the requirements of the DCSP.

1.5 The estimated total lot yield in the DCSP area is currently expected to be 2,191 -

of which approximately 825 allotments have already been created and developer contributions already paid – leaving a balance of some 1,366 lots remaining to be created. In addition, there is also estimated to be 170 retirement village units (attracting a 50% developer contribution) and 36 residential units (at Dawson) remaining to be created.

Page 4: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 77 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

1.6 The DCSP relates to the provision of community infrastructure and facilities. It

does not include items of infrastructure that are usually provided by developers as they proceed with subdivision and development, such as local roads, utility services, public open space and primary school sites. It should also be noted that there is a separate Main Roads WA Contributions Plan requirement pursuant to the DGP.

1.7 The DCSP is a stand-alone document but is to be read in conjunction with all

other relevant plans and/or policies. In the event of any inconsistency between the DCSP and any other local government policy which requires developer contributions, the provisions of the Plan shall prevail.

2. Purpose of the DCSP 2.1 The purpose of the DCSP is to:

apply development contributions beyond the standard provisions required by WAPC policy on the subdivision of land, for the development of new/upgrading of existing community infrastructure required as a result of demand generated by the development including a contribution to district facilities;

ensure that contributions are reasonably required as a result of the subdivision and development of the land in the development contribution area; and

co-ordinate the timely provision of infrastructure. 2.2 Developers will be responsible for their proportionate contributions in accordance

with the DCSP, together with other statutory and policy requirements, and agreements, as is relevant to their particular portion or stage of development.

3. Period of the Plan The period for the operation for the DCSP is 10 years or until completion of the subdivision and development if sooner. After 10 years the DCSP will be reviewed. In the meantime, the DCSP will be reviewed when appropriate having regard to the rate of development. 4. Basis of the plan 4.1 The current DCSP has been prepared having regard to:

Demographics analysis and projections (Appendix 1);

The DGP;

Page 5: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 78 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

State Planning Policy 3.6: Development Contributions for Infrastructure (2009);

Local Planning Policy 6D: Community Facilities Contribution Provisions;

Shire of Busselton Leisure Services Plan (2005); and

Guidelines on community facilities and recreation provision prepared by the Shire (Appendix 2).

4.2 Local Planning Policy 6D: Community Facilities Contribution Provisions

prescribes development contributions required for future development in the City based on a needs assessment. It takes into account the recommendations of the current, endorsed ‘Leisure Services Plan’. The Policy introduces a district contribution apportioned to existing development (from rates and other sources and to new development on a per lot/dwelling basis) for district wide facilities. The Policy also requires a precinct contribution for precincts in the City, apportioned between existing development and new development based on need. For the Vasse Development Area , the Policy requires a specific developer contributions plan.

5. Principles 5.1 Developer contributions are applied in accordance with the following principles

set out in State Planning Policy 3.6: Development Contributions for Infrastructure:

need and nexus;

transparency;

equity;

certainty;

efficiency;

consistency;

right of consultation and review; and

accountable. 5.2 The key principle is that the ‘beneficiary pays’. Developers within the DCSP area

will contribute to funding of both local and district community infrastructure and facilities. The developer’s local and district contributions will be determined in accordance with the above principles pursuant to this DCSP.

6. Developer Contributions 6.1 The developer contributions consist of cash contributions required on a per lot

basis at clearance stage and requirements for ceding of land or development of infrastructure in association with specified stages of subdivision.

6.2 The cash contribution payable under this DCSP includes a component to meet

the provision of community facilities and services within the local Vasse

Page 6: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 79 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Development Area , and a component to meet the demand generated by this development for the provision of district facilities. The cash contribution for local facilities is $1,620 per lot, with a further contribution to district facilities of $880 per lot, making a total of $2,500 per lot. This contribution amount will be adjusted in accordance with movements in the Local Government Cost Index for WA commencing 1 January 2015

NOTE: The cash contributions for local facilities was adjusted upwards as part of

a DCSP review undertaken by the City in early 2015. As a result of that review, some ‘in kind’ contributions were converted to cash contributions.

6.3 As at May 2015, with interest accrued, the total value of cash contributions expected to be collected by the City over the life of the current DCSP is expected to be approximately $3.05 million, of which approximately $1.97 million (or 64.8%) is expected to be raised for the provision of local facilities and $1.07 million (or 35.2%) for the provision of district facilities.

6.4 The district facilities contribution rate is based on the district contribution rate

pursuant to the City’s Community Facilities Implementation Policy (2008), less a number of offsets for facilities already provided, or partly provided for, within the Vasse Development Area pursuant to the DCSP.

6.5 Requirements for ceding of land or development of infrastructure in association

with specified stages of subdivision are in accordance with Schedule 1. 6.6 No clearances for any subdivided lots within the DCSP area , as indicated on

Figure 1, shall be issued until such time as all infrastructure/land items specified in Schedule 1 and relating to that stage have been delivered, or, at the discretion of the City, subject of bonding agreements in accordance with relevant City policy at the time clearance is sought.

7. Liability for Cash Contributions 7.1 Cash contribution requirements shall be satisfied by the payment of a

contribution in accordance with the requirements of this Plan. 7.2 Requirements for and payment of development contributions will be imposed by

the WAPC as a condition of subdivision or by the City of Busselton as a condition of development. The liability of developers to satisfy their cash contribution arises prior to whichever of the following two things occurs first with respect to any particular parcel of land within the DCSP area:

the City endorsing a deposited plan for clearance of the relevant conditions prior to the WAPC endorsing its approval on the deposited plan relating to the subdivision of the developers land; or

the commencement of the development of land, other than for the purposes of subdivisional works (with cash contributions to be paid prior to the issue of a building licence for development).

Page 7: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 80 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

7.3 There is no liability to pay a cash contribution for the development of the first single house or outbuildings associated with that first single house on an existing lot where the cost contribution for that lot has been paid on the subdivision of the land which created that lot.

7.4 In the case of grouped or multiple dwelling developments, cash contributions will

be calculated at the rate of 100% contribution for each dwelling less a one lot credit for the creation of the parent lot if a contribution was paid with respect to the creation of the parent lot.

7.5 For aged or dependent person dwellings, or dwellings to be used for tourist

accommodation purposes, the cash contribution will be 50% of the normal contribution.

7.6 In the case of commercial or industrial development, cash contributions will not

be payable if a contribution was paid with respect to the creation of the lot on which development is proposed. Cash contributions are not payable as a result of strata subdivision for commercial or industrial purposes.

8. Administration of Funds 8.1 The City of Busselton will establish and maintain an account in accordance with

the Local Government Act 1995 for the DCSP area, into which cash contributions will be credited. The purpose of the account is to ensure that the expenditure of funds from development contributions is limited to the purposes set out in the DCSP. Interest earned on cash contributions will be credited to the account.

8.2 Cash contributions for district level facilities which are not being provided in the

DCSP area will be held in an account established by the City under the Local Planning Policy 6D: Community Facilities Contribution Provisions and will be expended only on works specifically identified under that Policy or amendments thereto.

9. Disposal of land before subdivision or development 9.1 If a developer disposes of land within the DCSP area prior to subdivision or

development, the subsequent landowners will be liable for any outstanding development contributions for that land and are to be made aware of their responsibilities pursuant to the DCSP by the vendor.

9.2 If a developer dispose of land such that the whole of the undeveloped portion of

the DSCP area are no longer in a single ownership, it is the responsibility of the parties to negotiate appropriate arrangements to ensure delivery of contributions in accordance with the DCSP.

10. Reimbursement of cash contributions for works undertaken or land

transferred and crediting of in-kind contributions

Page 8: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 81 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

10.1 When a developer provides infrastructure identified in Schedule 1 and;

the City has approved the design of the infrastructure;

a contract has been awarded for the construction of the infrastructure;

an invoice for the works constructed under that contract has been certified by the Superintendent for the Works; and

the Citycertifies that the works have been undertaken in accordance with the approved design;

the City will reimburse that developer for each and every claim made during and up to the completion of the works up to the amount specified in Schedule 1 that is, at that time, held by the City and as otherwise agreed by the City prior to approving the design of the infrastructure.

10.2 Where the infrastructure is situated on land owned by that developer that is not

transferred to the City at that time, a licence agreement between the developer and the City will be required to allow for the use of the facilities pending the transfer of the land to the City.

10.3 Where a developer has transferred land or provided any infrastructure item

ahead of the City having received all contributions relating to that infrastructure item and subsequent cash contributions are made, the City will transfer funds, in accordance with what has been agreed pursuant to 10.1, to the developer that undertook the works within 3 months of the receipt of such funds. The amount of reimbursement is to be the amount contributed, plus any cost indexation prior to the contribution having been made and interest earned on the contribution once it was made. If a developer undertakes works to provide any of the infrastructure specified in the Schedules and the cost of the works exceeds the value specified in Schedule 1 plus any indexation or interest component, the City is not required to reimburse the developer for any of the excess.

10.4 Whilst the City does not currently intend to do so, subject to prior consultation

with the owner of the land in the stage with which the infrastructure is associated, the City may apply funds towards the development of infrastructure specified in Schedule 1 and up to the maximum value specified in Schedule 1

11. Surplus funds If there are surplus funds when all cash contributions have been made and all specified infrastructure delivered, the City is to apply the surplus funds to the provision of additional facilities to meet the needs of the Vasse Community. 12. Arbitration Any dispute between a developer and the City of Busselton in connection with the contributions required to be made by the developer may be resolved by arbitration in

Page 9: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 82 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

accordance with the Commercial Arbitration Act 1985. This clause shall not impact upon any right of a review to the State Administrative Tribunal pursuant to overarching legislation.

Page 10: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 83 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Figure 1 Vasse Development Area Development Contribution and Staging Plan Area

Page 11: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 84 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Page 12: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 85 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Figure 2 Vasse Development Area Development Guide Plan

Page 13: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 86 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Page 14: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 87 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Schedule 1 Infrastructure Infrastructure/land item

Details Value for purposes of clause 10

1.Upgrading of Newtown Oval

To be determined following consultation with representatives of the Vasse community, including the Vasse Recreational Facilities Working Group

$150,000

2.Development of a consolidated and integrated active open space facility adjacent to Cape Naturaliste College to be known as the ‘Vasse Community and Recreation Precinct’ (VCRP)

It is envisaged that the VCRP will be able to comprise:

Two (2) north-south oriented AFL ovals PLUS one (1) ‘incorporated’ (separately line-marked and posted) full competition-sized AFL oval generally oriented on an east-west axis across the same, contiguous grassed areas;

One (1) north-south oriented, senior cricket oval, ‘incorporated’ seasonally within the same contiguous grassed area accommodating the AFL ovals (as described above);

Two (2) soccer/rugby pitches, ‘incorporated’ seasonally and/or through sporting club scheduling within the same contiguous grassed area (as described above);

Three (3) multi-purpose (basketball/netball/tennis) courts;

Two (2) competition-standard bowling greens;

A clubroom and changing room facilities;

Multi-purpose community

$3.05 million MINUS the value of that portion of land

remaining to be transferred by the

developer for integration into the

proposed VCRP that is residual to the

7,000m2 required to be ceded for

‘Community Purposes’ [see following]

[$7.65 million

estimated cost of works]

Page 15: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 88 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Infrastructure/land item

Details Value for purposes of clause 10

rooms;

Associated car parking for sports participants and spectators;

Landscaped pedestrian linkages.

3.Community purposes site adjacent to the Village Centre

Minimum 7,000m2 site to be ceded

to the Crown at no cost in fee simple in a location to be agreed with the City as part of the Village Centre DAP process. This site to be ceded as soon as practicable after WAPC endorsement of the Vasse Development Area DGP and Vasse Development Area DCSP and prior to the clearance of any additional lots.

N/A

Approx. $3.2million

Page 16: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 89 22 July 2015 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015

Infrastructure/land item

Details Value for purposes of clause 10

(MINUS per note at 2))

Page 17: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 90 22 July 2015 11.1 Attachment C Schedule of (Late) Submissions

App. No

ADDRESS LATE Submissions Comment Officer Recommendation

1 Alex Meares ON-Q Projects M 0417 932701 P O Box 1402 Busselton WA 6280. T (08)97 521980. [email protected]

30 June 2015 Acting as the Project Manager on behalf of the Vasse JV of Perron Developments P/L and Stawell P/L we provide this submission to the advertised amended DCSP for Vasse. The Vasse JV are supportive of the initiative of the City and the Vasse Community to centralise the sporting facilities at Vasse to a co-ordinated precinct within the designated recreation land at Dawson abutting Napoleon Promenade. To assist this approach the Vasse JV have been planning for the DGP amendment to allow the 7,000m2 of land to be ceded to the City to co-join this Dawson Active Recreation area (DAR area). In addition to this DAR area, the Vasse JV have agreed with the City to transfer a further 0.9ha to be amalgamated into this DAR area to provide a greater range of sporting facilities on this one site which also adjoins the Cape Naturaliste ovals. We understand that the City need to obtain a valuation on this 0.9ha parcel prior to incorporating this sum into the draft DCSP which may therefore require a subsequent minor amendment to the DCSP. At the time of undertaking this amendment, any updates of the planning and lot yields will be considered, together with the implications on the financial model, prior to changing the DCSP per lot Contributions. The Vasse JV support other changes to the DCSP. Whilst these changes have increased the Local Contributions per lot, they have levied all development areas within the Vasse catchment on an equitable and transparent basis. The Vasse JV are also supportive of the City’s program to have works progressed on the first stage of the DAR area over the next six months, which will be a large grassed area that could support a range of uses plus the first stage of the carpark facilities. We understand that the toilet & change room facilities are subject to special grant applications and as such, their timing cannot be fixed. The Vasse JV are committed to working with the City to achieve the best possible outcomes for the Dawson Active Recreation area and in addition to the substantial water infrastructure, have also established other infrastructure surrounding this DAR area which will greatly facilitate this project and enable the City to develop this as cost effectively as possible.

Late submission noted. ‘DAR’ will be referred to in endorsed, modified DGP and DCSP as the ‘Vasse Community and Recreation Precinct’ (VCRP)

The late submission is relevant and informative. It is recommended that it be noted and supported.

Page 18: Council 74 22 July 2015 11.1 Attachment A Extract from ... · 11.1 Attachment B Proposed Vasse Development Area DCSP July 2015 7.3 There is no liability to pay a cash contribution

Council 91 22 July 2015 11.1 Attachment C Schedule of (Late) Submissions

We look forward to continuing this working relationship with the City and during the next two months, finalise the legal agreements necessary to implement this recreation project.

2 Brooke Thomas Secretary Sports Subcommittee Vasse & Districts Community Centre Inc.

2 July 2015 The Vasse & Districts Community Committee (VDCC) support the proposed plan to redirect Developer’s funds of $700,000.00 plus interest, which was contributed in about 2007 for upgrading work on the recreation facilities on Kaloorup Road including the Hall, tennis courts and the oval. In March this year the VDCC negotiated with the City of Busselton for $150,000.00 to be made available in increments for much needed upgrading of the Newtown Oval. This focus of the committee is to provide a training ground for the junior sporting teams of Vasse. At the same time the committee successfully managed to ensure an ongoing supply of water for the oval and is in the process of obtaining a water licence from the Dept. of Water. Disappointingly there here has been a delay over the DET letter which still has not been received despite many assurances of support from DET. The committee have always acknowledged its willingness to assist where possible with the development of a sporting precinct at Dawson behind the Cape Naturaliste College. We believe this long term project will benefit the rapidly growing Vasse community. Therefore we are encouraging our members to become involved in any way possible to assist with the progress of the new precinct.

Late submission noted. The ‘sporting precinct at Dawson’ referred to in the submission is, in fact, the VCRP.

The $700,000 referred to was allocated in the existing (soon to be modified) Vasse Newtown Developer Contributions and Staging Plan (VNDCSP) (2011). It was proposed in the draft modifications to the VNDCSP that $150,000 of this sum be retained and set aside for upgrading works for the Newtown Oval, with the balance re-allocated to the proposed Vasse Community and Recreation Precinct (VCRP) Stage One works.