cotton testing procedures. production & modules cotton testing procedures production &...

31
Cotton Testing Procedures

Upload: branden-walters

Post on 29-Dec-2015

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Page 2: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Production & Modules

Page 3: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Production & Modules

Page 4: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Cotton Gin

Page 5: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

• Samples are drawn from each bale at gins and warehouses licensed by USDA

• Samples from each bale consist of two portion, one portion cut from each side of the bale

• Samples are cut from space between wires or ties of bale

Bale Sampling

Page 6: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Bale Sampling

Page 7: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

• Each portion is approximately 154 mm wide and 305 mm long

• Each portion must weigh 114 grams for a total sample weight of 228 grams

• A Permanent Bale Identification coupon is placed between the two portions of the sample

Cotton Testing Procedures

Bale Sampling

Page 8: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Bale Sampling

Page 9: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

• The sample is placed immediately in a sample sack which is provided by USDA

• The samples are transported to USDA Classing Offices by carriers contracted by USDA

Bale Sampling

Page 10: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

• Licensed samplers are under the supervision of USDA

• USDA employees perform random sampling inspections at all gins and warehouses that are licensed to sample cotton to ensure sampling procedures are followed

• Samplers that do not comply with established procedures are subject to the loss of sampling privileges

Bale Sampling

Page 11: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Receiving Samples

Page 12: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Traying Samples

Page 13: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing ProceduresSample Conditioning:

– USDA requirement:• 21°±1° C and 65%±2% RH• 6.75% - 8.25% moisture content (dry basis)• Methods: Passive (48 hour) or Rapid Conditioning

(10 – 15 minutes)

Rapid Conditioning Passive Conditioning

Page 14: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Moisture checking

• 6.75% - 8.25% moisture content (dry basis)

Page 15: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Instrument Testing

Page 16: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Instrument Fiber Property Measurements: Micronaire – fineness of fibers Strength – grams per tex Length – upper half mean length Length Uniformity – uniformity of fiber lengths Trash – percent area non-lint Rd – degree of brightness +b – degree of color Official Color Grade

Page 17: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Instrument Fiber Property Measurements: Micronaire – single test

Strength, length, length uniformity – two comb test

Rd, +b, trash – four image test

Page 18: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Manual Classer Determinations:• Official Leaf grade – determined in accordance with the Universal

Grade Standards• Extraneous Matter

Page 19: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training

• All USDA employees receive standardized training including: HVI Operators HVI Supervisors HVI Technicians

Page 20: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Operators

All new HVI operators must complete a two week training program

The training program covers the established procedures for instrument calibration and operation

New HVI operators must demonstrate their ability to perform all tasks and meet certain volume requirement

Page 21: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Operators, First Week

Training program orientation Instrument orientation Instrument calibration Reference level checks Instrument operation Evaluation/examination

Page 22: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Operators, Evaluation

HVI operators must demonstrate their ability to complete tasks associated with the operation of the instrument

Their abilities are documented on a HVI Skills Evaluation Checklist which must be certified by the HVI operator, HVI Supervisor, and Area Director

Page 23: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Page 24: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Operators, Examination

HVI Operators will operate instrument in a production setting and must test an established number of samples

7 hour shift 7.5 hour shift 8 hour shift

350 375 400

Page 25: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Operators, Second Week

Continue the operation of instruments to demonstrate proficiency of operations

Supervisors closely monitor HVI operator performance and provide additional training, if needed

Page 26: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Operators, Examination

HVI Operators will operate instrument during second week in a production setting and must test an established number of samples

7 hour shift 7.5 hour shift 8 hour shift

475 510 575

Page 27: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Supervisors

• Receive training on the following: Supervision of Calibration illustrating leadership ability Analysis of reference level check data Temperature and humidity monitoring Correction of routine problems encountered on

instruments Workplace efficiency

Page 28: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Technicians

• All new HVI Technicians must complete a two week training program

• The training program covers all aspect of instrument operation, maintenance, troubleshooting, and repair

Page 29: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Technicians

• HVI Technician Training areas: Instrument operation Calibration Instrument setup Operation of each component Instrument evaluation

Page 30: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Technicians

• HVI Technician Training Areas: Data analysis Proper instrument maintenance Identification of instrument problems Instrument repair

Page 31: Cotton Testing Procedures. Production & Modules Cotton Testing Procedures Production & Modules

Cotton Testing Procedures

Employee Training – HVI Technicians

• HVI technician must successfully pass a practical and written examination at the conclusion of the training to be certified