cost of building a house

Upload: tceterex

Post on 04-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Cost of Building a House

    1/123

    Wood - For Windows and DoorsIn wooden windows there are various options

    Red Sal. 900-1000 Rs/cft as on Sep 2012

    Granite

    Name DescriptionSadarahalli Cheapest

    of the lot.

    Useful Link for Granite -- to see the colours ahttp://www.pragatigranites.com/granites.htm

    Window frames and window shutters come in various types of materials.

    1. Steel - Low cost.

    4. Reno quality / ISI - Basic tank.

    15. Water Tank

    Overhead water tanks come in 4 types.

    http://www.pragatigranites.com/granites.htmhttp://www.pragatigranites.com/granites.htm
  • 8/13/2019 Cost of Building a House

    2/123

    Tiles

    Ceramic in all rooms

    Anti skid for Toilet and Bathrooms

    Make: Local asian, antique, murdeshwar ceramics

    century, city tiles, euro, oracle, orient

  • 8/13/2019 Cost of Building a House

    3/123

    d various other House interior related things

  • 8/13/2019 Cost of Building a House

    4/123

    Wood - For Windows and Doors

    In wooden windows there are various options

    1. Burma Teak. 3100 Rs / cft as on Sep 2012

    2. Ghana Teak. 1900 Rs / cft as on Sep 2012

    3. Columbia Teak. 1850 Rs / cft as on Sep 2012

    4. Honne. 1850 Rs / cft as on Sep 2012

    5. Red Sal. 900-1000 Rs/cft as on Sep 2012

    6. White Sal. 1000-1200 Rs/cft as on Sep 2012

    7. Jungle/Hard wood.

    4. UPVC - Weather proof.

    2. Aluminium - Not sturdy

    3. Double Layer - Little better than ISI grade.

    Window frames and window shutters come in various types of materials.

    15. Water Tank

    Overhead water tanks come in 4 types.

  • 8/13/2019 Cost of Building a House

    5/123

    Granite

    Name Descripti

    onCoffee Brown Looked

    good.

    Useful Link for Granite -- to see the colours a

    Tiles

    Vitrified for all Main Hall

    Anti skid for Toilet and Bathrooms

    Ceramic in all other rooms

    Make: Kajaria, Johnson

    http://www.pragatigranites.com/granites.htm

    In vitrified

    tiles whic

    has a the

    digital pri

    so

    A new app

    good looki

    way you av

    house a un

    focus of th

    you can de

    http://www.pragatigranites.com/granites.htmhttp://www.pragatigranites.com/granites.htm
  • 8/13/2019 Cost of Building a House

    6/123

  • 8/13/2019 Cost of Building a House

    7/123

    d various other House interior related things

    ange RAK has a nano pix vitrified

    h is around 120 Rs/Sq.Ft. which

    arble texture. Johnson tiles has

    nts which are good. Kajaria has

    me good options as well.

    oach would be to use a single

    g tile for the entire house that

    oid wastage and give the entire

    iform look. With this approach the

    house shifts to the walls which

    orate and highlight.

  • 8/13/2019 Cost of Building a House

    8/123

    Total Plot Area 60 x 40 ft

    = 2400 Sft

    Actual Area 1200 Sft

    Details % of total cost Cost Rs.

    Plan approval 1.6 21000.0

    Bore well 1.6 21000.0

    EB service connection 1.1 14000.0

    Materials- Cement, Steel, Bricks, Sand, Jelly,

    Wood, Tiles (Floor & Wall) etc

    42.2 550000.0

    Labour component 30 420000.0

    Painting works 2.5 35000.0

    Plumbing work (PVC tank, Pump set. etc) 2.5 35000.0

    Septic tank and sump (12,000 litre capacity) 5 70000.0

    Electrical works (Excluding fittings fan & 100830.0

    tube lights etc)

    Sanitary work (Including cost of fittings like

    Closets, wash basins Taps etc)

    2.5 35000.0

    Total 97 1301830

    Total Cost: 1301830 Rs13.0183 Lacs

    OverHead tank capacity Sizing

    Number of Occupants 4

    Water requirement per occupant 150

    Water requirement per Day 600

    Stoarage Capacity required for 5 Days 3000

    Excluding:-

    Cost of Registration Rs. 200000 Approx.

    Cost of Furnishings

    Cost of Light and Fan Fixtures

    Cost of Temporary Power supply

    Cost of Water required at site

    7.7

  • 8/13/2019 Cost of Building a House

    9/123

    Cost of foundation includeds cost of anti-termite treatment

    Particular Percentage Cost Range

    Material 70% 9.1

    Labour 20% 2.6Contractor Profit Margin 10% 1.3

    13.02

    Additional Costs

    Particular Cost

    Architect 1 Lakh

    Approval Costs 30K

    Water Tank

    Overhead water tanks come in 4 types.

    2. Triple layer - Good.

    Kitchen Sink

    Nirali - Stainless Steel

    Light Fixtures

    Phillips

    Havells

    Power Back Up

    Inverter

    Switch and Sockets

    legrand -- Mylinc

    Havells -- Coral

  • 8/13/2019 Cost of Building a House

    10/123

    Wires

    Havells

    Wood - For Windows and Doors

    In wooden windows there are various options

    2. Ghana Teak. 1900 Rs / cft as on Sep 2012

    3. Columbia Teak. 1850 Rs / cft as on Sep 2012

    4. Honne. 1850 Rs / cft as on Sep 2012

    Granite

    Name DescriptionCoffee Brown Looked good.

    Useful Link for Granite -- to see the colours and various other House interior related things

    Window frames and window shutters come in various types of materials.

    3. Wood - Costly

    http://www.pragatigranites.com/granites.htm

    4. UPVC - Weather proof.

    http://www.pragatigranites.com/granites.htmhttp://www.pragatigranites.com/granites.htm
  • 8/13/2019 Cost of Building a House

    11/123

    Tiles

    Vitrified for all Rooms

    Anti skid for Toilet and Bathrooms

    Make: Kajaria, Johnson, RAK

    Temporary Electricity Connection

    Water for construction

    The approved plan also mentions that drinking water cant be used for construction. Howev

    2. Non - Potable water - Recycled water ( Tertiary treated water )

    1. Potable water - Drinking water.

    Usually the temporary connection is provided for 28 days.

  • 8/13/2019 Cost of Building a House

    12/123

    Start construction

    Type of house

    The best season to start construction is during the month of April when the annual budget i

    you know what the new prices are. At the same time the rainy season will do natural curing

    walls.

    For construction non-potable water has to be used. However not every layout has dual line

    construction which means everyone has to buy water from tankers. It looks bad but is not.

    built and for curing. After 4-5 months your water usage will be pretty minimal. Tankers are

    when everyone goes for private borewell then they have nothing to gain as they all tap into

  • 8/13/2019 Cost of Building a House

    13/123

    Cost Rs/Sft.

    17.5

    17.5

    11.7

    458.3

    350.0

    29.2

    29.2

    58.3

    84.0

    29.2

    1085

    Lts

    Ltrs

    Ltrs

  • 8/13/2019 Cost of Building a House

    14/123

    Lakhs

    LakhsLakhs

    Lakhs

    MS tank painted, color goes away

    Food particle sticks to Marble sink

    LED lights high initial investment

    Go with conventional CFL

    DG set-- cost of diesel and Maintainence costLPG based Set -- Costly and cost of LPG

    Do not purchase switches with indicators. Indicator stops functioning

    Do not purchase coloredswitches, color fades away

    Look for local dealer who can supply. Difficult to locate havells vendor.

    2. It also keeps the water free from PVC

    3. The first outer layer acts a sun protection;

    Triple layer qualities of sintex tanks are

    durable and strong. It is the first grade with

    ISI mark.

    The benefits of triple layer which are not

    1. A white layer which is in between the two

  • 8/13/2019 Cost of Building a House

    15/123

    Teak wood for Main doorsHonne for windows and other doors

    4. Magadi road - Havent checked out.

    6. Do you want to do artificial seasoning or

    Places in Dharwad where granite can be

    purchased are

    3. Bannergatta - Good collection, bit costly, compared to Jigni 5-15 Rs price difference i

    Although upvc windows are weather proof, finding a frame integrated with grills was

    difficult, fennesta provides villa windows which come with grills but are not sturdy enough

    to prevent a break in. The usual upvc windows are fit using glue and the grills go inside or

    outside this upvc frame. Casement windows are costly in upvc, sliding windows

    accumulate dirt in the slide grooves. You cant get mosquito nets if you go for upvc

    casement. All these disadvantages made me sway my vote towards wooden windows.

    3. How can you be sure that the wood is what the timer merchant says it is.

    1. Jigni - Found some nice varieties here,

    2. Sarjapur Road - No good varieties, a bit

    Places in Dharwad / Bangalore where

    granite can be purchased are

    Burma teak turned out too expensive and since the outer area is going to be painted to

    endure the harsh weather, it was not economical. Burma teak doesnt deform and the wood

    grains are visible this is the reason people go for teak windows. Wood polish is expensive

    if you want to highlight the wood texture. Ghana teak has many knots and white in color

    compared to burma teak which is brown. From what i heard Ghana teak deforms slightly

    compared to Columbia teak, Columbia teak is supposed to be harder and deforms less.

    Honne comes under the hard wood category and doesnt deform. Honne has not grain

    texture so needs to be painted upon. Red sal and white sal usually have hairline cracks

    which can be covered during polishing. Honne turns yellow when exposed to water so

    painting it is mandatory. Some pain the outside and polish the inside of the frames. Red sal

    is the most moving wood for people who build rented houses.

    The main things to check while selecting

    1. Are you buying log or cut pieces.

    2. What will be the wastage

    4. Watch out for defective pieces.

    5. How long has the wood been seasoned.

  • 8/13/2019 Cost of Building a House

    16/123

    1. Near Dental College

    2. Near Vidyagiri

    Granite comes in various shades and colors, since its naturally formed finding the right

    shade is difficult.

    1. Buy from a good retailer.

    2. Put water on the unpolished side of the granite to reveal its true colour.

    12. Gang saw rates are 140 - 200+ Rs / SqFt.

    10. Epoxy resin can be seen on the side of granite slab. Epoxy give granite the gloss.

    9. Avoid granites treated with chemicals to induce artificial colour. All red granites usual

    8. Look out for iron content in granite, they rust or turn yellow over a period of time.

    7. Avoid too much clouds in the stone else there will be no continuity.

    6. Granites also are categorized into hard or soft stone. Buy hard stones.

    11. Granite comes in 3-4 types of polish.

    13. 3x11 slabs - 80-90 Rs / SqFt.

    r it doesnt clearly say what is the alternative. There are 2 types of water

    Check list for granite buying

    5. Avoid buying granites that are cracked from the side

    4. Look at the side of the granite slabs to see if cracks are present.

    3. Lookout for hair line cracks, If there is one chances are they will increase during laying

    time.

    14. 4x11 slabs - 110-120 Rs / SqFt.

    In vitrified range RAK has a nano pix vitrified

    tiles which is around 120 Rs/Sq.Ft. which

    has a the marble texture. Johnson tiles has

    digital prints which are good. Kajaria has

    some good options as well.

    15. Some shops use fancy names to bump up the price so watch out.

    A new approach would be to use a single

    good looking tile for the entire house that

    way you avoid wastage and give the entire

    house a uniform look. With this approach the

    focus of the house shifts to the walls which

    you can decorate and highlight.

  • 8/13/2019 Cost of Building a House

    17/123

    announced and

    to all the outer

    or water supply. BWSSB has stopped giving non-domestic water connection for

    ou will require water during the initial stages of construction till the super structure is

    ow providing water at 550 Rs / 6500 Litres. As i have mentioned in the section above

    ame water table. Borwells causing earthquake is another aspect to look at.

  • 8/13/2019 Cost of Building a House

    18/123

  • 8/13/2019 Cost of Building a House

    19/123

  • 8/13/2019 Cost of Building a House

    20/123

    seen.

  • 8/13/2019 Cost of Building a House

    21/123

    Light Points

    Area Qty:

    Bedrooms 4

    Living 2

    Kitchen 1

    Toilet 2

    Dining 2

    Balcony 1

    Front House 2

    Gate Light 2

    TOTAL 16

    Stage 1: Type of house

    The basic types of house people build in

    Bangalore are

    2. Mangalore / Kerala style - Sloped roof with

    tiling.

    2. House for self use + Renting out (Luxury +

    cost effective)

    3. House for renting out. (Cost and revenue

    generation in mind)

    3. Colonial style.

    4. Roman style - Pantheon roof, big pillars etc.

    1. House for self use. - (Luxury, privacy and

    comfort in mind)

    Once you decide which category you belong you

    can move on to the next stage. Few people are

    not sure if they fit in category 1 or 2 for them I

    would advice to think ahead and plan their home

    design in such a way that they can expand if the

    need arises in future.

    Pick a design style. There are a few house

    design styles that are prominent in Bangalore.

    The style you pick will also impact your cost.

    1. Contemporary designs - Boxes shapes and

    angles.

  • 8/13/2019 Cost of Building a House

    22/123

    A house cant be 100% vaastu complaint, so try

    to comply based on feasibility.

    This leaves out just the middle sections and the

    north west corner for the plot for modification.

    To have some cross ventilation its ideal if the

    rooms (Kitchen, Master bedroom) are in the

    corner.

    1. Kitchen to the south east.

    2. Master bedroom to the south west

    3. Entrance & Car parking in north east.

    4. Sump to be in the north east

    5. Pooja room not to be next to / below /

    above bathrooms.

    Stage 2: Vaastu

    Learn about Vaastu. Even before you think of

    putting a plan on paper read a few articles on

    vaastu so that you know how to come up with a

    sound plan. Vaastu has some science behind it

    Eg: Flow of light, Flow of wind etc. Here are a

    few basics on Vaastu.

    https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/vastu_residence.jpg?attredirects=0
  • 8/13/2019 Cost of Building a House

    23/123

    Choices! There will be various choices each

    with its own pros and cons. Here I discuss about

    some of them.

    4. Inverted T-BeamsVs Concealed Beams- If

    T-Beam. If inverted T-Beam is used then the roo

    to get a flatter ceiling is to go in for concealed b

    beam is not actually a beam and c

    3. Privacy Vs Open spaces-If you need more

    out the living and dining rooms. If you dont t

    http://www.floorplanner.com/

    http://www.sweethome3d.com/index.jsp

    For 3D modelling you can use google sketchp,

    look up a few tutors on youtube on architecture

    design using floor plan. Its very simple to use

    and you can visualize your house elevation.

    Stage 3: Self design

    Chart out a layout of how you want the floor plan

    to look like. This will give you some idea when

    you go talk to the architect. I used Sweet Home

    3D to draw up my floor plan. There are various

    other online tools available as well. If you arent

    well versed with a computer then paper will do.

    Write down some of the requirements of your

    houses.

    1. Serial car parking Vs Parallel car parking-

    2. Stilt Vs ground floor VS basement parking

    http://www.floorplanner.com/http://www.sweethome3d.com/index.jsphttp://www.sweethome3d.com/index.jsphttp://www.floorplanner.com/
  • 8/13/2019 Cost of Building a House

    24/123

    6. Ceiling height VS false ceiling - False

    ceiling is a craze these days in apartments,

    but on a long run its more difficult to maintain

    it. Dust will gather around the false ceiling and

    cause health problems. Ceiling heights are

    standard of 10' some go to 11' making the

    room look bigger. If you go in for a 11' ceiling

    then you will pay more in terms of airconditioning keep that in mind.

    7. Wood windows VS Aluminium windows

    Vs UPVC windows-Wood windows are

    costly 600 - 650 Rs /sq ft. Aluminum windows

    are delicate. Upvc windows range from 350

    Rs/sq ft for sliding designs and 500 Rs/sq st

    for casement windows both without grill

    option.Upvc windows work out well for high

    rise apartments, for individual houses security

    is a major concern and grills are mandatory to

    prevent burglary. Wooden windows with

    12mm hex rods are ideal for individual

    8. Teak main doors Vs Steel main doors-eventually has to go in for a grilled safety door.

    water hits it during rainy season else a steel doo

    now come with an option of single key with 3 lo

    variety very less. There are more options in

    5. Granite Vs vitrified Vs Marble -A white floor

    granite is naturally occurring stone so finding sha

    to find. Vitrified has lot more options and cost eff

    polished using rock polishers, this will remove 2

    have 16 mm slab then you can polish it only 4-5 ti

    crystallisation which uses a chemical to induce th

    not wide spread and people are unaware about itwork out an agreement with the dealer to replace

    when heavy objects are dropped, if the floor layin

    damage it easily. Check the quality of vitrified bef

    check if the loss will last lon er before urchase

    9. Modular Kitchen Vs Traditional Kitchen- Al

    to clean and maintain, the corners become inacc

    will rust after 5-10 years of usage and will look ba

    setup though and the hinges are much more smo

    cost a ton. If you can get a traditional kitchen with

    and cost effective. You can work with your carpe

  • 8/13/2019 Cost of Building a House

    25/123

    10. Brick Vs Cement Block- Cement block

    work out cheap and easy in terms of

    construction. Brick gives a cooling effect

    compared to a cement brick wall. A room built

    with Cement block will heat up soon. Brick

    outer walls are usually 9" and cement outer

    walls are usually 6". In terms of safety brickwall of 9" is much safer. Cement block loose

    its property after 10-15 years. I would suggest

    go with a brick wall even if you loose 3" you

    will benefit in terms of a cooler room in

    summer. The RCC columns will be quite good

    in 9" compared to 6" RCC column. Mud bricks

    come in 2 varieties one that is 6 Rs/brick with

    rough edges used for walls, 8 Rs/Brick which

    has smooth edges and used when brick work

    is exposed.

    11. Borewell vs BWSSB water connection-

    BWSSB is supposed to provide non-potablewater (recycled water) for construction but

    there is still some problems with delivery and

    distribution. There are no takers for recycled

    water, there are plans to have dual pipelines

    in all areas but that will take time. In areas

    where water scarcity is present borewell is a

    life saver. A borewell might cost 1.5 - 2 lakhs.

    Always check for the yield of water that you

    might get. Check with your neighbours to find

    out at what depth they got water. See if you

    can get a common borewell by co-ordinating

    with your neighbours. If on the other hand you

    decide to use a tanker to supply water for

    construction you will end up paying 5,500 Rs

    for 65K litres / month assuming you are paying

    550 Rs/ 6500 Liters. The cost difference

    between tanker and borewell is big. Just for 8

    month usage investing 1.5 lakh extra is not

    justified. Most house constructions in

    Bangalore start of by digging a borewell since

    BWSSB wont provide water for construction

    after construction is complete they rarely use

    12. Fe415 TMT Vs Fe 500 TMT - Fe500 Ste

    normal residential buildings Fe415 is sufficient

    prone zones. Make sure there is no rust and its

  • 8/13/2019 Cost of Building a House

    26/123

    14. Sinked Vs Flat Bathroom - Usually in old h

    and the dry areas in a bathroom. If your bathr

    Having a flat bathroom with a slope provided tow

    both the first floor and the ground floor bathroo

    can be sunk so that the first floor bathroom wi

    makes sure that the

    15. Grills Vs Hex Rods - Grills are nice to look i

    patterns done in them. However grills are easy t

    the frame then its easy to break in. Hex rods are

    the hex rods is usually done with 3"

    13. Cut Lintel Vs Through Lintel- The reason f

    windows done deform. RCC framed structure

    earthquake resistance the benefit of having throu

    between them is 20-30K which is why I have se

    equally distributed in a through lintel. Places whi

    also gives you the liberty to do alterations to the

    are through lintels.'My suggestion is to go for thrcut lintels the columns raise all the way upto the

    be taken to make sur

  • 8/13/2019 Cost of Building a House

    27/123

    3. How many bedrooms?

    4. Attached toilet for all bedrooms or common

    toilets?

    If you know the details and dont require an

    architect you can go meet a draftsmen who will

    design the floor plan and structural and

    elevation for around 20K. Offcourse his

    knowledge base will be limited and you will be

    the person in charge.

    You would need to meet the 2nd kind first.

    Laydown your requirements and ideas and let

    the architect work out few plans for you. Here is

    a check-list that I think will work.

    1. How many members in the family?

    2. How many floors?

    Once you know what you want, its time to meet

    an architect. There are 2 types of architects in

    Bangalore

    1. Architects who are registered with BBMP

    and do house plans for approval only.2. Architects who are not registered with

    BBMP and do house plans for construction.

    16. 43 Grade Vs 53 Grade vs PPC - For RC

    strength, it requires more water during the curing

    with cement this seals the minute holes in ce

    based cements

    17. Spiral Staircase vs Normal Staircase - S

    wasted. In a normal stair case the space under i

    comfort in climbing anything more will hurt the an

    footing. Use laputra finish

    Stage 4: Meet an architect

  • 8/13/2019 Cost of Building a House

    28/123

    4. Khata Certificate - You get this done in your

    local BBMP office.

    This can be done in parallel. In case of BDA

    layout the following are the legal documents

    1. Title deed / Sale deed / Parent deed /

    Master deed - Agreement of sale / tiltle. You

    get this done in your local sub-registrar office.

    2. Gift deed - Agreement of transfer of

    ownership. Not required if site is purchased.

    You get this done in your local sub-registrar

    office.

    3. Khata Extract - You get this done in your

    local BBMP office.

    Once you are satisfied with the design its time to

    move to the next phase.

    Stage 5: Get your legal

    documents ready.

    Download the Architect & Owner Agreement

    Once the requirements are laid out, the architect

    will have something to work with. He can

    probably get you a working floor plan in a week

    which you can review.

    Note: Always measure the site before the

    planning starts. There may be differences in

    dimension which when you discover later

    may be a problem if your plan is already

    drawn. Sometimes dimensions will be

    correct but the site wont be a perfect

    rectangle, this has to be taken into account.

    9. New trends or ideas you have in mind?

    10. Space utilisation

    Architect cost & Services - Bangalore

    The following is the estimate I got from my

    Architect.

    5. Closed car parking or open parking?

    6. Single or multiple car parking.

    7. How many floor to rent out.

    8. Future expansion plans if any.

    https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjViYTZlOTJiZTcxMDk2NjAhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjViYTZlOTJiZTcxMDk2NjA
  • 8/13/2019 Cost of Building a House

    29/123

    I am not in favour of bribing, the legal path

    usually take a bit longer and some effort on your

    path but its cleaner and you will feel good. Every

    govt department has an RTI officer who is

    nominated by the govt. His duties are to register

    any RTI applications and provide you the

    acknowledgement number. If the particular

    service is not completed within the stipulated

    number of days then you can file an RTI (Right

    to information) demanding to know the status of

    your application. It works like a charm.

    Where do i find out what are the service time

    lines?

    Gift deed - Will take a day to get done, provided

    all the other documents are in order. - No bribe

    required if all documents are in order. You may

    need to bribe 100 Rs or so to the office boy who

    stamps your documents.

    Khata transfer - Will take 15-30 days to get

    done, provided all the other documents are in

    order. - No bribe required if all documents are in

    order. Ideal bribe range is some where between

    5K for a 30x40 plot to 8K for a 40x60 plot. You

    will need to go meet the Revenue Inspector and

    show him your plot, he may give your dates and

    times that are odd, but be persistent.

    Sale deed -

    5. Emcumbrance Certificate - Shows if there

    are any loans on the site.You get this done in

    your local sub-registrar office.

    Khata extract and Khata certificate will be

    provided within a week if the site is already in

    your name. - No bribe required. If you do plan tobribe then anything in range of 500 Rs - 1000

    Rs should do.

    Encumbrance of 13 years will take 20-25 days

    to get officially. No bribe required, automated

    process.

  • 8/13/2019 Cost of Building a House

    30/123

    Usually thing move faster once you file an RTI, if

    that doesnt happen then you can reach out to

    lokayukta and complain against the officer who

    is demanding bribe. All this will work if all your

    legal documents are in order. If there are any

    loop holes then you will end up running from

    pillar to post.

    What documents i need to submit?

    Note: When dealing with govt office please

    carry/get acknowledgements in writing along

    with a seal. Without this you will end up making

    many rounds. Always carry a photo copy of your

    application to get it sealed and signed, if you

    filled a form then ask for an acknowledgement

    number or a slip.

    Download the RTI Template

    What to do if RTI doesnt work?

    How to file an RTI in bangalore?

    You can write a simple letter in English or

    Kannada (not sure if Hindi will do) and either

    post it to the concerned office or hand it over in

    person to the RTI officer in charge of that office.

    Once you hand over the RTI application they

    need to respond within 30 days. Once you hand

    over the RTI to the RTI officer he will register it

    a register book and provide you an

    acknowledgement number. Better if you could

    carry a photo copy of the RTI and get a govt

    seal and his signature along with date on that.

    You will also need to carry any supporting

    documents. A postal order of 10 Rs which can

    be purchased in your post office.

    Under the "Garuntee of service for citizen system" you

    find all timelines under this link -

    http://sakala.kar.nic.in/kgsc1/ which is a govt hosted site,

    specifying timelines for all services. Their phone number

    works :) and they help you in finding the right people to

    https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjY3NjdmYjYwYjY2MGRjNDEhttp://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjY3NjdmYjYwYjY2MGRjNDE
  • 8/13/2019 Cost of Building a House

    31/123

    Particular Plot Cost Year

    The costof working

    drawing

    and seal

    from

    registered

    architect

    30x40 4-5K 2012

    FAQ - BBMPAutomatic Plan approval - Automatic Plan

    Sanction.pdf

    The cost of working drawing and seal from

    registered architect may range from 4-5K for a

    30 x40 plot. 5-6K for a 60x40 plot as of 2012.

    Find a registered architect who will draw up a

    plan which meets the bye laws and get it

    approved. Again this is a 15-30 day process

    officially. Without bribe the engineer who

    approves your plan might ask you to make

    some modifications, show him your site for

    inspection.

    Read the bye laws so that you are aware of

    what they are talking about.

    You can download the zoking rules for Bangalore -

    Zoning_Regulations_RMP2015.pdf

    Read my experiences with an RTI -

    https://sites.google.com/site/arjunwebworld/Home/blogs/

    i-su ort-corru tion

    Stage 6: Get your building

    plan approved.

    To get an idea of what additional documents

    you need to submit you can look at

    http://bbmp.gov.in/the BBMP site which will

    provide more information. If you think something

    is not clear look it up in the GSC site as well -

    http://sakala.kar.nic.in/kgsc1/and call the

    helpline (During govt working hours/day). Makesure the photo copies are readable.

    https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0
  • 8/13/2019 Cost of Building a House

    32/123

    The cost

    of working

    drawing

    and seal

    from

    registered

    architect

    60x40 5-6K 2012

    Bribe for

    plan

    approval

    30x40 10-15K 2012

    Bribe for

    plan

    approval

    60x40 15-20K 2012

    Admin

    charges +

    Taxes

    If plan not to bribe then make sure your plan ismeeting the norms set by 2015 master plan and

    there are no violations, else you will pay a hefty

    fine or the engineer can stop construction if you

    are violating the norms. The building plans are

    valid upto 2 years after which they need to be

    renewed.

    Couple of things that need to be added to the

    above agreement.

    1. Mentioning through lintel.

    2. Contractor to be responsible for taking the

    right permission for erection of construction

    shed and material storage at construction site.

    Contractor will make sure that road safety is

    not compromised due to materials stored at

    the site. Necessary precautions will be taken

    by contractor to avoid any road accidents.

    3. Mention brand of steel to be used.

    4. Provisioning of attic.

    Also make sure the approved plan is as close tothe construction plan as possible this will make

    sure you dont pay too much tax. The more built

    up area you show on the approved plan the

    more tax you will end up paying.

    Download the House Construction Estimate

    Download the Contractor & Owner Agreement

    https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjZiNjkzY2QwMjY4OTFhZDQhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjI1MjBlOWQ3N2U5NzBiM2Mhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjI1MjBlOWQ3N2U5NzBiM2Mhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjZiNjkzY2QwMjY4OTFhZDQ
  • 8/13/2019 Cost of Building a House

    33/123

    Deviations during Construction

    Plan approval

    I believe 90% of the plan approval process

    involves some sort of bribe as no one adheresto the bye laws. There is atleast some degree of

    violation in the approved plan vs the actual plan.

    Knowing this the BBMP engineers are very

    much aware of the fact that they have the upper

    hand here since everyone violates to some

    extent. I filed an RTI for some delayed

    documentation which really got the engineer

    pissed at me and he started to threaten me by

    saying he will give me notice if there is a

    deviation in construction. Then i understood that

    since these engineers are never challenged by

    anyone they have grown accustomed to power

    and can easily threaten people. So I

    investigated further and found out what a

    deviation means.

    BBMP bye law says:

    If you are building a house yourself it becomes

    very important that you understand the laws. Lot

    of times govt officials end up asking for a bribe

    and threaten you of a violation and the

    consequences. Knowing the violation and the

    consequence before hand will keep you aware

    of the situations.

    Khata Transfer

    This should be fairly simple. If you dont have

    previous tax records or missing some document

    then there is a option that things will move

    slowly.

    The Automatic building plan scrutiny system for

    approval of building plans is having some

    technical issues and as of 2012 some BBMP

    accept plan submission only online where as

    some take a physical copy. Your architect will

    provide 10 ammonia prints with the house plan.

    This will be verified by the AEE (AssistantExecutive Engineer) in BBMP office and within

    15 days they will let you know the DD amount

    that needs to be submitted towards road

    cutting.

  • 8/13/2019 Cost of Building a House

    34/123

    Assuming this if one has left no setback on one

    side his violation would be 1/4 of 25%.

    On consulting a lawyer the following was his

    opinion.

    1. Setback - 25%

    2. Coverage - 25%

    3. FAR - 25%

    4. Height - 25%

    i) Wherever any construction is in

    violation/deviation of the sanctioned plan, the

    Commissioner may, if he considers that the

    violations / deviations are within 5% of (1) theset

    back to be provided around the building, (2) plot

    coverage (3) floor area ratio and (4)height of the

    building and that the demolition under chapterXV of the Act is not feasible without affecting

    structural stability, he may regularise such

    violations/deviations after recording detailed

    reasons for the same.ii) Violation/deviation as at

    6.0 (i) above may be regularised only after

    sanctioning the modified plan recording thereon

    the violations/deviations and after the levy of fee

    prescribed by the Corporation from time to

    time.iii) Regularisation of violations / deviations

    under this provision are not applicable to the

    buildings which are constructed without

    obtaining any sanctioned plan whatsoever andalso the violations / deviations which are made

    inspite of the same being specifically deleted or

    rejected in the sanctioned plan.

    So the question is how is this 5% derived?

    If one doesnt leave any setback on one side

    would that be 100% violation or 25% violation? If

    one doesnt leave any setback on any side then

    is that a 400% violation or a 100%? If one

    leaves right setback on all side but his FAR ratio

    exceeds norm then is it a 100% violation?

    Based on my understanding 25% is allotted to

    each violation.

  • 8/13/2019 Cost of Building a House

    35/123

    Stage 7: Market survey

    2. Submit annexure after plint level is complete.

    Usually the engineer will have some or the other

    reason why commencement certificate cant be

    provided. The fine for starting construction

    without obtaining commencement certificate is

    100 Rs.

    Commencement Certificate

    All approved plans come with certain

    instructions, one of which says - "Laying of

    Foundation Concrete & Columns ShouldCommence Only After Obtaining

    Commencement Certificate From Bruhat

    Bangalore Mahanagara Palike After Inspection

    from AEE". Now this ideally makes sense for big

    constructions and apartment complexes. For

    small residential buildings the trend has been

    that no one follows this rule. There are 2

    processes that need to be followed if you want

    to get the commencement certificate.

    1. Submit annexure before laying foundation

    columns.

    Ask BBMP people to accept for fine after

    issuance of notice.If they are not prepared

    accept to receive fine. You have every right to

    prefer e appeal against the said notice before

    Karnataka appellate tribunal for quashing of the

    said notice.If you decide to prefer appeal: Points

    which you have to bear it your mind are that thecourt process will take time, as an advantage

    you can seek an order of stay from demolishing

    any violated portion till the disposal of such

    appeal by BBMP officials.Try to settle amicably

    and keep judicial excise as last option.

  • 8/13/2019 Cost of Building a House

    36/123

    Particular

    Cost Year

    RMC

    (Ready

    made

    concrete) -

    3000 per

    cubic

    meter

    53 grade -

    340

    43 grade -

    320

    Tata - 51K

    / ton

    Primegold - 55 /

    ton

    20 mm

    jelly - 23 /

    cft

    40 mm

    jelly 18 /

    cft

    Cement

    Gravel

    9. What is current cost for steel, cement,

    gravel, labour etc.

    Here is quick table on cost of materials

    2012

    3. What type of wardrobes and cost of sq ft.

    4. What type of windows and cost of sq ft.

    5. What type of doors and cost of sq ft.

    6. What type of sanitary and cost of individualitems like EWC, sinks, shower heads.

    7. What type of paint? Exterior & Interior.

    What will be the cost associated

    8. What type of electrical items?

    Find out what the price of materials are, what

    type of flooring you require, what is the going

    rate for square ft of construction. This you can

    either talk to people who have built a house or

    by talking to vendors and getting estimates.You

    need to do this before stage 8 because you

    need to be aware of what the current trend incost estimation is. This keeps changing year on

    year based on market rates. Here is a checklist

    of things you need to enquire.

    1. Cost of construction for sq ft in your area.

    2. What type of flooring you want. What will it

    cost you in sq ft.

    2012

    Steel 2012

  • 8/13/2019 Cost of Building a House

    37/123

    12 mm

    jelly 17 /

    cft

    1 truck -

    540 cft.

    Fenestaupvc white

    sliding -

    500 / sq ft

    Fenesta

    upvc white

    casement

    600-700 /

    sq ft

    Localmade

    upvc white

    sliding -

    350 / sq ft

    Local

    made

    upvc

    casement

    sliding -

    450-500

    sq/ft

    Grill

    12mm

    thick - 150

    /sq ft

    Aluminium

    - 250 / sq

    ft.

    Steel

    fabricated

    with grill -

    150-200

    /sq ftHonne

    Wood with

    sal frame

    with grill -

    600 /sq ft.

    2012Wood

  • 8/13/2019 Cost of Building a House

    38/123

    Vitrified

    2'x2' (600

    mm x 600

    mm) - 150

    / sq ft.

    VitrifiedGranite -

    Low end

    black

    texture -

    150 / sq ft.

    Granite -

    High end

    white

    texture -

    250 / sq ft.

    Anti skid

    tiles - 1'x1'

    - 60 / sq

    ft.

    Wall tiles -

    60-70 /sq

    ft

    Wall

    cladding -

    70-90 /sq

    ft

    Aashirvad

    Supreme

    pvc -

    25K - 600

    cft

    (65K

    during

    strikes)

    10 Rs /

    stone

    1 truck -

    850, 950

    stonesBrick 6 Rs /

    Brick

    2012

    Flush

    Doors

    150 - 200

    / Sq ft

    2012

    Stone 2012

    2012

    Sand 2012

    Tiles 2012

    Plumbing

  • 8/13/2019 Cost of Building a House

    39/123

    Cost Range Year

    1200 -

    1400Rs /

    sq ft

    Economy 2012

    1500 -

    1600 Rs /

    sq ft

    Mid

    Range

    2012

    1700Rs -

    2000 / sq

    ft

    High End 2012

    Economy

    Midrange High End

    Flooring Vitrif ied 70

    Rs / Sq ft

    Vitrified 100-

    150 Rs / Sq ft

    Granite

    250 Rs /

    Sq ft

    Switches Cona Anchor Roma Anchor

    Ave

    InteriorPaint

    Exterior

    Paint

    Wardrobe

    s

    1. Lump sum - You release money once

    various stages are completed.

    2. Labour only - You buy the materials and

    hire only the labour from the contractor.

    3. tCost - You pay for labour and material

    accurately. Then you pay additional for the

    services of the contractor.

    Make sure the agreement between you and the

    contractor is as crystal clear as possible to the

    minute detail. This will help avoiding cost

    deviations.

    Stage 8: Find a contractor &

    work out an agreement

    After stage 7 you are aware of the market

    situation and its time to find a contractor. Find

    out a good contractor who you can trust withyour money. See his past work, talk to his

    customers and get a quotation. There are 3

    types of contract you can work out with your

    contractor

  • 8/13/2019 Cost of Building a House

    40/123

    Kitchen Simple

    cabinets

    with

    Andhra

    Slabs

    Modular

    kitchen in

    plywood

    Italian

    Kitchen.

    Box type

    Contemporary.

    Sloped Roof

    Tiled Roof

    Doors Steel

    fabricated

    Honne and

    sal wood

    frames or

    flush doors

    Teak

    wood.

    Windows Steel

    fabricated

    Honne and

    sal wood

    frames,

    UPVC sliding

    UPVC

    casement,

    Teak

    Wood.

    16. Rain water harvesting unit

    17. Kitchen chimney

    18. Water pump

    You need to negotiate to some extend, so here

    your market survey is going to be handy. Dontreduce the price too much from market rate this

    will force the contractor to use sub-standard

    materials. There is always a profit margin which

    he will make, so keep that in mind, if you eat

    away his profit margin he will try to balance it out

    with sub-strandard materials.

    10. Gate.

    11. Compound wall.

    12. Flagging concrete.

    13. Drain stone.

    14. Security grills

    15. Anti termite treatment.

    4. Road cutting charges.

    5. Temporary electricity connection.

    6. Borewell.

    7. Geysers for bathrooms.

    8. Solar unit.

    9. Sump tank.

    This cost per sq ft doesnt include.

    1. Drawing and architect plan.

    2. Bribes.

    3. Costs like plan approval.

    Exterior

    Look

    Box type Granite

    claddingon

    exteriors.

  • 8/13/2019 Cost of Building a House

    41/123

    If you need a loan then look up a good bank and

    apply for a home loan. Check their history as to

    how happy their existing home loan customers

    are? The shorter the term less interest you pay.

    Dont look for a low EMI, look for a low interestrate. If the EMI is small you will end up paying

    towards the loan for a longer duration thus

    increasing the interest amount that you paid

    towards your home loan.

    Some banks force you to take a insurance

    policy to cover your home loan. This is not

    mandatory but usually advised.

    9. Does he think at your level? Simple test

    here is to ask how much would be the basic

    cost of a sink he will put according to his

    estimate? Assuming that as baseline assume

    that the rough estimate he gave will have

    materials costs in that range. If he is thinking

    3K sink and you are thinking of 5K sink then

    you know that the estimate he has given you

    is at lower end.

    Stage 9: Apply for loan

    3. Any other construction work he is doing in

    parallel? Will he be too occupied with the

    other construction. Will he share workforce

    between construction.

    4. How much deviation does he expect

    considering the prices

    5. How much aware is he about the current

    market prices

    6. Does he get aggressive when things dontwork out.

    7. How soon will be get the work done.

    8. Does he look at the site and actual plan to

    provide an accurate estimate?

    Take quotations from multiple contractors and

    compare the pros & cons. 90% of the decision is

    based on trust, but keep a legal agreement in

    hand as well.

    Check list of questions for contractor selection.

    1. Previous work done?

    2. References?

  • 8/13/2019 Cost of Building a House

    42/123

    1. Eligibility for home loan?

    2. What is the interest rate?

    3. What is the base rate?

    4. Is it fixed or floating and for what duration.

    How will the revised interest rates be

    calculated.

    5. Documents required?

    Use the following link to calculate your home loan ratio:

    http://www.bankbazaar.com/finance-tools/emi-

    calculator.html

    Question to ask the home loan officer / bank

    manager wrt to home loans

    1. Look for smaller tenure and not lower EMI.

    The lower the EMI the more money you pay the

    bank.

    2. If you cant get a lower tenure then try to

    reduce your principal by doing prepayments

    periodically when you have bulk cash in hand so

    that the interest component is low. Check with

    the bank if you can do pre-payment any time

    and there is no penalty against it.

    For a home loan of 30 lakhs at the interest rate

    of 10.5% and a tenure of 5 years you will end up

    paying 77% towards principal deduction & 22%

    towards interest deduction. The EMI will come

    up to 65K / month.

    Its advisable to keep the ratio at 70:30 and not

    go below. 70% - principal, 30% interest.

    Key points to remember:

    The processing fees also varies from bank to

    bank. Some banks charge 0.5% of the loan

    amount as processing fee, some bank charge a

    fixed amount of 10K. This money is not

    refundable if you dont get you home loan

    approved so think carefully before applying.Make sure you have all the documents the bank

    has asked for before applying. Look out for loan

    mela where a discount is provided.

    http://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.html
  • 8/13/2019 Cost of Building a House

    43/123

    1. Legal valuation charges - 1500 Rs.

    2. Legal charges - 1500 Rs.3. Processing fee.

    Home Loan Disbursement.

    18. Estimate of construction signed by

    registered architect.

    19. Employment appointment letters and

    experience/relieve letters for past 5 years.

    20. Photographs.

    Additional charges.

    12. Property tax paid receipts.

    13. Khata Certificate

    14. Khata extract

    15. Latest Encumbrance certificate.16. Past 13 year Encumbrance certificate.

    17. BBMP approved building plan.

    6. Pan card

    7. Passport copy

    8. Address proof - Company HR letter will do.

    9. Employment letter

    10. Salary slip for last 3 months signed by

    employer

    11. Form16 & IT returns for last 2 years.

    1. Title deed.

    2. Sale deed.

    3. Gift deed

    4. Past 6 month bank statements

    5. Company id card

    BPLR / RPLR vs Base Rate

    http://www.nitinbhatia.in/home-loan/floating-home-loan-

    bplr-vs-base-rate/

    Document check list.

    6. Guarantor required and his eligibility?

    7. How long does it take to release the loan?

    8. Insurance or add-on packages that might

    come with the loan.

    9. Pre-closure penalty.

    10. Any accident insurance covering fire,

    earthquake etc.11. Daily reducing balance interest.

    http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/
  • 8/13/2019 Cost of Building a House

    44/123

    ACC Home Construction guide - ACC-Dream-House.pdf

    TATA Home Construction guide - TATA House

    Construction Guide.pdf

    Stage 10: Start

    construction

    Seismic Design Philosophy - Seismic Design

    Philosophy.pdf

    Usually the banks ask for a letter from the

    contractor and then an engineer appointed by

    the bank visits the site and after 10-12 days the

    bank release the loan in stages. SBI Bank

    however asks home loan customers to produce

    bills for 50% of the loan allotted. This means

    you will end up paying 14% VAT on all materialspurchased. As per them this is an RBI guideline

    that they follow. No other bank usually asks for

    bills of material purchase to be produced.

    Knowing this before you opt of the loan is very

    important. If its a turn-key project then

    producing material purchase bills for 50% of

    loan may be difficult, then you can speak to the

    branch manager and ask for an exception in

    your case by providing the agreement between

    you and the contractor.

    http://www.jagoinvestor.com/2012/05/best-bank-home-

    loan-india.html

    https://sites.google.com/site/arjunwebworld/files/ACC-Dream-House.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0http://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttp://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttp://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttp://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttps://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/ACC-Dream-House.pdf?attredirects=0
  • 8/13/2019 Cost of Building a House

    45/123

  • 8/13/2019 Cost of Building a House

    46/123

  • 8/13/2019 Cost of Building a House

    47/123

  • 8/13/2019 Cost of Building a House

    48/123

    https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/vastu_residence.jpg?attredirects=0
  • 8/13/2019 Cost of Building a House

    49/123

    the room dimension is bigger than 15x15 then its ideal to go in for a

    m ceiling looks cleaner and the room looks longer. The other option

    am which has extra steel rods and thus is slimmer, but a concealed

    are has to be taken as to not to bring heavy load on it.

    rivacy in the house when people visit you then you need to separate

    en you get a bigger area which is combined of living and dining.

    erial car parking makes it difficult to take 2 cars in and out. It can be

    Stilt parking based houses loose the looks aspects. Efficient in

  • 8/13/2019 Cost of Building a House

    50/123

    ecurity is a big concern in Bangalore. So anyone with a teak dooreak doors provide good looks provided they are maintained and no

    with wood finish (powder coating) will be equally good. Safety doors

    ks. Although there are not many buyers for steel doors making the

    the north. 90% will end up putting a teak door as the main door.

    reflects more light, brightness up the room. Granite is expensive,

    des of white are difficult, grains without any fault line are also difficult

    ctive but vitrified has the tendency to chip off. Granite can be

    m - 3 mm of the granite surface each time. This means that if you

    imes in the life time. Vitrified can be polished using a process called

    e gloss, this wont remove the surface layer but this approach is still

    . Granite tends to get cracks at the time of laying, so make sure youany faulty slabs. Vitrified has the tendency of chipping and cracking

    g is not done correctly the tile will sit on hollow floor which will

    ore buying. The print on vitrified tiles are deep upto 1-2 mm. So

    . Looks ood in the first few ears. Granite floorin is cold durin

    hough modular kitchens are nice and look glamorous they are hard

    ssible and a place for roaches if not maintained properly. The metal

    d if not maintained in modular kitchen. Modular kitchens are easy to

    oth and fluid than the ones done by a carpenter. Modular kitchens

    slabs with the single hinge doors it will be more easy to maintain

    ter to get good hinges and good veneer sheets.

  • 8/13/2019 Cost of Building a House

    51/123

    l is used in high rise buildings and bridges has more strength, for

    . FE500D is more ductile than the FE500 used in the high seismic

    ISI marked. Fe 500X is a new type which promises more strength.

  • 8/13/2019 Cost of Building a House

    52/123

    ouses the shower area is sunk by 6". This helps demarcate the wet

    oom is small then doing this will make the bathroom look smaller.

    rds the drain will make the bathroom look bigger. It pays if you have

    s in the same line. That way the pipes can be shared and the roof

    ll be in level with the first floor flooring. They sink the roof by 6" to

    first floor bathroom doesn't get elevated.

    n terms of aesthetics as compared to hex rods ,there can be various

    break into. If someone breaks the glass and unscrews the grill from

    hard to break through as they run throughout the frame. Spacing of

    gap and since the rods are thicks they are hard to bend.

    or a lintel is to support the weight of the bricks on top and make sure

    dont need a through lintel if interlocking is done at plint level. For

    gh lintel is that it wont allow the columns to twist. The cost difference

    en most houses in Bangalore go with a through lintel. The weight is

    h have longer windows are suitable for through lintel. Through lintel

    house later on. You can move doors and windows easily if the lintels

    ough lintels. Make sure the alignment of columns doesnt deviate, inroof, in through lintels they raise till lintel level so extra care needs to

    e the columns dont shift from centre line.

  • 8/13/2019 Cost of Building a House

    53/123

    C columns ideally 53 Grade cement is used as it provides higher

    stage. 43 grade cement is used for brick work, PPC is mix of fly ash

    ent and requires less water to set and less cracks are seen. PPC

    are used for inside wall plastering.

    iral staircase look grand but keep in mind that the space under it is

    t can be used as cabinets. Steps should raise between 6" and 7" for

    kles. A single step should be at-least 10" wide (tread) to give enough

    ranite for steps as it will give a rough surface.

  • 8/13/2019 Cost of Building a House

    54/123

  • 8/13/2019 Cost of Building a House

    55/123

  • 8/13/2019 Cost of Building a House

    56/123

  • 8/13/2019 Cost of Building a House

    57/123

  • 8/13/2019 Cost of Building a House

    58/123

  • 8/13/2019 Cost of Building a House

    59/123

  • 8/13/2019 Cost of Building a House

    60/123

  • 8/13/2019 Cost of Building a House

    61/123

  • 8/13/2019 Cost of Building a House

    62/123

  • 8/13/2019 Cost of Building a House

    63/123

  • 8/13/2019 Cost of Building a House

    64/123

  • 8/13/2019 Cost of Building a House

    65/123

  • 8/13/2019 Cost of Building a House

    66/123

  • 8/13/2019 Cost of Building a House

    67/123

  • 8/13/2019 Cost of Building a House

    68/123

    https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0
  • 8/13/2019 Cost of Building a House

    69/123

    https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0
  • 8/13/2019 Cost of Building a House

    70/123

  • 8/13/2019 Cost of Building a House

    71/123

  • 8/13/2019 Cost of Building a House

    72/123

  • 8/13/2019 Cost of Building a House

    73/123

  • 8/13/2019 Cost of Building a House

    74/123

  • 8/13/2019 Cost of Building a House

    75/123

  • 8/13/2019 Cost of Building a House

    76/123

  • 8/13/2019 Cost of Building a House

    77/123

  • 8/13/2019 Cost of Building a House

    78/123

  • 8/13/2019 Cost of Building a House

    79/123

  • 8/13/2019 Cost of Building a House

    80/123

  • 8/13/2019 Cost of Building a House

    81/123

  • 8/13/2019 Cost of Building a House

    82/123

  • 8/13/2019 Cost of Building a House

    83/123

  • 8/13/2019 Cost of Building a House

    84/123

  • 8/13/2019 Cost of Building a House

    85/123

  • 8/13/2019 Cost of Building a House

    86/123

  • 8/13/2019 Cost of Building a House

    87/123

  • 8/13/2019 Cost of Building a House

    88/123

  • 8/13/2019 Cost of Building a House

    89/123

  • 8/13/2019 Cost of Building a House

    90/123

  • 8/13/2019 Cost of Building a House

    91/123

  • 8/13/2019 Cost of Building a House

    92/123

  • 8/13/2019 Cost of Building a House

    93/123

  • 8/13/2019 Cost of Building a House

    94/123

    https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0
  • 8/13/2019 Cost of Building a House

    95/123

    https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0
  • 8/13/2019 Cost of Building a House

    96/123

    Date 31-Jan-13

    Project

    Clients

    Architects

    Subject : Electrical Work - Internal BOQ

    Internal Electrification of Apartments

    Internal work : Li htin & Power circuits

    from distribution board to load voice data &

    telephone cable from comm. box to respective

    fixture.

    Note:- All materials and workman ship shallbe to standards / consultants' approval and shall

    comply with EB rules & Electrical Inspectorate.

    All Civil work re uired for the electrical work such

    as chipping of walls, floor, etc and rough plastering

    with chicken mesh shall be deemed included.

    A 2 BHK Home

    Sl. No Description Unit Qty. Rate Am

    1 Distribution Boards

    S I T & C of surface mounting / flush mounting

    9kA TPN MCB distribution boards (MCB DB). The

    DB shall be made out of 1.2mm CRCA sheet steel

    enclosure and powder coated complete with,

    100A copper bus, neutral & earth bus, cable gland

    plate with knockout at the top and bottom. The

    busbar shall be tinned co er Insulated fork t e

    for hases Inde endent neutral bus for each

    phase including interconnecting wiring and earth

    bus on insulatation mount. The DB shall be IP 43,

    along with 4" high wire way box both on top and

    bottom, the width and depth shall match with

    DB

    1.1 2Row of 13 Module Flexy DB similar to Legrand type

    607746 with metal door, 32A DP RCBO

    30mA SI Series ,as incomer and 14nos. 5/16A SP MCB

    as outgoings.

    Supply Nos. 1 4000 40

    Installation Nos. 1 400 4

    2 Sub Mains / Circuit Mains :

    Supply and carrying out sub/ circuit mains using

    2mm thick PVC conduit and its access- ories like

    pvc bends,junction boxes, deep M.S junction

    boxes, GI cleat and saddles etc., 660/ 1100V

    grade FRLS flexible copper wires and wir ing

    accessories. Termination of wires on either ends

    shall be by providing copper lugs. The wiring shall

    be surface / concealed type.

    The rate shall include grooving of walls, floors

    chipping, rough plastering, providing MS brackets

    for conduit suspension. Sub mains shall be

    measured from meter board to DB.

    Circuit mains shall be measured from DB to switch

    board and looping from switch board to switch

    board

  • 8/13/2019 Cost of Building a House

    97/123

    Sl. No Description Unit Qty. Rate Am

    2.1 Sub Mains :

    2.1.1 2x6+1x2.5sqmm in 1 runs of 32mm conduit. M 30 160.00 48

    2.2 Circuit Mains :

    2.2.1 2 x 2.5 + 1 x 1.5 s mm in 19 mm dia

    - for lt . Circuit mains M 90 65 58

    2.2.2 2 x 4.0 + 1 x 2.5 sqmm in 19 mm dia

    - for power Circuit mains M 125 110 13

    3 Point Wiring

    Wiring for Light & fan point and socket outlets by

    using 2mm rigid PVC conduit / casing - capping

    with MS unction box and PVC accessories 2 x

    1.5 + 1 x 1.5s mm PVC insulated co er flexible

    wires, 5A modular switch, socket, GI box, wiring

    accessories and carrying out surface/ concealed

    point wiring. Conduit drop to switch box shall be

    minimum 25mm conduit. Wiring shall NOT be paid

    on RM basis. All oints shall be earthed with 1.5s mm PVC insulated co er wire. Points shall be

    terminated into fitting, holder, ceiling rose,

    socket, 5A connector; wire ends shall not be left

    bare.

    3.1 1 light point controlled by a 6A SP switch Nos. 10 500 50

    3.5 1 Chandelier light points controlled by a 5A switch

    and 650W 2 module electronic dimmer. Rate shall

    include Two no. chandelier box. Nos. 1 750 7

    3.7 1 light point controlled by 2 - 2way switch

    (b/rooms) Nos. 2 650 13

    3.8 Exhaust fan point with ceiling rose, controlledby 5A socket near the fan and a switch, Nos. 3 550 16

    3.9 Ceiling fan point controlled by a 5A switch, fan

    hook box and 100W, 2 module fan step

    regulator. Nos. 4 850 34

    3.1 Call bell oint with 6A 2 module bell ush and

    connector Nos. 1 475 4

  • 8/13/2019 Cost of Building a House

    98/123

    Sl. No Description Unit Qty. Rate Am

    3.12 5A 3pin socket with 5A SP switch on lighting

    circuit:

    -dependant point Nos. 5 450 2

    3.13 5A 3pin socket with 5A SP switch on lighting

    circuit: For Ironing

    Independant point Nos. 1 450 4

    4 Power Points

    Supply and installation of modular type switch

    socket MCB in GI MS enclosure with cover

    late blanks etc com lete.

    4.2 2Nos. 6A 3 pin socket with 6A SP Switch ( 2 TV & 1

    and Computer) Nos. 3 450 1

    4.4 6A 3 pin socket with 6A SP Switch for (mixi &

    AG,) Nos. 2 285 5

    4.5 6/16A 6 pin sockets with 16A SP Switch in

    separate box at independent location ( Fridge ) Nos. 1 500 5

    4.6 16A 3 pin socket and 16A DP switch with

    indicator in separate enclosures. (for GP)inde endent location Sets 1 600 6

    4.7 20A 3 pin weatherproof Metal Clad socket with 25A

    DP Modular Switch mounted seperately (for AC). No. 1 1250 1

    4.8 1no. 6/16A 6pin socket with 16A SP switch in

    single box.(M/O & WM) No. 2 500 1

    4.10 Shaver Sockets Nos 2 850 1

    5 Telephone System

    Providing and fixing Telephone cable and modular

    RJ 11 Tel. outlets with box.

    5.1 RJ 11 ( 2 wire) Telephone outlet in Box. Nos. 1 155 1

    5.2 3 pair Tel. Wire 0.5 mm dia. Copper, PVC / PVC

    tel wire in existing conduit (from Shaft ) M 45 25 1

  • 8/13/2019 Cost of Building a House

    99/123

    Sl. No Description Unit Qty. Rate

    6 Television S stem

    Providing and fixing modular co-axial TV outlets

    with box.

    6.1 Co axial TV outlets in Box. Nos. 2 175

    6.2 RG 11 / co-axial cable as per TV vendor in existing32mm PVC conduit.from shat to inside the flat M 60 50

    7 Computer System

    Providing and fixing modular cp outlets with box.

    7.1 Only laying of computer cable in existing 19mm M 45 6

    Conduit.

    7.2 RJ 45 (4 wire) data outlet in Box. Nos. 1 185

    8 Miscellaneous Items

    Empty Conduits

    Providing & laying of empty 2mm thick PVCconduits with MS junction boxes and other PVC

    accessories, 16G GI fish wire. (for TV and Data

    system)

    8.1 19mm dia PVC conduit.

    (for Tel systems) M 45 30

    8.2 32mm dia PVC conduit.

    (for TV & Data systems) M 60 50

    8.4 Wire pull box 200 x 150 x 150mm. With dummy

    plate Nos. 1 350

    9.1 CCTV (with 2 cameras connected to one Monitor with NightVision faciltiy) including power supply for CCTV on inverter

    Set 1 25000

    9.2 Inverter (600VA) with 1 Hour Battery back up Set 1 15000

    9.3 Video Door phone

    2 (7" color) monitors + 1 camera Set RO 18000

    Conduiting for Solar Lighting

    Fridge shall be in separate circuit

    Total

  • 8/13/2019 Cost of Building a House

    100/123

    Qty Total Load in kW

    A Lighting Load

    1

    Wall and ceiling lights 40 15 0.6

    2 2' FTL Ltg 20 1 0.02

    2 Mirror lights 20

    3 Chandlier Lights 200 1 0.2

    4 Study Light 15 1 0.015

    18 0.835

    B Raw Power1 Ceiling Fan Type A 75 4 0.3

    2

    Ceiling Fan in Kitchen

    Type - B

    60

    3 Exhaust Fan 60 3 0.18

    7 0.48

    C Kitchen Load

    1 Aqua Gauard 75 1 0.075

    2 Mixer 300 1 0.3

    3 M Oven 1250 1 1.25

    4 Chimney 60

    5 Fridge 400 1 0.4

    4 2.025

    D Washing Machine 1200 1 1.2

    E Geyser Point 1500 2 2

    F AC load 1750 1 1.75

    Total Load in kW 4 8.3

    2 BHKSL No. Description Load in watts

  • 8/13/2019 Cost of Building a House

    101/123

    DATE:

    PROJECT:

    SUBJECT:

    ARCHITECH:

    CONSULTANT :

    WALL LIGHT 4' FTL

    1 Foyer 3 --

    2 Living / DINING -- 23 Kitchen 1 1

    4 Master Bed room 3 --

    5 Toilet--(Master) -- --

    6 Bed room--1 3 --

    7 Toilet--1 -- --

    8 Passage -- --

    9 Utility -- --

    Total 10 3

    1 Lt.pt controlled

    by 10A SP

    switch

    2 Lt.pt controlled by 10A SP

    switch

    Living room

    & Dining room 3 -

    Foyer kitchen / Utility 6 -

    Bed room / Toilet 4 -

    Master bed room / Toilet 4 -

    TOTAL POINTS 17 0

    5A Socket depende 5A Soc independent

    Kitchen Fridge - FR

    SL. NO. DESCRIPTION

    16th JUN 2011

  • 8/13/2019 Cost of Building a House

    102/123

    Chimney - CH

    Mixi

    Aqua guard-AG

    Toilet Shaver

    Utility Ironing

    Master Bed room able lamp /Telephon TV

    Table lamp/PC

    Bed room 2 able lamp /Telephon Table lamp

    Living room Telephone TV

    Table lamp

    Charger

    Dining room Charger

  • 8/13/2019 Cost of Building a House

    103/123

    CEILING LTG BULK HEAD MIRROR FTL FAN EX. FAN 5A PT.

    1 -- -- -- -- 1

    -- -- -- 2 -- 2-- -- -- -- -- 5

    -- -- -- 1 -- 2

    1 -- 1 -- 1 1

    -- -- -- 1 -- 1

    1 -- 1 -- 1 1

    1 -- -- -- -- --

    -- 1 -- -- -- --

    4 1 2 4 2 13

    1 Lt.pt controlled

    by 2 way switch

    Dependent

    point

    Independent

    point

    15A socket 5/15A socket Ceiling fan

    - 1 2 - - 2

    - - 5 1 1 -

    1 1 1 - - 1

    1 3 1 - - 1

    2 5 9 1 1 4

    5/15A socket 15A Socket

    Micro oven - M/O

  • 8/13/2019 Cost of Building a House

    104/123

    Instant gyser- IG

    Gyser

    Washing machine

  • 8/13/2019 Cost of Building a House

    105/123

    2 NO'S 5A

    PT.TV PT. TEL. DATA CHAND. LTG 15A PT. 15A CH,DS

    -- -- -- -- -- -- --

    1 1 1 -- 1 -- ---- -- -- -- -- 2 --

    1 1 1 -- -- -- --

    -- -- -- -- -- -- --

    -- -- 1 -- -- -- --

    -- -- -- -- -- -- --

    -- -- -- -- -- -- --

    -- -- -- -- -- 1 --

    2 2 3 0 1 3 0

    exe.fan TV tele Geyser CALLBL AC

    - 1 1 - 1 1

    1 - 1 - -

    1 - 1 1 - -

    1 1 1 1 - 1

    3 2 3 3 1 2

  • 8/13/2019 Cost of Building a House

    106/123

  • 8/13/2019 Cost of Building a House

    107/123

    15A GP AC PT.

    -- --

    -- 1-- --

    -- 1

    1 --

    -- --

    1 --

    -- --

    -- --

    2 2

  • 8/13/2019 Cost of Building a House

    108/123

    Labour Break up

    No Type Cost

    1 Mason 500 Rs / Day2 Mason Helper 250 Rs / Day

    3 Electrician 500 Rs / Day

    4 Carpenter

    5 Painter

    6 Plumber

    7 Flooring

    No Type Cost

    1 Gang saw slab 20-25 Rs / Sft

    2 Smaller slabs 15-20 Rs / Sft

    3 Wall tiles 15 Rs / Sft.

    4 Skirting 40-45 Rs / Sft.

    5 Nosing 55-60 Rs / Sft.

    Part icu lar Cos t Year

    RMC (Ready madeconcrete) - 3000 per

    cubic meter

    53 grade - 340

    43 grade - 320

    Tata - 51K / ton

    Prime gold - 55 / ton

    20 mm jelly - 23 / cft

    40 mm jelly 18 / cft

    12 mm jelly 17 / cft

    1 truck - 540 cft.Fenesta upvc white

    sliding - 500 / sq ft

    Fenesta upvc white

    casement - 600-700 /

    sq ft

    Local made upvc

    white sliding - 350 / sq

    ft

    Steel 2012

    Gravel 2012

    Wood 2012

    Cement 2012

  • 8/13/2019 Cost of Building a House

    109/123

    Local made upvc

    casement sliding -

    450-500 sq/ft

    Grill 12mm thick - 150

    /sq ft

    Aluminium - 250 / sq

    ft.Steel fabricated with

    grill - 150-200 /sq ft

    Honne Wood with sal

    frame with grill - 600

    /sq ft.

    Vitrified 2'x2' (600

    mm x 600 mm) - 150

    / sq ft.

    Vitrified

    Granite - Low end

    black texture - 150 /

    sq ft.Granite - High end

    white texture - 250 /

    sq ft.

    Anti skid tiles - 1'x1' -

    60 / sq ft.

    Wall tiles - 60-70 /sq

    ft

    Wall cladding - 70-90

    /sq ft

    Aashirvad -

    Supreme pvc -

    25K - 600 cft

    (65K during strikes)

    10 Rs / stone

    1 truck - 850, 950

    stones

    Brick 6 Rs / Brick 2012

    Flush Doors 150 - 200 / Sq ft 2012

    Economy Mid range High End

    Flooring Vitrif ied 70 Rs / Sq ft Vitrified 100-150 Rs / Sq

    ft

    Granite 250 Rs

    / Sq ft

    Switches Cona Anchor Roma Anchor Ave

    Interior Paint

    Exterior Paint

    Wardrobes

    Kitchen Simple cabinets with

    Andhra Slabs

    Modular kitchen in

    plywood

    Italian Kitchen.

    Stone 2012

    Tiles 2012

    Plumbing 2012

    Sand 2012

  • 8/13/2019 Cost of Building a House

    110/123

    Box type Contemporary.

    Sloped Roof

    Tiled Roof

    Doors Steel fabricated Honne and sal wood

    frames or flush doors

    Teak wood.

    Windows Steel fabricated Honne and sal woodframes, UPVC sliding

    UPVCcasement,

    Teak Wood.

    10. Gate.

    11. Compound wall.

    12. Flagging concrete.

    13. Drain stone.

    18. Water pump

    14. Security grills

    15. Anti termite treatment.

    16. Rain water harvesting unit

    17. Kitchen chimney

    1. Drawing and architect plan.

    6. Borewell.9. Sump tank.

    2. Bribes.

    3. Costs like plan approval.

    4. Road cutting charges.

    5. Temporary electricity connection.

    Exterior Look Box type Granite

    cladding on

    exteriors.

    This cost per sq ft doesnt include.

  • 8/13/2019 Cost of Building a House

    111/123

    For carpenters better go with the ones

    available at the timer yard, as they have themachines needed to complete the work and

    will get the work done quickly than preparing

    the frames on site.2. 18 Rs / Sq Ft - Doors frames

    3. Nails extra

    4. Plaining extra

    Charges of carpenter

    8. 80 Rs / Sq Ft - Window shutter plain

    9. 100 Rs / Sq Ft - Window french shutter

    1. 30 Rs / Sq Ft - Window frames

    6. 120 Rs / Sq Ft - Main door shutter

    7. 600 Rs - Flush door fixing

    5. 90 Rs / Sq Ft - Door shutter

  • 8/13/2019 Cost of Building a House

    112/123

    Material Break up

    TOTAL COST (in Lacs) 13

    No Material Percentage

    1 Bricks 9

    2 Stone Aggregate 5

    3 Steel Rods 4

    4 Door & Window 7

    5 Shuttering / Framework 3

    6 Plumbing & Sanitary 7

    7 Electric 5

    8 Flooring 5

    9 Painting 9

    10 Compound & Gate 2

    11 Water 2

    12 Cement 12

    13 Concrete Contractor 7

    14 Sand 4

    15 Soil Filling 2

    16 Water Harvesting 4

    17 Solar 3

    18 Sump 7

    19 Wardrobe 3

    TOTAL 100

    AMOUNT

    No Work Time

    1 Excavation as per

    drawing

    2 Weeks

    2 Footing/Foundation 2 Weeks

    3 Pillars/Columns (up to

    plinth level)

    2 Weeks

    4 Soil filling in trenches;

    compaction till ground

    level

    1 Week

    5 Plinth construction 2 Weeks

    6 Pillars upto lintel level 2 Weeks

    7 Lintel 4 Weeks8 Filling up to lintel level 2 Weeks

    9 Soil filling and

    compaction till plinth level

    2 Weeks

    10 Roof slab 5 Weeks

    11 Brickwork and curing 7 Weeks

    12 Ducts for electrical wiring 2 Weeks

    Timeline

  • 8/13/2019 Cost of Building a House

    113/123

    13 Frames for doors and

    windows

    1 Week

    14 Plastering and curing 3 Weeks

    15 Water treatment/heat

    treatment

    1 Week

    16 Furnishing 2 Weeks

    17 Flooring/Tiling 4 Weeks18 Electrical wiring 3 Weeks

    19 Water supply, sanitary

    and plumbing

    3 Weeks

    20 Doors and windows 3 Weeks

    21 Painting 4 Weeks

    22 Electricity and drainage

    connections

    2 Weeks

    23 Inside furnishing 2 Weeks

    Total: 58 Weeks = 13 Months.

    With some parallel activities this can be reduced to 8-9 Mo

  • 8/13/2019 Cost of Building a House

    114/123

    Cost

    Range inLakhs

    Cost in

    Rs.

    1.17 117000

    0.65 65000

    0.52 52000

    0.91 91000

    0.39 39000

    0.91 91000

    0.65 65000

    0.65 65000

    1.17 117000

    0.26 26000

    0.26 26000

    1.56 156000

    0.91 91000

    0.52 52000

    0.26 26000

    0.52 52000

    0.39 39000

    0.91 91000

    0.39 39000

    13 1300000

  • 8/13/2019 Cost of Building a House

    115/123

    ths.

  • 8/13/2019 Cost of Building a House

    116/123

  • 8/13/2019 Cost of Building a House

    117/123

  • 8/13/2019 Cost of Building a House

    118/123

  • 8/13/2019 Cost of Building a House

    119/123

  • 8/13/2019 Cost of Building a House

    120/123

    Make

    Cement 1 ACC2 Bharti

    3 JK

    4 Ambuja

    Steel TATA

    Wood

    Granite

    Floor Tiles RAK, Kajaria, somany,

    Toilet Tiles RAK, Kajaria

    Paint Asian, Berger, Nerolac

    You can outsource painting to Asian Paints

    They do everthing systematically

    List of contractors at sangli as per ACC cement helpline

    Pramod Shinde

    Indrajit S.Taywade Patil

    Sukumar Chougule

  • 8/13/2019 Cost of Building a House

    121/123

    per KG

    per Ton

    Per Cubic feet

    Per Sft

    Per box / Per Sft (2 x 2) = 600 mm x 600 mm

    Per box / Per Sft (2 x 2) = 600 mm x 600 mm

    Bhagwant Workshop,

    Timber area

    0233-2372240

    Sangli- 416 416

    Shilp', Opp. Geust

    House, Dhamni Road

    0233-2303665

    Vishram Bag, Sangli-

    416 415

    347/6, Near BirnaleCollege, Neminath

    0233-2326165

    Sangli- 416 415

    Gang saw rates are 140 - 200+ Rs / SqFt.

    3x11 slabs - 80-90 Rs / SqFt.

    4x11 slabs - 110-120 Rs / SqFt.

  • 8/13/2019 Cost of Building a House

    122/123

  • 8/13/2019 Cost of Building a House

    123/123

    Interior Costing

    Item Description Approx. Costing

    (a) Washing Machine

    (b) Air conditioner

    Microwave

    (d) Fridge

    (e) LPG based Geyser

    (f) Light fixtures

    (g) Fan Fittings

    (i) Sofa Set

    (j) Chairs

    (k) Centre Table

    (l) Solar for Water Heating

    (k) Solar for Lighting

    (m) Solar for Inverting Charging

    (n) Ward robe