Wood - For Windows and DoorsIn wooden windows there are various options
Red Sal. 900-1000 Rs/cft as on Sep 2012
Granite
Name DescriptionSadarahalli Cheapest
of the lot.
Useful Link for Granite -- to see the colours ahttp://www.pragatigranites.com/granites.htm
Window frames and window shutters come in various types of materials.
1. Steel - Low cost.
4. Reno quality / ISI - Basic tank.
15. Water Tank
Overhead water tanks come in 4 types.
http://www.pragatigranites.com/granites.htmhttp://www.pragatigranites.com/granites.htm -
8/13/2019 Cost of Building a House
2/123
Tiles
Ceramic in all rooms
Anti skid for Toilet and Bathrooms
Make: Local asian, antique, murdeshwar ceramics
century, city tiles, euro, oracle, orient
-
8/13/2019 Cost of Building a House
3/123
d various other House interior related things
-
8/13/2019 Cost of Building a House
4/123
Wood - For Windows and Doors
In wooden windows there are various options
1. Burma Teak. 3100 Rs / cft as on Sep 2012
2. Ghana Teak. 1900 Rs / cft as on Sep 2012
3. Columbia Teak. 1850 Rs / cft as on Sep 2012
4. Honne. 1850 Rs / cft as on Sep 2012
5. Red Sal. 900-1000 Rs/cft as on Sep 2012
6. White Sal. 1000-1200 Rs/cft as on Sep 2012
7. Jungle/Hard wood.
4. UPVC - Weather proof.
2. Aluminium - Not sturdy
3. Double Layer - Little better than ISI grade.
Window frames and window shutters come in various types of materials.
15. Water Tank
Overhead water tanks come in 4 types.
-
8/13/2019 Cost of Building a House
5/123
Granite
Name Descripti
onCoffee Brown Looked
good.
Useful Link for Granite -- to see the colours a
Tiles
Vitrified for all Main Hall
Anti skid for Toilet and Bathrooms
Ceramic in all other rooms
Make: Kajaria, Johnson
http://www.pragatigranites.com/granites.htm
In vitrified
tiles whic
has a the
digital pri
so
A new app
good looki
way you av
house a un
focus of th
you can de
http://www.pragatigranites.com/granites.htmhttp://www.pragatigranites.com/granites.htm -
8/13/2019 Cost of Building a House
6/123
-
8/13/2019 Cost of Building a House
7/123
d various other House interior related things
ange RAK has a nano pix vitrified
h is around 120 Rs/Sq.Ft. which
arble texture. Johnson tiles has
nts which are good. Kajaria has
me good options as well.
oach would be to use a single
g tile for the entire house that
oid wastage and give the entire
iform look. With this approach the
house shifts to the walls which
orate and highlight.
-
8/13/2019 Cost of Building a House
8/123
Total Plot Area 60 x 40 ft
= 2400 Sft
Actual Area 1200 Sft
Details % of total cost Cost Rs.
Plan approval 1.6 21000.0
Bore well 1.6 21000.0
EB service connection 1.1 14000.0
Materials- Cement, Steel, Bricks, Sand, Jelly,
Wood, Tiles (Floor & Wall) etc
42.2 550000.0
Labour component 30 420000.0
Painting works 2.5 35000.0
Plumbing work (PVC tank, Pump set. etc) 2.5 35000.0
Septic tank and sump (12,000 litre capacity) 5 70000.0
Electrical works (Excluding fittings fan & 100830.0
tube lights etc)
Sanitary work (Including cost of fittings like
Closets, wash basins Taps etc)
2.5 35000.0
Total 97 1301830
Total Cost: 1301830 Rs13.0183 Lacs
OverHead tank capacity Sizing
Number of Occupants 4
Water requirement per occupant 150
Water requirement per Day 600
Stoarage Capacity required for 5 Days 3000
Excluding:-
Cost of Registration Rs. 200000 Approx.
Cost of Furnishings
Cost of Light and Fan Fixtures
Cost of Temporary Power supply
Cost of Water required at site
7.7
-
8/13/2019 Cost of Building a House
9/123
Cost of foundation includeds cost of anti-termite treatment
Particular Percentage Cost Range
Material 70% 9.1
Labour 20% 2.6Contractor Profit Margin 10% 1.3
13.02
Additional Costs
Particular Cost
Architect 1 Lakh
Approval Costs 30K
Water Tank
Overhead water tanks come in 4 types.
2. Triple layer - Good.
Kitchen Sink
Nirali - Stainless Steel
Light Fixtures
Phillips
Havells
Power Back Up
Inverter
Switch and Sockets
legrand -- Mylinc
Havells -- Coral
-
8/13/2019 Cost of Building a House
10/123
Wires
Havells
Wood - For Windows and Doors
In wooden windows there are various options
2. Ghana Teak. 1900 Rs / cft as on Sep 2012
3. Columbia Teak. 1850 Rs / cft as on Sep 2012
4. Honne. 1850 Rs / cft as on Sep 2012
Granite
Name DescriptionCoffee Brown Looked good.
Useful Link for Granite -- to see the colours and various other House interior related things
Window frames and window shutters come in various types of materials.
3. Wood - Costly
http://www.pragatigranites.com/granites.htm
4. UPVC - Weather proof.
http://www.pragatigranites.com/granites.htmhttp://www.pragatigranites.com/granites.htm -
8/13/2019 Cost of Building a House
11/123
Tiles
Vitrified for all Rooms
Anti skid for Toilet and Bathrooms
Make: Kajaria, Johnson, RAK
Temporary Electricity Connection
Water for construction
The approved plan also mentions that drinking water cant be used for construction. Howev
2. Non - Potable water - Recycled water ( Tertiary treated water )
1. Potable water - Drinking water.
Usually the temporary connection is provided for 28 days.
-
8/13/2019 Cost of Building a House
12/123
Start construction
Type of house
The best season to start construction is during the month of April when the annual budget i
you know what the new prices are. At the same time the rainy season will do natural curing
walls.
For construction non-potable water has to be used. However not every layout has dual line
construction which means everyone has to buy water from tankers. It looks bad but is not.
built and for curing. After 4-5 months your water usage will be pretty minimal. Tankers are
when everyone goes for private borewell then they have nothing to gain as they all tap into
-
8/13/2019 Cost of Building a House
13/123
Cost Rs/Sft.
17.5
17.5
11.7
458.3
350.0
29.2
29.2
58.3
84.0
29.2
1085
Lts
Ltrs
Ltrs
-
8/13/2019 Cost of Building a House
14/123
Lakhs
LakhsLakhs
Lakhs
MS tank painted, color goes away
Food particle sticks to Marble sink
LED lights high initial investment
Go with conventional CFL
DG set-- cost of diesel and Maintainence costLPG based Set -- Costly and cost of LPG
Do not purchase switches with indicators. Indicator stops functioning
Do not purchase coloredswitches, color fades away
Look for local dealer who can supply. Difficult to locate havells vendor.
2. It also keeps the water free from PVC
3. The first outer layer acts a sun protection;
Triple layer qualities of sintex tanks are
durable and strong. It is the first grade with
ISI mark.
The benefits of triple layer which are not
1. A white layer which is in between the two
-
8/13/2019 Cost of Building a House
15/123
Teak wood for Main doorsHonne for windows and other doors
4. Magadi road - Havent checked out.
6. Do you want to do artificial seasoning or
Places in Dharwad where granite can be
purchased are
3. Bannergatta - Good collection, bit costly, compared to Jigni 5-15 Rs price difference i
Although upvc windows are weather proof, finding a frame integrated with grills was
difficult, fennesta provides villa windows which come with grills but are not sturdy enough
to prevent a break in. The usual upvc windows are fit using glue and the grills go inside or
outside this upvc frame. Casement windows are costly in upvc, sliding windows
accumulate dirt in the slide grooves. You cant get mosquito nets if you go for upvc
casement. All these disadvantages made me sway my vote towards wooden windows.
3. How can you be sure that the wood is what the timer merchant says it is.
1. Jigni - Found some nice varieties here,
2. Sarjapur Road - No good varieties, a bit
Places in Dharwad / Bangalore where
granite can be purchased are
Burma teak turned out too expensive and since the outer area is going to be painted to
endure the harsh weather, it was not economical. Burma teak doesnt deform and the wood
grains are visible this is the reason people go for teak windows. Wood polish is expensive
if you want to highlight the wood texture. Ghana teak has many knots and white in color
compared to burma teak which is brown. From what i heard Ghana teak deforms slightly
compared to Columbia teak, Columbia teak is supposed to be harder and deforms less.
Honne comes under the hard wood category and doesnt deform. Honne has not grain
texture so needs to be painted upon. Red sal and white sal usually have hairline cracks
which can be covered during polishing. Honne turns yellow when exposed to water so
painting it is mandatory. Some pain the outside and polish the inside of the frames. Red sal
is the most moving wood for people who build rented houses.
The main things to check while selecting
1. Are you buying log or cut pieces.
2. What will be the wastage
4. Watch out for defective pieces.
5. How long has the wood been seasoned.
-
8/13/2019 Cost of Building a House
16/123
1. Near Dental College
2. Near Vidyagiri
Granite comes in various shades and colors, since its naturally formed finding the right
shade is difficult.
1. Buy from a good retailer.
2. Put water on the unpolished side of the granite to reveal its true colour.
12. Gang saw rates are 140 - 200+ Rs / SqFt.
10. Epoxy resin can be seen on the side of granite slab. Epoxy give granite the gloss.
9. Avoid granites treated with chemicals to induce artificial colour. All red granites usual
8. Look out for iron content in granite, they rust or turn yellow over a period of time.
7. Avoid too much clouds in the stone else there will be no continuity.
6. Granites also are categorized into hard or soft stone. Buy hard stones.
11. Granite comes in 3-4 types of polish.
13. 3x11 slabs - 80-90 Rs / SqFt.
r it doesnt clearly say what is the alternative. There are 2 types of water
Check list for granite buying
5. Avoid buying granites that are cracked from the side
4. Look at the side of the granite slabs to see if cracks are present.
3. Lookout for hair line cracks, If there is one chances are they will increase during laying
time.
14. 4x11 slabs - 110-120 Rs / SqFt.
In vitrified range RAK has a nano pix vitrified
tiles which is around 120 Rs/Sq.Ft. which
has a the marble texture. Johnson tiles has
digital prints which are good. Kajaria has
some good options as well.
15. Some shops use fancy names to bump up the price so watch out.
A new approach would be to use a single
good looking tile for the entire house that
way you avoid wastage and give the entire
house a uniform look. With this approach the
focus of the house shifts to the walls which
you can decorate and highlight.
-
8/13/2019 Cost of Building a House
17/123
announced and
to all the outer
or water supply. BWSSB has stopped giving non-domestic water connection for
ou will require water during the initial stages of construction till the super structure is
ow providing water at 550 Rs / 6500 Litres. As i have mentioned in the section above
ame water table. Borwells causing earthquake is another aspect to look at.
-
8/13/2019 Cost of Building a House
18/123
-
8/13/2019 Cost of Building a House
19/123
-
8/13/2019 Cost of Building a House
20/123
seen.
-
8/13/2019 Cost of Building a House
21/123
Light Points
Area Qty:
Bedrooms 4
Living 2
Kitchen 1
Toilet 2
Dining 2
Balcony 1
Front House 2
Gate Light 2
TOTAL 16
Stage 1: Type of house
The basic types of house people build in
Bangalore are
2. Mangalore / Kerala style - Sloped roof with
tiling.
2. House for self use + Renting out (Luxury +
cost effective)
3. House for renting out. (Cost and revenue
generation in mind)
3. Colonial style.
4. Roman style - Pantheon roof, big pillars etc.
1. House for self use. - (Luxury, privacy and
comfort in mind)
Once you decide which category you belong you
can move on to the next stage. Few people are
not sure if they fit in category 1 or 2 for them I
would advice to think ahead and plan their home
design in such a way that they can expand if the
need arises in future.
Pick a design style. There are a few house
design styles that are prominent in Bangalore.
The style you pick will also impact your cost.
1. Contemporary designs - Boxes shapes and
angles.
-
8/13/2019 Cost of Building a House
22/123
A house cant be 100% vaastu complaint, so try
to comply based on feasibility.
This leaves out just the middle sections and the
north west corner for the plot for modification.
To have some cross ventilation its ideal if the
rooms (Kitchen, Master bedroom) are in the
corner.
1. Kitchen to the south east.
2. Master bedroom to the south west
3. Entrance & Car parking in north east.
4. Sump to be in the north east
5. Pooja room not to be next to / below /
above bathrooms.
Stage 2: Vaastu
Learn about Vaastu. Even before you think of
putting a plan on paper read a few articles on
vaastu so that you know how to come up with a
sound plan. Vaastu has some science behind it
Eg: Flow of light, Flow of wind etc. Here are a
few basics on Vaastu.
https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/vastu_residence.jpg?attredirects=0 -
8/13/2019 Cost of Building a House
23/123
Choices! There will be various choices each
with its own pros and cons. Here I discuss about
some of them.
4. Inverted T-BeamsVs Concealed Beams- If
T-Beam. If inverted T-Beam is used then the roo
to get a flatter ceiling is to go in for concealed b
beam is not actually a beam and c
3. Privacy Vs Open spaces-If you need more
out the living and dining rooms. If you dont t
http://www.floorplanner.com/
http://www.sweethome3d.com/index.jsp
For 3D modelling you can use google sketchp,
look up a few tutors on youtube on architecture
design using floor plan. Its very simple to use
and you can visualize your house elevation.
Stage 3: Self design
Chart out a layout of how you want the floor plan
to look like. This will give you some idea when
you go talk to the architect. I used Sweet Home
3D to draw up my floor plan. There are various
other online tools available as well. If you arent
well versed with a computer then paper will do.
Write down some of the requirements of your
houses.
1. Serial car parking Vs Parallel car parking-
2. Stilt Vs ground floor VS basement parking
http://www.floorplanner.com/http://www.sweethome3d.com/index.jsphttp://www.sweethome3d.com/index.jsphttp://www.floorplanner.com/ -
8/13/2019 Cost of Building a House
24/123
6. Ceiling height VS false ceiling - False
ceiling is a craze these days in apartments,
but on a long run its more difficult to maintain
it. Dust will gather around the false ceiling and
cause health problems. Ceiling heights are
standard of 10' some go to 11' making the
room look bigger. If you go in for a 11' ceiling
then you will pay more in terms of airconditioning keep that in mind.
7. Wood windows VS Aluminium windows
Vs UPVC windows-Wood windows are
costly 600 - 650 Rs /sq ft. Aluminum windows
are delicate. Upvc windows range from 350
Rs/sq ft for sliding designs and 500 Rs/sq st
for casement windows both without grill
option.Upvc windows work out well for high
rise apartments, for individual houses security
is a major concern and grills are mandatory to
prevent burglary. Wooden windows with
12mm hex rods are ideal for individual
8. Teak main doors Vs Steel main doors-eventually has to go in for a grilled safety door.
water hits it during rainy season else a steel doo
now come with an option of single key with 3 lo
variety very less. There are more options in
5. Granite Vs vitrified Vs Marble -A white floor
granite is naturally occurring stone so finding sha
to find. Vitrified has lot more options and cost eff
polished using rock polishers, this will remove 2
have 16 mm slab then you can polish it only 4-5 ti
crystallisation which uses a chemical to induce th
not wide spread and people are unaware about itwork out an agreement with the dealer to replace
when heavy objects are dropped, if the floor layin
damage it easily. Check the quality of vitrified bef
check if the loss will last lon er before urchase
9. Modular Kitchen Vs Traditional Kitchen- Al
to clean and maintain, the corners become inacc
will rust after 5-10 years of usage and will look ba
setup though and the hinges are much more smo
cost a ton. If you can get a traditional kitchen with
and cost effective. You can work with your carpe
-
8/13/2019 Cost of Building a House
25/123
10. Brick Vs Cement Block- Cement block
work out cheap and easy in terms of
construction. Brick gives a cooling effect
compared to a cement brick wall. A room built
with Cement block will heat up soon. Brick
outer walls are usually 9" and cement outer
walls are usually 6". In terms of safety brickwall of 9" is much safer. Cement block loose
its property after 10-15 years. I would suggest
go with a brick wall even if you loose 3" you
will benefit in terms of a cooler room in
summer. The RCC columns will be quite good
in 9" compared to 6" RCC column. Mud bricks
come in 2 varieties one that is 6 Rs/brick with
rough edges used for walls, 8 Rs/Brick which
has smooth edges and used when brick work
is exposed.
11. Borewell vs BWSSB water connection-
BWSSB is supposed to provide non-potablewater (recycled water) for construction but
there is still some problems with delivery and
distribution. There are no takers for recycled
water, there are plans to have dual pipelines
in all areas but that will take time. In areas
where water scarcity is present borewell is a
life saver. A borewell might cost 1.5 - 2 lakhs.
Always check for the yield of water that you
might get. Check with your neighbours to find
out at what depth they got water. See if you
can get a common borewell by co-ordinating
with your neighbours. If on the other hand you
decide to use a tanker to supply water for
construction you will end up paying 5,500 Rs
for 65K litres / month assuming you are paying
550 Rs/ 6500 Liters. The cost difference
between tanker and borewell is big. Just for 8
month usage investing 1.5 lakh extra is not
justified. Most house constructions in
Bangalore start of by digging a borewell since
BWSSB wont provide water for construction
after construction is complete they rarely use
12. Fe415 TMT Vs Fe 500 TMT - Fe500 Ste
normal residential buildings Fe415 is sufficient
prone zones. Make sure there is no rust and its
-
8/13/2019 Cost of Building a House
26/123
14. Sinked Vs Flat Bathroom - Usually in old h
and the dry areas in a bathroom. If your bathr
Having a flat bathroom with a slope provided tow
both the first floor and the ground floor bathroo
can be sunk so that the first floor bathroom wi
makes sure that the
15. Grills Vs Hex Rods - Grills are nice to look i
patterns done in them. However grills are easy t
the frame then its easy to break in. Hex rods are
the hex rods is usually done with 3"
13. Cut Lintel Vs Through Lintel- The reason f
windows done deform. RCC framed structure
earthquake resistance the benefit of having throu
between them is 20-30K which is why I have se
equally distributed in a through lintel. Places whi
also gives you the liberty to do alterations to the
are through lintels.'My suggestion is to go for thrcut lintels the columns raise all the way upto the
be taken to make sur
-
8/13/2019 Cost of Building a House
27/123
3. How many bedrooms?
4. Attached toilet for all bedrooms or common
toilets?
If you know the details and dont require an
architect you can go meet a draftsmen who will
design the floor plan and structural and
elevation for around 20K. Offcourse his
knowledge base will be limited and you will be
the person in charge.
You would need to meet the 2nd kind first.
Laydown your requirements and ideas and let
the architect work out few plans for you. Here is
a check-list that I think will work.
1. How many members in the family?
2. How many floors?
Once you know what you want, its time to meet
an architect. There are 2 types of architects in
Bangalore
1. Architects who are registered with BBMP
and do house plans for approval only.2. Architects who are not registered with
BBMP and do house plans for construction.
16. 43 Grade Vs 53 Grade vs PPC - For RC
strength, it requires more water during the curing
with cement this seals the minute holes in ce
based cements
17. Spiral Staircase vs Normal Staircase - S
wasted. In a normal stair case the space under i
comfort in climbing anything more will hurt the an
footing. Use laputra finish
Stage 4: Meet an architect
-
8/13/2019 Cost of Building a House
28/123
4. Khata Certificate - You get this done in your
local BBMP office.
This can be done in parallel. In case of BDA
layout the following are the legal documents
1. Title deed / Sale deed / Parent deed /
Master deed - Agreement of sale / tiltle. You
get this done in your local sub-registrar office.
2. Gift deed - Agreement of transfer of
ownership. Not required if site is purchased.
You get this done in your local sub-registrar
office.
3. Khata Extract - You get this done in your
local BBMP office.
Once you are satisfied with the design its time to
move to the next phase.
Stage 5: Get your legal
documents ready.
Download the Architect & Owner Agreement
Once the requirements are laid out, the architect
will have something to work with. He can
probably get you a working floor plan in a week
which you can review.
Note: Always measure the site before the
planning starts. There may be differences in
dimension which when you discover later
may be a problem if your plan is already
drawn. Sometimes dimensions will be
correct but the site wont be a perfect
rectangle, this has to be taken into account.
9. New trends or ideas you have in mind?
10. Space utilisation
Architect cost & Services - Bangalore
The following is the estimate I got from my
Architect.
5. Closed car parking or open parking?
6. Single or multiple car parking.
7. How many floor to rent out.
8. Future expansion plans if any.
https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjViYTZlOTJiZTcxMDk2NjAhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjViYTZlOTJiZTcxMDk2NjA -
8/13/2019 Cost of Building a House
29/123
I am not in favour of bribing, the legal path
usually take a bit longer and some effort on your
path but its cleaner and you will feel good. Every
govt department has an RTI officer who is
nominated by the govt. His duties are to register
any RTI applications and provide you the
acknowledgement number. If the particular
service is not completed within the stipulated
number of days then you can file an RTI (Right
to information) demanding to know the status of
your application. It works like a charm.
Where do i find out what are the service time
lines?
Gift deed - Will take a day to get done, provided
all the other documents are in order. - No bribe
required if all documents are in order. You may
need to bribe 100 Rs or so to the office boy who
stamps your documents.
Khata transfer - Will take 15-30 days to get
done, provided all the other documents are in
order. - No bribe required if all documents are in
order. Ideal bribe range is some where between
5K for a 30x40 plot to 8K for a 40x60 plot. You
will need to go meet the Revenue Inspector and
show him your plot, he may give your dates and
times that are odd, but be persistent.
Sale deed -
5. Emcumbrance Certificate - Shows if there
are any loans on the site.You get this done in
your local sub-registrar office.
Khata extract and Khata certificate will be
provided within a week if the site is already in
your name. - No bribe required. If you do plan tobribe then anything in range of 500 Rs - 1000
Rs should do.
Encumbrance of 13 years will take 20-25 days
to get officially. No bribe required, automated
process.
-
8/13/2019 Cost of Building a House
30/123
Usually thing move faster once you file an RTI, if
that doesnt happen then you can reach out to
lokayukta and complain against the officer who
is demanding bribe. All this will work if all your
legal documents are in order. If there are any
loop holes then you will end up running from
pillar to post.
What documents i need to submit?
Note: When dealing with govt office please
carry/get acknowledgements in writing along
with a seal. Without this you will end up making
many rounds. Always carry a photo copy of your
application to get it sealed and signed, if you
filled a form then ask for an acknowledgement
number or a slip.
Download the RTI Template
What to do if RTI doesnt work?
How to file an RTI in bangalore?
You can write a simple letter in English or
Kannada (not sure if Hindi will do) and either
post it to the concerned office or hand it over in
person to the RTI officer in charge of that office.
Once you hand over the RTI application they
need to respond within 30 days. Once you hand
over the RTI to the RTI officer he will register it
a register book and provide you an
acknowledgement number. Better if you could
carry a photo copy of the RTI and get a govt
seal and his signature along with date on that.
You will also need to carry any supporting
documents. A postal order of 10 Rs which can
be purchased in your post office.
Under the "Garuntee of service for citizen system" you
find all timelines under this link -
http://sakala.kar.nic.in/kgsc1/ which is a govt hosted site,
specifying timelines for all services. Their phone number
works :) and they help you in finding the right people to
https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjY3NjdmYjYwYjY2MGRjNDEhttp://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/http://sakala.kar.nic.in/kgsc1/https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjY3NjdmYjYwYjY2MGRjNDE -
8/13/2019 Cost of Building a House
31/123
Particular Plot Cost Year
The costof working
drawing
and seal
from
registered
architect
30x40 4-5K 2012
FAQ - BBMPAutomatic Plan approval - Automatic Plan
Sanction.pdf
The cost of working drawing and seal from
registered architect may range from 4-5K for a
30 x40 plot. 5-6K for a 60x40 plot as of 2012.
Find a registered architect who will draw up a
plan which meets the bye laws and get it
approved. Again this is a 15-30 day process
officially. Without bribe the engineer who
approves your plan might ask you to make
some modifications, show him your site for
inspection.
Read the bye laws so that you are aware of
what they are talking about.
You can download the zoking rules for Bangalore -
Zoning_Regulations_RMP2015.pdf
Read my experiences with an RTI -
https://sites.google.com/site/arjunwebworld/Home/blogs/
i-su ort-corru tion
Stage 6: Get your building
plan approved.
To get an idea of what additional documents
you need to submit you can look at
http://bbmp.gov.in/the BBMP site which will
provide more information. If you think something
is not clear look it up in the GSC site as well -
http://sakala.kar.nic.in/kgsc1/and call the
helpline (During govt working hours/day). Makesure the photo copies are readable.
https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/Home/blogs/i-support-corruptionhttps://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Zoning_Regulations_RMP2015.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Automatic%20Plan%20Sanction%0A.pdf?attredirects=0 -
8/13/2019 Cost of Building a House
32/123
The cost
of working
drawing
and seal
from
registered
architect
60x40 5-6K 2012
Bribe for
plan
approval
30x40 10-15K 2012
Bribe for
plan
approval
60x40 15-20K 2012
Admin
charges +
Taxes
If plan not to bribe then make sure your plan ismeeting the norms set by 2015 master plan and
there are no violations, else you will pay a hefty
fine or the engineer can stop construction if you
are violating the norms. The building plans are
valid upto 2 years after which they need to be
renewed.
Couple of things that need to be added to the
above agreement.
1. Mentioning through lintel.
2. Contractor to be responsible for taking the
right permission for erection of construction
shed and material storage at construction site.
Contractor will make sure that road safety is
not compromised due to materials stored at
the site. Necessary precautions will be taken
by contractor to avoid any road accidents.
3. Mention brand of steel to be used.
4. Provisioning of attic.
Also make sure the approved plan is as close tothe construction plan as possible this will make
sure you dont pay too much tax. The more built
up area you show on the approved plan the
more tax you will end up paying.
Download the House Construction Estimate
Download the Contractor & Owner Agreement
https://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjZiNjkzY2QwMjY4OTFhZDQhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjI1MjBlOWQ3N2U5NzBiM2Mhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjI1MjBlOWQ3N2U5NzBiM2Mhttps://docs.google.com/viewer?a=v&pid=sites&srcid=ZGVmYXVsdGRvbWFpbnxhcmp1bndlYndvcmxkfGd4OjZiNjkzY2QwMjY4OTFhZDQ -
8/13/2019 Cost of Building a House
33/123
Deviations during Construction
Plan approval
I believe 90% of the plan approval process
involves some sort of bribe as no one adheresto the bye laws. There is atleast some degree of
violation in the approved plan vs the actual plan.
Knowing this the BBMP engineers are very
much aware of the fact that they have the upper
hand here since everyone violates to some
extent. I filed an RTI for some delayed
documentation which really got the engineer
pissed at me and he started to threaten me by
saying he will give me notice if there is a
deviation in construction. Then i understood that
since these engineers are never challenged by
anyone they have grown accustomed to power
and can easily threaten people. So I
investigated further and found out what a
deviation means.
BBMP bye law says:
If you are building a house yourself it becomes
very important that you understand the laws. Lot
of times govt officials end up asking for a bribe
and threaten you of a violation and the
consequences. Knowing the violation and the
consequence before hand will keep you aware
of the situations.
Khata Transfer
This should be fairly simple. If you dont have
previous tax records or missing some document
then there is a option that things will move
slowly.
The Automatic building plan scrutiny system for
approval of building plans is having some
technical issues and as of 2012 some BBMP
accept plan submission only online where as
some take a physical copy. Your architect will
provide 10 ammonia prints with the house plan.
This will be verified by the AEE (AssistantExecutive Engineer) in BBMP office and within
15 days they will let you know the DD amount
that needs to be submitted towards road
cutting.
-
8/13/2019 Cost of Building a House
34/123
Assuming this if one has left no setback on one
side his violation would be 1/4 of 25%.
On consulting a lawyer the following was his
opinion.
1. Setback - 25%
2. Coverage - 25%
3. FAR - 25%
4. Height - 25%
i) Wherever any construction is in
violation/deviation of the sanctioned plan, the
Commissioner may, if he considers that the
violations / deviations are within 5% of (1) theset
back to be provided around the building, (2) plot
coverage (3) floor area ratio and (4)height of the
building and that the demolition under chapterXV of the Act is not feasible without affecting
structural stability, he may regularise such
violations/deviations after recording detailed
reasons for the same.ii) Violation/deviation as at
6.0 (i) above may be regularised only after
sanctioning the modified plan recording thereon
the violations/deviations and after the levy of fee
prescribed by the Corporation from time to
time.iii) Regularisation of violations / deviations
under this provision are not applicable to the
buildings which are constructed without
obtaining any sanctioned plan whatsoever andalso the violations / deviations which are made
inspite of the same being specifically deleted or
rejected in the sanctioned plan.
So the question is how is this 5% derived?
If one doesnt leave any setback on one side
would that be 100% violation or 25% violation? If
one doesnt leave any setback on any side then
is that a 400% violation or a 100%? If one
leaves right setback on all side but his FAR ratio
exceeds norm then is it a 100% violation?
Based on my understanding 25% is allotted to
each violation.
-
8/13/2019 Cost of Building a House
35/123
Stage 7: Market survey
2. Submit annexure after plint level is complete.
Usually the engineer will have some or the other
reason why commencement certificate cant be
provided. The fine for starting construction
without obtaining commencement certificate is
100 Rs.
Commencement Certificate
All approved plans come with certain
instructions, one of which says - "Laying of
Foundation Concrete & Columns ShouldCommence Only After Obtaining
Commencement Certificate From Bruhat
Bangalore Mahanagara Palike After Inspection
from AEE". Now this ideally makes sense for big
constructions and apartment complexes. For
small residential buildings the trend has been
that no one follows this rule. There are 2
processes that need to be followed if you want
to get the commencement certificate.
1. Submit annexure before laying foundation
columns.
Ask BBMP people to accept for fine after
issuance of notice.If they are not prepared
accept to receive fine. You have every right to
prefer e appeal against the said notice before
Karnataka appellate tribunal for quashing of the
said notice.If you decide to prefer appeal: Points
which you have to bear it your mind are that thecourt process will take time, as an advantage
you can seek an order of stay from demolishing
any violated portion till the disposal of such
appeal by BBMP officials.Try to settle amicably
and keep judicial excise as last option.
-
8/13/2019 Cost of Building a House
36/123
Particular
Cost Year
RMC
(Ready
made
concrete) -
3000 per
cubic
meter
53 grade -
340
43 grade -
320
Tata - 51K
/ ton
Primegold - 55 /
ton
20 mm
jelly - 23 /
cft
40 mm
jelly 18 /
cft
Cement
Gravel
9. What is current cost for steel, cement,
gravel, labour etc.
Here is quick table on cost of materials
2012
3. What type of wardrobes and cost of sq ft.
4. What type of windows and cost of sq ft.
5. What type of doors and cost of sq ft.
6. What type of sanitary and cost of individualitems like EWC, sinks, shower heads.
7. What type of paint? Exterior & Interior.
What will be the cost associated
8. What type of electrical items?
Find out what the price of materials are, what
type of flooring you require, what is the going
rate for square ft of construction. This you can
either talk to people who have built a house or
by talking to vendors and getting estimates.You
need to do this before stage 8 because you
need to be aware of what the current trend incost estimation is. This keeps changing year on
year based on market rates. Here is a checklist
of things you need to enquire.
1. Cost of construction for sq ft in your area.
2. What type of flooring you want. What will it
cost you in sq ft.
2012
Steel 2012
-
8/13/2019 Cost of Building a House
37/123
12 mm
jelly 17 /
cft
1 truck -
540 cft.
Fenestaupvc white
sliding -
500 / sq ft
Fenesta
upvc white
casement
600-700 /
sq ft
Localmade
upvc white
sliding -
350 / sq ft
Local
made
upvc
casement
sliding -
450-500
sq/ft
Grill
12mm
thick - 150
/sq ft
Aluminium
- 250 / sq
ft.
Steel
fabricated
with grill -
150-200
/sq ftHonne
Wood with
sal frame
with grill -
600 /sq ft.
2012Wood
-
8/13/2019 Cost of Building a House
38/123
Vitrified
2'x2' (600
mm x 600
mm) - 150
/ sq ft.
VitrifiedGranite -
Low end
black
texture -
150 / sq ft.
Granite -
High end
white
texture -
250 / sq ft.
Anti skid
tiles - 1'x1'
- 60 / sq
ft.
Wall tiles -
60-70 /sq
ft
Wall
cladding -
70-90 /sq
ft
Aashirvad
Supreme
pvc -
25K - 600
cft
(65K
during
strikes)
10 Rs /
stone
1 truck -
850, 950
stonesBrick 6 Rs /
Brick
2012
Flush
Doors
150 - 200
/ Sq ft
2012
Stone 2012
2012
Sand 2012
Tiles 2012
Plumbing
-
8/13/2019 Cost of Building a House
39/123
Cost Range Year
1200 -
1400Rs /
sq ft
Economy 2012
1500 -
1600 Rs /
sq ft
Mid
Range
2012
1700Rs -
2000 / sq
ft
High End 2012
Economy
Midrange High End
Flooring Vitrif ied 70
Rs / Sq ft
Vitrified 100-
150 Rs / Sq ft
Granite
250 Rs /
Sq ft
Switches Cona Anchor Roma Anchor
Ave
InteriorPaint
Exterior
Paint
Wardrobe
s
1. Lump sum - You release money once
various stages are completed.
2. Labour only - You buy the materials and
hire only the labour from the contractor.
3. tCost - You pay for labour and material
accurately. Then you pay additional for the
services of the contractor.
Make sure the agreement between you and the
contractor is as crystal clear as possible to the
minute detail. This will help avoiding cost
deviations.
Stage 8: Find a contractor &
work out an agreement
After stage 7 you are aware of the market
situation and its time to find a contractor. Find
out a good contractor who you can trust withyour money. See his past work, talk to his
customers and get a quotation. There are 3
types of contract you can work out with your
contractor
-
8/13/2019 Cost of Building a House
40/123
Kitchen Simple
cabinets
with
Andhra
Slabs
Modular
kitchen in
plywood
Italian
Kitchen.
Box type
Contemporary.
Sloped Roof
Tiled Roof
Doors Steel
fabricated
Honne and
sal wood
frames or
flush doors
Teak
wood.
Windows Steel
fabricated
Honne and
sal wood
frames,
UPVC sliding
UPVC
casement,
Teak
Wood.
16. Rain water harvesting unit
17. Kitchen chimney
18. Water pump
You need to negotiate to some extend, so here
your market survey is going to be handy. Dontreduce the price too much from market rate this
will force the contractor to use sub-standard
materials. There is always a profit margin which
he will make, so keep that in mind, if you eat
away his profit margin he will try to balance it out
with sub-strandard materials.
10. Gate.
11. Compound wall.
12. Flagging concrete.
13. Drain stone.
14. Security grills
15. Anti termite treatment.
4. Road cutting charges.
5. Temporary electricity connection.
6. Borewell.
7. Geysers for bathrooms.
8. Solar unit.
9. Sump tank.
This cost per sq ft doesnt include.
1. Drawing and architect plan.
2. Bribes.
3. Costs like plan approval.
Exterior
Look
Box type Granite
claddingon
exteriors.
-
8/13/2019 Cost of Building a House
41/123
If you need a loan then look up a good bank and
apply for a home loan. Check their history as to
how happy their existing home loan customers
are? The shorter the term less interest you pay.
Dont look for a low EMI, look for a low interestrate. If the EMI is small you will end up paying
towards the loan for a longer duration thus
increasing the interest amount that you paid
towards your home loan.
Some banks force you to take a insurance
policy to cover your home loan. This is not
mandatory but usually advised.
9. Does he think at your level? Simple test
here is to ask how much would be the basic
cost of a sink he will put according to his
estimate? Assuming that as baseline assume
that the rough estimate he gave will have
materials costs in that range. If he is thinking
3K sink and you are thinking of 5K sink then
you know that the estimate he has given you
is at lower end.
Stage 9: Apply for loan
3. Any other construction work he is doing in
parallel? Will he be too occupied with the
other construction. Will he share workforce
between construction.
4. How much deviation does he expect
considering the prices
5. How much aware is he about the current
market prices
6. Does he get aggressive when things dontwork out.
7. How soon will be get the work done.
8. Does he look at the site and actual plan to
provide an accurate estimate?
Take quotations from multiple contractors and
compare the pros & cons. 90% of the decision is
based on trust, but keep a legal agreement in
hand as well.
Check list of questions for contractor selection.
1. Previous work done?
2. References?
-
8/13/2019 Cost of Building a House
42/123
1. Eligibility for home loan?
2. What is the interest rate?
3. What is the base rate?
4. Is it fixed or floating and for what duration.
How will the revised interest rates be
calculated.
5. Documents required?
Use the following link to calculate your home loan ratio:
http://www.bankbazaar.com/finance-tools/emi-
calculator.html
Question to ask the home loan officer / bank
manager wrt to home loans
1. Look for smaller tenure and not lower EMI.
The lower the EMI the more money you pay the
bank.
2. If you cant get a lower tenure then try to
reduce your principal by doing prepayments
periodically when you have bulk cash in hand so
that the interest component is low. Check with
the bank if you can do pre-payment any time
and there is no penalty against it.
For a home loan of 30 lakhs at the interest rate
of 10.5% and a tenure of 5 years you will end up
paying 77% towards principal deduction & 22%
towards interest deduction. The EMI will come
up to 65K / month.
Its advisable to keep the ratio at 70:30 and not
go below. 70% - principal, 30% interest.
Key points to remember:
The processing fees also varies from bank to
bank. Some banks charge 0.5% of the loan
amount as processing fee, some bank charge a
fixed amount of 10K. This money is not
refundable if you dont get you home loan
approved so think carefully before applying.Make sure you have all the documents the bank
has asked for before applying. Look out for loan
mela where a discount is provided.
http://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.htmlhttp://www.bankbazaar.com/finance-tools/emi-calculator.html -
8/13/2019 Cost of Building a House
43/123
1. Legal valuation charges - 1500 Rs.
2. Legal charges - 1500 Rs.3. Processing fee.
Home Loan Disbursement.
18. Estimate of construction signed by
registered architect.
19. Employment appointment letters and
experience/relieve letters for past 5 years.
20. Photographs.
Additional charges.
12. Property tax paid receipts.
13. Khata Certificate
14. Khata extract
15. Latest Encumbrance certificate.16. Past 13 year Encumbrance certificate.
17. BBMP approved building plan.
6. Pan card
7. Passport copy
8. Address proof - Company HR letter will do.
9. Employment letter
10. Salary slip for last 3 months signed by
employer
11. Form16 & IT returns for last 2 years.
1. Title deed.
2. Sale deed.
3. Gift deed
4. Past 6 month bank statements
5. Company id card
BPLR / RPLR vs Base Rate
http://www.nitinbhatia.in/home-loan/floating-home-loan-
bplr-vs-base-rate/
Document check list.
6. Guarantor required and his eligibility?
7. How long does it take to release the loan?
8. Insurance or add-on packages that might
come with the loan.
9. Pre-closure penalty.
10. Any accident insurance covering fire,
earthquake etc.11. Daily reducing balance interest.
http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/http://www.nitinbhatia.in/home-loan/floating-home-loan-bplr-vs-base-rate/ -
8/13/2019 Cost of Building a House
44/123
ACC Home Construction guide - ACC-Dream-House.pdf
TATA Home Construction guide - TATA House
Construction Guide.pdf
Stage 10: Start
construction
Seismic Design Philosophy - Seismic Design
Philosophy.pdf
Usually the banks ask for a letter from the
contractor and then an engineer appointed by
the bank visits the site and after 10-12 days the
bank release the loan in stages. SBI Bank
however asks home loan customers to produce
bills for 50% of the loan allotted. This means
you will end up paying 14% VAT on all materialspurchased. As per them this is an RBI guideline
that they follow. No other bank usually asks for
bills of material purchase to be produced.
Knowing this before you opt of the loan is very
important. If its a turn-key project then
producing material purchase bills for 50% of
loan may be difficult, then you can speak to the
branch manager and ask for an exception in
your case by providing the agreement between
you and the contractor.
http://www.jagoinvestor.com/2012/05/best-bank-home-
loan-india.html
https://sites.google.com/site/arjunwebworld/files/ACC-Dream-House.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0http://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttp://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttp://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttp://www.jagoinvestor.com/2012/05/best-bank-home-loan-india.htmlhttps://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/Sesmic%20Design%20Philosophy.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/TATA%20House%20Construction%20Guide.pdf?attredirects=0https://sites.google.com/site/arjunwebworld/files/ACC-Dream-House.pdf?attredirects=0 -
8/13/2019 Cost of Building a House
45/123
-
8/13/2019 Cost of Building a House
46/123
-
8/13/2019 Cost of Building a House
47/123
-
8/13/2019 Cost of Building a House
48/123
https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/vastu_residence.jpg?attredirects=0 -
8/13/2019 Cost of Building a House
49/123
the room dimension is bigger than 15x15 then its ideal to go in for a
m ceiling looks cleaner and the room looks longer. The other option
am which has extra steel rods and thus is slimmer, but a concealed
are has to be taken as to not to bring heavy load on it.
rivacy in the house when people visit you then you need to separate
en you get a bigger area which is combined of living and dining.
erial car parking makes it difficult to take 2 cars in and out. It can be
Stilt parking based houses loose the looks aspects. Efficient in
-
8/13/2019 Cost of Building a House
50/123
ecurity is a big concern in Bangalore. So anyone with a teak dooreak doors provide good looks provided they are maintained and no
with wood finish (powder coating) will be equally good. Safety doors
ks. Although there are not many buyers for steel doors making the
the north. 90% will end up putting a teak door as the main door.
reflects more light, brightness up the room. Granite is expensive,
des of white are difficult, grains without any fault line are also difficult
ctive but vitrified has the tendency to chip off. Granite can be
m - 3 mm of the granite surface each time. This means that if you
imes in the life time. Vitrified can be polished using a process called
e gloss, this wont remove the surface layer but this approach is still
. Granite tends to get cracks at the time of laying, so make sure youany faulty slabs. Vitrified has the tendency of chipping and cracking
g is not done correctly the tile will sit on hollow floor which will
ore buying. The print on vitrified tiles are deep upto 1-2 mm. So
. Looks ood in the first few ears. Granite floorin is cold durin
hough modular kitchens are nice and look glamorous they are hard
ssible and a place for roaches if not maintained properly. The metal
d if not maintained in modular kitchen. Modular kitchens are easy to
oth and fluid than the ones done by a carpenter. Modular kitchens
slabs with the single hinge doors it will be more easy to maintain
ter to get good hinges and good veneer sheets.
-
8/13/2019 Cost of Building a House
51/123
l is used in high rise buildings and bridges has more strength, for
. FE500D is more ductile than the FE500 used in the high seismic
ISI marked. Fe 500X is a new type which promises more strength.
-
8/13/2019 Cost of Building a House
52/123
ouses the shower area is sunk by 6". This helps demarcate the wet
oom is small then doing this will make the bathroom look smaller.
rds the drain will make the bathroom look bigger. It pays if you have
s in the same line. That way the pipes can be shared and the roof
ll be in level with the first floor flooring. They sink the roof by 6" to
first floor bathroom doesn't get elevated.
n terms of aesthetics as compared to hex rods ,there can be various
break into. If someone breaks the glass and unscrews the grill from
hard to break through as they run throughout the frame. Spacing of
gap and since the rods are thicks they are hard to bend.
or a lintel is to support the weight of the bricks on top and make sure
dont need a through lintel if interlocking is done at plint level. For
gh lintel is that it wont allow the columns to twist. The cost difference
en most houses in Bangalore go with a through lintel. The weight is
h have longer windows are suitable for through lintel. Through lintel
house later on. You can move doors and windows easily if the lintels
ough lintels. Make sure the alignment of columns doesnt deviate, inroof, in through lintels they raise till lintel level so extra care needs to
e the columns dont shift from centre line.
-
8/13/2019 Cost of Building a House
53/123
C columns ideally 53 Grade cement is used as it provides higher
stage. 43 grade cement is used for brick work, PPC is mix of fly ash
ent and requires less water to set and less cracks are seen. PPC
are used for inside wall plastering.
iral staircase look grand but keep in mind that the space under it is
t can be used as cabinets. Steps should raise between 6" and 7" for
kles. A single step should be at-least 10" wide (tread) to give enough
ranite for steps as it will give a rough surface.
-
8/13/2019 Cost of Building a House
54/123
-
8/13/2019 Cost of Building a House
55/123
-
8/13/2019 Cost of Building a House
56/123
-
8/13/2019 Cost of Building a House
57/123
-
8/13/2019 Cost of Building a House
58/123
-
8/13/2019 Cost of Building a House
59/123
-
8/13/2019 Cost of Building a House
60/123
-
8/13/2019 Cost of Building a House
61/123
-
8/13/2019 Cost of Building a House
62/123
-
8/13/2019 Cost of Building a House
63/123
-
8/13/2019 Cost of Building a House
64/123
-
8/13/2019 Cost of Building a House
65/123
-
8/13/2019 Cost of Building a House
66/123
-
8/13/2019 Cost of Building a House
67/123
-
8/13/2019 Cost of Building a House
68/123
https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0 -
8/13/2019 Cost of Building a House
69/123
https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0 -
8/13/2019 Cost of Building a House
70/123
-
8/13/2019 Cost of Building a House
71/123
-
8/13/2019 Cost of Building a House
72/123
-
8/13/2019 Cost of Building a House
73/123
-
8/13/2019 Cost of Building a House
74/123
-
8/13/2019 Cost of Building a House
75/123
-
8/13/2019 Cost of Building a House
76/123
-
8/13/2019 Cost of Building a House
77/123
-
8/13/2019 Cost of Building a House
78/123
-
8/13/2019 Cost of Building a House
79/123
-
8/13/2019 Cost of Building a House
80/123
-
8/13/2019 Cost of Building a House
81/123
-
8/13/2019 Cost of Building a House
82/123
-
8/13/2019 Cost of Building a House
83/123
-
8/13/2019 Cost of Building a House
84/123
-
8/13/2019 Cost of Building a House
85/123
-
8/13/2019 Cost of Building a House
86/123
-
8/13/2019 Cost of Building a House
87/123
-
8/13/2019 Cost of Building a House
88/123
-
8/13/2019 Cost of Building a House
89/123
-
8/13/2019 Cost of Building a House
90/123
-
8/13/2019 Cost of Building a House
91/123
-
8/13/2019 Cost of Building a House
92/123
-
8/13/2019 Cost of Building a House
93/123
-
8/13/2019 Cost of Building a House
94/123
https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0 -
8/13/2019 Cost of Building a House
95/123
https://sites.google.com/site/arjunwebworld/Home/blogs/constructing-a-house-in-bangalore/homeloan.png?attredirects=0 -
8/13/2019 Cost of Building a House
96/123
Date 31-Jan-13
Project
Clients
Architects
Subject : Electrical Work - Internal BOQ
Internal Electrification of Apartments
Internal work : Li htin & Power circuits
from distribution board to load voice data &
telephone cable from comm. box to respective
fixture.
Note:- All materials and workman ship shallbe to standards / consultants' approval and shall
comply with EB rules & Electrical Inspectorate.
All Civil work re uired for the electrical work such
as chipping of walls, floor, etc and rough plastering
with chicken mesh shall be deemed included.
A 2 BHK Home
Sl. No Description Unit Qty. Rate Am
1 Distribution Boards
S I T & C of surface mounting / flush mounting
9kA TPN MCB distribution boards (MCB DB). The
DB shall be made out of 1.2mm CRCA sheet steel
enclosure and powder coated complete with,
100A copper bus, neutral & earth bus, cable gland
plate with knockout at the top and bottom. The
busbar shall be tinned co er Insulated fork t e
for hases Inde endent neutral bus for each
phase including interconnecting wiring and earth
bus on insulatation mount. The DB shall be IP 43,
along with 4" high wire way box both on top and
bottom, the width and depth shall match with
DB
1.1 2Row of 13 Module Flexy DB similar to Legrand type
607746 with metal door, 32A DP RCBO
30mA SI Series ,as incomer and 14nos. 5/16A SP MCB
as outgoings.
Supply Nos. 1 4000 40
Installation Nos. 1 400 4
2 Sub Mains / Circuit Mains :
Supply and carrying out sub/ circuit mains using
2mm thick PVC conduit and its access- ories like
pvc bends,junction boxes, deep M.S junction
boxes, GI cleat and saddles etc., 660/ 1100V
grade FRLS flexible copper wires and wir ing
accessories. Termination of wires on either ends
shall be by providing copper lugs. The wiring shall
be surface / concealed type.
The rate shall include grooving of walls, floors
chipping, rough plastering, providing MS brackets
for conduit suspension. Sub mains shall be
measured from meter board to DB.
Circuit mains shall be measured from DB to switch
board and looping from switch board to switch
board
-
8/13/2019 Cost of Building a House
97/123
Sl. No Description Unit Qty. Rate Am
2.1 Sub Mains :
2.1.1 2x6+1x2.5sqmm in 1 runs of 32mm conduit. M 30 160.00 48
2.2 Circuit Mains :
2.2.1 2 x 2.5 + 1 x 1.5 s mm in 19 mm dia
- for lt . Circuit mains M 90 65 58
2.2.2 2 x 4.0 + 1 x 2.5 sqmm in 19 mm dia
- for power Circuit mains M 125 110 13
3 Point Wiring
Wiring for Light & fan point and socket outlets by
using 2mm rigid PVC conduit / casing - capping
with MS unction box and PVC accessories 2 x
1.5 + 1 x 1.5s mm PVC insulated co er flexible
wires, 5A modular switch, socket, GI box, wiring
accessories and carrying out surface/ concealed
point wiring. Conduit drop to switch box shall be
minimum 25mm conduit. Wiring shall NOT be paid
on RM basis. All oints shall be earthed with 1.5s mm PVC insulated co er wire. Points shall be
terminated into fitting, holder, ceiling rose,
socket, 5A connector; wire ends shall not be left
bare.
3.1 1 light point controlled by a 6A SP switch Nos. 10 500 50
3.5 1 Chandelier light points controlled by a 5A switch
and 650W 2 module electronic dimmer. Rate shall
include Two no. chandelier box. Nos. 1 750 7
3.7 1 light point controlled by 2 - 2way switch
(b/rooms) Nos. 2 650 13
3.8 Exhaust fan point with ceiling rose, controlledby 5A socket near the fan and a switch, Nos. 3 550 16
3.9 Ceiling fan point controlled by a 5A switch, fan
hook box and 100W, 2 module fan step
regulator. Nos. 4 850 34
3.1 Call bell oint with 6A 2 module bell ush and
connector Nos. 1 475 4
-
8/13/2019 Cost of Building a House
98/123
Sl. No Description Unit Qty. Rate Am
3.12 5A 3pin socket with 5A SP switch on lighting
circuit:
-dependant point Nos. 5 450 2
3.13 5A 3pin socket with 5A SP switch on lighting
circuit: For Ironing
Independant point Nos. 1 450 4
4 Power Points
Supply and installation of modular type switch
socket MCB in GI MS enclosure with cover
late blanks etc com lete.
4.2 2Nos. 6A 3 pin socket with 6A SP Switch ( 2 TV & 1
and Computer) Nos. 3 450 1
4.4 6A 3 pin socket with 6A SP Switch for (mixi &
AG,) Nos. 2 285 5
4.5 6/16A 6 pin sockets with 16A SP Switch in
separate box at independent location ( Fridge ) Nos. 1 500 5
4.6 16A 3 pin socket and 16A DP switch with
indicator in separate enclosures. (for GP)inde endent location Sets 1 600 6
4.7 20A 3 pin weatherproof Metal Clad socket with 25A
DP Modular Switch mounted seperately (for AC). No. 1 1250 1
4.8 1no. 6/16A 6pin socket with 16A SP switch in
single box.(M/O & WM) No. 2 500 1
4.10 Shaver Sockets Nos 2 850 1
5 Telephone System
Providing and fixing Telephone cable and modular
RJ 11 Tel. outlets with box.
5.1 RJ 11 ( 2 wire) Telephone outlet in Box. Nos. 1 155 1
5.2 3 pair Tel. Wire 0.5 mm dia. Copper, PVC / PVC
tel wire in existing conduit (from Shaft ) M 45 25 1
-
8/13/2019 Cost of Building a House
99/123
Sl. No Description Unit Qty. Rate
6 Television S stem
Providing and fixing modular co-axial TV outlets
with box.
6.1 Co axial TV outlets in Box. Nos. 2 175
6.2 RG 11 / co-axial cable as per TV vendor in existing32mm PVC conduit.from shat to inside the flat M 60 50
7 Computer System
Providing and fixing modular cp outlets with box.
7.1 Only laying of computer cable in existing 19mm M 45 6
Conduit.
7.2 RJ 45 (4 wire) data outlet in Box. Nos. 1 185
8 Miscellaneous Items
Empty Conduits
Providing & laying of empty 2mm thick PVCconduits with MS junction boxes and other PVC
accessories, 16G GI fish wire. (for TV and Data
system)
8.1 19mm dia PVC conduit.
(for Tel systems) M 45 30
8.2 32mm dia PVC conduit.
(for TV & Data systems) M 60 50
8.4 Wire pull box 200 x 150 x 150mm. With dummy
plate Nos. 1 350
9.1 CCTV (with 2 cameras connected to one Monitor with NightVision faciltiy) including power supply for CCTV on inverter
Set 1 25000
9.2 Inverter (600VA) with 1 Hour Battery back up Set 1 15000
9.3 Video Door phone
2 (7" color) monitors + 1 camera Set RO 18000
Conduiting for Solar Lighting
Fridge shall be in separate circuit
Total
-
8/13/2019 Cost of Building a House
100/123
Qty Total Load in kW
A Lighting Load
1
Wall and ceiling lights 40 15 0.6
2 2' FTL Ltg 20 1 0.02
2 Mirror lights 20
3 Chandlier Lights 200 1 0.2
4 Study Light 15 1 0.015
18 0.835
B Raw Power1 Ceiling Fan Type A 75 4 0.3
2
Ceiling Fan in Kitchen
Type - B
60
3 Exhaust Fan 60 3 0.18
7 0.48
C Kitchen Load
1 Aqua Gauard 75 1 0.075
2 Mixer 300 1 0.3
3 M Oven 1250 1 1.25
4 Chimney 60
5 Fridge 400 1 0.4
4 2.025
D Washing Machine 1200 1 1.2
E Geyser Point 1500 2 2
F AC load 1750 1 1.75
Total Load in kW 4 8.3
2 BHKSL No. Description Load in watts
-
8/13/2019 Cost of Building a House
101/123
DATE:
PROJECT:
SUBJECT:
ARCHITECH:
CONSULTANT :
WALL LIGHT 4' FTL
1 Foyer 3 --
2 Living / DINING -- 23 Kitchen 1 1
4 Master Bed room 3 --
5 Toilet--(Master) -- --
6 Bed room--1 3 --
7 Toilet--1 -- --
8 Passage -- --
9 Utility -- --
Total 10 3
1 Lt.pt controlled
by 10A SP
switch
2 Lt.pt controlled by 10A SP
switch
Living room
& Dining room 3 -
Foyer kitchen / Utility 6 -
Bed room / Toilet 4 -
Master bed room / Toilet 4 -
TOTAL POINTS 17 0
5A Socket depende 5A Soc independent
Kitchen Fridge - FR
SL. NO. DESCRIPTION
16th JUN 2011
-
8/13/2019 Cost of Building a House
102/123
Chimney - CH
Mixi
Aqua guard-AG
Toilet Shaver
Utility Ironing
Master Bed room able lamp /Telephon TV
Table lamp/PC
Bed room 2 able lamp /Telephon Table lamp
Living room Telephone TV
Table lamp
Charger
Dining room Charger
-
8/13/2019 Cost of Building a House
103/123
CEILING LTG BULK HEAD MIRROR FTL FAN EX. FAN 5A PT.
1 -- -- -- -- 1
-- -- -- 2 -- 2-- -- -- -- -- 5
-- -- -- 1 -- 2
1 -- 1 -- 1 1
-- -- -- 1 -- 1
1 -- 1 -- 1 1
1 -- -- -- -- --
-- 1 -- -- -- --
4 1 2 4 2 13
1 Lt.pt controlled
by 2 way switch
Dependent
point
Independent
point
15A socket 5/15A socket Ceiling fan
- 1 2 - - 2
- - 5 1 1 -
1 1 1 - - 1
1 3 1 - - 1
2 5 9 1 1 4
5/15A socket 15A Socket
Micro oven - M/O
-
8/13/2019 Cost of Building a House
104/123
Instant gyser- IG
Gyser
Washing machine
-
8/13/2019 Cost of Building a House
105/123
2 NO'S 5A
PT.TV PT. TEL. DATA CHAND. LTG 15A PT. 15A CH,DS
-- -- -- -- -- -- --
1 1 1 -- 1 -- ---- -- -- -- -- 2 --
1 1 1 -- -- -- --
-- -- -- -- -- -- --
-- -- 1 -- -- -- --
-- -- -- -- -- -- --
-- -- -- -- -- -- --
-- -- -- -- -- 1 --
2 2 3 0 1 3 0
exe.fan TV tele Geyser CALLBL AC
- 1 1 - 1 1
1 - 1 - -
1 - 1 1 - -
1 1 1 1 - 1
3 2 3 3 1 2
-
8/13/2019 Cost of Building a House
106/123
-
8/13/2019 Cost of Building a House
107/123
15A GP AC PT.
-- --
-- 1-- --
-- 1
1 --
-- --
1 --
-- --
-- --
2 2
-
8/13/2019 Cost of Building a House
108/123
Labour Break up
No Type Cost
1 Mason 500 Rs / Day2 Mason Helper 250 Rs / Day
3 Electrician 500 Rs / Day
4 Carpenter
5 Painter
6 Plumber
7 Flooring
No Type Cost
1 Gang saw slab 20-25 Rs / Sft
2 Smaller slabs 15-20 Rs / Sft
3 Wall tiles 15 Rs / Sft.
4 Skirting 40-45 Rs / Sft.
5 Nosing 55-60 Rs / Sft.
Part icu lar Cos t Year
RMC (Ready madeconcrete) - 3000 per
cubic meter
53 grade - 340
43 grade - 320
Tata - 51K / ton
Prime gold - 55 / ton
20 mm jelly - 23 / cft
40 mm jelly 18 / cft
12 mm jelly 17 / cft
1 truck - 540 cft.Fenesta upvc white
sliding - 500 / sq ft
Fenesta upvc white
casement - 600-700 /
sq ft
Local made upvc
white sliding - 350 / sq
ft
Steel 2012
Gravel 2012
Wood 2012
Cement 2012
-
8/13/2019 Cost of Building a House
109/123
Local made upvc
casement sliding -
450-500 sq/ft
Grill 12mm thick - 150
/sq ft
Aluminium - 250 / sq
ft.Steel fabricated with
grill - 150-200 /sq ft
Honne Wood with sal
frame with grill - 600
/sq ft.
Vitrified 2'x2' (600
mm x 600 mm) - 150
/ sq ft.
Vitrified
Granite - Low end
black texture - 150 /
sq ft.Granite - High end
white texture - 250 /
sq ft.
Anti skid tiles - 1'x1' -
60 / sq ft.
Wall tiles - 60-70 /sq
ft
Wall cladding - 70-90
/sq ft
Aashirvad -
Supreme pvc -
25K - 600 cft
(65K during strikes)
10 Rs / stone
1 truck - 850, 950
stones
Brick 6 Rs / Brick 2012
Flush Doors 150 - 200 / Sq ft 2012
Economy Mid range High End
Flooring Vitrif ied 70 Rs / Sq ft Vitrified 100-150 Rs / Sq
ft
Granite 250 Rs
/ Sq ft
Switches Cona Anchor Roma Anchor Ave
Interior Paint
Exterior Paint
Wardrobes
Kitchen Simple cabinets with
Andhra Slabs
Modular kitchen in
plywood
Italian Kitchen.
Stone 2012
Tiles 2012
Plumbing 2012
Sand 2012
-
8/13/2019 Cost of Building a House
110/123
Box type Contemporary.
Sloped Roof
Tiled Roof
Doors Steel fabricated Honne and sal wood
frames or flush doors
Teak wood.
Windows Steel fabricated Honne and sal woodframes, UPVC sliding
UPVCcasement,
Teak Wood.
10. Gate.
11. Compound wall.
12. Flagging concrete.
13. Drain stone.
18. Water pump
14. Security grills
15. Anti termite treatment.
16. Rain water harvesting unit
17. Kitchen chimney
1. Drawing and architect plan.
6. Borewell.9. Sump tank.
2. Bribes.
3. Costs like plan approval.
4. Road cutting charges.
5. Temporary electricity connection.
Exterior Look Box type Granite
cladding on
exteriors.
This cost per sq ft doesnt include.
-
8/13/2019 Cost of Building a House
111/123
For carpenters better go with the ones
available at the timer yard, as they have themachines needed to complete the work and
will get the work done quickly than preparing
the frames on site.2. 18 Rs / Sq Ft - Doors frames
3. Nails extra
4. Plaining extra
Charges of carpenter
8. 80 Rs / Sq Ft - Window shutter plain
9. 100 Rs / Sq Ft - Window french shutter
1. 30 Rs / Sq Ft - Window frames
6. 120 Rs / Sq Ft - Main door shutter
7. 600 Rs - Flush door fixing
5. 90 Rs / Sq Ft - Door shutter
-
8/13/2019 Cost of Building a House
112/123
Material Break up
TOTAL COST (in Lacs) 13
No Material Percentage
1 Bricks 9
2 Stone Aggregate 5
3 Steel Rods 4
4 Door & Window 7
5 Shuttering / Framework 3
6 Plumbing & Sanitary 7
7 Electric 5
8 Flooring 5
9 Painting 9
10 Compound & Gate 2
11 Water 2
12 Cement 12
13 Concrete Contractor 7
14 Sand 4
15 Soil Filling 2
16 Water Harvesting 4
17 Solar 3
18 Sump 7
19 Wardrobe 3
TOTAL 100
AMOUNT
No Work Time
1 Excavation as per
drawing
2 Weeks
2 Footing/Foundation 2 Weeks
3 Pillars/Columns (up to
plinth level)
2 Weeks
4 Soil filling in trenches;
compaction till ground
level
1 Week
5 Plinth construction 2 Weeks
6 Pillars upto lintel level 2 Weeks
7 Lintel 4 Weeks8 Filling up to lintel level 2 Weeks
9 Soil filling and
compaction till plinth level
2 Weeks
10 Roof slab 5 Weeks
11 Brickwork and curing 7 Weeks
12 Ducts for electrical wiring 2 Weeks
Timeline
-
8/13/2019 Cost of Building a House
113/123
13 Frames for doors and
windows
1 Week
14 Plastering and curing 3 Weeks
15 Water treatment/heat
treatment
1 Week
16 Furnishing 2 Weeks
17 Flooring/Tiling 4 Weeks18 Electrical wiring 3 Weeks
19 Water supply, sanitary
and plumbing
3 Weeks
20 Doors and windows 3 Weeks
21 Painting 4 Weeks
22 Electricity and drainage
connections
2 Weeks
23 Inside furnishing 2 Weeks
Total: 58 Weeks = 13 Months.
With some parallel activities this can be reduced to 8-9 Mo
-
8/13/2019 Cost of Building a House
114/123
Cost
Range inLakhs
Cost in
Rs.
1.17 117000
0.65 65000
0.52 52000
0.91 91000
0.39 39000
0.91 91000
0.65 65000
0.65 65000
1.17 117000
0.26 26000
0.26 26000
1.56 156000
0.91 91000
0.52 52000
0.26 26000
0.52 52000
0.39 39000
0.91 91000
0.39 39000
13 1300000
-
8/13/2019 Cost of Building a House
115/123
ths.
-
8/13/2019 Cost of Building a House
116/123
-
8/13/2019 Cost of Building a House
117/123
-
8/13/2019 Cost of Building a House
118/123
-
8/13/2019 Cost of Building a House
119/123
-
8/13/2019 Cost of Building a House
120/123
Make
Cement 1 ACC2 Bharti
3 JK
4 Ambuja
Steel TATA
Wood
Granite
Floor Tiles RAK, Kajaria, somany,
Toilet Tiles RAK, Kajaria
Paint Asian, Berger, Nerolac
You can outsource painting to Asian Paints
They do everthing systematically
List of contractors at sangli as per ACC cement helpline
Pramod Shinde
Indrajit S.Taywade Patil
Sukumar Chougule
-
8/13/2019 Cost of Building a House
121/123
per KG
per Ton
Per Cubic feet
Per Sft
Per box / Per Sft (2 x 2) = 600 mm x 600 mm
Per box / Per Sft (2 x 2) = 600 mm x 600 mm
Bhagwant Workshop,
Timber area
0233-2372240
Sangli- 416 416
Shilp', Opp. Geust
House, Dhamni Road
0233-2303665
Vishram Bag, Sangli-
416 415
347/6, Near BirnaleCollege, Neminath
0233-2326165
Sangli- 416 415
Gang saw rates are 140 - 200+ Rs / SqFt.
3x11 slabs - 80-90 Rs / SqFt.
4x11 slabs - 110-120 Rs / SqFt.
-
8/13/2019 Cost of Building a House
122/123
-
8/13/2019 Cost of Building a House
123/123
Interior Costing
Item Description Approx. Costing
(a) Washing Machine
(b) Air conditioner
Microwave
(d) Fridge
(e) LPG based Geyser
(f) Light fixtures
(g) Fan Fittings
(i) Sofa Set
(j) Chairs
(k) Centre Table
(l) Solar for Water Heating
(k) Solar for Lighting
(m) Solar for Inverting Charging
(n) Ward robe