corporate presentation: rare earth metals inc. (tsxv: ra)

46

Upload: rare-earths-rare-metals

Post on 16-Jul-2015

759 views

Category:

Investor Relations


2 download

TRANSCRIPT

Page 1: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 2: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

FORWARD LOOKING STATEMENTFORWARD LOOKING STATEMENT

ForwardForward--Looking Statements Looking Statements –– Certain statements included in this presentation are forwardCertain statements included in this presentation are forward--looking looking statements which are made pursuant to the “safe harbor” provisions of the United States Private statements which are made pursuant to the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. They include estimates and statements that describe the Securities Litigation Reform Act of 1995. They include estimates and statements that describe the Company’s future plans, objectives and goals, including words to the effect that the Company or Company’s future plans, objectives and goals, including words to the effect that the Company or management expects a stated condition or result to occur. When used herein, words such as management expects a stated condition or result to occur. When used herein, words such as “estimate”, “expect”, “believe”, “intend”, “budget”, “plan”, “projection”, “progressing”, “strategy”, “estimate”, “expect”, “believe”, “intend”, “budget”, “plan”, “projection”, “progressing”, “strategy”, estimate , expect , believe , intend , budget , plan , projection , progressing , strategy , estimate , expect , believe , intend , budget , plan , projection , progressing , strategy , “outlook”, “will”, and other similar expressions are intended to identify forward“outlook”, “will”, and other similar expressions are intended to identify forward--looking statements. In looking statements. In particular statements relating to the estimated future metal prices, cash flows, expenses, capital particular statements relating to the estimated future metal prices, cash flows, expenses, capital costs, ore production, mine life, financing, construction and commissioning are forwardcosts, ore production, mine life, financing, construction and commissioning are forward--looking looking statements. Such forwardstatements. Such forward--looking statements involve inherent risks and uncertainties and are subject looking statements involve inherent risks and uncertainties and are subject to factors, many of which are beyond our control, that may cause actual results or performance to to factors, many of which are beyond our control, that may cause actual results or performance to differ materially from those currently anticipated in such statements. Important factors that could differ materially from those currently anticipated in such statements. Important factors that could cause actual results to differ materially from those expressed or implied by such forwardcause actual results to differ materially from those expressed or implied by such forward looking looking cause actual results to differ materially from those expressed or implied by such forwardcause actual results to differ materially from those expressed or implied by such forward--looking looking statements include among others metal price volatility, changes in the US/CDN dollar exchange rate, statements include among others metal price volatility, changes in the US/CDN dollar exchange rate, economic and political events affecting metal supply and demand, fluctuations in ore grade, ore economic and political events affecting metal supply and demand, fluctuations in ore grade, ore tonnestonnes milled, geological, technical, mining or processing problems, future profitability and production, milled, geological, technical, mining or processing problems, future profitability and production, availability of financing on acceptable terms and unexpected problems during the development, availability of financing on acceptable terms and unexpected problems during the development, construction and startconstruction and start--up phases of the underground mine. For a more comprehensive review of risk up phases of the underground mine. For a more comprehensive review of risk factors, please refer to the Company’s most recent Annual Report in Form 40factors, please refer to the Company’s most recent Annual Report in Form 40--F/Annual Report under F/Annual Report under “M t’ Di i d A l i f Fi i l R lt ” d A l I f ti F d “Ri k “M t’ Di i d A l i f Fi i l R lt ” d A l I f ti F d “Ri k “Management’s Discussion and Analysis of Financial Results” and Annual Information Form under “Risk “Management’s Discussion and Analysis of Financial Results” and Annual Information Form under “Risk Factors” on file with the U.S. Securities and Exchange Commission and Canada provincial securities Factors” on file with the U.S. Securities and Exchange Commission and Canada provincial securities regulatory authorities. The Company disclaims any obligation to update or revise any forwardregulatory authorities. The Company disclaims any obligation to update or revise any forward--looking looking statements whether as a result of new information, events or otherwise. Readers are cautioned not to statements whether as a result of new information, events or otherwise. Readers are cautioned not to put undue reliance on these forwardput undue reliance on these forward--looking statements. Descriptions of mineral reserves and looking statements. Descriptions of mineral reserves and resources estimates included herein under Canadian standards may not be comparable to similar resources estimates included herein under Canadian standards may not be comparable to similar information made available by U.S. companies subject to reporting and disclosure requirements of the information made available by U.S. companies subject to reporting and disclosure requirements of the information made available by U.S. companies subject to reporting and disclosure requirements of the information made available by U.S. companies subject to reporting and disclosure requirements of the United States Securities and Exchange Commission. See “Mineral Reserve and Resource Estimate United States Securities and Exchange Commission. See “Mineral Reserve and Resource Estimate ––Note to U.S. Shareholders” in the Annual Report in Form 40Note to U.S. Shareholders” in the Annual Report in Form 40--F.F.The presentation has been prepared by management of Rare Earth Metals Inc, and does not represent The presentation has been prepared by management of Rare Earth Metals Inc, and does not represent a recommendation to buy or sell these securities. Investors should always consult their investment a recommendation to buy or sell these securities. Investors should always consult their investment advisors prior to making any Investment decision.advisors prior to making any Investment decision.

Page 3: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

PRESENTATION OUTLINEPRESENTATION OUTLINE

Corporate StrategyCorporate Strategy Corporate StrategyCorporate Strategy Corporate StructureCorporate Structure Officers and DirectorsOfficers and Directors

i li l Rationale Rationale ProjectsProjects

•• ClayClay--Howells Howells •• Lackner Lake Lackner Lake •• Red Wine Red Wine

SummarySummary SummarySummary

Page 4: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CORPORATE STRUCTURECORPORATE STRUCTURE

COMPANY IS THE RESULT OF A “MERGER” BETWEEN EAST COMPANY IS THE RESULT OF A “MERGER” BETWEEN EAST ENERGY CORP (TSXENERGY CORP (TSX--V:EEC) AND RARE EARTH METALS INC V:EEC) AND RARE EARTH METALS INC ENERGY CORP. (TSXENERGY CORP. (TSX--V:EEC) AND RARE EARTH METALS INC. V:EEC) AND RARE EARTH METALS INC. (PRIVATE COMPANY) WITH RESULTING COMPANY RARE (PRIVATE COMPANY) WITH RESULTING COMPANY RARE EARTH METALS EARTH METALS

73 4 MILLION OUTSTANDING73 4 MILLION OUTSTANDING 73.4 MILLION OUTSTANDING73.4 MILLION OUTSTANDING

3.75 MILLION OPTIONS3.75 MILLION OPTIONS

12 MILLION WARRANTS12 MILLION WARRANTS

89.15 MILLION FULLY DILUTED89.15 MILLION FULLY DILUTED

$9.6 MILLION IN THE TREASURY$9.6 MILLION IN THE TREASURY

Page 5: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

OFFICERS & DIRECTORSOFFICERS & DIRECTORSOFFICERS & DIRECTORSOFFICERS & DIRECTORS

MICHAEL STARESMICHAEL STARESPRESIDENT & CEOPRESIDENT & CEO

WAYNE REIDWAYNE REIDWAYNE REIDWAYNE REIDDIRECTORDIRECTOR

STEPHEN STARESSTEPHEN STARESPRESIDENT OF BENTON RESOURCES CORPPRESIDENT OF BENTON RESOURCES CORPPRESIDENT OF BENTON RESOURCES CORP.PRESIDENT OF BENTON RESOURCES CORP.

WILLIAM HARPERWILLIAM HARPERDIRECTORDIRECTOR

Page 6: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

LIGHT RARE EARTH ELEMENTS(LREE)(LREE) PRICES AS OF MARCH 2/10

ELEMENT ATOMIC SYMBOL PRICE KG

ALL DATA IS FOB CHINAFROM METALS-PAGES.C0M

AND STANS ENERGY’S WEBSITE

Lanthanum La $5.55 Cerium Ce $4.15 Praseodymium Pr $25.75 Neodymium Nd $26.75 Samarium Sm $4.50

Page 7: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

Heavy Rare Earth Elements(HREE)(HREE) PRICES AS OF MAR 2 /10

ELEMENT ATOMICIC SYMBOL PRICE KG

ALL DATA IS FOB CHINAFROM METALS-PAGES.C0M

AND STANS ENERGY’S WEBSITE

Europium Eu $480.00 Gadolinium Gd $7.65 Terbium Tb $350.00

Dysprosium Dy $129 50 Dysprosium Dy $129.50 Holmium Ho $25.38 Erbium Er $25.50 Thulium Tm $790.00 Ytterbium Yb $155 30 Ytterbium Yb $155.30 Lutetium Lu $238.00 Yttrium Y $10.25

Page 8: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 9: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 10: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 11: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CORPORATE STRATEGYCORPORATE STRATEGY

FOCUS ON REE DEPOSITS WITH ADDITIONAL MINERAL CREDITS ie FOCUS ON REE DEPOSITS WITH ADDITIONAL MINERAL CREDITS ie IRON ORE BERYLLIUM ZIRCONIUM NIOBIUMIRON ORE BERYLLIUM ZIRCONIUM NIOBIUMIRON ORE, BERYLLIUM, ZIRCONIUM, NIOBIUMIRON ORE, BERYLLIUM, ZIRCONIUM, NIOBIUM

PRIORITIZE OPPORTUNITIES TO ACQUIRE ADVANCED (DRILL PRIORITIZE OPPORTUNITIES TO ACQUIRE ADVANCED (DRILL READY) PROJECTS WITH GOOD ACCESS AND INFRASTRUCTURE READY) PROJECTS WITH GOOD ACCESS AND INFRASTRUCTURE

MOVE ON THESE OPPORTUNITIES QUICKLY MOVE ON THESE OPPORTUNITIES QUICKLY -- PRESENTLY A TIGHT PRESENTLY A TIGHT QQSUPPLY of REEs AND EXPORT RESTRICTIONS SHOULD ENSURE A SUPPLY of REEs AND EXPORT RESTRICTIONS SHOULD ENSURE A HEALTHY MARKET WITH GOOD FUTURE METAL PRICES BUT HEALTHY MARKET WITH GOOD FUTURE METAL PRICES BUT TIMING WILL BE IMPORTANTTIMING WILL BE IMPORTANT

PRIORITY IS TO COMPLETE METALLURGICAL TEST WORK ON THE PRIORITY IS TO COMPLETE METALLURGICAL TEST WORK ON THE PRIORITY IS TO COMPLETE METALLURGICAL TEST WORK ON THE PRIORITY IS TO COMPLETE METALLURGICAL TEST WORK ON THE CLAY HOWELLS PROSPECT CLAY HOWELLS PROSPECT

MAINTAIN A PIPELINE OF OTHER ADVANCED PROPERTIES THAT MAINTAIN A PIPELINE OF OTHER ADVANCED PROPERTIES THAT CAN BE EVALUATED EITHER INTERNALLY OR THROUGH JOINT CAN BE EVALUATED EITHER INTERNALLY OR THROUGH JOINT VENTUREVENTUREVENTURE.VENTURE.

Page 12: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

REDWINE PROPERTY

GOOSE BAY

ST JOHNSCLAY

HOWELLSHOWELLSPROPERTY

THUNDER BAY

TIMMINSLACKNER

PROPERTY

CLAY - HOWELLS PROPERTY LOCATION

Page 13: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CLAYCLAY-- HOWELLS PROSPECTHOWELLS PROSPECT

18 DIAMOND DRILL HOLES TESTED THE CABONATITE18 DIAMOND DRILL HOLES TESTED THE CABONATITE--MAGNETITE ZONE FOR A STRIKE MAGNETITE ZONE FOR A STRIKE LENGTH OF 700 METERS LENGTH OF 700 METERS

NEWEST DRILL HOLE ASSAYS INCLUDE:NEWEST DRILL HOLE ASSAYS INCLUDE:

CHCH--09 09 : 0.69% TREO /0.12% Nb203 /47.20% Fe203 /76.6 METERS : 0.69% TREO /0.12% Nb203 /47.20% Fe203 /76.6 METERS

CHCH--1717 : : 0.85% TREO /0.13% Nb205 /37.76% Fe203 /35 METERS0.85% TREO /0.13% Nb205 /37.76% Fe203 /35 METERS

CHCH--1313 :: 0.69% TREO / 0.14% Nb205 /57.8% Fe203/105.3 METER INC: 1.088%0.69% TREO / 0.14% Nb205 /57.8% Fe203/105.3 METER INC: 1.088%TREO/0.14% Nb205 and 65.95% Fe203/ 16.9 METERSTREO/0.14% Nb205 and 65.95% Fe203/ 16.9 METERS

100% OWNED PATENTED MINERAL AND SURFACE RIGHTS, ROAD ACCESSIBLE WITH 100% OWNED PATENTED MINERAL AND SURFACE RIGHTS, ROAD ACCESSIBLE WITH GREAT INFRASTRUCTURE GREAT INFRASTRUCTURE -- HIGHWAY, RAILROAD AND PIPELINES WITHIN 40 HIGHWAY, RAILROAD AND PIPELINES WITHIN 40 KILOMETERS KILOMETERS

VERY SIMILAR TO THE BAYAN OBO MINE IN CHINAVERY SIMILAR TO THE BAYAN OBO MINE IN CHINA

NUMEROUS OTHER UNTESTED MAGNETIC ANOMALIES WITHIN THE 110 SQ KM NUMEROUS OTHER UNTESTED MAGNETIC ANOMALIES WITHIN THE 110 SQ KM CARBONATITE COMPLEXCARBONATITE COMPLEX

Page 14: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CLAYCLAY-- HOWELLS HOWELLS -- LOCATION MAPLOCATION MAP

Page 15: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CLAIM MAP WITH ROAD ACCESS

CLAY HOWELLSHOWELLSPROSPECT

Page 16: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

AIRBORNE MAGNETICS: CLAYAIRBORNE MAGNETICS: CLAY-- HOWELLSHOWELLS

AREA OF 2010 WINTER DRILL PROGRAM

UNTESTEDMAGNETIC

ANOMALIES

Page 17: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CLAYCLAY-- HOWELL PROSPECT FIRST DERIVATIVE MAGNETICS HOWELL PROSPECT FIRST DERIVATIVE MAGNETICS

2010 DRILLING AREA

RED OUTLINE IS THE AREA OF POTENTIAL

TO ADD TONS TO IRON DEPOSIT PLUS

REE

Page 18: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

REE Distribution of Various DepositsREE Distribution of Various Deposits100%

90%

70%

80%

60%

50%50%

ss ou d ns llslls ge ho

40%

ge

Mt P

ass

Baot

ouM

t Wel

dN

olan

syay--H

owel

l

How

ell

Pea

Ridg

eN

echa

lach

o

Stra

nge

Lake

Clay

Clay N

Page 19: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CH-02CH-01

CH-08CH-10

CH-15CH-17

CH-04CH-05CH-06CH-07

CH-09CH-11CH-13

CH-16CH-18

CH-12CH-14

Page 20: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 21: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

Hole FROM (m)

TO (m)

Interval (m) Zone TREO

(%)LREO TREO

HREO TREO

Fe2O3(t) (%)

Nb2O5 (%)

CH-17 85 120 35 B Zone 0.85 92% 8% 37.76 0.13

CH-17 inc 94 5 101 6 5 B Zone 2 06 94% 6% 59 04 0 16CH-17 inc 94.5 101 6.5 B Zone 2.06 94% 6% 59.04 0.16

CH-17 221 248 27 C Zone 0.73 88% 12% 46.81 0.19

CH-17 inc 221 228 5 7 5 C Zone 1 12 92% 8% 40 07 0 09CH-17 inc 221 228.5 7.5 C Zone 1.12 92% 8% 40.07 0.09

CH‐17 CH‐17

8%(C Zone: 27m @ 0.73% TREO)

6%(B Zone: 6.5m @ 2.06% TREO)

92% 94%

LREO/TREO  HREO/TREO  LREO/TREO  HREO/TREO 

Page 22: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CH-01CH-02

CH-08CH-10

CH-15CH-17

CH-04CH-05CH-06CH-07

CH-09CH-11CH-13

CH-11CH-13

CH-11CH-13

Page 23: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 24: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

Hole FROM (m) TO (m) DEPTH (m) Zone TREO 

(%)LREO TREO 

HREO TREO 

Fe2O3(t) (%)

Nb2O5 (%)

CH‐06 158 210 52 B Zone 0.62 91% 9% 43.18 0.12

CH‐06 inc 161 173.5 12.5 B Zone 1.05 91% 9% 39.51 0.20

i % %CH‐06 inc 169.2 173.5 4.3 B Zone 1.94 93% 7% 40.26 0.17

CH‐06 239 304.5 65.5 C Zone 0.62 89% 11% 40.48 0.14

CH‐06 inc 250.3 256.3 6 C Zone 1.03 89% 11% 31.56 0.08

7%

CH‐06(B Zone: 4.3m @ 1.94% TREO)

11%

CH‐06(C Zone: 6.0m @ 1.03% TREO)

93%

LREO/TREO HREO/TREO

89%

LREO/TREO HREO/TREOLREO/TREO  HREO/TREO  LREO/TREO  HREO/TREO 

Page 25: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CH-01CH-02

CH-08CH-10

CH-15CH-17

CH-04CH-05CH-06CH-07

CH-09CH-11CH-13

CH-16CH-18

CH-12CH-14

Page 26: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 27: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

Hole FROM (m)

TO (m)

Interval (m) Zone TREO

(%)LREO TREO

HREO TREO

Fe2O3(t) (%)

Nb2O5 (%)

CH-09 124.5 201.1 76.6 B Zone 0.69 90% 10% 47.20 0.12

CH-09 inc 139.5 155.7 16.2 B Zone 1.19 91% 9% 45.55 0.08

CH-09 inc 150.8 155.7 4.9 B Zone 2.45 92% 8% 46.21 0.09

CH‐09(B Zone: 76.6m @ 0.69% TREO)

CH‐09(B Zone: 4.9m @ 2.45% TREO)

10%

( @ )8%

( @ )

90%

LREO/TREO HREO/TREO

92%

LREO/TREO HREO/TREOLREO/TREO  HREO/TREO  LREO/TREO  HREO/TREO 

Page 28: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CH-01CH-02

CH-08CH-10

CH-15CH-17

CH-04CH-05CH-06CH-07

Ch-09CH-11CH-13

CH-16CH-18

CH-12CH-14

Page 29: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 30: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

Hole FROM (m) TO (m) Interval

(m) Zone TREO (%)

LREOTREO

HREOTREO

Fe2O3(t) (%)

Nb2O5 (%)

CH-13 102.2 207.5 105.3 TBD 0.69 90% 10% 57.83 0.14

CH-13 inc 102.2 118.5 16.3 TBD 0.82 90% 10% 45.37 0.14

CH-13 and 164 203 39 TBD 0.85 91% 9% 59.41 0.13

CH 13 279 6 298 18 4 TBD 0 47 95% 5% 53 29 0 06CH-13 279.6 298 18.4 TBD 0.47 95% 5% 53.29 0.06

CH‐13105 3 @ 0 69% TREO)

10%105.3m @ 0.69% TREO)

90%

LREO/TREO  HREO/TREO 

Page 31: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CLAY HOWELLS CAMPCAMP

CLAY HOWELLS CAMP

Page 32: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

CLAY – HOWELLS EXPLORATION PLANCLAY HOWELLS EXPLORATION PLAN

AIRBORNE SURVEY COMPLETED

18 DDH COMPLETED (5432.5 METERS)

MUTIPLE MAGNETITE ZONES INTERSECTED IN DRILLING THAT INDICATE A STRIKE LENGTH OF OVER 700 METERS AND OPEN IN ALL DIRECTIONS

CORE SAMPLES HAVE BEEN SELECTED AND SENT TO XSTRATA PROCESS SUPPORT IN SUDBURY FOR METALLURGICAL TESTWORK; RESULTS WILL BE AVAILBLE IN SIX WEEKSRESULTS WILL BE AVAILBLE IN SIX WEEKS

FOLLOW UP DRILLING ONCE ALL ASSAYS ARE COMPILED AND PRELIMINARY MINERALOGICAL WORK COMPLETED, ALSO PROSPECT ALL OTHER TARGETS IN THE COMPLEX

TOTAL EXPENDITURES FOR WINTER DRILLING AND SUMMER PROGRAM $2,290,000.00

Page 33: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 34: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

RED WINE PROSPECTRED WINE PROSPECT-- LABRADORLABRADOR

CLAIM BLOCKS COVERING FIVE HISTORIC SHOWINGS:CLAIM BLOCKS COVERING FIVE HISTORIC SHOWINGS:

MANN #1MANN #1 MANN #2MANN #2 MICHELIN #1MICHELIN #1 NORTH RED WINE #1&2NORTH RED WINE #1&2 TWOTWO--TOM LAKETOM LAKE

ALL WITHIN THE RED WINE PERALKALINE COMPLEXALL WITHIN THE RED WINE PERALKALINE COMPLEX

HYDRO DAM ACCESS ROAD WITHIN 40 KM OF THE SHOWINGSHYDRO DAM ACCESS ROAD WITHIN 40 KM OF THE SHOWINGS HYDRO DAM ACCESS ROAD WITHIN 40 KM OF THE SHOWINGSHYDRO DAM ACCESS ROAD WITHIN 40 KM OF THE SHOWINGS

Page 35: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

ROAD ACCESS ROAD ACCESS –– WEST CENTRAL LABRADORWEST CENTRAL LABRADOR

Page 36: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 37: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

MANN #1 BERYLLIUM SHOWINGMANN #1 BERYLLIUM SHOWING

DISCOVERED BY GEOCHEMICAL AND RADIOMETRIC DISCOVERED BY GEOCHEMICAL AND RADIOMETRIC SURVEYS IN 1956SURVEYS IN 1956

RADIOMETRIC ZONE TRACED UP TO 1 6 KILOMETERS RADIOMETRIC ZONE TRACED UP TO 1 6 KILOMETERS RADIOMETRIC ZONE TRACED UP TO 1.6 KILOMETERS RADIOMETRIC ZONE TRACED UP TO 1.6 KILOMETERS LONG AND 100 METERS WIDELONG AND 100 METERS WIDE

DIAMOND DRILL HOLES BY RIO TINTO IN 1961 INCLUDE DIAMOND DRILL HOLES BY RIO TINTO IN 1961 INCLUDE DIAMOND DRILL HOLES BY RIO TINTO IN 1961 INCLUDE DIAMOND DRILL HOLES BY RIO TINTO IN 1961 INCLUDE INTERVAL OF 41.9 METERSINTERVAL OF 41.9 METERS OF 0.35% BERYILLIUM (BeO).OF 0.35% BERYILLIUM (BeO).

2.25 MILLION TONS AT 0.35% TO 0.40% BeO2.25 MILLION TONS AT 0.35% TO 0.40% BeO RESOURCE RESOURCE CALCULATED TO A VERTICAL DEPTH OF 60 METERS BASED CALCULATED TO A VERTICAL DEPTH OF 60 METERS BASED CALCULATED TO A VERTICAL DEPTH OF 60 METERS BASED CALCULATED TO A VERTICAL DEPTH OF 60 METERS BASED ON BLASTED CHANNEL SAMPLING AND LIMITED DIAMOND ON BLASTED CHANNEL SAMPLING AND LIMITED DIAMOND DRILLING( NON 43DRILLING( NON 43--101 COMPLIANT)101 COMPLIANT)

ASSAYS OF 16 SAMPLES TAKEN FROM RECENT ASSAYS OF 16 SAMPLES TAKEN FROM RECENT ASSAYS OF 16 SAMPLES TAKEN FROM RECENT ASSAYS OF 16 SAMPLES TAKEN FROM RECENT PROSPECTING RAN UP PROSPECTING RAN UP TO 0.97% BERYLLIUM (BeO), TO 0.97% BERYLLIUM (BeO), 2.35% NIOBIUM (NB205) AND 4.99% TOTAL RARE EARTHS 2.35% NIOBIUM (NB205) AND 4.99% TOTAL RARE EARTHS TREO). TREO).

Page 38: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

MANN #2 SHOWINGMANN #2 SHOWING

MINERALIZED RADIOACTIVE ANOMALY

STRIKE LENGTH OF APPROXIMATELY 2400 METERS AND UP TO 90 METERS WIDE

GRAB SAMPLES BY NFLD GOVERNMENT IN 1985 ASSAYED 0.33% CESIUM, 0.17% ZIRCONIUM, 0.14% BERYLLIUM, 0.14% NIOBIUM

Page 39: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

MICHELIN #1 SHOWINGMICHELIN #1 SHOWING

RADIOACTIVE ANOMALY UP TO 75 METERS WIDE AND TRACED ALONG STRIKE FOR A DISTANCE OF 1 KILOMETER

GRAB SAMPLING BY NFLD GOVERNMENT IN 1985 ASSAYED 0.79 % CESIUM, 0.096 % YITTRIUM, 0.24% NIOBIUM,0.16 % ZIRCONIUM

Page 40: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

TWO TOM SHOWINGTWO TOM SHOWING

DISCOVERED BY BRINEX IN 1967 DISCOVERED BY BRINEX IN 1967

RADIOACTIVE ANOMALY TRACED FOR 1500 METRESRADIOACTIVE ANOMALY TRACED FOR 1500 METRES RADIOACTIVE ANOMALY TRACED FOR 1500 METRESRADIOACTIVE ANOMALY TRACED FOR 1500 METRES

LARGE NUMBER OF BOULDERS PROBABLY DERIVED FROM LARGE NUMBER OF BOULDERS PROBABLY DERIVED FROM LOCAL SOURCELOCAL SOURCE

RECENT PROSPECTING SAMPLING OF RECENT PROSPECTING SAMPLING OF 13 SAMPLES RAN UP 13 SAMPLES RAN UP TO 0.93 % BERYILLIUM (BEO), 4.93 % NIOBIUM (NB205), TO 0.93 % BERYILLIUM (BEO), 4.93 % NIOBIUM (NB205), 3 24 % (TREO) 3 24 % (TREO) 3.24 % (TREO) 3.24 % (TREO)

Page 41: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

NORTH RED WINE #1 & 2 SHOWINGNORTH RED WINE #1 & 2 SHOWING

DISCOVERED BY BRINEX LATE 1950’SDISCOVERED BY BRINEX LATE 1950’S DISCOVERED BY BRINEX LATE 1950’SDISCOVERED BY BRINEX LATE 1950’S

OLD PITS TRACED FOR 400 METERSOLD PITS TRACED FOR 400 METERS

UP TO 40 % EUDIALYTE UP TO 40 % EUDIALYTE -- A RUBY RED NAA RUBY RED NA--CA ZIRCONIUM CA ZIRCONIUM SILICATE MINERAL WITH APPRECIABLE REEs AND YSILICATE MINERAL WITH APPRECIABLE REEs AND Y

RECENT PROSPECTING: SAMPLED ANALYZED BETWEEN RECENT PROSPECTING: SAMPLED ANALYZED BETWEEN 1.28 % AND 4.93 % ZIRCONIUM , BETWEEN 0.31 % TO 1.28 % AND 4.93 % ZIRCONIUM , BETWEEN 0.31 % TO 1.04 %1.04 % TREO)TREO)))

Page 42: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

LABRADOR EXPLORATION PLANLABRADOR EXPLORATION PLAN FLY NEW RADIOMETRIC AND MAGNETIC SURVEY IN EARLY

SPRING 2010 OVER THE RED WINE PROPERTYSPRING 2010 OVER THE RED WINE PROPERTY

FOLLOW UP BY PROSPECTING, MAPPING, AND TRENCHING ON ALL OUTLINED TARGETS

DRILLING WILL COMMENCE ON MANN # 1 PROPERTY IN MID SUMMER 2010 TO PROPERLY OUTLINE THE EXTENT OF THE BERYLLIUM DEPOSIT OUTLINED BY RIO TINTO IN THE 1960

TO FURTHER EVALUATE THE RARE EARTH AND NIOBIUM VALUES TO FURTHER EVALUATE THE RARE EARTH AND NIOBIUM VALUES OBTAINED BY THE PROSPECTING CREWS IN THE LATE FALL OF 2009

TOTAL EXPENDITURES FOR THE PROGRAM FOR 2010 SHOULD BE TOTAL EXPENDITURES FOR THE PROGRAM FOR 2010 SHOULD BE APPROXIMATELY $500,000.00

Page 43: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

REDWINE PROPERTY

GOOSE BAY

ST JOHNSTHUNDER

BAYCLAY

HOWELLS

LACKNER PROPERTY

TIMMINS

LACKNER PROPERTY LOCATION

Page 44: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)
Page 45: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

LACKNER PROPERTYLACKNER PROPERTY LACKNER LAKE IS SITUATED WITHIN A 30 SQ KM CIRCULAR LACKNER LAKE IS SITUATED WITHIN A 30 SQ KM CIRCULAR

ALKALIC COMPLEX WITH HISTORIC NIOBIUM AND IRON ALKALIC COMPLEX WITH HISTORIC NIOBIUM AND IRON RESOURCESRESOURCES

NEW REE DISCOVERY (POLE LAKE) HOSTED IN A SYENITE NEW REE DISCOVERY (POLE LAKE) HOSTED IN A SYENITE BRECCIA, VALUES UP TO BRECCIA, VALUES UP TO 9.60 %TREO,9.60 %TREO, MINIMUM 3 METERS WIDEMINIMUM 3 METERS WIDE

NO PREVIOUS WORK TARGETED ON REE POTENTIALNO PREVIOUS WORK TARGETED ON REE POTENTIAL

LOCATED 20 KM EAST OF CHAPLEAU, WITH EASY ACCESS LOCATED 20 KM EAST OF CHAPLEAU, WITH EASY ACCESS OC 0 S O C U, S CC SSOC 0 S O C U, S CC SSTHROUGH A SERIES OF WOODS ROADSTHROUGH A SERIES OF WOODS ROADS

HIGHWAY AND RAILWAY WITHIN 10 KM OF PROPERTYHIGHWAY AND RAILWAY WITHIN 10 KM OF PROPERTY

Page 46: Corporate Presentation: Rare Earth Metals Inc. (TSXv: RA)

REM SUMMARY REM SUMMARY 18 DIAMOND DRILL HOLES HAVE BEEN COMPLETED TO DATE ON 18 DIAMOND DRILL HOLES HAVE BEEN COMPLETED TO DATE ON

THE CLAY HOWELLS PROJECT, METALURGICAL TEST ARE THE CLAY HOWELLS PROJECT, METALURGICAL TEST ARE CURRENTLY BEING UNDERTAKEN AND RESULTS WILL BE CURRENTLY BEING UNDERTAKEN AND RESULTS WILL BE AVAILABLE IN 6 WEEKSAVAILABLE IN 6 WEEKS

FOUNDED AND MANAGED BY AN EXPERIENCED TEAM WHOSE FOUNDED AND MANAGED BY AN EXPERIENCED TEAM WHOSE FORTE IS PROJECT GENERATION, PROJECT IMPLEMENTATION FORTE IS PROJECT GENERATION, PROJECT IMPLEMENTATION AND AND DISCOVERY DISCOVERY

WELL FUNDED TO ADVANCE PROJECTSWELL FUNDED TO ADVANCE PROJECTS WELL FUNDED TO ADVANCE PROJECTSWELL FUNDED TO ADVANCE PROJECTS

FOCUSING ON ADVANCED REE PROPERTIES WITH HISTORIC FOCUSING ON ADVANCED REE PROPERTIES WITH HISTORIC RESOURCES IN PROVEN GEOLOGICAL ENVIROMENTSRESOURCES IN PROVEN GEOLOGICAL ENVIROMENTS

PROJECT GENERALLY HAVE GOOD ACCESS AND INFRASTRUCTUREPROJECT GENERALLY HAVE GOOD ACCESS AND INFRASTRUCTURE

OPERATING IN MINING FRIENDLY JURISDICTIONS IN ONTARIO, OPERATING IN MINING FRIENDLY JURISDICTIONS IN ONTARIO, NEWFOUNDLAND AND LABRADORNEWFOUNDLAND AND LABRADORNEWFOUNDLAND AND LABRADORNEWFOUNDLAND AND LABRADOR

www.rareearthmetals.ca