corbels decorative millwork - b&b wood products · decorative millwork corbels continued...
TRANSCRIPT
Deco
rativ
e M
illw
ork
Corbels
Part Number Projection Height Overall Width
COR5X10Recessed
5 1/4" 10" 4"
COR7X11SWoodgrain/Stainable
7 3/8" 11 3/8" 7"
COR7X15X4SWoodgrain/Stainable
7" 15" 4"
COR8X9X4SWoodgrain/Stainable
8" 9" 4"
COR10X14Detailed
9 11/16" 14 1/2" 3 3/4"
COR12X16Detailed
10 15/16" 16 1/4" 6"
COR11X20Designer
11" 20" 6 1/2"
COR14X26Designer
14 1/2" 26" 6 1/2"
COR16X5X3S Woodgrain/Stainable
16" 5 3/8" 3 3/8"
Part Number Projection HeightOverall Width
COR16X7X3SWoodgrain/Stainable
16" 7 1/4" 3 1/2"
COR16X7X5S Woodgrain/Stainable
16" 7 1/4" 5 1/2"
COR16X8SWoodgrain/Stainable
16" 8" 6"
COR16X10X8SWoodgrain/Stainable
16" 10 1/2" 8"
COR16X7X3RX5SWoodgrain/Stainable
16" 7 1/4" 5"
COR21X6X12SWoodgrain/Stainable
21" 12" 6"
COR22X26Designer
22 1/2" 26" 8 1/2"
COR24X5X5SWoodgrain/Stainable
24" 5 1/2" 5 1/2"
COR24X6X5SWoodgrain/Stainable
24" 6 1/2" 5 1/2"
CorbelsContinued
Accessory F100 Page 83
Top Trim not included on this size.
CorbelsDecorative Millwork
Corbel selection is continued on the following page
Decorative Millw
ork
CorbelsContinued
CorbelsDecorative Millwork
Part Number Projection HeightOverall Width
COR24X6X6SWoodgrain/Stainable
24" 6" 6"
COR24X7X5SWoodgrain/Stainable
24" 7 1/2" 5 1/2"
COR24X8X6SWoodgrain/Stainable
24" 8" 6"
COR24X16X4SWoodgrain/Stainable
24" 16" 4"
COR39X10X5.5SWoodgrain/Stainable
39" 10" 5 1/2"
COR48X7X5S Woodgrain/Stainable
48" 7 1/2" 5 1/2"
CORA24X16X4SWoodgrain/Stainable
24" 8" 4"
Bullnose Corbels
Part Number Projection Height Overall Width
CORBN14X8X6SWoodgrain/Stainable
14" 7 1/4" 5 1/4"
CORBN14X10X6SWoodgrain/Stainable
14" 9 1/4" 5 1/4"
CORBN16X8X4SWoodgrain/Stainable
16" 7 1/4" 3 1/4"
CORBN18X6X4SWoodgrain/Stainable
18" 5 1/4" 3 1/4"
CORBN18X12X6SWoodgrain/Stainable
18" 11 1/4" 5 1/4"
CORBN22X10X6SWoodgrain/Stainable
22" 9 1/4" 5 1/4"
CORBN24X6X6S Woodgrain/Stainable
24" 5 1/4" 5 1/4"
COR18X10X6S Cove Corbels
1
Deco
rativ
e M
illw
ork
Ogee Corbels
Part Number Projection HeightOverall Width
COROG8X12SWoodgrain/Stainable
7 3/8" 11 3/8" 7 3/8"
COROG15X7SWoodgrain/Stainable
14 1/2" 7 1/4" 6"
Ogee CorbelsContinued
Part Number Projection HeightOverall Width
COROG20X7SWoodgrain/Stainable
20" 7" 8 1/2"
COROG24X6SWoodgrain/Stainable
24" 5 7/8" 5 5/8"
COROG29X8SWoodgrain/Stainable
28 3/8" 18 3/4" 7 3/8"
COROG34X19SWoodgrain/Stainable
33 3/4" 18 3/4" 7 3/8"
COROG48X8SWoodgrain/Stainable
48" 7 3/8" 7 3/8"
COROGA15X7SWoodgrain/Stainable
14 1/2" 7 1/4" 6"
COROGD15X7SWoodgrain/Stainable
14 1/2" 7 1/4" 6"
COROGF15X7SWoodgrain/Stainable
14 1/2" 7 1/4" 6"
Cove Corbels
Part Number Projection Height Overall Width
CORCV18X6X4SWoodgrain/Stainable
18" 5 1/4" 3 1/4"
CORCV18X6X6SWoodgrain/Stainable
18" 5 1/4" 5 1/4"
CORCV18X8X4SWoodgrain/Stainable
18" 7 1/4" 3 1/4"
CORCV18X8X6SWoodgrain/Stainable
18" 7 1/4" 5 1/4"
CORCV18X10X6SWoodgrain/Stainable
18" 9 1/4" 5 1/4"
CORCV18X12X6SWoodgrain/Stainable
18" 11 1/4" 5 1/4"
CorbelsDecorative Millwork
Decorative MillworkTIP: You may wish to paint, stain or faux finish your decorative millwork piece prior to installation. This can speed up installation and reduce errors.
INSTALLATION INSTRUCTIONS MATERIALS NEEDED
Tape Measure
Hammer or Pneumatic Nailer
Corrosion-resistant Nails
Nail Countersink
Caulk Gun
PL Premium Adhesive
Safety Glasses
Caulk or Wood Filler
Sandpaper
Pencil
Latex or Oil Base Paint
1. MARK INSTALLATION AREA
Select the location for your Decorative Millwork. Hold the millwork in place and mark the location with a pencil.
2. APPLY ADHESIVE
Apply a 1/4" bead of PL Premium Adhesive to only the portion of the millwork surface that will touch the mounting surface.
3. FASTEN MILLWORK INTO PLACE
Press the millwork in place using the pencil marks as guides. Fasten securely with nails or screws. Countersink fasteners and fill holes with caulk or wood filler.
4. FILL GAPS
If desired, caulk around millwork, filling any gaps between millwork and mounting surfaces.
5. FINISH AS DESIRED
Sand or texture any filled holes and touch up with paint or other finishes, as desired.
USING CORROSION-RESISTANT FASTENERS AND PL PREMIUM ADHESIVE Always use corrosion-resistant mechanical fasteners (nails or screws) and PL Premium Adhesive when installing Fypon products. This combination provides a secure, long lasting bond. Countersink all fasteners about 1/8 inch and fill with exterior grade white spackle. If desired, sand any minor imperfections and topcoat with a quality exterior latex or oil base paint. Fypon exterior millwork installations should be finished using a quality, exterior grade silicone caulk to prevent water infiltration behind siding, windows and doors. Some exterior millwork installations, in particular new construction (before siding is applied) may require a J-channel and/or flashing to prevent water infiltration. Installers must determine which installation technique is best for the specific situation.
IMPORTANT:Please read these installation guidelines thoroughly before beginning installation. Please note that these guidelines are provided only to assist with the installation of Fypon mouldings and millwork products. Modified procedures may be required in order to meet specific situations, unique applications and local building codes. The manufacturer does not under any circumstances warrant the installation of its products. Be sure to wear appropriate protective clothing, gloves and safety glasses when working with any tools. Installer should check for and relocate all electrical wiring within the proposed installation area, as needed (be sure to disconnect all electric power before working with any electrical wiring and follow all applicable local electrical codes and safety procedures).