METALS DIVISION PROJECT: PEDESTRIAN BRIDGE AT NOOR ISLAND IN SHARJAH CLIENT:WAAGNER BIRO GULF LLC DOC ID: KMD/SF 4875/ITP/001 REVISION: A DATE: 22/05/2014 PAGE: 1-4 SI.No D es cr ipt ion o f i ns pe ct ion / T es ti ng P roj ec t S pe ci fi ca ti on Re fe re nc e A cc ept anc e c ri te ri a T es t M et ho d / T ype of I ns pe ct io n I PRILIMIARY 1 Fabrication Drawings (By Client) As per Contract Specification(IND-0136-0 TC#01) → Approved Shop Drawing (Drawing Provided by Client) Review 2 Inspection and Test Plan As per Contract Specification Approved ITP Review 3 Document Submittal: Inspection and Test Plan, Welding Procedure Specification, Procedure Qualification Record, Welder Certificate. As per Contract S pecification Project Specification Review 4 NDT Procedures As per Contract Specification AWS D1.1 Review 5 Welding Procedure Specification & Procedure Qualification As per Contract Specification AWS D1.1 Review 6 Welder Qualification As per Contract Specification AWS D1.1 Review Legend: I-Inspection, W-Witness Point, H-Hold Point, RC-Random check, ITA-Independent Testing Agency, V-Visual, D-Dimension, S-Surveillance

Upload: skhasan

Post on 15-Oct-2015

28 views

Category:

Documents


0 download

DESCRIPTION

des

TRANSCRIPT

Sheet2 (4)METALS DIVISIONPROJECT: PEDESTRIAN BRIDGE AT NOOR ISLAND IN SHARJAHCLIENT:WAAGNER BIRO GULF LLCSUB CONTRACTOR: KHANSAHEB METALS DIVISIONDOC ID: KMD/SF 4875/ITP/001REVISION: AITP - INSPECTION & TEST PLANDATE: 22/05/2014PAGE: 1-4STEEL FABRICATION FOR PEDESTRIAN BRIDGEInspection Parties / Type of inspection(Inspection,Witness,Hold point, Review)SI.NoDescription of inspection / TestingProject Specification ReferenceAcceptance criteriaTest Method / Type of InspectionFrequencyVerifying / Control Data FormSUB CONTRACTORITACLIENTKMDIPRILIMIARY1Fabrication Drawings (By Client)As per Contract Specification(IND-0136-0 TC#01) Approved Shop Drawing (Drawing Provided by Client)ReviewOne TimeEngineering Status, Quality Records Forms - E2,HR&A2Inspection and Test PlanAs per Contract SpecificationApproved ITPReviewOne TimeITPHR&A3Document Submittal: Inspection and Test Plan, Welding Procedure Specification, Procedure Qualification Record, Welder Certificate.As per Contract SpecificationProject SpecificationReviewOne TimeApproved Status, Quality RecordsHH4NDT ProceduresAs per Contract SpecificationAWS D1.1ReviewOne TimeRT,UT&MPT ProceduresHH5Welding Procedure Specification & Procedure QualificationAs per Contract SpecificationAWS D1.1ReviewOne TimeRT,UT & MPT ProceduresHH6Welder QualificationAs per Contract SpecificationAWS D1.1ReviewOne TimeWQTHHMETALS DIVISIONPROJECT: PEDESTRIAN BRIDGE AT NOOR ISLAND IN SHARJAHCLIENT:WAAGNER BIRO GULF LLCSUB CONTRACTOR: KHANSAHEB METALS DIVISIONDOC ID: KMD/SF 4875/ITP/001REVISION: AITP - INSPECTION & TEST PLANDATE: 22/05/2014PAGE: 2-4STEEL FABRICATION FOR PEDESTRIAN BRIDGEInspection Parties / Type of inspection(Inspection,Witness,Hold point, Review)SI.NoDescription of inspection / TestingProject Specification ReferenceAcceptance criteriaTest Method / Type of InspectionFrequencyVerifying / Control Data FormSUB CONTRACTORITACLIENTKMDIIMATERIAL1Raw materialAs per Contract Specification(IND-0136-0 TC#02) S275JR or EquivalentApproved MTC'sV & DRandom of Each lot and Each TypeMill Test CertificateHR2Welding ConsumablesAs per Contract SpecificationApproved MTC'sV & DRandom of Each lot and Each TypeMill Test CertificateHR3Painting Materials Receiving InspectionAs per Contract Specification Batch Certificates Approved Painting systemV & RRandom of Each lot and Each Type Batch Certificates MSDSHR4Calibration of Instruments & EquipmentsAs per Contract SpecificationList of Master EquipmentReviewOne TimeCalibration CertificateHRMETALS DIVISIONPROJECT: PEDESTRIAN BRIDGE AT NOOR ISLAND IN SHARJAHCLIENT:WAAGNER BIRO GULF LLCSUB CONTRACTOR: KHANSAHEB METALS DIVISIONDOC ID: KMD/SF 4875/ITP/001REVISION: AITP - INSPECTION & TEST PLANDATE: 22/05/2014PAGE: 3-4STEEL FABRICATION FOR PEDESTRIAN BRIDGEInspection Parties / Type of inspection(Inspection,Witness,Hold point, Review)SI.NoDescription of inspection / TestingProject Specification ReferenceAcceptance criteriaTest Method / Type of InspectionFrequencyVerifying / Control Data FormSUB CONTRACTORITACLIENTKMDIIIFABRICATION1Material Preparation & FIT UPAs per Contract SpecificationApproved Drawings, WPS, AWS D1:1V & D100%Internal Inspection Request Q12aHR2WeldingAs per Contract SpecificationAWS D1:1V & S100%Weld visual Report and Dimensional ReportHR3Final Visual, dimensional inspection & Workmanship (Before Painting)As per Contract SpecificationAs per Project SpecV & D100%Weld visual Report and Dimensional ReportHRIVNDT1RT' on Full Penetration weld (Only Selected Location) Location of RT Test will be Selected by M/S Waagner BiroAs per Contract SpecificationAWS D1.1V10%Independent Third Party "RT" ReportHHR2UT on Full Penetration weld (T 8mm) Test area is defined as a Zone Up to 150mm away from the weld joint (Only Selected Location) Location of RT Test will be Selected by M/S Waagner BiroAs per Contract SpecificationAWS D1:1V10%UT ReportWRR3MT' on Fillet and Partial penetration weldsAs per Contract SpecificationAWS D1.1V10%Independent Third Party "MPT" ReportHHRMETALS DIVISIONPROJECT: PEDESTRIAN BRIDGE AT NOOR ISLAND IN SHARJAHCLIENT:WAAGNER BIRO GULF LLCSUB CONTRACTOR: KHANSAHEB METALS DIVISIONDOC ID: KMD/SF 4875/ITP/001REVISION: AITP - INSPECTION & TEST PLANDATE: 22/05/2014PAGE: 4-4STEEL FABRICATION FOR PEDESTRIAN BRIDGEInspection Parties / Type of inspection(Inspection,Witness,Hold point, Review)SI.NoDescription of inspection / TestingProject Specification ReferenceAcceptance criteriaTest Method / Type of InspectionFrequencyVerifying / Control Data FormSUB CONTRACTORITACLIENTKMDVSURFACE PREPARATION & PAINTING1Surface Preparation (Prior to surface preparation all oil and grease patches on the surface shall be removed by cleaning solvent and dried off)As per Contract SpecificationBS 7079ElcometerRCBlasting & Painting Inspection ReportHR2Environmental Condition (During Painting)As per Contract SpecificationProduct Data Sheet Steel Temp: Max 50C Due Point Min 3C Relative Humidity 80%ElcometerEvery 2HrsClimate Condition RecordHR3Painting InspectionAs per Contract Specification Approved Painting SystemDFT & VEach CoatBlasting & Painting Inspection ReportHWThe EngineerThe ContractorDOC ID:ELS10-8SS-M550-BSC-GEN-00077ITP - INSPECTION & TEST PLANFORM ID: ELS10-8SS-M550-BSC-GEN-00077REVISION: APAGE: 1-1For steel structure InstallationDATE:Inspection Parties / Type of inspection(Inspection,Witness,Hold point, Review)SI.NoDescription of inspection / TestingProject Specification ReferenceAcceptance CriteriaTest Method / Type of InspectionFrequencyVerifying / Control Data FormCONTRACTORITACLIENTKMDIXERECTION1Pre site inspectionAST-9000-SYS-RT-13001-B Structural Steel work specification Part- 11.17NSSS -2004V & D100%Q11b & Q11dHR2ErectionAST-9000-SYS-RT-13001-B Structural Steel work specification Part- 11.17NSSS -2004D100%OP -07 Rev.0.HR3Plumbing & allignmentAST-9000-SYS-RT-13001-B Structural Steel work specification Part- 11.17NSSS -2004V & D100%Q12HR4Torque InspectionAST-9000-SYS-RT-13001-B Structural Steel work specification Part- 11.17NSSS -2004V & DRCQ12HR7SnaggingAST-9000-SYS-RT-13001-B Structural Steel work specification Part- 11.17NSSS -2004V & D100%Q19HR5Primer Touch-upAST-9000-SYS-RT-13001-B Structural Steel work specification Part- 11.17NSSS -2004V & DFT100%Q12HR6Handing OverAST-9000-SYS-RT-13001-B Structural Steel work specification Part- 11.17NSSS -2004V & D100%Q40HR

&L&"-,Bold"&K002060Legend: I-Inspection, W-Witness Point, H-Hold Point, RC-Random check, ITA-Independent Testing Agency, V-Visual, D-Dimension, S-Surveillance, RW-Random Witness, T-Thickness, DFT-Dry film Thickness.AL SUFOUH TRANSIT SYSTEM PROJECTAlstom Besix ConsortiumP.O. Box 13055 - Dubai, UAE