Coordinating Drawings and
Specifications
Review Questions
-
8/12/2019 Coord Drawing Review Ver010712
2/22
1. A particular mater ial may appear many times
throughout the Drawings but is specif ied in how
many locations?
a. One
b. Two
c. According to the number of trades
involved
d. As determined in Division 1
-
8/12/2019 Coord Drawing Review Ver010712
3/22
1. A particular mater ial may appear many times
throughout the Drawings but is specif ied in how
many locations?
a. One
b. Two
c. According to the number of trades
involved
d. As determined in Division 1
-
8/12/2019 Coord Drawing Review Ver010712
4/22
2. When cross-referencing between the
Drawings and Specif ications the proper term is:
a. Refer to specifications
b. See specifications
c. Neither, as the practice is discouraged
-
8/12/2019 Coord Drawing Review Ver010712
5/22
2. When cross-referencing between the
Drawings and Specif ications the proper term is:
a. Refer to specifications
b. See specifications
c. Neither, as the practice is discouraged
-
8/12/2019 Coord Drawing Review Ver010712
6/22
3. A disadvantage of repeating a requi rement
on both Drawings and Specif ication is when a
discrepancy arises:
a. An addendum covering a change in one
location may overlook it in another
b. It causes bidders to make different
interpretations of what is required
c. Court interpretations of inconsistent
requirements bind the contractor only tothe lesser requirement
d. All of the above
-
8/12/2019 Coord Drawing Review Ver010712
7/22
3. A disadvantage of repeating a requirements
on both Drawings and Specif ication is when a
discrepancy arises:
a. An addendum covering a change in one
location may overlook it in another
b. It causes bidders to make different
interpretations of what is required
c. Court interpretations of inconsistent
requirements bind the contractor only tothe lesser requirement
d. All of the above
-
8/12/2019 Coord Drawing Review Ver010712
8/22
4. To avoid confusion, who should take
responsibil i ty for enforcing consistent
terminology?
a. Drafting Job Captain
b. Owner
c. Specifier
d. Contractor
-
8/12/2019 Coord Drawing Review Ver010712
9/22
4. To avoid confusion, who should take
responsibil i ty for enforcing consistent
terminology?
a. Drafting Job Captain
b. Owner
c. Specifier
d. Contractor
-
8/12/2019 Coord Drawing Review Ver010712
10/22
5. Detailed written information should appear
only in the:
a. Keynotes
b. Preliminary Project Descriptions
c. Drawing details
d. Specifications
-
8/12/2019 Coord Drawing Review Ver010712
11/22
5. Detailed written information should appear
only in the:
a. Keynotes
b. Preliminary Project Descriptions
c. Drawing details
d. Specifications
-
8/12/2019 Coord Drawing Review Ver010712
12/22
6. A role of specif ications in describing a
construction project is:
a. Showing size, form, and relationship
b. Describing administrative procedures and
workmanship
c. Showing quantity and generic type
-
8/12/2019 Coord Drawing Review Ver010712
13/22
6. A role of specif ications in describing a
construction project is:
a. Showing size, form, and relationship
b. Describing administrative procedures and
workmanship
c. Showing quantity and generic type
-
8/12/2019 Coord Drawing Review Ver010712
14/22
7. Reference Drawings serve which purpose:
a. Show existing work that is to be modified
b. Show construction related to the work, but
which is not included in the contract
c. Provide the Owner with a set of
documents that will facilitate operation
-
8/12/2019 Coord Drawing Review Ver010712
15/22
7. Reference Drawings serve which purpose:
a. Show existing work that is to be modified
b. Show construction related to the work, but
which is not included in the contract
c. Provide the Owner with a set of
documents that will facilitate operation
-
8/12/2019 Coord Drawing Review Ver010712
16/22
-
8/12/2019 Coord Drawing Review Ver010712
17/22
8. The Uni form Location of Subject Matter
jointly publ ished by the EJCDC and AIA provides a
recommended location of topics in all of the
following except:
a. Supplementary Conditions
b. Division 1
c. Agreement
d. Drawings
-
8/12/2019 Coord Drawing Review Ver010712
18/22
9. When placed in the specif ication section,
schedules are:
a. Located at the end of PART 3 -EXECUTION
b. To help simplify communications byusing tabular form or matrix
c. Schedules are never placed in the
specifications, but are found on thedrawings
d. Both a and b
-
8/12/2019 Coord Drawing Review Ver010712
19/22
9. When placed in the specif ication section,
schedules are:
a. Located at the end of PART 2 -PRODUCTS
b. To help simplify communications byusing tabular form or matrix
c. Schedule are never placed in thespecifications, but are found on thedrawings
d. Both a and b
-
8/12/2019 Coord Drawing Review Ver010712
20/22
10. Marked up or corrected contract drawings
that indicate changes incorporated in the Work are
called:
a. Bidding Requirements
b. Contract Forms
c. Conditions of the Contract
d. Record Drawings
-
8/12/2019 Coord Drawing Review Ver010712
21/22
10. Marked up or corrected contract drawings
that indicate changes incorporated in the Work are
called:
a. Bidding Requirements
b. Contract Forms
c. Conditions of the Contract
d. Record Drawings
-
8/12/2019 Coord Drawing Review Ver010712
22/22
Answers
1. a
2. c
3. d
4. c5. d
6. b
7. b
8. d
9. d
10. d