    Coordinating Drawings and

    Specifications

    Review Questions

  • 8/12/2019 Coord Drawing Review Ver010712

    2/22

    1. A particular mater ial may appear many times

    throughout the Drawings but is specif ied in how

    many locations?

    a. One

    b. Two

    c. According to the number of trades

    involved

    d. As determined in Division 1

  • 8/12/2019 Coord Drawing Review Ver010712

    3/22

    1. A particular mater ial may appear many times

    throughout the Drawings but is specif ied in how

    many locations?

    a. One

    b. Two

    c. According to the number of trades

    involved

    d. As determined in Division 1

  • 8/12/2019 Coord Drawing Review Ver010712

    4/22

    2. When cross-referencing between the

    Drawings and Specif ications the proper term is:

    a. Refer to specifications

    b. See specifications

    c. Neither, as the practice is discouraged

  • 8/12/2019 Coord Drawing Review Ver010712

    5/22

    2. When cross-referencing between the

    Drawings and Specif ications the proper term is:

    a. Refer to specifications

    b. See specifications

    c. Neither, as the practice is discouraged

  • 8/12/2019 Coord Drawing Review Ver010712

    6/22

    3. A disadvantage of repeating a requi rement

    on both Drawings and Specif ication is when a

    discrepancy arises:

    a. An addendum covering a change in one

    location may overlook it in another

    b. It causes bidders to make different

    interpretations of what is required

    c. Court interpretations of inconsistent

    requirements bind the contractor only tothe lesser requirement

    d. All of the above

  • 8/12/2019 Coord Drawing Review Ver010712

    7/22

    3. A disadvantage of repeating a requirements

    on both Drawings and Specif ication is when a

    discrepancy arises:

    a. An addendum covering a change in one

    location may overlook it in another

    b. It causes bidders to make different

    interpretations of what is required

    c. Court interpretations of inconsistent

    requirements bind the contractor only tothe lesser requirement

    d. All of the above

  • 8/12/2019 Coord Drawing Review Ver010712

    8/22

    4. To avoid confusion, who should take

    responsibil i ty for enforcing consistent

    terminology?

    a. Drafting Job Captain

    b. Owner

    c. Specifier

    d. Contractor

  • 8/12/2019 Coord Drawing Review Ver010712

    9/22

    4. To avoid confusion, who should take

    responsibil i ty for enforcing consistent

    terminology?

    a. Drafting Job Captain

    b. Owner

    c. Specifier

    d. Contractor

  • 8/12/2019 Coord Drawing Review Ver010712

    10/22

    5. Detailed written information should appear

    only in the:

    a. Keynotes

    b. Preliminary Project Descriptions

    c. Drawing details

    d. Specifications

  • 8/12/2019 Coord Drawing Review Ver010712

    11/22

    5. Detailed written information should appear

    only in the:

    a. Keynotes

    b. Preliminary Project Descriptions

    c. Drawing details

    d. Specifications

  • 8/12/2019 Coord Drawing Review Ver010712

    12/22

    6. A role of specif ications in describing a

    construction project is:

    a. Showing size, form, and relationship

    b. Describing administrative procedures and

    workmanship

    c. Showing quantity and generic type

  • 8/12/2019 Coord Drawing Review Ver010712

    13/22

    6. A role of specif ications in describing a

    construction project is:

    a. Showing size, form, and relationship

    b. Describing administrative procedures and

    workmanship

    c. Showing quantity and generic type

  • 8/12/2019 Coord Drawing Review Ver010712

    14/22

    7. Reference Drawings serve which purpose:

    a. Show existing work that is to be modified

    b. Show construction related to the work, but

    which is not included in the contract

    c. Provide the Owner with a set of

    documents that will facilitate operation

  • 8/12/2019 Coord Drawing Review Ver010712

    15/22

    7. Reference Drawings serve which purpose:

    a. Show existing work that is to be modified

    b. Show construction related to the work, but

    which is not included in the contract

    c. Provide the Owner with a set of

    documents that will facilitate operation

  • 8/12/2019 Coord Drawing Review Ver010712

    16/22

  • 8/12/2019 Coord Drawing Review Ver010712

    17/22

    8. The Uni form Location of Subject Matter

    jointly publ ished by the EJCDC and AIA provides a

    recommended location of topics in all of the

    following except:

    a. Supplementary Conditions

    b. Division 1

    c. Agreement

    d. Drawings

  • 8/12/2019 Coord Drawing Review Ver010712

    18/22

    9. When placed in the specif ication section,

    schedules are:

    a. Located at the end of PART 3 -EXECUTION

    b. To help simplify communications byusing tabular form or matrix

    c. Schedules are never placed in the

    specifications, but are found on thedrawings

    d. Both a and b

  • 8/12/2019 Coord Drawing Review Ver010712

    19/22

    9. When placed in the specif ication section,

    schedules are:

    a. Located at the end of PART 2 -PRODUCTS

    b. To help simplify communications byusing tabular form or matrix

    c. Schedule are never placed in thespecifications, but are found on thedrawings

    d. Both a and b

  • 8/12/2019 Coord Drawing Review Ver010712

    20/22

    10. Marked up or corrected contract drawings

    that indicate changes incorporated in the Work are

    called:

    a. Bidding Requirements

    b. Contract Forms

    c. Conditions of the Contract

    d. Record Drawings

  • 8/12/2019 Coord Drawing Review Ver010712

    21/22

    10. Marked up or corrected contract drawings

    that indicate changes incorporated in the Work are

    called:

    a. Bidding Requirements

    b. Contract Forms

    c. Conditions of the Contract

    d. Record Drawings

  • 8/12/2019 Coord Drawing Review Ver010712

    22/22

    Answers

    1. a

    2. c

    3. d

    4. c5. d

    6. b

    7. b

    8. d

    9. d

    10. d