cooper-eromanga basins in south australia

7
Cooper-Eromanga Basins in South Australia Barry Goldstein, Executive Director – Energy Resources South Australian State Government ` www.petroleum.dmitre.sa.g ov.au GO TO AUSTRALIA DRILL A WELL BI NGO SORTED Go to South Australia 1.Conventional Oil 2.Unconvention al Petroleum 3.Roundtable Join us

Upload: xenia

Post on 25-Feb-2016

36 views

Category:

Documents


2 download

DESCRIPTION

Go to South Australia. Conventional Oil Unconventional Petroleum Roundtable Join us . Cooper-Eromanga Basins in South Australia . Barry Goldstein, Executive Director – Energy Resources South Australian State Government `. www.petroleum.dmitre.sa.gov.au. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Cooper-Eromanga Basins in South  Australia

Cooper-Eromanga Basinsin South Australia

Barry Goldstein, Executive Director – Energy ResourcesSouth Australian State Government

`www.petroleum.dmitre.sa.gov.au

GO TO AUSTRALIA

DRILL A WELL

BINGO

SORTED

GO TO AUSTRALIA

DRILL A WELL

BINGO

SORTED

Go to South

Australia1. Conventional Oil

2. Unconventional Petroleum

3. Roundtable

Join us

Page 2: Cooper-Eromanga Basins in South  Australia

Retention Leases for Oil

2

Petroleum Licence Holders

Oil exploration wells (2000-13), western Cooper – Eromanga o 56% located with 3D were

discoveries (and find-size )o 30% located with 2D were

discoverieso Average 2.53 mmbo find sizeo 10 operators for 22 companies

Proven Cooper-Eromanga oil play

Page 3: Cooper-Eromanga Basins in South  Australia

Cooper Basin Composite and Deep Coal Plays Ga

s sat

urat

ed c

ompo

site

play

Page 4: Cooper-Eromanga Basins in South  Australia

Composite Play

below ~2,900m

Base Patchawarra depth structure map showing unconventional gas wells

Cooper Basin, South AustraliaPatchawarra Fm. Pressure Gradient

Page 5: Cooper-Eromanga Basins in South  Australia

2014 2015 2016 2017-2028 (12 years)

Drilling rigs 3 5 9 15

Type of wells Vertical Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal

Rig Years @ 50% vertical

vs horizontal

1.5 1.5 2.5 2.5 4.5 4.5 7.5 7.5

Wells/yr/rig 17.5 11 17.5 11 17.5 11 17.5 11

Wells Tally 26.25 16.5 43.75 27.5 78.75 49.5 1575 990

Supply-chain goal posts: 2,800 wells @ 3Pj / well over 15 yrs to attain 8,422 Pj

(~10% of 93 TCF EIA estimate for gas from shales)

Work for government-industry:• Discover competence possibly without capacity to supply rigs, pipe, roads, rail, materials,

services, people, etc, etc. • Foster pre-qualification for tenders; and• Enable clusters and IPOs for budding multi-nationals

Page 6: Cooper-Eromanga Basins in South  Australia

Conclusions for the Cooper-Eromanga Basins

1. >50% success rate in finding average 2.5 mmbo post 3D

2. Huge shale, tight sandstone and deep coal gas plays.

3. Proven 1,000+ metre gas columns can be developed with a mix of (mostly) verticals and (fewer) horizontal wells

4. Initial unconventional resource estimates for the Cooper Basin are high:• EIA potential sales gas from shales: 93 TCF • Rough estimate of sales gas in Composite Play: ~ 300 TCF

5. Exploration and appraisal ramping up with several E&Ps and gas customers now funding exploration. Expect deals

Page 7: Cooper-Eromanga Basins in South  Australia

Barry Goldstein, Executive Director – Energy ResourcesSouth Australian State Government

`

Nirvana Outcomes

Look – it is possible to herd cats

www.petroleum.dmitre.sa.gov.au

Cooper-Eromanga Basinsin South Australia