QUALITY CONTROL SUPPORT AND INSPECTIONS FOR HUMANITARIAN PROJECTS IN INDONESIA

POD IDIQ Contract # W912UM-07-D-0004

Page 2: Contract No

No. 063/ZAi/B.900 Jakarta, 25 October 2007 Mssrs.: CH2M HILL Denver office 9191 South Jamaica Street, Englewood, CO, 80112-5946, USA. Attn: Daena Mulleitner ([email protected]) Dear Madam, First of all, we would like to thank you for this opportunity. With reference to your Request for Proposal for POD IDIQ Contract No. W912UM-07-D-0004 Task Order 2 for Humanitarian Assistance Indonesia dated 20 September 2007, we herewith would like to submit our Bid Proposal with the following contents:

- Technical Proposal - Commercial Proposal - Subcontractor Pre qualification Package - Subcontractor Safety Performance Questionnaire

We hope that our proposal would be of interest for you and we’re waiting for your further information. Should there be any points requiring further clarification, please do not hesitate to contact us. Thank you for your kind attention and cooperation. Yours Faithfully, PT ENCONA INTI INDUSTRI HARYONO YB PRESIDENT DIRECTOR Cc: file

Page 3: Contract No

Quality Control Support and Inspections for Humanitarian Projects in Indonesia POD IDIQ Contract # W912UM-07-D-0004

TECHNICAL PROPOSAL

Page 4: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 1 of 61

PT ENCONA INTI INDUSTRI

I PRELIMINARY TECHNICAL APPROACH 1. INTRODUCTION The involvement of QC SUBCONTRACTOR starts at the very beginning of the project, according to the sequence below:

a. Project Strategy b. Design Management and Coordination c. Bidding Phase d. Construction Phase e. Fit out Management, Testing and Commissioning. f. Hand Over

2. PROJECT STRATEGY Before construction of the projects that locate at different location and relatively apart from the other, adequate time for planning are suggested to evaluate strategy and to prepare project’s planning. It is really important to ensure that risks and strength are identified and anticipated. And then steps of solution and project programming can be arranged to ensure project’s goal achievement. The strategy will include: Project organization. This consists of Project Manager, Site Superintendent, Construction

Management, Supervisor, etc. Determination of Optimum Capital Budgeting and Cost Cutting effort. Procurement method and requirement of D-B Subcontractor Construction Method Project Controlling Response to actual local issues that are directly connected to the project

Those conceptual strategic should be accommodated and QC SUBCONTRACTOR will suggest further input in project execution strategy according to information obtained. 3. DESIGN MANAGEMENT AND COORDINATION Considering the project location are scattered, coordination among disciplines need to be simplify, and difficulty of getting appropriate Design Subcontractor must be anticipated, we propose to

Page 5: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 2 of 61

PT ENCONA INTI INDUSTRI

complete design of certain projects using in house architect and engineering. Therefore, concepts and ideas can be directly proposed to CH2M HILL in planned drawing and specification. 3.1. DESIGN PROCESS For having quality assurance of design, QC SUBCONTRACTOR will ensure that all steps in design process have done appropriately. Those steps are at least: Terms of Reference (TOR) arrangement. TOR document must at least consist of :

o Goal or target to be achieved o Physical requirement o Building Capacity o Schedule and time limit o Standard, quality and cost limitation o Scope of Work of Architect and Engineer o Terms and procedures of work o Output or deliverables

Design Issues & Approval Survey Design Concept & Approval Design Development & Approval Detailed Design & Approval Final Design Document & Approval Authorization Process Presentation

3.2. DESIGN INTERPHASE-COORDINATION In design phase QC SUBCONTRACTOR has roles as design coordinator and design team. As design coordinator, QC SUBCONTRACTOR support design team to do interphase coordination among disciplines. Interphase controlling is very important to ensure design’s quality and constructability. Design interphase is done through regular meeting coordination and design control procedures. Design control procedure described as follows: Design Planning:

Page 6: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 3 of 61

PT ENCONA INTI INDUSTRI

o Design Planning "Job Instruction" should be prepared. o Organizational and technical interfaces between different departments shall be

identified, and the necessary information shall be documented, transmitted, and reviewed through project meetings.

Design Input:

o Design input requirements including specifications, as well as applicable statutory and regulatory requirements will be identified and documented, and their selection shall be reviewed for adequacy.

o Design input requirements will include the contract review results Design Output:

o Design outputs shall be documented and described in drawings, specifications, purchasing data, calculations and analyses etc.

o Design outputs shall be reviewed and verified before issuing for use. o Design outputs shall meet the design input requirements and contain or make

references to accept criteria. Design Review:

o Design reviews shall be performed in accordance with "Design Review and Verification Procedure" to ensure that prepared design outputs conform to the design input requirements at appropriate design stage. Design review results shall be recorded and maintained. Design review may include design interface check by relevant teams.

o Design outputs requiring CH2M HILL approval shall be reviewed or approved prior to issuing for use or for construction

Design Verification:

o Design Verification shall be performed to ensure that design outputs satisfy the specified design input requirements according to "Design Review and Verification Procedure”.

Design Changes:

o Design Changes and modifications shall be identified, documented, reviewed and approved.

Page 7: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 4 of 61

PT ENCONA INTI INDUSTRI

o Design changes shall be controlled by the same method applied at earlier design control.

o The design change control shall be performed in accordance with "Design Change Procedure".

Design approval process sometimes impedes design schedule especially if procedure of approval not properly prepared. QC SUBCONTRACTOR in project plan will determine it after consulted with all team. 3.3. DESIGN STANDARDS Detail Design will be performed in accordance with the latest version of applicable local and national standards, laws and regulations. In the event of conflict between such standards, specifications, laws and/or regulations, QC SUBCONTRACTOR shall obtain CH2M HILL guidance on the applicable standard, specification, law and/or regulations. In the absence of any specific CH2M HILL instruction to the contrary, QC SUBCONTRACTOR will comply with the most stringent standards, specification, laws and/or regulations. 3.4. CONSTRUCTABILITY & MAINTAINABILITY Construction aspect must be considered since design concept arrangement for determined main construction method of main building component and other component. For example is prefabrication, preassembly, modular building system, or construction staging. Standardization design by using manufacturer standard dimension and Mechanical & Electrical (M&E) standard connection will increase constructability of design and also easiness in duplicating and repetition of element building construction. For example is the usage of formwork. QC SUBCONTRACTOR will study maintainability aspects of designs through constructability-maintainability evaluation standard procedures.

Page 8: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 5 of 61

PT ENCONA INTI INDUSTRI

3.5. DESIGN OPTIMIZATION QC SUBCONTRACTOR will ensure that all building component, especially high cost component, have review through value optimization process to achieve cost effective design. Review of design alternatives are very important to be done from the first step design (design concept), to achieve significant cost-cutting effect. 3.6. ADEQUACY OF DESIGN QC SUBCONTRACTOR will ensure that design process will product adequate design to execute and construct. Including in this point is Design Quality, Sufficiency, Clarity, Completeness, Simplicity and Reliability. Drawing quality, also with specification and other construction information needed, will affect construction productivity. If necessary, detail and form that is to complicated need to be avoided. On the contrary, unfinished design or not detailed design will enforce site team to find their own solution. This will delay construction activity, resulting inefficiency and at the end follow-on uncontrolled extra cost activity, like demolished, reconstruction, extra work, over time, etc. 3.7. ENVIROMENT EFFECT Although this project is not a large scale construction, but QC SUBCONTRACTOR will ensure that design already consider potential effect to environment which will affect the project success if not properly handled. Common effects are: Noise and Vibration.

During construction, noise and vibration will occur, so site management of Construction Subcontractor must be checked. The noise from heavy equipment usage must be finely anticipated.

Water. Waste water will cause sensitive case among society if the treatment is not proper.

Traffic A study must be done to ensure that new traffic in construction and operation phase can be handled.

Page 9: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 6 of 61

PT ENCONA INTI INDUSTRI

Sosio-Economic Planner and QC SUBCONTRACTOR must observe potential effect caused by project to surrounding society and potential effect from society to project in contrary.

Identification and mitigation plan of this effect must be part of the project’s plan. 3.8. SAFETY AND SECURITY ISSUES Considering that facility being constructed is public facility, safety and security will become important point of interest by all team, so a special treatment need to be done in this project. 3.9. DOCUMENT CONTROL PROCEDURE QC SUBCONTRACTOR will develop and maintain computerized systems and procedures to identify and log communications and documentation transmission / receipts in electronic format in accordance with CH2M HILL’s requirements. The system will cater for project documentation both produced by QC SUBCONTRACTOR and for Construction Subcontractor / Supplier document relating to purchased materials and equipment and Services. The system will incorporate facilities to ensure the accurate issue, tracking and monitoring of documentation and shall ensure that up-to-date document register are available at all times and issued to CH2M HILL every 2 weeks. Document Control will be operate by a document administrator to be provided by QC SUBCONTRACTOR staffed with sufficient dedicated and competent technical and clerical personnel to enable documents to be received, registered, and issued to CH2M HILL, QC SUBCONTRACTOR and Construction Subcontractor in a timely way. Document control section will be electronically centralized with hubs for accessibility for other locations. Document control at least consists of: Control of deliverables as stated in master list of document Control of Internal review cycles. This is production status control which explains progress of

each deliverables since project started until first hand over. Control of interfaces or information exchange Control of information changes which has been appointed by change control register.

Page 10: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 7 of 61

PT ENCONA INTI INDUSTRI

Control of approval process from proposed deliverable until get approval. 3.9.1. Design Document Register QC SUBCONTRACTOR will set up and maintain a computerized Design Document Register, which shall provide a complete listing of all documents and drawings produced by QC SUBCONTRACTOR and Construction Subcontractor/Suppliers. This register shall be able to provide accurate and up-to-date information on the current status of all registered documents and drawings. Each record on the Document Design Register will include, a minimum, the following data: Document/drawing number Document/drawing title shown on the document Latest revision number and date on issue to CH2M HILL Transmittal number of issue to CH2M HILL Status Summarized issue information clearly indicating the dates of previous issues. The format of the Design Document Register will be agreed with and distributed every 2

weeks. Regular reports on Construction Subcontractor/Supplier's documentation will be submitted to CH2M HILL. This will include, as minimum: Documents/drawings due/overdue from Construction Subcontractor/Supplier Documents/drawings due/overdue for return to Construction Subcontractor/Supplier.

3.9.2. Filing and Archiving QC SUBCONTRACTOR will set and maintain a centralized filing system for both technical documentation (documents and drawings) and correspondence. Separate Design and Supplier/Construction Subcontractor files shall be maintained with the latest revision of each original document/drawing held in reproducible and electronic form. This requirement shall apply to both QC SUBCONTRACTOR and CH2M HILL technical data and correspondence. QC SUBCONTRACTOR document control will include: Set-up and review of a Document Distribution Matrix for both CH2M HILL and QC

Page 11: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 8 of 61

PT ENCONA INTI INDUSTRI

SUBCONTRACTOR Ensure pertinent issues are available at all locations Changes are in writing or traceable to electronic version and processed efficiently Record changes with the ability to demonstrate changes following CH2M HILL approval of

documents. 3.9.3. Dispatch Documents All documents, with the exception of telefaxes, memoranda, e-mail, and letters will be sent under cover of a uniquely numbered Document Transmittal. For reference purposes all transmittal sheet shall be numbered sequentially and shall bear the Contract Number and QC SUBCONTRACTOR Project Title. Documents or Drawings in differing stages of release e.g. 'FOR COMMENT', 'FOR INFORMATION', 'CONSTRUCTION RELEASED' etc., will be submitted with separate transmittals. To facilitate the distribution, drawings and documents of a different nature will not be sent under cover of one transmittal sheet. Document will be grouped under separate transmittals such as, but not be limited to the following: Area/Location General Specific area Discipline

3.9.4. Manpower Scheduling QC SUBCONTRACTOR will ensure that the schedule and manpower plan is established and agreed with CH2M HILL, for each Work Authorization. QC SUBCONTRACTOR schedule will be manpower resources loaded by discipline including all eligible personnel. QC SUBCONTRACTOR will provide in the monthly report histogram showing the weekly manpower requirements and availabilities by discipline for Work Authorization "rolled up" to totals for all Work Authorizations. QC SUBCONTRACTOR will endeavor to maintain manpower leveled plans. In the event of significant manpower overloads or under loads, QC SUBCONTRACTOR shall prepare and communicate to CH2M HILL a detailed plan of the remedial measures QC SUBCONTRACTOR will take to manage this deviation while maintaining the schedule dates.

Page 12: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 9 of 61

PT ENCONA INTI INDUSTRI

3.9.5. Construction Subcontractor Drawings QC SUBCONTRACTOR will review and comment upon received construction subcontractor drawings. 3.10. CONTRACT PACKAGING QC SUBCONTRACTOR will evaluate work package by considering: Possibility to shorten construction time schedule Quality expected of certain work Sequencing of construction work Long-lead items Load of work capital of construction subcontractor in this crisis economy situation Risk distribution and contractor’s responsibility Project cost cutting Public campaign for the project persistence by involving local strength. Public Campaign untuk keberlangsungan Pekerjaan dengan melibatkan potensi peran lokal.

QC SUBCONTRACTOR will extra carefulness to set the project work, as it will affect complexity of construction management or work quality and as the result productivity and whole construction quality will impede. 4. BIDDING PHASE In tendering phase, QC SUBCONTRACTOR will support CH2M HILL to procure construction subcontractor. QC SUBCONTRACTOR’s services are as follows : Arranging tender agenda Acting as the POC and tender committee Arranging tender procedure Determining criteria of participant Determining criteria of selection Determining Engineer’s Estimate as ceiling price Providing punctual tender document Doing Pra-Qualification process Determining location, facility and budget for tender activity

Page 13: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 10 of 61

PT ENCONA INTI INDUSTRI

Evaluating submitted proposals based on selection criteria and providing recommendations to CH2M HILL for construction subcontractor

Notifying construction subcontractors of the selection result 5. CONSTRUCTION MANAGEMENT Construction management basically are management of execution to reach project’s goal in planned budget, time and quality. Many factors involved support the project success, for example: Good partnership spirit among project’s participants CM leadership role Sufficient design to contract and construct Sufficient project planning

QC SUBCONTRACTOR divides construction phase in 4 stages as seen on picture below.

PREPARATION CONSTRUCTION TESTING & COMMISIONING MAINTENANCE Preparation and construction stages are described as follows:

A. PREPARATION In this stage, QC SUBCONTRCONTRACTOR will study all contract documents of Construction Subcontractor that consist of:

Construction drawing Technical Specification Bill of Quantity Memorandum Schedule of construction

On Kick of Meeting, QC SUBCONTRCONTRACTOR will explain to Construction Subcontractor about some procedures such as:

procedure of Material Approval procedure of Shop Drawing Approval procedure of work permit procedure of supervising work progress procedure of publishing progress report

Page 14: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 11 of 61

PT ENCONA INTI INDUSTRI

procedure of hand over

B. CONSTRUCTION Based on construction drawing, Construction Subcontractor must make shop drawing. Shop drawing must show details, measurement, material, and if necessary, tools needed to make construction work easier. Basically to execute their job, Construction Subcontractor must go through certain phase such as:

Approval slip of approved shop drawing Approval slip of approved material Checking of construction preparation Permit to execute the construction work

At least 2 weeks before start the construction, Construction Subcontractor must submit shop drawing for approval. The procedure as follows:

Page 15: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 12 of 61

PT ENCONA INTI INDUSTRI

By referring to contract document, Construction Subcontractor makes shop drawing and submits it. If there is no difference between shop drawing and construction drawing, then Construction Subcontractor uses Form A and Construction Management (CM) will evaluate the shop drawing in maximum 1 week. If there is any correction, Construction Subcontractor must revise it. Time consume for submission until approval is maximum 2 weeks. If there are some differences between shop drawing and construction drawing, then CM together with Quantity Surveyor will evaluate and then submit to designer and CH2M HILL for approval. Process from submission until approval is maximum 2 weeks. Other approval for starting the construction work is material approval. This process is similar with shop drawing approval.

CONTRACT DOCUMENT

EVALUATION BY CM & QS

SHOP DRAWING SUBMISSION

STORED DATA

APPROVAL BY DESIGNER & CH2M HILL

APPROVAL BY CM

WORK

PREPARATION

FORM B

FORM A

Y

Y

Y

N

Y

N

N

SHOP DRAWING SUBMISSION EVALUATION APPROVAL & REVISION CONSTRUCTION PREPARATION

Page 16: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 13 of 61

PT ENCONA INTI INDUSTRI

Before starting the construction work, QC SUBCONTRACTOR will check construction subcontractor readiness based on preparation checklist for construction subcontractor. If construction subcontractor is ready (reflected on the checklist), permit for starting the work will be issued.

Herewith are several points needed to be paid attention to: 5.1. CONSTRUCTION INFRASTRUCTURE FACILITY QC SUBCONTRACTOR will ensure that infrastructure facility and utility needed must be planned before hand. For example: Water for construction, site office and worker must available already since initial work on site.

Either deep-well or others, this must be covered in pay item of contract. Electricity for construction and site office must be available. Capacity and electricity source

should be adequate.

CONTRACT DOCUMENT

EVALUATION BY CM & QS

MATERIAL SUBMISSION

STORED DATA

APPROVAL BY DESIGNER & CH2M HILL

APPROVAL BY CM

WORK

PREPARATION

FORM B

FORM A

Y

Y

Y

N

Y

N

N

Page 17: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 14 of 61

PT ENCONA INTI INDUSTRI

Phone line that will be needed for project must be available when the project start Worker cabin in project site if possible Toilet/urinary for worker

5.2. SITE ARRANGEMENT AND LAY DOWN AREA Effective lay out site will support construction activity and will reduce costs. Area for storage, access, and road which have enough clearances for construction equipment must be provides. Other, accessibility during construction must be ensure not impeded by or impede to construction. Traffic for material and equipment supply during mobilization, construction and demobilization must be considered, especially if the project locates nearby or at busy and hectic lane. Usage of lane on off peak hour must be also considered. QC SUBCONTRACTOR will be coordinate with local authorities concerned. 5.3. MATERIAL MANAGEMENT QC SUBCONTRACTOR primary objectives in executing the material management for the project is to ensure that procurement of all equipment, materials and services necessary for the project by Construction Subcontractor, from the optimum sources in regard to technical, financial and project schedule criteria, taking such factors into consideration as an availability of effective maintenance, including vendors services after the installation as well as standardization and interchangeability of spare parts. QC SUBCONTRACTOR’ strategies to realize the above objective are as follows: Maximization of Indonesian Procurement

o Engineering work performed by QC SUBCONTRACTOR will emphases to maximize the procurement from Indonesian sources as long as the specifications, quality, delivery and overall cost characteristic are equivalent and compatible with CH2M HILL requirement.

o Based on the knowledge of Indonesia vendor capabilities it has obtained, Construction Subcontractor will suggest QC SUBCONTRACTOR to arrange for providing necessary technical assistance of fabrication supervision to vendors to ensure the delivery schedule or required quality of equipment and materials.

Page 18: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 15 of 61

PT ENCONA INTI INDUSTRI

standardization of equipment o CONTRACTOR will implement the standardization of equipment to simplify and

minimize the stock of spare part such as Grouping the various types and models of related or logically combined functional equipment to maximize purchasing leverage while minimizing spare parts and servicing requirements.

o Limiting in the selection and recommendation of makes of purchased equipment Schedule oriented procurement operations

o QC SUBBCONTRACTOR will ensure that all procurement efforts rendered by Construction Subcontractor will be directed toward the on-schedule delivery of equipment and materials to the site.

The following is brief description of the procurement procedure: 5.3.1. Purchasing Construction Subcontractor will check and prepare the product or material details for review by QC SUBCONTRACTOR. QC SUBCONTRACTOR will submit on the appropriate CH2M HILL material submittal form for approval. 5.3.2. Expediting Expediting begins from the day of the purchase order is issued to the Vendor by Construction Subcontractor. QC SUBCONTRACTOR receives the receiving schedule and status from Construction Subcontractor and ensuring that it meets with schedule requirement such as: material shipping schedules material receipt status requisition list with Vendor promised delivery date material expediting status report delivery schedule which shall meet field construction schedule

QC SUBCONTRACTOR will expedite and advise corrective action as required such as: ensure Construction Subcontractor to expedite transport to site for shipped and unloaded

cargos check transit area to minimize loss time with Construction Subcontractor push Construction Subcontractor to expedite for delayed material push Construction Subcontractor to requisition for unordered material

Page 19: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 16 of 61

PT ENCONA INTI INDUSTRI

advise Construction Subcontractor to adjust manpower / equipment for accelerate transportations required

A schedule listing the delivery dates will be submitted to CH2M HILL. 5.3.3. Inspection QC SUBCONTRACTOR utilizes qualified personnel for inspections and audits in Construction Subcontractor / Vendor's facilities in accordance with requirements stated in CH2M HILL procurement documents and as requested by the Project. This inspection activity is planned and performed to confirm Construction Subcontractor Quality Assurance / Quality Control efforts and to verify product conformity. Specific activities typically include: Providing sufficient surveillance of Construction Subcontractor facilities, monitoring inspection

progress, coordinating the resolution of nonconformance, unsatisfactory conditions and resolving questions / concerns raised by inspection personnel.

Insuring all specified activities in the fabrication / manufacturing cycle conform to applicable specifications, codes/standards, welding procedures, non-destructive examination (NOE) requirements, etc.

Coordinating inspection assignments with Construction Subcontractor’s shops to ensure schedules are maintained.

Conducting pre-inspection meetings at Construction Subcontractor’s shops, as soon as possible, after receipt of an inspection assignment and prior to production.

Monitoring via verifying, witnessing or performing those activities necessary to provide assurance that the Construction Subcontractor is complying with all quality and technical requirements of the Purchase Order.

Preparing and submit Inspection Reports of all Construction Subcontractor’s shop visits within 24 hours after the visit, documenting pertinent results of the inspection.

Assisting Construction Subcontractor in clarifying unresolved issues and correcting unsatisfactory items and nonconformance.

Issuing Certificates of Compliance after Construction Subcontractor have complied with the Purchase Order / Requisition requirements and materials have been satisfactorily packaged and released for transportation.

Issuing Final Inspection Report briefly summarizing the completion of the inspection attributes and the closure of inspection activities.

Page 20: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 17 of 61

PT ENCONA INTI INDUSTRI

5.3.4. Inspection Plan The Inspection Plan to be prepared for the project will be based on the Inspection Activity Plan (lAP) that the Construction Subcontractor always prepares for each Material Requisition. This lAP document (sometimes also referred to as Inspection Data Sheet) defines the type and extent of the activity to be performed by Construction Subcontractor and acknowledge by QC SUBCONTRACTOR. QC SUBCONTRACTOR will ensure that for each specific project and for each specific group of items, the Standard lAP will be revised and tailored taking into account the following: Type of project Client requirements and/or specifications and applicable codes Proper characteristics of the specific item (i.e. low temperature, high pressure, lethal service

etc.). Construction Subcontractor shall attach the tailored lAP to the Material Requisition (MR) issued for inquiry and discussed with the potential Vendors at the time of negotiation. CONTRACTOR will ensure that each pertinent MR when issued for order. 5.3.5. Inspection Activity The QI will be responsible for carrying out progressive inspections on the scheduled dates in strict accordance with the instructions given by the QC SUBCONTRACTOR. Kick-of meeting for major equipment may be held with Construction Subcontractor/ manufacturers to maintain good communication during fabrication of equipment and/or materials. The agenda will include, but not be limited to the following: Clarification of the person-in-charge, both QC SUBCONTRACTOR and Construction

Subcontractor/ Manufacturers. Confirmation of the contents of requisition and of special requirements Confirmation of the preliminary manufacturing schedule Confirmation of special inspection requirements

Page 21: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 18 of 61

PT ENCONA INTI INDUSTRI

Pre-inspection meetings will be arranged when necessary for important supplies in order to resolve questions arisen in compliance with the specifications, and / or to establish a tentative inspection schedule, and/or to define hold points according to the lAP, and / or review Sub-Supplier's List and determine which companies require further evaluation or inspection. The following are examples of the agenda items to be covered. Purchase order requirements Code and Specification Scope of third-party inspection agency for statutory requirements MPS, PQR and welders' performance records Manufacturers' inspection program, inspection points, witnessing of tests

Fabrication schedule Nondestructive inspection requirements Hydrostatic or pneumatic tests (if required) Additional or Special inspection requirements Extent of QC SUBCONTRACTOR’s inspection and CH2M HILL inspection.

Discussions and conclusions of the meeting will be reported by the QI to the SQI via a precise and detailed "Minutes of Meeting". The QI shall follow up, until release of equipment or materials, all items covered by the pre-inspection meeting. Under the following conditions, a pre-inspection meeting may not be held, subject to SQI's discretion. Construction Subcontractor/ Vendor have done business with CH2M HILL previously and are regarded as maintaining adequate inspection and quality. Construction Subcontractor / Vendor has extensive experience and no trouble is anticipate in the fabrication process The inspection procedure is simple and no misunderstanding is existed between the vendor and QC SUBCONTRACTOR / CH2M HILL. Visit for testing (intermediate or final) is made by Construction Subcontractor’s inspectors on the basis of the lAP. After every visit the Construction Subcontractor’s inspectors will compile an Inspection Report and send it to the QC SUBCONTRACTOR.

Page 22: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 19 of 61

PT ENCONA INTI INDUSTRI

The QI who, during his inspection activities and / or after any intermediate or final test, finds that the material /equipment is not in conformity with the prescription of the order must issue to the Construction Subcontractor/ Supplier a Non-Conformity Note, which clearly specifies the reasons of nonconformity and any possible remedial action. 5.3.6. Non-conformance during Manufacturer When any non-conformance occurs during manufacturing and inspection, the responsible inspector shall prepare a trouble report according to the SQI's instructions. The trouble report shall outline the non-conformance and describe the cause and outline the countermeasures thereto. The SQI shall request that the Engineering Coordinator concerned evaluate the failure and decide on countermeasures and shall consult with the engineering group. The engineering group shall coordinate between the necessary personnel involved. 5.3.7. Equipment and Materials Accepted as Non-conforming When the equipment / materials are to be accepted as being in non-conformance with the specification as a result of the evaluation of, the non-conformance, the relevant documents and specifications shall be revised accordingly. When repair or a modification of such failure is required, the repair procedure shall be prepared by the manufacturer for review by QC SUBCONTRACTOR and approval by CH2M HILL, then, the repair or modification work shall be carried out. In addition to the countermeasures, measures to prevent the recurrence of such failure shall also be established. For non-conformance items, tags marked "HOLD" or "REJECT" or the like shall be affixed to avoid use in error then to be quarantined. When the final test has a positive outcome, the Inspector will issues to the Supplier the Release Note that authorizes the vendor to ship the material. The issue of the Release Note must be subordinated to the fulfillment, by the Supplier, of all the duties regarding the preparation and finalization of related technical and commercial documents

Page 23: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 20 of 61

PT ENCONA INTI INDUSTRI

connected with the order including testing certificates, analysis certificates, etc. and shipping documents (in case off-shore items). Furthermore it is the responsibility of the QI to ascertain, before issuing the Release Note, that the Construction Subcontractor has followed the instruction relative to marking, color coding (piping materials) and packing prescribed by the Construction Subcontractor. 5.3.8. Materials Certificates Materials certificates for the pressure retaining parts shall be submitted by the vendor in accordance with the relevant specifications. Construction Subcontractor shall check the certificate and confirm the correctness of the identification marks on the materials and shall be reported to QC SUBCONTRACTOR. 5.4. SAFETY AND SECURITY Safety and security during construction usually consist of: Safety:

o Regulation of Safety working on site o Safety working organization o Safety working facility, such as helmet, sling, signage, first aid kit, etc. o Training o Periodic inspection

Security:

o Security organization, personnel included o Permit and necessary contacts o Security regulation on site o Security equipment, such as fence, gate, guarding towers, spot lights, ID card, handy talky, etc. o Training o Periodic Inspection

Cleanliness: o Site cleanliness regulation o Cleaning organization

Page 24: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 21 of 61

PT ENCONA INTI INDUSTRI

o Field cleanliness facility o Routine Inspection

5.5. ENVIROMENTAL PROTECTION Side effects handling must be ensured covered in specification, drawings and other document planning and also direct or compensation pay item need to be available by Construction Contractor or other project team. Soil Dirt During construction time, soil work will cause excess dirt that are scattered

everywhere. This should be handled. For example, each soil truck going out from the site must be covered by a sheet of plastic.

Noise and Vibration Drilling activity, usage of generators etc, during construction work will also

generate noise and vibration. This can be handled by for example the usage of silencers.

Ash Soil work and others construction work will always generate ash. This can be

handled by for example sprinkling water regularly on non-pavement areas. Water Construction activities usually cause of sedimentation in nearby ditch. Any ditch

crossing construction site must be ensured its condition, by for example eliminating sedimentation or executing the construction project not on rainy season.

Traffic Traffic need to be studied during project planning phase to ensure new traffic caused by construction can be controlled, both during the construction time and during operational.

Sosio-economic Need to consider all local strength that can be contributed by surrounding society to support projects smoothness.

5.6. PROJECT CONTROLLING Project controlling basically consist of controlling management plans and will involve: Schedule controlling Scope of work controlling Cost controlling Document controlling

Page 25: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 22 of 61

PT ENCONA INTI INDUSTRI

Quality controlling Risk controlling

Controlling process goes through steps of: Report Analysis Identification of changes required Cause checking Determination of correction steps

Reports used for controlling are progress reports, which resulting in Project Plan Updates, including plan of correction. Risk Controlling is plan of corrective action noted in every report as response to certain problem. Even though documentation of periodic control recorded through weekly report, biweekly and monthly, but in reality project controlling will be done on daily basis. Controlling activity will also reflecting in weekly progress meeting. 5.6.1. Schedule Controlling A realistic project schedule is accountable and easiness in controlling. Schedule controlling can also be done nicely if information of activity plan are nicely noted and well organized, started from master schedule as a baseline. Schedule must consist of all project activity such as: Project Preparation Phase Design Phase Tendering Phase Demolition Works Construction phase Fitting out phase Commissioning-handover-migration phase

Which are made in hierarchy, as follows: Project Master Schedule Individual Contract Schedule Be-Weekly Schedule

Page 26: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 23 of 61

PT ENCONA INTI INDUSTRI

Controlling process will be effective if done through priority list, started from strategic milestone and crucial or critical work during project execution, coordinating schedule periodically, handling progress or obstacle responsively. Critical path and obstacles that can be immediately identified in schedule controlling are: Milestone as determined by owner Long Lead items Fabrication work Finishing work Work changes Weather Critical activities on Critical Path Method

QC SUBCONTRACTOR in arranging master schedule will identify and study those crucial parts /obstacles to obtain priority and arranging solution. QC SUBCONTRACTOR will use special software for planning, monitoring and controlling schedule. As first input in controlling is project schedule, then reevaluating the progress report including request for changes. As the result is updating schedule including several other action plans? Chart of controlling used is Project Schedule Tracker. 5.6.2. Communication Controlling Availability of simple yet effective system of communication and all coordination system basically will ensure project’s controlled. Planning of communication and coordination, as basic communication must be determined at the very beginning after project organization appointed. Coordination plan must consist of: coordination among major disciplines or interphasing coordination of responsibility distribution (responsibility chart) coordination with Client and other authorities directly involved, such as institute/agency or

contractor Communication can be done through electronic mail, and other formal such as letters. Periodic meeting are other mean of effective communication media. Meeting will be held daily and weekly.

Page 27: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 24 of 61

PT ENCONA INTI INDUSTRI

QC SUBCONTRACTOR will be held Daily Tailgate Meeting in each morning at the site to discuss the following subjects, as a minimum: The work planned for the day Changes in work assignment Health and safety issues Review problems encountered the previous day Sign the safety task assignment form prior to beginning any work on site

At Weekly Progress Meeting, project’s team will discuss: Construction progress Technical, engineering or regulatory issues Progress schedule Submissions schedule Contractual issues Changes in work assignment Follow up and corrective action

All communication and coordination activity will be noted on minutes of meeting. 5.6.3. Scope of Work Controlling Scope of Work Controlling is management plan and scope of work control that the items are defined from contract and arranged into main WBS (Work Breakdown Structure), with measured definitions that become baseline to work’s execution. At the implementation, the result will be verified, inspected and approved or not approved through reports or agenda. For controlling, input used is main WBS, Scope of Work baseline that comes from TOR and contract documents, progress report and changes in assignment. 6. FIT-OUT MANAGEMENT, COMMISSIONING & HAND OVER Fit out activity, testing, commissioning, and hand over are specific action need to be seriously and separately handled. All these actions will involve many project teams which are contractual separated, such as: contractor, sub-contractor, supplier, manufacturer, and also several people in client’s organization. Therefore careful planning needed, including clauses in contract, providing pay-item for those activities, staff training, etc.

Page 28: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 25 of 61

PT ENCONA INTI INDUSTRI

QC SUBCONTRACTOR will ensure those activities can be done nicely and review of organization or commissioning team, schedule, costs, procedures and responsibility distribution The activities in this phase, for example:

Commissioning Checklists:

Handover Checklists:

Commissioning-Handover-Migration Brief Budget Program Commissioning action checklist Appointment Client operating procedure Training of staff Client equipment Building services & equipment Maintenance Security Communications Signs & graphics Initiation of operations Review operation of facility Feedback Commissioning Documents

Handover procedure Program Building Manuals Operating and Maintenance Manual As-built and installed drawings Letting or disposal Additional works Final account Liaison with tenants, purchaser or financier Access by contractors Security Spares Read meters Publicity Opening arrangements Client’s acceptance of building Inspection & certificates

7. DELIVERABLES The deliverables of QC SUBCONTRACTOR studies, detailed, and reports shall, as applicable, include but not be limited to the following: Architectural drawings, structural drawings, substructure drawings, mechanical-electrical

drawings. Design or calculation reports

Page 29: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 26 of 61

PT ENCONA INTI INDUSTRI

Material and fabrication specification Cost and schedule estimate for the Services (Owner's Estimate both preliminary and final) Process evaluation report Master schedule Partial schedule Project procedure Monthly report Daily report Field log book Minutes of Progress Work As Built Drawing Minutes of Meeting Safety & Security Report Material Testing Report Material Approval Report Variation Order Report Project Completion Report Defect/ Punch List Project Documentation Testing & Commissioning Report Minutes of Hand Over I Minutes of Hand Over II

Page 30: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 27 of 61

PT ENCONA INTI INDUSTRI

II PRELIMANARY PROJECT SCHEDULE

Page 31: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 28 of 61

PT ENCONA INTI INDUSTRI

Page 32: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 29 of 61

PT ENCONA INTI INDUSTRI

II ORGANIZATION CHART Project organization must be appointed early which include: Project Organization QC SUBCONTRACTOR Organization

Those organizations chart tentatively as below: 1. PROJECT ORGANIZATION CHART

SCHEME OF WORKING RELATIONSHIP

SCHEME OF CONTRACTUAL RELATIONSHIP

CH2M HILL

QC/DESIGN SUBCONTRACTOR

CONSTRUCTION SUBCONTRACTOR

CH2M HILL

QC/DESIGN SUBCONTRACTOR

CONSTRUCTION SUBCONTRACTOR

Page 33: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 30 of 61

PT ENCONA INTI INDUSTRI

2. QC SUBCONTRACTOR ORGANIZATION CHART

CENTRAL JAVA

QC SUBCONTRACTOR PM

HES MANAGER

HES INSPECTOR

SENIOR DESIGN ENGINEER

ARCHITECT CIVIL ENGINEER

GEODETIC ENGINEER

MECH/ELECTRICAL ENGINEER

CONSTRUCTION MANAGER

SITE SUPERINTENDENT (1)

SITE SUPERINTENDENT (2

SITE SUPERINTENDENT (3)

SITE SUPERINTENDENT (4)

SITE SUPERINTENDENT (5)

SITE SUPERINTENDENT (6)

SITE SUPERINTENDENT (7)

DRAFTMEN SUPERVISOR

DRAFTMAN DRAFTMAN DRAFTMAN

TECHNICAL ASSISTANCE

ENGINEERING GROUP HOME OFFICE

SITE OFFICE

HOME OFFICE

PROJECT CONTROLLING SCHEDULLING DOCUMENT CONTROL

PROJECT MANAGEMENT GROUP HOME OFFICE

CM GROUP SITE OFFICE

HES GROUP

Page 34: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 31 of 61

PT ENCONA INTI INDUSTRI

3. QC SUBCONTRACTOR ORGANIZATION CHART NORTH SULAWESI AREA

QC SUBCONTRACTOR PM

HES MANAGER

HES INSPECTOR

SENIOR DESIGN ENGINEER

ARCHITECT ENGINEER

CIVIL ENGINEER

GEODETIC ENGINEER

M/E ENGINEER

CONSTRUCTION MANAGER

SITE SUPERINTENDENT (1)

SITE SUPERINTENDENT (2

SITE SUPERINTENDENT (3)

SITE SUPERINTENDENT (4)

SITE SUPERINTENDENT (5)

SITE SUPERINTENDENT (6)

DRAFTMEN SUPERVISOR

DRAFTMAN DRAFTMAN DRAFTMAN

TECHNICAL ASSISTANCE

ENGINEERING GROUP HOME OFFICE

SITE OFFICE

HOME OFFICE

PROJECT CONTROLLING SCHEDULLING DOCUMENT CONTROL

PROJECT MANAGEMENT GROUP HOME OFFICE

CM GROUP SITE OFFICE

OFFSHORE ENGINEER

HES GROUP

Page 35: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 32 of 61

PT ENCONA INTI INDUSTRI

4. JOB DESCRIPTION AND RESPONSIBILITIES OF QC SUBCONTRACTOR 4.1. JOB DESCRIPTION OF PERSONNEL The entire job descriptions here below mention the responsibilities and authorities to perform work that they are assigned. 4.1.1. QC SUBCONTRACTOR PROJECT MANAGER (PM) Reports to : PT. ENCONA INTI INDUSTRI Board of Directors and CH2M HILL PM Based on : Home Office Function / Responsibility Work effectively with QC SUBCONTRACTOR’s Personnel of diverse tier, background and interest, and maintain good liaison with CH2M HILL’s Representatives, professionals, community and local government. Manage and direct QC SUBCONTRACTOR’s activities and represent QC SUBCONTRACTOR for all contractual matters during the implementation of this Contract. The roles and responsibilities of this position include: Plan, organize, direct and manage the activities and resources of QC SUBCONTRACTOR an

the execution of the services to satisfy CH2M HILL, Propose QC SUBCONTRACTOR’s organization required to carry out and accomplish the

assigned projects efficiently and in accordance with approved plans and schedules, Employ and maintain acceptable project management procedures, accounting records, cost

control procedure, and establish QC SUBCONTRACTOR’s policy, Plan, develop and execute sustainable local business development program during Contract

duration, Ensures that the obligations of the QC SUBCONTRACTOR under the terms of the Contract are

fulfilled, Co-ordinates with and draws upon the functional resources of the QC SUBCONTRACTOR

organization as required for supporting the Project, Participates in the Joint Operation Management meetings, Verify that in-house procedures are implemented during the Works phases, Co-ordinates the Construction Subcontractor tasks within the frame of the detailed Scope of

Works, Assess and select Construction Subcontractor(s) and supplier(s).

4.1.2. Project Control Reports to : QC SUBCONTRACTOR PM

Page 36: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 33 of 61

PT ENCONA INTI INDUSTRI

Based : Home Office Function / Responsibility Prepare, complete, lead, coordinate, and control QC SUBCONTRACTOR’s activities in the projects. The roles and responsibilities of this position include: Lead a project controls group consisting of Schedulers, Document Controllers, and Cost

Engineers to provide project controls Services to project under QC SUBCONTRACTOR or directly under CH2M HILL,

Work closely with CH2m HILL’s representatives related to project controls, Develop, implement and monitor QC SUBCONTRACTOR’s Key Performance Indicator, Developing and maintaining QC SUBCONTRACTOR’s project control SOP, techniques, and

guidance, Developing and implementing the Scheduling and Progress measurement procedures. Drafting and preparing WBS for each project, Preparing and maintaining project master schedules, Updating the Contract execution schedule each month and issuing planned versus actual

progress curves, histograms, tables, status reports, bar charts, computerized listings. Anticipating problem areas and recommending to the Construction Manager actions to be

taken before delay occurs. Developing a cost monitoring system and implementing it, Setting up the physical progress assessment system by combining the physical measurable

quantities supplied and/or installed with the progress key dates, Issuing change order requests, Evaluating financial and time impact of change order proposals and keep the register for the

same, Collecting and/or preparing the supporting documentation in accordance with the contractual

requirements, for measurement and invoicing activities, Analyzing whenever necessary methods of overcoming deviations to the construction program, Supervising document control activities and ensuring that the established procedures are

maintained, Preparing the contract documents, Preparing the progress payment for Sub-Contractors, Preparing and issuing various reports such as the Monthly report, and the Weekly Progress

report.

Page 37: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 34 of 61

PT ENCONA INTI INDUSTRI

4.1.3. Health and Safety (H&S) Manager Reports to : QC SUBCONTRACTOR PM Based on : Home Office Function / Responsibility Manage, coordinate, develop, and enforce QC SUBCONTRACTOR’s Health and Safety (H&S) procedure, program, policy and regulation that shall be aligned with CH2M HILL’s H&S policy. The roles and responsibilities of this position include: Develop QC SUBCONTRACTOR’s H&S management plan to be implemented by QC

SUBCONTRACTOR and its supervised Construction Subcontractor, Responsible for the implementation and the administration of the QC SUBCONTRACTOR’s

Health & Safety Programs for the Works, Implement and administrate the Project Safety & Health Regulations, Maintain, report, and distribute QC SUBCONTRACTOR’s and its supervised construction

subcontractor’s H&S statistics and reports, Facilitate incidents investigation and follow up its recommendations, Interface with CH2M HILL Representatives as necessary to address safety & health

regulations, Issue a safety and health reports on monthly basis to the Corporate Safety Manager, Arrange and conduct regular safety meetings with the QC SUBCONTRACTOR’s Staff, Draw Safety Inspection and Audits Program and participates in those inspection and audits, Maintain good relations with government officials on H&S, Develop, implement and monitor QC SUBCONTRACTOR’s and its supervised construction QC

SUBCONTRACTOR’s key Performance Indicator on H&S, Work closely with CH2M HILL’s H&S representative and QC SUBCONTRACTOR’s related

functions to manage and enforce H&S during performance of the Contract Advise all levels, from Project Management to work force, on safety matters, Prepare, review, respond and manage to the safety statistics, Determine the need, and prepare, review and manage safety-training programs, Develop and review emergency procedures and organizes drills and exercises, Report to and assist QC SUBCONTRACTOR PM related to QC SUBCONTRACTOR’s H&S

management during the Contract period.

Page 38: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 35 of 61

PT ENCONA INTI INDUSTRI

4.1.4. Senior Design Engineer Reports to : QC SUBCONTRACTOR PM Based : Home Office Function / Responsibility Prepare and complete engineering design, coordinate and control QC SUBCONTRACTOR’s activities in the development of engineering and drafting, material take off, survey, cost estimate, administration, and projects planning and scheduling. The roles and responsibilities of this position include: Provide technical consultation for Facility construction and commissioning, Work closely with CH2M HILL’s representative related to project engineering, Implement and monitor QC SUBCONTRACTOR’s Key Performance Indicator.

4.1.5. Construction Manager Reports to : The QC SUBCONTRACTOR PM Based : Site Office Function / Responsibility Construction Manager will control, monitor and responsible for all construction activities on all project site. Due to there are many sites must be handled, he will be supported by Site Superintendents. The roles and responsibilities of this position include: Implement QC SUBCONTRACTOR’s H&S management plan on all project sites, Responsible of the interfaces between the Construction Subcontractor and other entities on all

project sites, Provide field construction consultation for Facility engineering, Work closely with CH2M HILL’s representative related to projects construction, Implement, control, and monitor QC SUBCONTRACTOR’s Key Performance Indicator, Organise the construction team to achieve the optimum productivity and carries out the Works

in the most efficient manner and in stipulated time, Create quality consciousness in the construction team and fully supporting CH2M HILL to

achieve the standard of quality as per the requirements of the Contract, Develop and maintain construction management plans, and monitor progress against the

schedule and budget on all project sites, Control that all construction documents are up to date, are received and issued to the

construction team,

Page 39: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 36 of 61

PT ENCONA INTI INDUSTRI

Inform the Project Controlling on engineering changes, which may have impact on cost and schedule,

Prepares the construction monthly progress reports in conjunction with the Project Controlling, 4.1.6. Site Superintendent Reports to : Construction Manager (CM) Based : Site Office Function / Responsibility Site Superintendent will support CM by controlling and monitoring daily activities on site where he is placed. Basically, he is as CM representatives on site. Each project site has one Site Superintendent. The roles and responsibilities of this position include: Responsible for all construction activities on site, Responsible of the interfaces between the Construction Subcontractor and other entities, Assisting CM to implement QC SUBCONTRACTOR’s H&S management plan, Assisting the development of local contractors in construction techniques and quality, Supporting CM to provide field construction consultation for Facility engineering, Controlling construction subcontractor activities to achieve the optimum productivity and carries

out the Works in the most efficient manner and in stipulated time, Creating quality consciousness in the construction team to achieve the standard of quality as

per the requirements of the Contract, Maintaining construction management plans and monitoring progress against the schedule and

budget, Controlling that all construction documents on site are up to date, are received and issued to

the construction team, Informing the CM on engineering changes, which may have impact on cost and schedule, Preparing the construction daily and weekly progress reports

4.2. QC SUBCONTRACTOR’s RESPONSIBILITIES AND SERVICES All the descriptions here below mention the responsibilities, authorities and services of QC SUBCONTRACTOR according to project phase. 4.2.1. PRE SOLICITATION & SOLICITATION

Page 40: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 37 of 61

PT ENCONA INTI INDUSTRI

Preparing and providing advice to PM CH2M HILL about construction implementation and project packaging.

Identifying a minimum of 3 capable and experienced Construction Subcontractor for each project or construction package

Describing project package according to RFP, preparing schedule, translating and developing design concept offered by Construction Subcontractor and with PM CH2M HILL review and preparing budget plan for every project.

Coordinating and conducting site walks at each project site, and providing necessary transportation for CH2M HILL personnel.

Acting as the POC during solicitation activities, directing questions to the CH2M HILL POC and providing recommendations for responses.

Providing any required support in obtaining local permits, establishing MOUs, and providing support for governmental and stakeholder relations.

Acting as POC with Construction Subcontractor for distribution of contract amendments, etc. and acting as the receipt point for submitted proposals.

Evaluating submitted proposals and providing recommendation to CH2M HILL for Construction Subcontractor selection based on a fair evaluation per the selection criteria identified by CH2M HILL

Notifying Construction Subcontractors of the selection results. Assisting CH2M HILL in getting contract documents in place, providing any necessary

translation, and facilitating signing of the construction contract.

4.2.2. DESIGN PHASE Preparing QC Subcontractor Quality Control and H&S plans specific to the projects to be

designed and constructed. Preparing the QC plan in accordance with the CH2M HILL Construction Quality plan.

Coordinating a project kickoff meeting with in-house design team in an adequate facility, providing an agenda for the meeting that covers the key areas of coordination necessary to properly implement the projects.

Identifying standard design drawings/strategies for facilities to be constructed and work with in-house design team to site adapt these to existing project conditions. Ensure that the design team prepares all design drawings and specifications necessary for the Construction Subcontractor to construct the facilities in a quality manner. Ensure that designs are fully compliant with all local and host nation codes and regulations. Ensure that the design is

Page 41: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 38 of 61

PT ENCONA INTI INDUSTRI

prepared to accommodate the budgeted construction costs for each project. Conducting a QC review of the completed design plans and design drawings/ specifications

and providing written review comments to the CH2M HILL PM. Coordinating CH2M HILL review and approval of these documents. Ensuring that all CH2M HILL comments are appropriately incorporated into revised design.

Completing design plan and design drawing by in-house design team. Coordinating and leading a design review meeting with stakeholders. Provide three copies of the approved, final design drawings and specifications to the CH2M

HILL PM. Assisting in-house design team to develop site specific Health and Safety (H&S) and Quality

Control plans that meet US Army Corps of Engineers standards. The H&S plan shall include and Accident Prevention Plan and an Activities Hazard Analysis.

Provide design drawings in an electronic format approved by the CH2M HILL PM. 4.2.3. BIDDING PHASE Preparing and arranging bidding agenda. Assisting Bidding Committee in arranging Owner’s Estimate of construction cost. Assisting Bidding Committee evaluating bidder in Pre-Qualification. Assisting Bidding Committee in bidding announcement through announcement board, print

media and electronic media. Assisting in giving explanation about the project in project explanation meeting. Assisting in opening and evaluating bidder’s document. Assisting in preparing draft of contract for construction work. Arranging project report in bidding phase.

4.2.4. CONSTRUCTION PHASE QC SUBCONTRACTOR is responsible for monitoring Construction Subcontractor’s performance and ensures that established standards for timelines, quality, and cost are met in accordance with final approved technical design and specifications. Assisting and guiding the Construction Subcontractor in preparing all required work plans,

submittal registers, testing plans for all project work. Providing these for review and comment to the CH2M HILL PM. Ensuring these plans are properly revised in response to CH2M HILL comments.

Assisting and guiding the Construction Subcontractor in preparing final H&S plan, APPs and AHAs. Providing these review and comment to the CH2M HILL PM. Ensuring these plans are

Page 42: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 39 of 61

PT ENCONA INTI INDUSTRI

properly revised in response to CH2M HILL comments. Reviewing all submittals and materials specifications and recommending acceptance or

rejection to CH2M HILL. Ensuring that all required submittals are submitted by the Construction Subcontractor.

Coordinating with the Construction Subcontractor during mobilization to the site, assuring that all required planning, equipment, materials etc. have been appropriately mobilized. Conducting an Operational Readiness Review with the Subcontractor and CH2M HILL PM to ensure readiness to begin construction work.

Organizing and leading a preconstruction meeting for each project, providing a suitable space for the meeting. Preparing a meeting agenda and distribute to an appropriate parties per direction from CH2M HILL PM.

Monitoring the Construction Subcontractor’s progress and progress reporting. In detail can be described as follows: Deciding milestone in project site for Construction Subcontractor in stacking out work.

Checking and consulting to in-house design team and approving the stack made by Construction Subcontractor.

Supervising Construction Subcontractor’s implementation work in accordance with the established specification, quality and timelines in contract work package.

Adjusting Schedule of construction followed by Construction Subcontractor, supervising, observing and maintaining that schedule.

Checking and reviewing Construction Subcontractor’s Work Plans, and controlling the implementation in accordance with contract.

Providing necessary guidelines for Construction Subcontractor so the work are done according to schedule and contract terms.

Supervising quality of work, supervising and testing the used material and equipment. Arranging and determining workshops and supporting facility for each Construction

Subcontractor and supplier regarding material storage, temporary warehouses, temporary office shed, workers cabin and others with approval from CH2M HILL.

Held coordination meeting with Construction Subcontractor(s) with consultant presence and CH2M HILL at least once a week. On that meeting, procedure are explained and project problem are discussed.

Observing project cost estimation which progressive updated. Checking and approving work progress on site, publishing memo if execution are done

according contract.

Page 43: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 40 of 61

PT ENCONA INTI INDUSTRI

Preparing and submitting work changing proposal for getting owner approval, accomodating CH2M HILL need/wish for work changing and confirming it to construction subcontractor.

Advising CH2M HILL about the risk occurence and the linkage with contract, and suggesting solution.

Evaluating extra cost proposal for extra scope of work or extra timelines submitted by construction Subcontractor, and recommending it to CH2M HILL.

Assisting CH2M HILL if dispute happened against Construction Subcontractor by advising and suggeting.

Delivering daily, weekly and monthly progress report including necessary photos. Inspecting and recommending to accept the construction subcontractor work when the

construction work is finished and approved. Delivering report to Dinas Pengawasan Pembangunan Kota (City Developement Council)

according rules and regulation applied. Ensuring that construction subcontractor’s health and safety program is applied. Ensuring availablity of contract document and original manual and others important document

on site. Observing mechanical electrical installations regarding system and operational readiness for

test and start up. Placing experts for supervising construction work. Checking and judging all claims from contractor and others so CH2M HILL will not suffer loss.

4.2.5. MAINTENANCE PERIOD Preparing defect list after Hand Over I of each work package. Assisting CH2M HILL in obtaining building usage permit Supervising during maintenance period Preparing memorandum of Hand over II of each work package. Instructing construction subcontractor to make as built drawing, checking and responsible for

the content of the drawing. Delivering final report consist of construction chronologic during project lifetime. Ensuring execution of training for user technician by Construction Subcontractor before Hand

over II.

Page 44: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 41 of 61

PT ENCONA INTI INDUSTRI

III QUALIFICATIONS AND PAST EXPERIENCE 1. COMPANY PROJECT LIST (LAST 5 YEARS)

SCHEDULE NO. PROJECT TITLE LOCATION YEAR CLIENT ADDRESS CONTRACT NO.

START FINISH CONTRACT VALUE

1 Pre Construction for RABC Building Balikpapan 2002 PT Unocal Indonesia Pasir Ridge, Balikpapan

29302 18-Mar-02 30-Apr-02 230,000,000.00 IDR

2 Construction Management Engineers RABC Renovation Project Balikpapan 2002 PT Unocal Indonesia Pasir Ridge, Balikpapan

BTS/000351-02/CONT 20-May-02 20-Nov-02 1,150,430,000.00IDR

3 Construction Management Engineers for RABC Building Balikpapan 2003 PT Unocal Indonesia Pasir Ridge, Balikpapan

DA/0213-03/EOS 18-Feb-03 20-May-03 354,868,500.00IDR

4 Consultant Management Service for Renovation of Housing & Apartment at Pasir Ridge Compound

Balikpapan 2003 PT Unocal Indonesia Pasir Ridge, Balikpapan

DA/0399-03/EOS 16-Apr-03 24-Aug-03 33,000.00USD

5 Senoro Industrial Dev. Master Plan Luwuk 2002

Job Pertamina Exspan Tomori

Bidakara Building, Jakarta

K0101/JOBT/OPS 8-Jul-02 7-Dec-02 106,300.00USD

6 Sarana-Prasarana Air Bersih (ME&I) Bontang 2002 PT Altra Excis Investama Group Plaza Centris, Kuningan, Jakarta

333/AXIS/PD/SPK/AB-JKT/IX/02 12-Sep-02 12-Jun-03 6,250,000,000.00IDR

7 Sarana-Prasarana Air Bersih (Civil) Bontang 2002 PT Altra Excis Investama Group Plaza Centris, Kuningan, Jakarta

332/AXIS/PD/SPK/AB-JKT/IX/02 12-Sep-02 12-Jun-03 8,800,000,000.00IDR

8 Renovation of Federal Chain Factory Jakarta 2002 PT Federal Superior Chain Mnf. Kawasan Industri Puologadung

05/FSCM-EII/KK/XII/02 13-Dec-02 30-Apr-03 1,210,000,000.00IDR

9 Design and Engineering Muara Tawar Gas Turbines Power Plant Jakarta 2003 PT Balfour Beatty Sakti Indonesia

Muara Tawar, Jakarta

BBSI/20237G/SCA/DESIGN/001 5-May-03 31-Oct-03 2,150,445,545.00IDR

10 Study and Design Engineering Bekasap OU Infield Drainage System Sumatera 2004 PT. Caltex Pacific Indonesia Bekasap SPK-LPM/EII-III-01 15-Apr-04 up to present 344,078.81USD

11 Pembangkit Tenaga Listrik 2 x 6 MVA Sulawesi Tenggara

2004 PT Bau-Bau Mitra Energi Bau-bau 08/BME-ECN/SP/IV/04 8-Apr-04 7-Jul-04 1,750,000,000.00IDR

12 MPS for Tuban Aromatic Project Tuban 2004 PT Pertafenikki Engineering Jakarta 002/Tuban Aromatic Pj./2004 5-May-04 31-Jan-06 48,600.00 USD

13 Engineering Study Services For Airport Upgrading Soroako 2004 PT International Nickel Indonesia Tbk

Soroako C-02468 8-Jul-04 8-Aug-04 25,300.00USD

14 Conceptual Analysis Duri Drainage & Canal Improvement Duri-Riau 2004 PT Istech Resources Asia Duri, Riau 01/HO-036/Rev-1/03/05 5-Oct-04 15-Apr-05 88,795.00USD

15 Soil Investigation for Kulin Pipeline Project Sumatera 2004 PT Istech Resources Asia Duri, Riau ECS/IRA-subcon/L-030/011/04 1-Dec-04 15-Jan-05 11,817.00USD 16 Komatsu New Foundry Plant Project Jakarta 2004 PT Komatsu Indonesia Jl. Raya Cakung

Cilincing 002/KOMATSU/KI/XII/04 (PO) 003/KOMATSU/KI/XII/04 (WO)

Januari 05 Agustus 05

4,480,000,000.00IDR

17 Waste Management Facility Detail Engineering Design Development Project

Duri-Riau 2004 PT Caltex Pacific Indonesia Duri - Riau 2525 OK Februari 05

Juli 05 1,500,000,000.00IDR

18 Masterplan Komatsu Indonesia Jakarta 2005 PT Komatsu Indonesia Jl. Raya Cakung Cilincing

100/SPK/GA/KI/II/2005 18-Mar-05 175,800,000.00 IDR

19 Perencanaan teknis Pembangunan Perpustakaan Daerah Kota Bontang Bontang 2005 Pemda Kota Bontang JL KH. Achmad dahlan No. 74, Bontang

600/64.A/DPU-B/CK/III/2005 1-Mar-05 15-Jul-05 810,482,000.00IDR

20 Study and Engineering Include Survey of Bekasap Infield Drainage System (Bekasap Drain 2)

Duri-Riau 2005 PT Caltex Pacific Indonesia Bekasap 2505-OK 1-Apr-05 30-Sep-05 410,000.00USD

21 Study and Engineering Include Survey of Bekasap Infield Drainage System (Bekasap Drain 2), Ammendment-1

Duri-Riau 2005 PT Caltex Pacific Indonesia Bekasap 2505-OK 1-Apr-05 30-Sep-05 12,912.00USD

22 Study and Engineering Include Survey of Bekasap Infield Drainage System (Bekasap Drain 2), Ammendment-2

Duri-Riau 2005 PT Caltex Pacific Indonesia Bekasap 2505-OK 1-Apr-05 31-Dec-05 45,000.00USD

Page 45: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 42 of 61

PT ENCONA INTI INDUSTRI

23 Engineering and Construction Management Project Duri-Riau 2005 PT Chevron Pacific Indonesia Duri - Riau 3074-OK 1-Aug-05 31-Aug-07 12,299,153.991.30 IDR 24 Engineering, Fabrication and Transport of Temporary Building for Tangguh

LNG Project Jakarta 2005 JGC/PT BRI CONSORTIUM Sentra Mulia Building,

Jl. HR Rasuna Said RFP-JOC-I-0698-REV.1 24-Aug-05 22-Nov-05 732,930.00USD

25 BD-1 Building Works for 3.8 MTPA Train Capacity Tangguh LNG Project Papua 2005 JGC/PT BRI CONSORTIUM Sentra Mulia Building, Jl. HR Rasuna Said

3400-3140-001 21-Oct-05 7-Nov-06 16,700,000.00USD

26 Flexible Program Management Services -FEED for Main Canal & Secondary Canal 8 Improvement Duri Heavy Oil

Duri-Riau 2005 PT Tripatra Engineers & Constructors

Duri, Riau SA-9415-0009-TF-EII-05

12-Oct-05 12-Feb-06 172,680.00USD

27 Flexible Program Management -FEED for NDD New Canal (Ammendment -1) Duri-Riau 2006 PT Tripatra Engineers & Constructors

Duri, Riau SA-9415-0009-TF-EII-06

26-Apr-06 8-Aug-06 62,750.00USD

28 Flexible Program Management Services -FEED for Geotechnical Investigation Services (Ammendment-2)

Duri-Riau 2006 PT Tripatra Engineers & Constructors

Duri, Riau SA-9415-0009-TF-EII-05

7-May-06 9-Aug-06 78,421.71USD

29 Design Drawing & Development of Scrap Yard , Garbage & Dust Storage, Finishing & Machining Subcontractor, WWT Plant, Mosque, Employee Service Center and Data Center Building

Jakarta 2006 PT Komatsu Indonesia Jakarta 059/SPK/GA/KI/VII/2006 1-Aug-06 31-Dec-06 197,895,000.00IDR

30 Feasibility Study for Coal Fired Power Plant 2 x 25 MW PT Central Pertiwi bahari, Tulang Bawang, Lampung

Lampung 2006 PT Truba Alam Manunggal Engineering, Tbk

Sona Topas Tower 11th Floor, Jalan Jend. Sudirman Kav. 26 Jakarta 12920

001/TAM-EII/CA/06 6-Nov-06 8-Jan-07 1,536,300,000.00IDR

31 Feasibility Study for Jetty PT Central Pertiwi bahari, Tulang Bawang, Lampung

Lampung 2006 PT Truba Alam Manunggal Engineering, Tbk

Sona Topas Tower 11th Floor, Jalan Jend. Sudirman Kav. 26 Jakarta 12920

002/TAM-EII/CA/06 13-Nov-06 15-Jan-07 486,000,000.00IDR

32 Pekerjaan Penyelidikan Geoteknik Batang Field Proyek SLN WP - 25 Duri-Riau 2006 PT Multi Structure Rukan Taman Meruya Blok M 72, Meruya Utara, Jakarta

006/MS-EII/WP.25/XI/2006

14-Nov-06 23-Jan-07 55,168.45USD

33 Jasa Perencanaan dan Supervisi Pekerjaan Pembangnan Gudang Jalan Raya Cakung -Cilincing Km 5 No. 20, Jakarta 14130

Jakarta 2006 PT Ritra Konnas Freight Center Jalan Raya Cakung - Cilincing Km. 5 No. 20 Jakarta 14130

KON-EII/RKFC/XII/2006/01

18-Dec-06 18-Jun-07 250,000,000.00IDR

34 Pekerjaan Penyelidikan Geoteknik Batang Field Proyek SLN WP - 25 Duri-Riau 2006 PT Multi Structure 006/MS-EII/WP.25/XI/2006

14-Nov-06 23-Jan-07 55,168.45USD

35 Additional Work for Soil Investigation regarding Feasibility Study for Coal Fired Steam Power Plant 2 x 25 MW PT Central Pertiwi Bahari, Tulang Bawang, Lampung

Tulang Bawang, Lampung

2007 PT Truba Alam Manunggal Engineering, Tbk

Sona Topas Tower 11th Floor, Jalan Jend. Sudirman Kav. 26 Jakarta 12920

003/TAM-EII/CA/07 19-Feb-07 19-Apr-07 217,175,000.00IDR

36 Soil Investigation and Detail Engineering of Duri Canal Improvement Project Duri-Riau 2007 PT Tripatra Engineers & Constructors

Duri, Riau SA-9415-0113-TF-EII-06

16-Feb-07 15-Jun-07 140,067.59USD

37 Construction Management for TVS Motor Project Karawang 2007 PT TVS Motor Company Karawang 1-Mar-07 30-Sep-07 350,000,000.00IDR 38 Provision of Soil Investigation Works of Jabung Gas Booster Station Project Jambi 2007 MMC Oil & Gas Engineering Sdn

Bhd Level 22, Menara Asia Life, 189, Jalan Tun Razak, 50400, Kuala Lumpur

MMC O&G (KL)/D&C/LA06/EPCC-

00/07

16-Apr-07 30-May-07 29,861.25USD

39 Pekerjaan Project Management Services Revitalisasi Tambak Dipasena Lampung

Lampung 2007 PT Manunggal Engineering Sona Topas Tower 11th Floor, Jalan Jend. Sudirman Kav. 26 Jakarta 12920

001 ME/SPK-VI/2007 8-Jun-07 31-Dec-08 13,800,000,000.00Rp

40 Banyuasin 2 x 135 MW Coal Fired Power Plant Project Palembang 2007 PT Manunggal Engineering Sona Topas Tower 11th Floor, Jalan Jend. Sudirman Kav. 26 Jakarta 12920

MOU Jun-07 18,800,000,000.00Rp

Page 46: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 43 of 61

PT ENCONA INTI INDUSTRI

2. TECHNICAL LICENSES AND CERTIFICATES 1. SIUJK (COMPANY LICENSE FOR CONSTRUCTION BUSINESS)

Page 47: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 44 of 61

PT ENCONA INTI INDUSTRI

Page 48: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 45 of 61

PT ENCONA INTI INDUSTRI

2. SIBP ( PROFESSIONAL LICENSE FOR DESIGNER IN JAKARTA)

Page 49: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 46 of 61

PT ENCONA INTI INDUSTRI

3. CERTIFICATION AS CONSTRUCTION COMPANY FROM INDONESIAN CONSTRUCTION ASSOCIATION – HOUSING, INDUSTRIALAND WAREHOUSE BUILDING, NON HOUSING BUILDING INCLUDING MAINTENANCE

Page 50: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 47 of 61

PT ENCONA INTI INDUSTRI

Page 51: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 48 of 61

PT ENCONA INTI INDUSTRI

4. CERTIFICATION AS CONSTRUCTION COMPANY FROM INDONESIAN CONSTRUCTION ASSOCIATION – ROAD, DRAINAGE, PORT AND PIER, WATER SUPPLY INCLUDING MAINTENANCE WORKS

Page 52: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 49 of 61

PT ENCONA INTI INDUSTRI

Page 53: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 50 of 61

PT ENCONA INTI INDUSTRI

Page 54: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 51 of 61

PT ENCONA INTI INDUSTRI

5. CERTIFICATION AS ENGINEERING CONSULTANT FROM NATIONAL ASSOCIATION OF INDONESIAN CONSULTANTS

Page 55: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 52 of 61

PT ENCONA INTI INDUSTRI

6. ISO CERTIFICATE FOR ENGINEERING, PROCUREMENT AND CONSTRUCTION

Page 56: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 53 of 61

PT ENCONA INTI INDUSTRI

7. CERTIFICATION AS CONSTRUCTION COMPANY FROM INDONESIAN CONSTRUCTION

ASSOCIATION – ELECTRICAL WORKS (LARGE SCALE CLASS)

Page 57: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 54 of 61

PT ENCONA INTI INDUSTRI

Page 58: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 55 of 61

PT ENCONA INTI INDUSTRI

Page 59: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 56 of 61

PT ENCONA INTI INDUSTRI

8. CERTIFICATION AS CONSTRUCTION COMPANY FROM INDONESIAN CONSTRUCTION

ASSOCIATION – CIVIL WORKS (LARGE SCALE CLASS)

Page 60: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 57 of 61

PT ENCONA INTI INDUSTRI

Page 61: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 58 of 61

PT ENCONA INTI INDUSTRI

9. CERTIFICATION AS CONSTRUCTION COMPANY FROM INDONESIAN CONSTRUCTION

ASSOCIATION – ARCHITECTURAL WORKS (LARGE SCALE CLASS)

Page 62: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 59 of 61

PT ENCONA INTI INDUSTRI

Page 63: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 60 of 61

PT ENCONA INTI INDUSTRI

10. CERTIFICATION AS CONSTRUCTION COMPANY FROM INDONESIAN CONSTRUCTION

ASSOCIATION – ENVIROMENTAL WORKS (LARGE SCALE CLASS)

Page 64: Contract No

Doc. No : 05.CHM.513/ZAi/B.337 Revision : 00 Date : October 22, 2007 Page : 61 of 61

PT ENCONA INTI INDUSTRI

Page 65: Contract No

Quality Control Support and Inspections for Humanitarian Projects in Indonesia POD IDIQ Contract # W912UM-07-D-0004

COMMERCIAL PROPOSAL

Page 66: Contract No

Schedule of Values - Quality Control Support and Inspections For HA Projects - Indonesia

Item # Project Est QTY UOMPrice

US$

CENTRAL JAVASambak Primary School

1 Presolicitation and Solicitation Support Services 1 LS 5,860.30

2 Design Phase Services 1 LS 28,721.11

3 Construction Phase Services 1 LS 79,790.52

Subtotal 114,371.93

Bengking Primary School

4 Presolicitation and Solicitation Support Services 1 LS 5,860.30

5 Design Phase Services 1 LS 27,745.51

6 Construction Phase Services 1 LS 79,790.52

Subtotal 113,396.33

Sutopati Primary School

7 Presolicitation and Solicitation Support Services 1 LS 5,860.30

8 Design Phase Services 1 LS 29,648.03

9 Construction Phase Services 1 LS 79,790.52

Subtotal 115,298.85

Menorah Primary School

10 Presolicitation and Solicitation Support Services 1 LS 5,860.30

11 Design Phase Services 1 LS 27,745.51

12 Construction Phase Services 1 LS 79,790.52

Subtotal 113,396.33

Salaman II Primary School

13 Presolicitation and Solicitation Support Services 1 LS 5,860.30

14 Design Phase Services 1 LS 27,745.51

15 Construction Phase Services 1 LS 79,790.52

Subtotal 113,396.33

Bayat Jr. High School

16 Presolicitation and Solicitation Support Services 1 LS 5,860.30

17 Design Phase Services 1 LS 31,515.16

18 Construction Phase Services 1 LS 79,790.52

Subtotal 117,165.98

Kwarasan Primary School

19 Presolicitation and Solicitation Support Services 1 LS 5,860.30

20 Design Phase Services 1 LS 27,258.29

21 Construction Phase Services 1 LS 79,790.52

Subtotal 112,909.11

SULAWESIBatulubang School #1

22 Presolicitation and Solicitation Support Services 1 LS 8,097.62

23 Design Phase Services 1 LS 37,770.57

24 Construction Phase Services 1 LS 111,996.35

Subtotal 157,864.54

Batulubang School #2

25 Presolicitation and Solicitation Support Services 1 LS 8,097.62

26 Design Phase Services 1 LS 37,502.87

27 Construction Phase Services 1 LS 111,996.35

Subtotal 157,596.84

Paudean School

28 Presolicitation and Solicitation Support Services 1 LS 8,097.62

29 Design Phase Services 1 LS 36,527.27

30 Construction Phase Services 1 LS 111,996.35

Subtotal 156,621.24

Pantenusu Primary School

31 Presolicitation and Solicitation Support Services 1 LS 8,097.62

32 Design Phase Services 1 LS 36,704.57

33 Construction Phase Services 1 LS 111,996.35

Subtotal 156,798.54

Scope Item

Page 67: Contract No

Item # Project Est QTY UOMPrice

US$Scope Item

Pamurutan Pier and Well

34 Presolicitation and Solicitation Support Services 1 LS 8,097.62

35 Design Phase Services 1 LS 36,527.27

36 Construction Phase Services 1 LS 111,996.35

Subtotal 156,621.24

Lirang Primary School

37 Presolicitation and Solicitation Support Services 1 LS 8,097.62

38 Design Phase Services 1 LS 37,822.19

39 Construction Phase Services 1 LS 111,996.35

Subtotal 157,916.16

Total Price (US $) 1,743,353.42

Offeror certifies that the price(s) specified above represents its full bid amount to complete the work proposed.

These prices are valid for 270 days (not less than 270 days). All bids must be in US dollars

The Total Amount will be adjusted using bid prices listed for items selected by CH2M HILL.

Each Item shall include all labor, materials, and equipment to complete the required scope

whether specifically shown in the item description or in the SOW.

Signature:

Printed Name: HARYONO YB.

Title: President Director of PT.ENCONA INTI INDUSTRI

Date: October 26th 2007

Phone: 021 5276710, 5276711, 5276712

Measurement and Payment

Costs for on-site project oversight, day-to-day project management, materials required but not specifically identified herein, and

all required travel and per diem are to be included in the cost for various bid items. Cumulatively, the sum of all bid items are to

include the total cost to perform all work identified in the SOW, drawings, and specifications.

Page 68: Contract No

PR

OJE

CT

CO

ST

ES

TIM

AT

E

CL

IEN

T:

CH

2M H

ILL

JOB

TIT

LE

: Q

C S

UB

CO

NT

RA

CT

OR

LO

CA

TIO

N:

CE

NT

RA

L J

AV

A

1. D

IRE

CT

CO

ST

( R

EM

UN

ER

AT

ION

)

12

34

56

78

910

1112

1314

1516

1718

PS

+SD

ES

IGN

IMP

LE

ME

NT

AT

ION

A.

EX

PE

RT

ISE

1 P

RO

JEC

T M

AN

AG

ER

1x

14.7

5M

/M0.

50.

51

11

11

11

11

11

11

0.25

0.25

0.25

3,35

7.40

3,35

7.40

10,0

72.2

136

,092

.08

49,5

21.6

9

2 P

RO

JEC

T C

ON

TR

OL

MA

NA

GE

R1

x14

.75

M/M

0.5

0.5

11

11

11

11

11

11

10.

250.

250.

252,

316.

602,

316.

606,

949.

8024

,903

.45

34,1

69.8

5

3 P

RO

JEC

T C

ON

TR

OL

ST

AF

F1

x15

.00

M/M

11

11

11

11

11

11

11

0.5

0.5

1,93

0.50

0.00

5,79

1.50

23,1

66.0

028

,957

.50

4 H

ES

MA

NA

GE

R1

x9.

50M

/M0.

50.

50.

51

11

11

11

12,

518.

032,

518.

030.

0021

,403

.30

23,9

21.3

3

5 H

ES

INS

PE

CT

OR

1x

8.50

M/M

0.5

11

11

11

11

1,93

0.50

0.00

0.00

16,4

09.2

516

,409

.25

6 C

ON

ST

RU

CT

ION

MA

NA

GE

R/S

SI C

OO

RD

INA

TO

R1

x9.

25M

/M0.

51

11

11

11

10.

250.

250.

252,

316.

600.

000.

0021

,428

.55

21,4

28.5

5

7 S

ITE

SU

PE

RIN

TE

ND

EN

T7

x9.

25M

/M0.

51

11

11

11

10.

250.

250.

251,

930.

500.

000.

0012

4,99

9.88

124,

999.

88

8A

RC

HIT

EC

T1

x4.

40M

/M0.

51

11

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

2,01

4.45

1,00

7.22

6,04

3.34

1,81

3.00

8,86

3.56

9 C

IVIL

/ST

RU

CT

UR

AL

EN

GIN

EE

R1

x4.

40M

/M0.

51

11

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

2,01

4.45

1,00

7.22

6,04

3.34

1,81

3.00

8,86

3.56

10

GE

OD

ET

IC E

NG

INE

ER

1x

1.50

M/M

0.5

12,

014.

451,

007.

222,

014.

450.

003,

021.

67

11

ME

KA

NIK

AL

EN

GIN

EE

R1

x3.

40M

/M0.

51

10.

10.

10.

10.

10.

10.

10.

10.

10.

12,

014.

451,

007.

224,

028.

901,

813.

006,

849.

12

12

ELE

KT

RIK

AL

EN

GIN

EE

R1

x3.

40M

/M0.

51

10.

10.

10.

10.

10.

10.

10.

10.

10.

12,

014.

451,

007.

224,

028.

901,

813.

006,

849.

12

B.

AS

SIS

TA

NT

EN

GIN

EE

R

1A

SS

IST

AN

T A

RC

HIT

EC

T E

NG

.1

x3.

00M

/M1

11

1,51

0.82

0.00

4,53

2.46

0.00

4,53

2.46

2A

SS

IST

AN

T S

TR

UC

TU

RA

L E

NG

.1

x3.

00M

/M1

11

1,51

0.82

0.00

4,53

2.46

0.00

4,53

2.46

3A

SS

IST

AN

T C

IVIL

EN

GIN

EE

R1

x3.

00M

/M1

11

1,51

0.82

0.00

4,53

2.46

0.00

4,53

2.46

4A

SS

IST

AN

T M

EC

HA

NIC

AL

EN

G.

1x

3.00

M/M

11

11,

510.

820.

004,

532.

460.

004,

532.

46

5A

SS

IST

AN

T E

LEK

TR

IKA

L E

NG

INE

ER

1x

3.00

M/M

11

11,

510.

820.

004,

532.

460.

004,

532.

46

6 S

UR

VE

YO

R E

NG

INE

ER

1x

1.50

M/M

0.5

11,

510.

8275

5.41

1,51

0.82

0.00

2,26

6.23

7 C

OS

T E

ST

IMA

TO

R1

x2.

30M

/M0.

51

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

1,51

0.82

755.

411,

510.

821,

208.

663,

474.

89

0.00

CS

UP

PO

RT

ING

ST

AF

F0.

00

1 S

EC

RE

TA

RY

1x

14.7

5M

/M0.

50.

51

11

11

11

11

11

11

0.25

0.25

0.25

772.

2077

2.20

2,31

6.60

8,30

1.15

11,3

89.9

5

2A

DM

INIS

TR

AT

ION

ST

AF

F1

x14

.75

M/M

0.5

0.5

11

11

11

11

11

11

10.

250.

250.

2550

3.60

503.

601,

510.

795,

413.

677,

428.

06

3 C

OM

PU

TE

R O

PE

RA

TO

R1

x14

.75

M/M

0.5

0.5

11

11

11

11

11

11

10.

250.

250.

2550

3.60

503.

601,

510.

795,

413.

677,

428.

06

4 C

AD

OP

ER

AT

OR

/ D

RA

FT

ER

3x

3.00

M/M

11

175

5.41

0.00

6,79

8.69

0.00

6,79

8.69

5 D

RIV

ER

1x

12.0

0M

/M1

11

11

11

11

11

150

3.60

0.00

0.00

6,04

3.16

6,04

3.16

6 S

EC

UR

ITY

OF

FIC

ER

1x

12.0

0M

/M1

11

11

11

11

11

150

3.60

0.00

0.00

6,04

3.16

6,04

3.16

7 O

FF

ICE

BO

Y /

ME

SS

EN

GE

R1

x12

.00

M/M

11

11

11

11

11

11

503.

600.

000.

006,

043.

166,

043.

16

SU

B T

OT

AL

16,5

18.3

582

,793

.25

314,

121.

1441

3,43

2.74

NO

DE

SC

RIP

TIO

N U

NIT

PR

ICE

US

$

SU

B T

OT

AL

(R

p)

MO

NT

H

QU

AN

TIT

Y

Page 69: Contract No

2. U

ND

IRE

CT

CO

ST

12

34

56

78

910

1112

1314

1516

1718

PS

+SD

ES

IGN

IMP

LE

ME

NT

AT

ION

A.

OF

FIC

E R

UN

NIN

G C

OS

T

1 O

FF

ICE

SP

AC

ER

EN

T1

x18

Uni

t/M1

11

11

11

11

11

11

11

11

15,

791.

5011

,583

.00

17,3

74.5

075

,289

.50

104,

247.

00

2 O

FF

ICE

SU

PP

LIE

S1

x18

Uni

t/M1

11

11

11

11

11

11

11

11

11,

774.

083,

548.

165,

322.

2423

,063

.04

31,9

33.4

4

3 E

QU

IPM

EN

T

-

Per

sona

l Com

pute

r/La

ptop

RE

NT

1x

149

Uni

t/M4

48

88

88

1010

1010

1010

1010

77

712

5.68

1,00

5.44

3,01

6.32

14,7

04.5

618

,726

.32

-

Plo

tter

RE

NT

1x

2U

nit/M

0.5

0.5

114

7.84

0.00

295.

680.

0029

5.68

-

Prin

ter

RE

NT

1x

18U

nit/M

11

11

11

11

11

11

11

11

11

125.

6825

1.36

377.

041,

633.

842,

262.

24

-

Dig

ital c

amer

a1

x82

Uni

t/M1

11

27

77

77

77

77

77

29.5

729

.57

59.1

42,

336.

032,

424.

74

-

Sca

nner

1x

2U

nit/M

10.

50.

529

.57

0.00

59.1

40.

0059

.14

4 E

LEC

TR

ICIT

Y, C

OM

MU

NIC

AT

ION

, FA

CS

& W

AT

ER

1x

18M

onth

11

11

11

11

11

11

11

11

11

1,77

4.08

3,54

8.16

5,32

2.24

23,0

63.0

431

,933

.44

B.

LA

ND

DA

TA

CO

LL

EC

TIO

N

1 S

AT

ELL

ITE

IMA

GE

2A

ER

IAL

PH

OT

O

C.

LO

CA

L T

RA

NS

PO

RT

AT

ION

1 C

AR

RE

NT

1x

9U

nit/M

11

11

11

11

11,

853.

280.

000.

0016

,679

.52

16,6

79.5

2

2 M

OT

OR

BIK

ER

EN

T1

x63

Uni

t/M7

77

77

77

77

270.

280.

000.

0017

,027

.64

17,0

27.6

4

3 M

OT

OR

OIL

/ F

UE

L15

x27

0ltr

1.11

4,49

5.50

4,49

5.50

D.

SU

RV

EY

RU

NN

ING

CO

ST

D.1

ZO

NE

CE

NT

RA

L J

AV

A (

7 L

OC

AT

ION

)

a. J

AK

AR

TA

- J

OG

YA

KA

RT

A4

x1

M/T

rips

369.

601,

478.

401,

478.

40

b. L

OC

AL

TR

AN

SP

OR

TA

TIO

N14

x1

Day

s14

7.84

2,06

9.76

2,06

9.76

c. A

CC

OM

MO

DA

TIO

N4

x12

Day

s16

0.70

7,71

3.39

7,71

3.39

D.2

MIS

CE

LL

AN

EO

US

b. T

OP

OG

RA

PH

IC14

x1

Da y

s80

.37

1,12

5.15

1,12

5.15

c. S

OIL

INV

ES

TIG

AT

ION

1S

amba

k1

x1

ls4,

017.

384,

017.

384,

017.

38

2B

enki

ng1

x1

ls4,

017.

384,

017.

384,

017.

38

3S

utop

ati

1x

1ls

4,01

7.38

4,01

7.38

4,01

7.38

4M

enor

ah1

x1

ls4,

017.

384,

017.

384,

017.

38

5S

alam

an1

x1

ls4,

017.

384,

017.

384,

017.

38

6B

ayat

1x

1ls

4,01

7.38

4,01

7.38

4,01

7.38

7K

war

asan

1x

1ls

e. G

PS

RE

NT

1x

14D

ays

32.1

444

9.95

449.

95

f. T

HE

OD

OLI

TE

& W

AT

ER

PA

SS

RE

NT

1x

14D

ays

56.2

378

7.27

787.

27

g. B

uild

ing

Per

mits

1S

amba

k0.

09x

2000

sqm

17.7

43,

193.

203,

193.

20

2B

enki

ng1

1ls

2,21

7.60

2,21

7.60

2,21

7.60

3S

utop

ati

0.09

x25

00sq

m17

.74

4,12

0.12

4,12

0.12

4M

enor

ah1

1ls

2,21

7.60

2,21

7.60

2,21

7.60

5S

alam

an1

1ls

2,21

7.60

2,21

7.60

2,21

7.60

6B

ayat

0.09

x37

50sq

m17

.74

5,98

7.25

5,98

7.25

7K

war

asan

0.09

x36

00sq

m17

.74

5,74

7.76

5,74

7.76

ES

ITE

VIS

IT

a. J

AK

AR

TA

- J

OG

YA

KA

RT

A1

x89

M/T

rips

22

22

27

77

77

77

77

73

33

369.

601,

478.

402,

217.

6029

,198

.40

32,8

94.4

0

b. A

CC

OM

MO

DA

TIO

N1

x17

8D

ays

44

44

414

1414

1414

1414

1414

146

66

160.

701,

285.

571,

928.

3525

,389

.91

28,6

03.8

3

FR

EP

OR

T &

DO

CU

ME

NT

AT

ION

1 B

UIL

DIN

G P

ER

MIT

DO

CU

ME

NT

1x

77

369.

600.

002,

587.

200.

002,

587.

20

2 T

EN

DE

R D

OC

UM

EN

T1

x35

3536

9.60

0.00

12,9

36.0

00.

0012

,936

.00

3 R

EP

OR

T1

x18

11

11

11

11

11

11

11

11

11

295.

6859

1.36

887.

043,

843.

845,

322.

24

4 D

RA

WIN

G D

OC

UM

EN

TA

TIO

N1

x18

11

11

11

11

11

11

11

11

11

295.

6859

1.36

887.

043,

843.

845,

322.

24

5 D

OC

UM

EN

TA

TIO

NS

1x

181

11

11

11

11

11

11

11

11

129

5.68

591.

3688

7.04

3,84

3.84

5,32

2.24

SU

B T

OT

AL

24,5

03.7

411

7,58

5.90

244,

412.

5038

6,50

2.14

NO

DE

SC

RIP

TIO

NQ

UA

NT

ITY

MO

NT

H U

NIT

PR

ICE

US

$

SU

B T

OT

AL

(R

p)

Page 70: Contract No

PR

OJE

CT

CO

ST

ES

TIM

AT

E

CL

IEN

T:

CH

2M H

ILL

JOB

TIT

LE

: Q

C S

UB

CO

NT

RA

CT

OR

LO

CA

TIO

N:

SU

LA

WE

SI

1. D

IRE

CT

CO

ST

( R

EM

UN

ER

AT

ION

)

12

34

56

78

910

1112

1314

1516

1718

PS

+SD

ES

IGN

IMP

LE

ME

NT

AT

ION

A.

EX

PE

RT

ISE

1 P

RO

JEC

T M

AN

AG

ER

1x

14.7

5M

/M0.

50.

51

11

11

11

11

11

11

0.25

0.25

0.25

3,35

7.40

3,35

7.40

10,0

72.2

136

,092

.08

49,5

21.6

9

2 P

RO

JEC

T C

ON

TR

OL

MA

NA

GE

R1

x14

.75

M/M

0.5

0.5

11

11

11

11

11

11

10.

250.

250.

252,

316.

602,

316.

606,

949.

8024

,903

.45

34,1

69.8

5

3 P

RO

JEC

T C

ON

TR

OL

ST

AF

F1

x15

M/M

11

11

11

11

11

11

11

0.5

0.5

1,93

0.50

0.00

5,79

1.50

23,1

66.0

028

,957

.50

4 H

ES

MA

NA

GE

R1

x9.

5M

/M0.

50.

50.

51

11

11

11

12,

518.

032,

518.

030.

0021

,403

.30

23,9

21.3

3

5 H

ES

INS

PE

CT

OR

1x

8.5

M/M

0.5

11

11

11

11

1,93

0.50

0.00

0.00

16,4

09.2

516

,409

.25

6 C

ON

ST

RU

CT

ION

MA

NA

GE

R/S

SI C

OO

RD

INA

TO

R1

x9.

25M

/M0.

51

11

11

11

10.

250.

250.

252,

316.

600.

000.

0021

,428

.55

21,4

28.5

5

7 S

ITE

SU

PE

RIN

TE

ND

EN

T6

x9.

25M

/M0.

51

11

11

11

10.

250.

250.

251,

930.

500.

000.

0010

7,14

2.75

107,

142.

75

8A

RC

HIT

EC

T1

x4.

4M

/M0.

51

11

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

2,01

4.45

1,00

7.22

6,04

3.34

1,81

3.00

8,86

3.56

9 C

IVIL

/ST

RU

CT

UR

AL

EN

GIN

EE

R1

x4.

4M

/M0.

51

11

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

2,01

4.45

1,00

7.22

6,04

3.34

1,81

3.00

8,86

3.56

10

GE

OD

ET

IC E

NG

INE

ER

1x

1.5

M/M

0.5

12,

014.

451,

007.

222,

014.

450.

003,

021.

67

11

ME

KA

NIK

AL

EN

GIN

EE

R1

x3.

4M

/M0.

51

10.

10.

10.

10.

10.

10.

10.

10.

10.

12,

014.

451,

007.

224,

028.

901,

813.

006,

849.

12

12

ELE

KT

RIK

AL

EN

GIN

EE

R1

x3.

4M

/M0.

51

10.

10.

10.

10.

10.

10.

10.

10.

10.

12,

014.

451,

007.

224,

028.

901,

813.

006,

849.

12

13

CIV

IL/O

FF

SH

OR

E E

NG

INE

ER

1x

4.4

M/M

0.5

11

10.

10.

10.

10.

10.

10.

10.

10.

10.

12,

014.

451,

007.

226,

043.

341,

813.

008,

863.

56

B.

AS

SIS

TA

NT

EN

GIN

EE

R

1A

SS

IST

AN

T A

RC

HIT

EC

T E

NG

.1

x3

M/M

11

11,

510.

820.

004,

532.

460.

004,

532.

46

2A

SS

IST

AN

T S

TR

UC

TU

RA

L E

NG

.1

x3

M/M

11

11,

510.

820.

004,

532.

460.

004,

532.

46

3A

SS

IST

AN

T C

IVIL

EN

GIN

EE

R1

x3

M/M

11

11,

510.

820.

004,

532.

460.

004,

532.

46

4A

SS

IST

AN

T M

EC

HA

NIC

AL

EN

G.

1x

3M

/M1

11

1,51

0.82

0.00

4,53

2.46

0.00

4,53

2.46

5A

SS

IST

AN

T E

LEK

TR

IKA

L E

NG

INE

ER

1x

3M

/M1

11

1,51

0.82

0.00

4,53

2.46

0.00

4,53

2.46

6A

SS

IST

AN

T C

IVIL

/OF

FS

HO

RE

EN

GIN

EE

R1

x3

M/M

11

11,

510.

820.

004,

532.

460.

004,

532.

46

7 S

UR

VE

YO

R E

NG

INE

ER

1x

1.5

M/M

0.5

11,

510.

8275

5.41

1,51

0.82

0.00

2,26

6.23

8 C

OS

T E

ST

IMA

TO

R1

x2.

3M

/M0.

51

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

1,51

0.82

755.

411,

510.

821,

208.

663,

474.

89

CS

UP

PO

RT

ING

ST

AF

F

1 S

EC

RE

TA

RY

1x

14.7

5M

/M0.

50.

51

11

11

11

11

11

11

0.25

0.25

0.25

772.

2077

2.20

2,31

6.60

8,30

1.15

11,3

89.9

5

2A

DM

INIS

TR

AT

ION

ST

AF

F1

x14

.75

M/M

0.5

0.5

11

11

11

11

11

11

10.

250.

250.

2550

3.60

503.

601,

510.

795,

413.

677,

428.

06

3 C

OM

PU

TE

R O

PE

RA

TO

R1

x14

.75

M/M

0.5

0.5

11

11

11

11

11

11

10.

250.

250.

2550

3.60

503.

601,

510.

795,

413.

677,

428.

06

4 C

AD

OP

ER

AT

OR

/ D

RA

FT

ER

3x

3M

/M1

11

755.

410.

006,

798.

690.

006,

798.

69

5 D

RIV

ER

1x

12M

/M1

11

11

11

11

11

150

3.60

0.00

0.00

6,04

3.16

6,04

3.16

6 S

EC

UR

ITY

OF

FIC

ER

1x

12M

/M1

11

11

11

11

11

150

3.60

0.00

0.00

6,04

3.16

6,04

3.16

7 O

FF

ICE

BO

Y /

ME

SS

EN

GE

R1

x12

M/M

11

11

11

11

11

11

503.

600.

000.

006,

043.

166,

043.

16

SU

B T

OT

AL

17,5

25.5

793

,369

.05

298,

077.

0140

8,97

1.63

QU

AN

TIT

Y

MO

NT

H U

NIT

PR

ICE

US

$

SU

B T

OT

AL

(R

p)

NO

DE

SC

RIP

TIO

N

Page 71: Contract No

2. U

ND

IRE

CT

CO

ST

12

34

56

78

910

1112

1314

1516

1718

PS

+SD

ES

IGN

IMP

LE

ME

NT

AT

ION

A.

OF

FIC

E R

UN

NIN

G C

OS

T

1 O

FF

ICE

SP

AC

ER

EN

T1

x18

Uni

t/M1

11

11

11

11

11

11

11

11

15,

791.

5011

,583

.00

17,3

74.5

075

,289

.50

104,

247.

00

2 O

FF

ICE

SU

PP

LIE

S1

x18

Uni

t/M1

11

11

11

11

11

11

11

11

11,

774.

083,

548.

165,

322.

2423

,063

.04

31,9

33.4

4

3 E

QU

IPM

EN

T

-

Per

sona

l Com

pute

r/La

ptop

RE

NT

1x

149

Uni

t/M4

48

88

88

1010

1010

1010

1010

77

712

5.68

1,00

5.44

3,01

6.32

14,7

04.5

618

,726

.32

-

Plo

tter

RE

NT

1x

2U

nit/M

0.5

0.5

114

7.84

0.00

295.

680.

0029

5.68

-

Prin

ter

RE

NT

1x

18U

nit/M

11

11

11

11

11

11

11

11

11

125.

6825

1.36

377.

041,

633.

842,

262.

24

-

Dig

ital c

amer

a1

x82

Uni

t/M1

11

27

77

77

77

77

77

29.5

729

.57

59.1

42,

336.

032,

424.

74

-

Sca

nner

1x

2U

nit/M

10.

50.

529

.57

0.00

59.1

40.

0059

.14

4 E

LEC

TR

ICIT

Y, C

OM

MU

NIC

AT

ION

, FA

CS

& W

AT

ER

1x

18M

onth

11

11

11

11

11

11

11

11

11

1,77

4.08

3,54

8.16

5,32

2.24

23,0

63.0

431

,933

.44

B.

LA

ND

DA

TA

CO

LL

EC

TIO

N

1 S

AT

ELL

ITE

IMA

GE

2A

ER

IAL

PH

OT

O

C.

LO

CA

L T

RA

NS

PO

RT

AT

ION

1 C

AR

RE

NT

1x

9U

nit/M

11

11

11

11

11,

853.

280.

000.

0016

,679

.52

16,6

79.5

2

2 M

OT

OR

BIK

ER

EN

T1

x63

Uni

t/M7

77

77

77

77

270.

280.

000.

0017

,027

.64

17,0

27.6

4

3 M

OT

OR

OIL

/ F

UE

L15

x27

0ltr

1.11

4,49

5.50

4,49

5.50

D.

SU

RV

EY

RU

NN

ING

CO

ST

D.1

ZO

NE

SU

LA

WE

SI (

6 L

OC

AT

ION

)

a. J

AK

AR

TA

- M

AN

AD

O4

x1

M/T

rips

739.

202,

956.

802,

956.

80

b. L

OC

AL

TR

AN

SP

OR

TA

TIO

N4

x1

M/T

rips

1,10

8.80

4,43

5.20

4,43

5.20

c. A

CC

OM

MO

DA

TIO

N4

x12

Day

s24

1.04

11,5

70.0

911

,570

.09

D.2

MIS

CE

LL

AN

EO

US

b. T

OP

OG

RA

PH

IC14

x1

Da y

s12

0.52

1,68

7.30

1,68

7.30

c. S

OIL

INV

ES

TIG

AT

ION

1B

atul

uban

g S

choo

l 11

x1

ls4,

435.

204,

435.

204,

435.

20

2B

atul

uban

g S

choo

l 21

x1

ls4,

435.

204,

435.

204,

435.

20

3P

aude

an S

choo

l1

x1

ls4,

435.

204,

435.

204,

435.

20

4P

ante

nusu

1x

1ls

4,43

5.20

4,43

5.20

4,43

5.20

5P

amur

utan

Pie

r &

Wel

l1

x1

ls4,

435.

204,

435.

204,

435.

20

6Li

rang

Prim

ary

Sch

ool

1x

1ls

4,43

5.20

4,43

5.20

4,43

5.20

e. G

PS

RE

NT

1x

14D

ays

32.1

444

9.95

449.

95

f. T

HE

OD

OLI

TE

& W

AT

ER

PA

SS

RE

NT

1x

14D

ays

56.2

378

7.27

787.

27

g. B

uild

ing

Per

mits

1B

atul

uban

g S

choo

l 10.

09x

2100

sqm

17.7

43,

460.

903,

460.

90

2B

atul

uban

g S

choo

l 20.

09x

2000

sqm

17.7

43,

193.

203,

193.

20

3P

aude

an S

choo

l1

1ls

2,21

7.60

2,21

7.60

2,21

7.60

4P

ante

nusu

0.09

x15

00sq

m17

.74

2,39

4.90

2,39

4.90

5P

amur

utan

Pie

r &

Wel

l1

x1

ls2,

217.

602,

217.

602,

217.

60

6Li

rang

Prim

ary

Sch

ool

0.09

x22

00sq

m17

.74

3,51

2.52

3,51

2.52

ES

ITE

VIS

IT

a. J

AK

AR

TA

- M

AN

AD

O1

x89

M/T

rips

22

22

27

77

77

77

77

73

33

739.

202,

956.

804,

435.

2058

,396

.80

65,7

88.8

0

b. L

OC

AL

TR

AN

SP

OR

TA

TIO

N1

x89

M/T

rips

22

22

27

77

77

77

77

73

33

1,10

8.80

4,43

5.20

6,65

2.80

87,5

95.2

098

,683

.20

c. A

CC

OM

MO

DA

TIO

N1

x17

8D

ays

44

44

414

1414

1414

1414

1414

146

66

241.

041,

928.

352,

892.

5238

,084

.87

42,9

05.7

4

FR

EP

OR

T &

DO

CU

ME

NT

AT

ION

1 B

UIL

DIN

G P

ER

MIT

DO

CU

ME

NT

1x

77

369.

600.

002,

587.

200.

002,

587.

20

2 T

EN

DE

R D

OC

UM

EN

T1

x35

3536

9.60

0.00

12,9

36.0

00.

0012

,936

.00

3 R

EP

OR

T1

x18

11

11

11

11

11

11

11

11

11

295.

6859

1.36

887.

043,

843.

845,

322.

24

4 D

RA

WIN

G D

OC

UM

EN

TA

TIO

N1

x18

11

11

11

11

11

11

11

11

11

295.

6859

1.36

887.

043,

843.

845,

322.

24

5 D

OC

UM

EN

TA

TIO

NS

1x

181

11

11

11

11

11

11

11

11

129

5.68

591.

3688

7.04

3,84

3.84

5,32

2.24

SU

B T

OT

AL

31,0

60.1

212

9,48

5.67

373,

901.

0653

4,44

6.85

NO

DE

SC

RIP

TIO

NQ

UA

NT

ITY

MO

NT

H U

NIT

PR

ICE

US

$

SU

B T

OT

AL

(R

p)