construction documents project
DESCRIPTION
This was a semester long project for my Methods and Materials II class at Kent State University. This document showcases the many kinds of CD's we learned to draft.TRANSCRIPT
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
G-0.01
Lakeland CollegeDigital and Mixed Media Arts Building
GENERAL NOTES1. COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, LAWS, SAFETY ORDERS, AND DIRECTIVES OF THE STATE, COUNTY, AND CITY.2. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR PROCURING ALL PERMITS, PAYING FEES, CERTIFICATES OF INSPECTION AND APPROVAL, UNLESS OTHERWISE NOTED BY CONTRACT DOCUMENTS.3. THE SUBMISSION OF A BID BY CONTRACTOR SHALL INDICATE THEY HAVE BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS4. PRIOR TO BIDDING EACH CONTRACTOR SHALL VISIT THE SITE, AND VERIFY ALL CONDITIONS. ANY DISCREPENCIES SHALL BE REPORTED TO THE ARCHITECT PRIOR TO BID OPENING.5. IN THE CASE OF DISCREPENCIES OR INCONSISTENCIES IN THE PROJECT MANUAL AND DRAWINGS THE ARCHITECT SHALL BE NOTIFIED.6. THE BUILDING STRUCTURE AND ALL WORK SHALL BE PROTECTED FROM THE WEATHER, CONSTRUCTION HAZARDS, FIRE, UNNECESSARY INTRUSIONS, DUST, DIRT, OR DEBRIS.7. CONTRACTORS SHALL PROVIDE INSTALL, AND MAINTAIN FOR THE DURATION OF CONSTRUCTION, ALL REQUIRED SCAFFOLDING, TARPAULINS, WARNING SIGNS, FENCES, AND OTHER TEMPORARY CONSTRUCTION ITEMS FOR THE SAFE COMPLETION OF THE WORK. CONTRACTORS SHALL COMPLY WITH ALL LOCAL, COUNTY, STATE, OSHA, AND EPA APPLICABLE REGULATIONS.8. THE CONTRACTOR SHALL DETERMINE CONSTRUCTION METHODS AND SEQUENCES, AND ENSURE THE SAFETY OF THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION.9. EACH CONTRACTOR TO REVIEW THE PROJECT MANUAL AND DRAWINGS FOR THEIR SCOPE OF WORK AND COORDINATE SEQUENCE OF THEIR WORK WITH OTHER CONTRACTORS.
DRAWING INDEXNUMBER
G-0.01
G-0.02
C-1.00
S-1.01
S-1.02/3
S-1.04/5
A-1.01/2
A-1.03/4
A-1.05
A-2.00
A-3.00
A-4.00
A-4.01
A-4.02
A-5.00
SHEET
TITLE SHEET
CODE ANALYSIS
SITE PLAN
FOUNDATION PLAN
FRAMING PLAN 2ND AND 3RD FLOOR
FRAMING PLAN 4TH AND 3RD FLOOR
ARCH 1ST AND 2ND FLOOR PLANS
ARCH 3RD AND 4TH FLOOR PLANS
ARCH ROOF AND ROOF DRAIN PLAN
BUILDING SECTIONS
FACADE COST ANALYSIS
2D WALL SECTIONS
ISOMETRIC A
ISOMETRIC B
STAIR DETAILS
ABBREVIATIONSCONC.
T.O.INSUL.C.M.U.W.W.F.
W/
CONCRETETOP OF
INSULATIONCONCRETE MASONRY UNIT
WELDED WIRE FABRICWITH
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
G-0.02
CODE ANALYSIS
Code Analysis Use Main: Assembly, A-3 §303.1 +2: Business, B §304.1 Maximum Floor Area Allowances per Occupant, Table 1004.1.1 (Square feet per occupant) Assembly without fixed seats: 7 net Assembly concentrated (chairs only – not fixed): 5 net Assembly Standing Space, Unconcentrated (tables and chairs): 15 net Business Areas: 100 gross, ~60 people per floor Allowable Building Height and Area 3 stories and 19,000 sq. ft. per floor, §504; Table 503 Type Type III-B construction with sprinklers allows for 4 stories, §504; Table 503 and §504.2 Number of exits 2 per story Table 1021.1 Minimum number of required plumbing fixtures, Table 2902.1 Main Floor:
WC: Men-2, Women-4 Lavatories: Men-2, Women-2 +2: WC: Men-2, Women-2 Lavatories: Men-1, Women-1 Fire Rating for Type III-B, Table 601
Primary Structural Frame: 0 (Not less than the ratings required for the fire-resistance-rated assemblies supported by the structural members) §704.1 Bearing Walls: Exterior, 2 Interior, 0 Nonbearing Walls and Partitions Exterior
x<5: 1 5≤x<10: 1 10≤x<30: 1 x≥30: 0
Interior, 0 Floor Construction and secondary members: 0 Roof Construction and secondary members: 0
Minimum Separation of Exits: Not less than 1/3 of the length of the maximum overall diagonal dimension of the area served. Main: 33’-6”, 2-4: 36’-8” §1015.2.1 Mixed Use and Occupancy: §508
Height for the main occupancy in accordance with §503.1 Height of accessory occupancies shall not exceed the values in Table 503 Each occupancy classified according to §302.1
Accessory occupancies shall not occupy more than 10% of the building area of the story in which they are located
No separation is required between accessory and main occupancies Standpipes Allowed but not required since the building is sprinkled §90503.1 and §905.3.2 Areas of refuge Not required in buildings with an automatic sprinkler system Foundations Inspections must be performed during the installation and testing of the “driven deep foundation” elements. §1704.8 Drilling operations must be observed and records kept for each element. Verification of the placement, plumbness, element diameters, lengths, applicable embedment into bedrock, and end bearing strata capacity are required. Table 1704.9 Exterior Insulation and finish systems: Special inspections required for all EIFS applications. §1704.14 Penthouse It cannot exceed 18’ above the roof. It and any other roof structures cannot have a total area of more than 1/3 the supporting roof. It can only be used for the shelter of mechanical equipment and/or vertical shaft openings §1509 Parapets Parapets must be provided on exterior walls of buildings. They must have the same fire resistance rating as the supporting wall. Height cannot be less than 30” §705.11.1 Shaft Enclosures Not required for floor openings between a mezzanine and the floor below §708.2.9 Emergency lighting Must be arranged to provide initial lighting that averages at least 1 foot-candle and is never lower than .1 foot-candle along a path of egress. §1006.4 Projection Room Any machine projecting film must be enclosed in a projection room. Supporting electrical equipment must also be in the projection room or in an adjacent room. §409 Signs Exit signs must be installed at exit access doorways. Approved directional exit marking will also be provided. §411.7 Egress Stairs must have a clear width of 48’ between handrails and have an area of refuge within an enlarged floor landing or be entered from an area of refuge §1007.3
C
2
B
1
A
3 4
A
3
C
2
B
4176'-0"
70'
29'-3
1 4"39
'-83 4"
34'-834" 40'-31
4" 34'-834" 40'-31
4" 14'14'
76'
70'
29'-3
1 4"39
'-83 4"
C
B
A
4321
B
3
C
2 41
A
DIAGONAL = 100’-6”DISTANCE FROM STAIR TO STAIR = 109’-0”
STAIR TO STAIR > 1/3 THE DIAGONAL
DIAGONAL = 111’-0”DISTANCE FROM STAIR TO STAIR = 211’-0”
STAIR TO STAIR > 1/3 THE DIAGONAL
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
C-1.00SUN PATH DIAGRAM SITE PLANSCALE: 1” = 20’-0”
GENERAL NOTES
1. LONGITUDE: 41º39’30” N LATITUDE: 81º27’23” W AZIMUTH: 50º2. SQUARE FEET PER FLOOR: FIRST: 5,032 SECOND: 2,823 THIRD: 5,984 FOURTH: 5,984 TOTAL SQUARE FEET: 19,823 3. PARKING: 45 + 5 HC4. USE GROUP: BUSINESS5. CONSTRUCTION TYPE: III-B6. STRATEGIES: - USE OVERHANG TO SHADE LOBBY AND THEATER FROM DIRECT SOUTH LIGHT. - USE RAINSCREEN WALL SYSTEM FACING THE LAKE TO INSULATE AGAINST WINTER WINDS. - USE A HIGH PERFROMANCE CURTAIN WALL TO DAYLIGHT INTERIOR SPACES.
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
S-1.01
3
C
41 2
B
A
DETAIL 1SCALE: 3/4” = 1’0”
FOUNDATION PLANSCALE: 1/8” = 1’-0”
8’ 16’ 32’
6” 3’18”
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
S-1.02/3
41
B
C
2
A
3 1
B
C
2
A
34
34'-834" 40'-31
4" 14'
75'
89'
29'-3
1 4"39
'-83 4"
69'
7' 7'
7' 7'
7'-3
3 4"7'
-33 4"
7'-3
3 4"7'
-33 4"
8'-814"8'-81
4"8'-814"8'-81
4"
34'-834" 40'-31
4" 14'
75'
89'
29'-3
1 4"39
'-83 4"
69'
8'-814"8'-81
4"8'-814"8'-81
4"
7'7'
33'-0
1 2"7'
-33 4"
7'-3
3 4"7'
-33 4"
7'-1
11 4"7'
-111 4"
7'-1
11 4"7'
-111 4"
7'-1
11 4"7'
-33 4"
7'-3
3 4"7'
-33 4"
7'-3
3 4"
7'-3
3 4"7'
-33 4"
7'-3
3 4"7'
-33 4"
3RD FLOOR FRAMING PLANSCALE: 1/8” = 1’0”
2ND FLOOR FRAMING PLANSCALE: 1/8” = 1’-0”
8’ 16’ 32’
GENERAL NOTES:
BEAM DEPTH: 40.25’/20 = 2.01’ W24 GIRDER DEPTH: 39.67/15 = 2.64’ W32 COMPOSITE DECK DEPTH: 8.67’(12”/1’) = 104.04 104.04/24 = 4.34”
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
S-1.04/5
41
B
C
2
A
3 1
B
C
2
A
34
34'-834" 40'-31
4" 14'
75'
89'
29'-3
1 4"39
'-83 4"
69'
7' 7'
7' 7'
7'-3
3 4"7'
-33 4"
7'-3
3 4"7'
-33 4"
8'-814"8'-81
4"8'-814"8'-81
4"
34'-834" 40'-31
4" 14'
75'
89'
29'-3
1 4"39
'-83 4"
69'
8'-814"8'-81
4"8'-814"8'-81
4"
7'7'
33'-0
1 2"7'
-33 4"
7'-3
3 4"7'
-33 4"
7'-1
11 4"7'
-111 4"
7'-1
11 4"7'
-111 4"
7'-1
11 4"7'
-33 4"
7'-3
3 4"7'
-33 4"
7'-3
3 4"
7'-3
3 4"7'
-33 4"
7'-3
3 4"7'
-33 4"
ROOF FLOOR FRAMING SCALE: 1/8” = 1’0”
4TH FLOOR FRAMING PLANSCALE: 1/8” = 1’-0”
8’ 16’ 32’
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-1.01/2
C
2
B
1
A
3 4
A
3
C
2
B
4176'-0"
70'
29'-3
1 4"39
'-83 4"
34'-834" 40'-31
4" 34'-834" 40'-31
4" 14'14'
76'
70'
29'-3
1 4"39
'-83 4"
GENERAL NOTES
1. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SPECIFICATIONS 2. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL SYSTEMS 3. BUILDING CROSS SECTION ANNOTATION SEE SHEET NUMBER A-2.00 4. FINISHED FLOOR ELEVATION 0’-0” 5. ALL WALLS TERMINATING BELOW METAL DECK SHALL BE SEALED WITH COMPRESSIBLE SEALER (TYP.) PROVIDE FIRE SAFING AT ALL RATED WALLS.
SECOND FLOOR PLANSCALE: 1/8” = 1’-0”
FIRST FLOOR PLANSCALE: 1/8” = 1’-0”
C
2
B
1
A
3 4
A
3
C
2
B
4176'-0"
70'
29'-3
1 4"39
'-83 4"
34'-834" 40'-31
4" 34'-834" 40'-31
4" 14'14'
76'
70'
29'-3
1 4"39
'-83 4"
8’ 16’ 32’
SPACES1. THEATER2. CHAIR/TABLE STORAGE3. ELECTRONICS ROOM4. COAT ROOM5. LOBBY6. MECHANICAL7. RESTROOMS8. JANITOR’S CLOSET
1
2 3
4
5
6
7
66 7
8
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-1.03/4FOURTH FLOOR PLANSCALE: 1/8” = 1’-0”
THIRD FLOOR PLANSCALE: 1/8” = 1’-0”
8’ 16’ 32’
C
B
A
4321
B
3
C
2 41
A
C
B
A
4321
B
3
C
2 41
A
GENERAL NOTES
1. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH SPECIFICATIONS 2. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL SYSTEMS 3. BUILDING CROSS SECTION ANNOTATION SEE SHEET NUMBER A-2.00 4. FINISHED FLOOR ELEVATION 0’-0” 5. ALL WALLS TERMINATING BELOW METAL DECK SHALL BE SEALED WITH COMPRESSIBLE SEALER (TYP.) PROVIDE FIRE SAFING AT ALL RATED WALLS.
SPACES1. OFFICE2. DIGITAL LAB3. PRACTICE ROOM4. LOUNGE AND VENDING AREA5. LIBRARY6. COPY ROOM7. DEPARTMENT DIRECTOR8. RECEPTION9. WORK ROOM10. GENERAL MAIL/COFFEE ROOM11. MAIN CONFERENCE ROOM12. SMALL CONFERENCE ROOM13. RESTROOMS14. JANITOR’S ROOM15. ELECTRICAL ROOM
1
1
1 1 1 1
1
1
1
111
11
1 1
7
7
7
2
222 2 2
2222
3 3 33
5
4
6
8
9
10
11
12
13
13
13
13
14 14
15 15
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-1.05
1 2 3C
B
A
4
RD RDOD OD
SCUPPER
B
BRICK VENEER
AIR SPACE
RIGID INSULATION R10 MIN
METAL STUD
SPRAY FOAMINSULATION R26 MIN
WOOD BLOCKING
EPDM ROOF MEMBRANE
FLASHING
ROOF INSULATION R5 PER INCH
POUR STOP
METAL DECK
34'-834" 40'-31
4" 14'
90'
29'-3
1 4"39
'-83 4"
70'
DETAIL 2SCALE: 1-1/2” = 1’-0”
ROOF PLANSCALE: 1/8” = 1’-0”
8’ 16’ 32’
GENERAL NOTES:
PARAPET HEIGHT: (37’-2.72”) x .25 = 9.3”=9 1/4” 9.25”+18” = 27.25”
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-2.00
CBA 21 3 4
13'-0
"12
'-6"
14'-0
"14
'-6"
24"
13'-0
"12
'-6"
14'-0
"14
'-6"
24"
20'-0
"5'
-6"
10'-0
"4'
-0"
10'-0
"4'
-6"
9'-0
"4'
-0"
8'-6
"4'
-0"
9'-0
"5'
-0"
10'-0
"4'
-6"
21'-6
"4'
-0"
10'-0
'4'
-0"
9'-0
"5'
-6"
21'-6
"
SECTION BBSCALE: 1/8” = 1’-0”
SECTION AASCALE: 1/8” = 1’-0”
8’ 16’ 32’4’
THEATER
LOBBYCORRIDOR CHAIR STORAGE
MECHANICAL
DIGITAL LAB
OFFICE
PRACTICE ROOM
DIGITAL LAB
OFFICE OFFICE OFFICEMAIL ROOM
HALL-WAY
HALL-WAY
HALL-WAY
HALLWAY
HALL-WAY
THEATERLOBBY
LIBRARY DIGITAL LAB DIGITAL LAB DIGITAL LABDIGITAL LABDIGITAL LAB HALL-WAY
HALLWAY HALL-WAY
MAINCONFERENCE ROOM
DEPTARTMENT DIRECTOR
OFFICEOFFICEOFFICE
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-3.00
Vision Glass 1260 Non toggle 2368.33Spandrel Glass 1108.33
Toggle Wall 1621.67
Item Price per SQFT Notes
Dual PaneUnitized Stick Toggle
V $8.40 $8.40 $8.40S $12.00 $12.00 $12.00Alum Members $8.40 $8.40 $6.00Anchors $1.20 $1.20 $0.00Sealants/Gaskets $3.60 $2.40 $2.40Insul $0.60 $0.60 $0.60Hardware $0.12 $0.12 $0.12Steel Rein $0.00 $0.00 $9.60Design $4.80 $4.80 $4.80Shipping $3.60 $3.60 $3.60Fab. Labor $7.20 $2.40 $2.40Field Labor $14.40 $21.60 $21.60Parapet Backer $1.80 $1.80 $0.00Field Equipment $4.80 $2.40 $2.40addt'lCoping Trim $62.00 $62.00 $62.00 57 LFMetal Alum S $48.00 $48.00 $48.00 142.5 SQFTSunshades $48.00 $48.00 $0.00Doors $0.00 $0.00 $4,500.00 Per door cost x 4
per sqft cost $70.92 $69.72 $73.92Cost $167,961.96 $165,119.97 $119,873.85Addt'l costs $70,854.00 $70,854.00 $28,374.00Total Cost $238,815.96 $235,973.97 $148,247.85New Per sqft cost $100.84 $99.64 $91.42
GENERAL NOTES
SOUTH ELEVATION BUILD TIME: UNITIZED (14’-6” x 8’) $100.84 /SQFT 68 UNITS AT 10 UNITS/DAY = 6.8 days STICK $99.64 /SQFT 3990 SQFT AT 800 SQFT/DAY = 4.9 days
TOTAL FACADE COST: BASED ON SINGLE PANE UNITIZED CURTAIN WALL: ((4801SQFT x 2) + 4332SQFT) x $100.34/SQFT = $1,398,137.56 RAINSCREEN WALL: (4332SQFT x $100.34/SQFT) x 80% = $347,738.30 TOTAL: $1,745,875.86 COST PER SQFT *RS MEANS CATALOG: $290.20/SQFT GROSS SQFT = 20,953SQFT TOTAL COST OF BUILDING = $6,080,560.60 PERCENTAGE OF COST OF THE FACADE: ($1,398,137.56/$6,080,560.60) x 100 = 22.99%
Triple PaneUnitized Stick Toggle
V $28.80 $28.80 $28.80S $32.40 $32.40 $32.40Alum Members $8.40 $8.40 $6.00Anchors $1.20 $1.20 $0.00Sealants/Gaskets $3.60 $2.40 $2.40Insul $0.60 $0.60 $0.60Hardware $0.12 $0.12 $0.12Steel Rein $0.00 $0.00 $9.60Design $4.80 $4.80 $4.80Shipping $3.60 $3.60 $3.60Fab. Labor $7.20 $2.40 $2.40Field Labor $14.40 $21.60 $21.60Parapet Backer $1.80 $1.80 $0.00Field Equipment $4.80 $2.40 $2.40addt'lCoping Trim $62.00 $62.00 $0.00 57 LFMetal Alum S $48.00 $48.00 $0.00 142.5 SQFTSunshades $48.00 $48.00 $0.00Doors $0.00 $0.00 $4,500.00 Per door cost x 4
per sqft cost $111.72 $110.52 $114.72Cost $264,589.83 $261,747.83 $271,694.82Addt'l costs $70,854.00 $70,854.00 $18,000.00Total Cost $335,443.83 $332,601.83 $289,694.82New Per sqft cost $141.64 $140.44 $178.64
Dual Pane DBLUnitized Stick Toggle
V $23.52 $23.52 $23.52S $33.60 $33.60 $33.60Alum Members $8.40 $8.40 $6.00Anchors $1.20 $1.20 $0.00Sealants/Gaskets $3.60 $2.40 $2.40Insul $0.60 $0.60 $0.60Hardware $0.12 $0.12 $0.12Steel Rein $0.00 $0.00 $9.60Design $4.80 $4.80 $4.80Shipping $3.60 $3.60 $3.60Fab. Labor $7.20 $2.40 $2.40Field Labor $14.40 $21.60 $21.60Parapet Backer $1.80 $1.80 $0.00Field Equipment $4.80 $2.40 $2.40addt'lCoping Trim $62.00 $62.00 $62.00 57 LFMetal Alum S $48.00 $48.00 $48.00 142.5 SQFTSunshades $48.00 $48.00 $0.00Doors $0.00 $0.00 $4,500.00 Per door cost x 4
per sqft cost $107.64 $106.44 $110.64Cost $254,927.04 $252,085.05 $179,421.57Addt'l costs $71,814.00 $71,814.00 $28,374.00Total Cost $326,741.04 $323,899.05 $207,795.57New Per sqft cost $137.96 $136.76 $128.14
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-4.00
B2
13'-0
"12
'-6"
14'-0
"14
'-6"
2'-0
"
9'-0
"4'
-0"
8'6"
4'-0
"10
'-0"
4'-0
"10
'-0"
4'-6
"
037000 CAISSON
037000 GRADE BEAM334623 POROUS FILL
032000 CONCRETE SLAB W/ W.W.F.042200 C.M.U.
GRADE072216 RIGID INSUL.
042113 BRICK MASONRY054000 ALUMINUM MULLION
084000 CURTAIN WALL
050000 ALUMINUM SCREEN
092000 GYPSUM CEILING
051000 BEAMS
042000 BRICKAIR SPACE072216 RIGID INSUL. R10072000 SPRAY FOAM INSUL. R26
051000 METAL STUDS
076000 FLASHING
085000 WINDOW092000 GYPSUM WALL BOARD055000 KICKER
054000 CLIP ANGLE054000 CLIP ANGLE W/ BOLTS053000 4" METAL DECKING
033000 CONC. FLOOR SLAB050000 POUR STOP076000 ROWLOCK SILL079000 FLASHING AND WEEP051000 GIRDER W27051000 BEAM W 23
072216 RIGID INSUL.075000 EPDM ROOF MEMBRANE061000 WOOD BLOCKING076000 FLASHING
WALL SECTION BSCALE: 3/8” = 1’-0”
WALL SECTION ASCALE: 3/8” = 1’-0”
DETAIL 3SCALE: 1” = 1’-0”
2” 12”6” 30” 6” 2’ 4’ 6’ 10’
GENERAL NOTES
R-VALUE OF WALL SECTION A INSIDE AIR FILM 1/2” GYPSUM WALL BOARD 4” R6.5 SPRAY FOAM INSULATION 2” R5 RIGID INSULATION 2” AIR SPACE EXTERIOR BRICK OUTSIDE AIR FILMTOTAL
R0.68R0.45R26.0R10.0R1.0R0.44R0.25R38.82
FIRST FLOOR 0’-0”
SECOND FLOOR 13’-0”
THIRD FLOOR 25’-6”
FOURTH FLOOR 39’-6”
ROOF 55’-0”
T.O. PARAPET 57’-0”
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-4.01
ISO
ME
TRIC
A (B
EA
RIN
G)
SC
ALE
: 1/2
” = 1
’-0”
GE
NE
RA
L N
OTE
S
R-V
ALU
E O
F W
ALL
SE
CTI
ON
A
INS
IDE
AIR
FIL
M
1/2”
GY
PS
UM
WA
LL B
OA
RD
4”
R6.
5 S
PR
AY F
OA
M IN
SU
LATI
ON
2”
R5
RIG
ID IN
SU
LATI
ON
2”
AIR
SPA
CE
E
XTE
RIO
R B
RIC
K
OU
TSID
E A
IR F
ILM
TOTA
L
R0.
68R
0.45
R26
.0R
10.0
R1.
0R
0.44
R0.
25R
38.8
2
KE
Y N
OTE
S
03 C
ON
CR
ETE
03
2000
CO
NC
. SLA
B W
/ W.W
.F.
03
3000
CO
NC
. FLO
OR
SLA
B
0370
00 G
RA
DE
BE
AM
03
7000
CA
ISS
ON
04 M
ASO
NRY
04
2113
BR
ICK
MA
SO
NR
Y
0420
00 E
XTE
RIO
R B
RIC
K
0422
00 C
.M.U
.05
MET
ALS
05
0000
PO
UR
STO
P
0510
00 B
EA
M W
23
0510
00 G
IRD
ER
W27
05
1000
ME
TAL
STU
DS
05
3000
4” M
ETA
L D
EC
KIN
G
0540
00 C
LIP
AN
GLE
05
5000
KIC
KE
R06
WO
OD
, PLA
STIC
S, A
ND
CO
MPO
SITE
S
0610
00 W
OO
D B
LOC
KIN
G07
TH
ERM
AL
AN
D M
OIS
TUR
E PR
OTE
CTI
ON
07
2000
SP
RAY
FO
AM
INS
UL.
07
2216
RIG
ID IN
SU
L.
0750
00 E
PD
M R
OO
F M
EM
BR
AN
E
0760
00 R
OW
LOC
K S
ILL
07
9000
FLA
SH
ING
AN
D W
EE
P08
OPE
NIN
GS
08
5000
WIN
DO
W09
FIN
ISH
ES
0920
00 G
YP
SU
M B
OA
RD
33 U
TILI
TIES
33
4623
PO
RO
US
FIL
L
13'-0"12'-6"14'-0"14'-6"2'-0"
57'-0"
0370
00 G
RA
DE
BE
AM
0422
00 C
.M.U
.07
2216
RIG
ID IN
SU
L33
4623
PO
RO
US
FIL
L03
2000
CO
NC
. SLA
B W
/ W.W
.F.
0920
00 G
YP
SU
M B
OA
RD
0420
00 B
RIC
K V
EN
EE
R
0722
16 R
IGID
INS
UL.
0720
00 S
PR
AY
FO
AM
INS
UL
0510
00 M
ETA
L S
TUD
S
0760
00 R
OW
LOC
K S
ILL
0850
00 W
IND
OW
0510
00 G
IRD
ER
W27
0510
00 B
EA
M W
23
0530
00 4
" ME
TAL
DE
CK
ING
0330
00 C
ON
C. F
LOO
R S
LAB
0550
00 K
ICK
ER
0540
00 C
LIP
AN
GLE
0760
00 F
LAS
HIN
G
0750
00 E
PD
M R
OO
F M
EM
BR
AN
E06
1000
WO
OD
BLO
CK
ING
0722
16 R
IGID
INS
UL.
DE
TAIL
5S
CA
LE: 1
” = 1
’-0”
DE
TAIL
4S
CA
LE: 1
” = 1
’-0”
FIRS
T FL
OO
R 0’
-0”
SECO
ND F
LOO
R 13
’-0”
THIR
D FL
OO
R 25
’-6”
FOUR
TH F
LOO
R 39
’-6”
ROO
F 55
’-0”
T.O
. PAR
APET
57’
-0”
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
A-4.02
13'-0"12'-6"14'-0"14'-6"2'-0"
0370
00 G
RA
DE
BE
AM
0422
00 C
.M.U
.07
2216
RIG
ID IN
SU
L33
4623
PO
RO
US
FIL
L03
2000
CO
NC
. SLA
B W
/ W.W
.F.
0420
00 B
RIC
K V
EN
EE
R
0840
00 C
UR
TAIN
WA
LL
0540
00 A
LUM
INU
M M
ULL
ION
0500
00 F
AS
TEN
ER
0510
00 B
EA
M W
23
0530
00 4
" ME
TAL
DE
CK
ING
0500
00 P
OU
R S
TOP
0330
00 C
ON
C.
FLO
OR
SLA
B
0540
00 A
LUM
INU
M S
CR
EE
N
0722
16 R
IGID
INS
UL.
0750
00 E
PD
M R
OO
F M
EM
BR
AN
E
0610
00 W
OO
D B
LOC
KIN
G
0760
00 F
LAS
HIN
G05
4000
ALU
MIN
UM
MU
LLIO
N
ISO
ME
TRIC
B (N
ON
-BE
AR
ING
)S
CA
LE: 1
/2” =
1’-0
”
FIRS
T FL
OO
R 0’
-0”
SECO
ND F
LOO
R 13
’-0”
THIR
D FL
OO
R 25
’-6”
FOUR
TH F
LOO
R 39
’-6”
ROO
F 55
’-0”
T.O
. PAR
APET
57’
-0”
GE
NE
RA
L N
OTE
S
R-V
ALU
E O
F W
ALL
SE
CTI
ON
B
INS
IDE
AIR
FIL
M
1/4”
ALU
MIN
UM
SC
RE
EN
2.
25” A
IR S
PAC
E
GLA
ZIN
G
OU
TSID
E A
IR F
ILM
TOTA
L
R0.
68R
0.61
R1.
00R
1.00
R0.
25R
3.54
KE
Y N
OTE
S
03 C
ON
CR
ETE
03
2000
CO
NC
. SLA
B W
/ W.W
.F.
03
3000
CO
NC
. FLO
OR
SLA
B
0370
00 G
RA
DE
BE
AM
03
7000
CA
ISS
ON
04 M
ASO
NRY
04
2113
BR
ICK
MA
SO
NR
Y
0422
00 C
.M.U
.05
MET
ALS
05
0000
ALU
MIN
UM
SC
RE
EN
05
0000
PO
UR
STO
P
0510
00 B
EA
M W
23
0530
00 4
” ME
TAL
DE
CK
ING
05
4000
CLI
P A
NG
LE06
WO
OD
, PLA
STIC
S, A
ND
CO
MPO
SITE
S
0610
00 W
OO
D B
LOC
KIN
G07
TH
ERM
AL
AN
D M
OIS
TUR
E PR
OTE
CTI
ON
07
5000
EP
DM
RO
OF
ME
MB
RA
NE
07
6000
FLA
SH
INg
08 O
PEN
ING
S
0840
00 C
UR
TAIN
WA
LL G
LAZI
NG
09 F
INIS
HES
09
2000
GY
PS
UM
BO
AR
D33
UTI
LITI
ES
3346
23 P
OR
OU
S F
ILL
DE
TAIL
6S
CA
LE: 1
” = 1
’-0”
DE
TAIL
7S
CA
LE: 1
” = 1
’-0”
*pg.
54
of B
UIL
DIN
G S
YS
TEM
S IN
TEG
RAT
ION
. M
AN
CH
ES
TER
CIV
IL J
US
TIC
E C
EN
TRE
FA
CA
DE
Sheet Number
Geno Catalano1196 Grovewood Dr
330-573-5449
Revisions
these are site specific drawings for information purposes only. reproduction
of these documents is permitted only with approval of the office.
copyright all rights reserved
Prof. HawkKSU CAED MM II
Fall 4th Year
Addendums
Lakeland CollegeDigital and
Mixed Media Arts Building
Eastlake, Ohio
1 6532 4A
CB
D
25'-0
"
12"
23'-0
"12
"
6'-0
"13
'-0"
4'-0
"
13 T
RE
AD
S P
ER
FLI
GH
T
126.000012.0000 102.0000 12.0000
13'-0
"12
'-6"
14'-0
"14
'-6"
2'-0
"
57'-0
"
12'
11'-6
"
6"
1'
12"
STAIR SECTIONSCALE: 1/4” = 1’-0”
DETAIL 8SCALE: 1” = 1’-0”
FIRST FLOOR STAIRSSCALE: 1/4” = 1’-0”
FOURTH FLOOR STAIRSSCALE: 1/4” = 1’-0”
MID-FLOOR STAIRSSCALE: 1/4” = 1’-0” A-5.00
2” 12”6” 30”
6” 2’ 4’ 6’ 10’
FIRST FLOOR 0’-0”
SECOND FLOOR 13’-0”
THIRD FLOOR 25’-6”
FOURTH FLOOR 39’-6”
ROOF 55’-0”
T.O. PARAPET 57’-0”