connected vehicle design review part 2

29
Connected Vehicle Design Review Part 2 Southwest Research Institute 1 03/14/11

Upload: quasar

Post on 24-Feb-2016

23 views

Category:

Documents


0 download

DESCRIPTION

Connected Vehicle Design Review Part 2. Southwest Research Institute. Agenda. Operational Concept System Architecture J2735 Driver Subsystem TSS CV Driver GUI Mockups Configuration Device Status TAMs Response Plans Alerting Additional Configuration. Operational Concept. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Connected Vehicle Design Review Part 2

1

Connected Vehicle Design ReviewPart 2

Southwest Research Institute

03/14/11

Page 2: Connected Vehicle Design Review Part 2

2

Agenda

Operational Concept System Architecture

– J2735 Driver– Subsystem– TSS CV Driver

GUI Mockups– Configuration– Device Status– TAMs

• Response Plans– Alerting

Additional Configuration

Connected Vehicle Design Review 03/14/11

Page 3: Connected Vehicle Design Review Part 2

3

Operational Concept

SunGuide will handle specific messages from the SAE J2735 - DSRC Message Set Dictionary– Basic Safety Message (BSM)– Probe Vehicle Data Message (PVDM)– Traveler Advisory Message (TAM)

GUI– Aggregated Probe Data display– Manually create/manage TAMs by RSE

Response Plans– Pre-selects RSEs

• Automatically generated presentation region

Connected Vehicle Design Review 03/14/11

Page 4: Connected Vehicle Design Review Part 2

4

Operational Concept

SDN– Send Probe data– Send TAMs

C2C– Provide demonstrators access

• Probe Data• TAMs• Standard SunGuide C2C data

Connected Vehicle Design Review 03/14/11

Page 5: Connected Vehicle Design Review Part 2

5

System Architecture

Connected Vehicle Design Review 03/14/11

Page 6: Connected Vehicle Design Review Part 2

Architecture Diagram

Connected Vehicle Design Review 03/14/11

Page 7: Connected Vehicle Design Review Part 2

Driver Architecture

Connected Vehicle Design Review 03/14/11

Page 8: Connected Vehicle Design Review Part 2

8

J2735 Driver

Probe Support– Support an incoming message from RSEs– Send incoming raw Probe data to SDN– Decode Probe data– Populate into XML formatting– Send to Subsystem

TAM– Decode XML from Subsystem– Send to SDN via web service interface– J2735 Encode– Send to RSEs at regular intervals

Connected Vehicle Design Review 03/14/11

Page 9: Connected Vehicle Design Review Part 2

9

Subsystem Architecture

Connected Vehicle Design Review 03/14/11

Page 10: Connected Vehicle Design Review Part 2

10

Subsystem Tasks

Probe– Collect Probe data by RSE

• Aggregate by Detection Zone– Log Probe data to the database– Send out to Databus for C2C and CV Driver

TAM– Receive TAM add/modify/delete messages– Maintain list of current messages– Notify J2735 Driver of message queue changes

Connected Vehicle Design Review 03/14/11

Page 11: Connected Vehicle Design Review Part 2

11

TSS Architecture

Connected Vehicle Design Review 03/14/11

Page 12: Connected Vehicle Design Review Part 2

12

TSS CV Driver Tasks

Tasks– Add detectors and links– Map links to detectors– Read databus for updated zone readings– Push updates to TSS for new zone data

Configuration– One detector per RSE

• RSE and detector should be named the same– One link per detection Zone

Connected Vehicle Design Review 03/14/11

Page 13: Connected Vehicle Design Review Part 2

13

Special Notes on Detection Zones

Detection Zone may receive data from ANY RSE– OBE may store its data and pass it on to the next

RSE– Therefore, there is no link between RSE and

Detection Zone– Purely a connection for operational

understanding– Zones could potentially be split away from RSEs

Connected Vehicle Design Review 03/14/11

Page 14: Connected Vehicle Design Review Part 2

14

GUI Mockups

Connected Vehicle Design Review 03/14/11

Page 15: Connected Vehicle Design Review Part 2

15

RSE Configuration

Connected Vehicle Design Review 03/14/11

Page 16: Connected Vehicle Design Review Part 2

16

RSE Configuration

Connected Vehicle Design Review 03/14/11

Page 17: Connected Vehicle Design Review Part 2

17

Optional: Configuration Inspection

Connected Vehicle Design Review

This configuration is complex and may become out of sync Tool could assist in verifying configuration Matches RSEs to

detectors Matches Zones Ids

to lanes Checks Zone/Name

mismatches for consistency

03/14/11

Page 18: Connected Vehicle Design Review Part 2

18

RSE Status

Connected Vehicle Design Review 03/14/11

Page 19: Connected Vehicle Design Review Part 2

19

TAM Management

Change Management Board 03/14/11

Page 20: Connected Vehicle Design Review Part 2

20

TAM Editing

Connected Vehicle Design Review 03/14/11

Page 21: Connected Vehicle Design Review Part 2

21

Manually Defined TAM Presentation Region

Connected Vehicle Design Review 03/14/11

Page 22: Connected Vehicle Design Review Part 2

22

RSE Selection in Response Plans

Recommend selection based on RSE radius search– Device linking is direction of travel based and could

miss RSEs that need to be selected

– RSE radius will be configured by a system-wide parameter• If RSE radius intersects the presentation region in

any way, the RSE will be automatically added to the TAM

Connected Vehicle Design Review 03/14/11

Page 23: Connected Vehicle Design Review Part 2

23

RSE Selection in Response Plans

Recommend selection based on RSE radius search– Device linking is direction of travel based and could

miss RSEs that need to be selected

– RSE radius will be configured by a system-wide parameter• If RSE radius intersects the presentation region in

any way, the RSE will be automatically added to the TAM

Connected Vehicle Design Review 03/14/11

Page 24: Connected Vehicle Design Review Part 2

24

Automatic Presentation Region Selection

Recommend selection based on device linking– RSE does not need to be in device linking for the

device linking to generate a presentation region– Region is generated by taking each involved

device linking segment and extending it in all upstream directions by a configurable amount

– Accurate device linking file required

Connected Vehicle Design Review 03/14/11

Page 25: Connected Vehicle Design Review Part 2

25

Automatic Presentation Region Selection

Multiple regions can be included as part of a single TAM

Auto generation would generate multiple regions– Solves issue of travelers in multiple directions

Connected Vehicle Design Review 03/14/11

Page 26: Connected Vehicle Design Review Part 2

26

Response Plan Dialog

Connected Vehicle Design Review

Managed by TAM not by RSE All aspects of the TAM can be modified before

activating the response plan

03/14/11

Page 27: Connected Vehicle Design Review Part 2

27

Alerting

Connected Vehicle Design Review

Alerts for speed would be handled through TSS like all other speed alarms– Threshold would be configured on a link basis– Consistent with TSS

There would be no alerting for “TBD” fields at this time– Could be added as an enhancement when fields

are better defined

03/14/11

Page 28: Connected Vehicle Design Review Part 2

28

Additional Configuration Config File

– Driver• Port for incoming BSM and Probe Data• SDN

– Host and port– URL for the TAM Interface

Admin Editor– Response Plan Template

• Default Message• Amber Alert

EM– TAM presentation region offset– RSE radius

Connected Vehicle Design Review 03/14/11

Page 29: Connected Vehicle Design Review Part 2

29

Questions

03/14/11Connected Vehicle Design Review