concrete removal
DESCRIPTION
Concrete removal. Concrete cutting area shrink wrapped to prevent dust. Concrete cutting starts Tuesday 25 th March, approx 4 - 6 weeks. South and North Magnetic steel walls. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Concrete removal](https://reader036.vdocuments.us/reader036/viewer/2022062301/56814582550346895db25e5a/html5/thumbnails/1.jpg)
Concrete removalConcrete cutting area shrink wrapped to prevent dust.
Concrete cutting starts Tuesday 25th March, approx 4 - 6 weeks.
![Page 2: Concrete removal](https://reader036.vdocuments.us/reader036/viewer/2022062301/56814582550346895db25e5a/html5/thumbnails/2.jpg)
South and North Magnetic steel walls• Steel tender awarded Tuesday 25th March (OJEC requires a 10 day period to
give unsuccessful tenders the right to appeal).
• 3D model of shield walls to– Label the steel plates for ease of installation.
– identify plates in each staged delivery.
– Make sure everything fits together.
![Page 3: Concrete removal](https://reader036.vdocuments.us/reader036/viewer/2022062301/56814582550346895db25e5a/html5/thumbnails/3.jpg)
False Floor
Provisional design from contactor
![Page 4: Concrete removal](https://reader036.vdocuments.us/reader036/viewer/2022062301/56814582550346895db25e5a/html5/thumbnails/4.jpg)
False floor
False floor in 3 sections
1. Frame (brown)
2. Cover plates (red)
3. Intermediate piece (green)
![Page 5: Concrete removal](https://reader036.vdocuments.us/reader036/viewer/2022062301/56814582550346895db25e5a/html5/thumbnails/5.jpg)
False floor intermediate piece
Hole pattern is either done in one plate (one size fits all, shown here) or in several modular plates to suit each stage of the build.