Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should signin at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with allLetting related questions.
The following items will be made available on March 13, 2018 unless otherwise noted:• EBS (Electronic Bidding System) files via Bid Express website• Hardcopy plans & proposals will be printed upon request only via Engineering Publications
o Located in room G23 SCDOT Headquarterso Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orderso Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)
Access the Construction Extranet for the following items:• Plans• Announcements• Bids as Received• CPM Schedule Templates
Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx.
Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.
The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx
Quantities shown herein are approximate for information only and should not be used for bidding purposes.The Department reserves the right to change these quantities without notice.
SOUTH CAROLINADEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORSFOR
REGULAR HIGHWAY LETTINGApril 10, 2018
Letting Location: SCDOT Headquarters Building
Conference Room 331 955 Park Street Columbia, SC
Call No.: 010 1Page:
South Carolina Department of Transportation 3/1/2018
0425551SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Anderson DBE Goal Percent: 0.00%
Completion Date:
Description: ANDERSON COUNTY LONGLINE PAINTCONTRACT
11/30/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032310P032310PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
PVMT.MRKS.(TEMP-HIGH BUILD PNT.W.WET REFL.) 4" WH. BRK.LNS. 22,671.000 LF
PVMT.MRKS.(TMP-H BD PNT.W.WET REFL.) 4" YEL. BRK.LNS. 001 47,869.000 LF
PVT MRK(TEMP-HI.BUIILD.PNT W.WET REFLECT.EL)-4"WH.SOLID 001 1,387,831.000 LF
PVT MRK(TEMP-HI.BUIILD.PNT W.WET REFLECT.EL)4"YEL.S 001 1,350,309.000 LF
Call No.: 020 2Page:
South Carolina Department of Transportation 3/1/2018
1147480SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Cherokee DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 CHEROKEE CTC RESURFACING
11/30/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
2.4600
P036994P036994PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 100.000 SY
REMOVAL & DISPOSAL OF EXISTING CONCRETE 11.250 CY
REMOVAL OF EXIST. GUARDRAIL 25.000 LF
BORROW EXCAVATION 695.000 CY
STATION GRADING 30.620 STA
CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 2 31,622.000 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,422.990 TON
MAINTENANCE STONE 270.000 TON
HOT MIX ASPHALT BASE COURSE - TYPE B 20.000 TON
LIQUID ASPHALT BINDER PG64-22 246.965 TON
FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 525.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,250.000 SY
MILLED-IN RUMBLE STRIP 4.440 MI
HOT MIX ASPHALT SURFACE COURSE TYPE C 2,260.730 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 1,698.780 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 972.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 450.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 53,200.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 60.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,180.000 LF
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,400.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 42,810.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 190.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 23,800.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 60.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 580.000 LF
Call No.: 020 3Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 800.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 21,610.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 187.000 EA
15" SMOOTH WALL PIPE 120.000 LF
ADJUST DROP INLET ADJUST D. I. 1.000 EA
CONCRETE SIDEWALK(4" UNIFORM) 58.000 SY
DETECTABLE WARNING MATERIAL 50.000 SF
PEDESTRIAN RAMP CONSTRUCTION 100.000 SY
END TERMINAL - TYPE T 1.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 2.211 ACRE
SILT FENCE 1,600.000 LF
REPLACE/REPAIR SILT FENCE 160.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 160.000 LF
Call No.: 030 4Page:
South Carolina Department of Transportation 3/1/2018
2847110SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Kershaw DBE Goal Percent: 0.00%
Completion Date:
Description: SHLD PAVING, FDP,CHIP SEALING
10/31/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
11.0300
P036980P036980PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 830.000 CY
EXCAVATION FOR SHOULDER PAVING 439.000 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 439.000 STA
MAINTENANCE STONE 21.000 TON
HMA SHOULDER WIDENING COURSE 2,191.200 TON
LIQUID ASPHALT BINDER PG64-22 109.560 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,100.000 SY
ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 129,399.332 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 832.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 240.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 159,835.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 114.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,400.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 134,095.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 120.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 116,235.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 72.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,200.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 103,365.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,190.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 4.024 ACRE
Call No.: 040 5Page:
South Carolina Department of Transportation 3/1/2018
3047580SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Laurens DBE Goal Percent: 0.00%
Completion Date:
Description: LAURENS COUNTY CTC PROJECT
5/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
2.8900
P037087P037087PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 3.000 EA
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 684.000 CY
CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) CURING METHOD 4 8,871.000 SY
CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 4 28,717.000 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,653.000 TON
LIQUID ASPHALT BINDER PG64-22 286.348 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,400.000 SY
MILLED-IN RUMBLE STRIP 4.340 MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1,200.320 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 3,812.189 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 694.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,400.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 91,668.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 752.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,880.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 72,028.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 350.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 22,917.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 188.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 720.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 18,007.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 10.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 193.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 2.803 ACRE
Call No.: 050 6Page:
South Carolina Department of Transportation 3/1/2018
3291462SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Lexington DBE Goal Percent: 9.50%
Completion Date:
Description: ST. PETER'S CHURCH ROADIMPROVEMENTS
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$35.00
$96.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
4.2500
P028774P028774PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
TRAFFIC CONTROL 1.000 LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY 11.000 ACRE
UNCLASSIFIED EXCAVATION 10,322.000 CY
BORROW EXCAVATION 5,700.000 CY
EXCAVATION FOR SHOULDER PAVING 448.800 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 448.800 STA
MAINTENANCE STONE 6.000 TON
HMA SHOULDER WIDENING COURSE 3,400.000 TON
LIQUID ASPHALT BINDER PG64-22 460.000 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,200.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2,300.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 12,600.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,000.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 6.380 LaMi
MILLED-IN RUMBLE STRIP 8.500 MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1,625.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 1,675.000 TON
PREVENTATIVE MAINTENANCE SURFACE TREATMENT 49,000.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 464.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 100.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 89,760.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 48.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3,000.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 71,400.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 50.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 44,880.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 24.000 LF
Call No.: 050 7Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,500.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 35,720.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 282.000 EA
24" R. C. PIPE CUL. BEVELED END SECTN-CL 3 2.000 EA
36" R. C. PIPE CUL. BEVELED END SECTN-CL 3 1.000 EA
18" SMOOTH WALL PIPE 3,310.000 LF
24" SMOOTH WALL PIPE 648.000 LF
36" SMOOTH WALL PIPE 180.000 LF
CATCH BASIN -TYPE 9 MH 5.000 EA
RIP-RAP (CLASS B) 1,690.000 TON
HAND PLACED RIPRAP 150.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 2,090.000 SY
STEEL BEAM GUARDRAIL STEEL BEAM GR. 1,082.500 LF
END TERMINAL - TYPE T 16.000 EA
THRIE BEAM G.R.BRIDGE CONN. 8.000 EA
RESET FENCE 1,220.000 LF
PERMANENT COVER 20.000 ACRE
TEMPORARY COVER 20.000 ACRE
HYDRAULIC MULCH (HM) 20.000 ACRE
FERTILIZER (NITROGEN) 2,000.000 LB
FERTILIZER (PHOSPHORIC ACID) 2,000.000 LB
FERTILIZER (POTASH) 2,000.000 LB
AGRICULTURAL GRANULAR LIME 40,000.000 LB
SELECTIVE WATERING 135,750.000 GAL
MOWING 20.000 ACRE
TEMPORARY EROSION CONTROL BLANKET (CLASS A) 25.000 MSY
SEDIMENT TUBES FOR DITCH CHECKS 2,980.000 LF
SILT FENCE 18,930.000 LF
DITCH CHECK 20.000 TON
Call No.: 060 8Page:
South Carolina Department of Transportation 3/1/2018
4047940SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Richland DBE Goal Percent: 0.00%
Completion Date:
Description: I-77 DYNAMIC SIGN STRUCTURES ANDCAMERA INSTALLATION
12/31/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$21.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
1.0000
P033618P033618PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 2.000 CY
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 300.000 LF
2" SCHEDULE 80 HDPE CONDUIT 150.000 LF
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) 237.000 LF
16 IN. ABOVE GROUND UTILITY MARKER 6.000 EA
12 SMFO LOOSE TUBE - DROPS 600.000 LF
ELECTRICAL SERVICE FOR ITS - IN EXCESS OF 50FT. 2.000 EA
17"X30"X28"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 2.000 EA
30"X48"X30"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD 4.000 EA
60' CONCRETE STRAIN POLE 1.000 EA
VARIABLE MESSAGE SIGN (PERMANENT WITH STRUCTURE) 2.000 EA
CAMERA LOWERING DEVICE 1.000 EA
INSTALL ITS CABINET - BASE MOUNTED 1.000 EA
STEEL BEAM GUARDRAIL STEEL BEAM GR. 822.000 LF
END ANCHOR-TYPE B 5.000 EA
END TERMINAL - TYPE T 6.000 EA
Call No.: 070 9Page:
South Carolina Department of Transportation 3/1/2018
5114570SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT 1 DBE Goal Percent: 0.00%
Completion Date:
Description: 2017-18 NON-INTERSTATE GUARDRAILREPAIR DISTRICT ONE
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032343P032343PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 75.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 75.000 EA
REMOVAL OF EXIST. GUARDRAIL 100.000 LF
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 500.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 7,000.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 50.000 LF
STEEL BEAM GUARDRAIL (THRIE) 50.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 50.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 25.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
END ANCHOR-TYPE B 5.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B 10.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 5.000 EA
END TERMINAL - TYPE T 20.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 60.000 EA
THRIE BEAM G.R.BRIDGE CONN. 20.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 22.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 2.000 EA
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM 1.000 EA
Call No.: 070 10Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM 1.000 EA
GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER 1.000 EA
GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT 1.000 EA
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
2' CRASH CUSHION 3B 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 080 11Page:
South Carolina Department of Transportation 3/1/2018
5146850SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Lexington Richland DBE Goal Percent: 0.00%
Completion Date:
Description: FDP AND PVMT MARKINGS
4/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
15.8900
P036931P036931PCN: Project No.:
P036932P036932PCN: Project No.:
P036956P036956PCN: Project No.:
P037091P037091PCN: Project No.:
P037092P037092PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 203.500 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 20,350.000 SY
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 67,470.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 189.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,130.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 67,520.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,900.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,900.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 46.000 EA
Call No.: 090 12Page:
South Carolina Department of Transportation 3/1/2018
5146980SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Kershaw LeeSumter
DBE Goal Percent: 0.00%
Completion Date:
Description: FD PATCHING AND PVMT MARKINGS
4/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
45.5500
P036933P036933PCN: Project No.:
P036934P036934PCN: Project No.:
P036935P036935PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 253.941 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 25,394.100 SY
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 127,388.400 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 158.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5,943.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 111,110.400 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,200.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 100.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,000.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,094.000 EA
Call No.: 100 13Page:
South Carolina Department of Transportation 3/1/2018
5147600SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Lexington Richland DBE Goal Percent: 0.00%
Completion Date:
Description: SHLD PAVING, FDP, LEVEL, CHIP SEAL
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
10.2900
P036977P036977PCN: Project No.:
P036978P036978PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
BORROW EXCAVATION 256.000 CY
EXCAVATION FOR SHOULDER PAVING 157.350 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 157.350 STA
MAINTENANCE STONE 27.250 TON
HMA SHOULDER WIDENING COURSE 527.000 TON
LIQUID ASPHALT BINDER PG64-22 37.060 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,725.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE D 170.000 TON
ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 125,616.480 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,396.000 SF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 55,591.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 563.000 LF
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 1.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 280.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 71,951.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 15,250.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 563.000 LF
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 1.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 280.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 14,330.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 704.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 0.050 ACRE
Call No.: 110 14Page:
South Carolina Department of Transportation 3/1/2018
5147850SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT 1 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 RPMS PRIMARY & SECONDARYROUTES - DISTRICT 1
10/15/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
750.0000
P037174P037174PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 19,635.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 12,010.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 69,300.000 EA
Call No.: 120 15Page:
South Carolina Department of Transportation 3/1/2018
5147960SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT 1 DBE Goal Percent: 0.00%
Completion Date:
Description: ON CALL INTERSTATE GUARDRAILDISTRICT 1
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P037204P037204PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 1031030 200.000 EA
BONDS AND INSURANCE 1032010 1.000 LS
TRAFFIC CONTROL 1071100 200.000 EA
REMOVAL OF EXIST. GUARDRAIL 2027801 100.000 LF
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 8050010 200.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 8051100 500.000 LF
MT3 LEADING END TREATMENT TL3 8051151 2.000 EA
MT2 LEADING END TREATMENT TL2 8051155 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 8051190 13,200.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 8051207 50.000 LF
STEEL BEAM GUARDRAIL (THRIE) 8051300 130.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 8051320 130.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 8051470 28.000 LF
MB TRAILING END TREATMENT 8051710 2.000 EA
MGS3 GR STANDARD SHOULDER 8052100 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 8052150 100.000 LF
MGS2C GR BEHIND CURB 8052200 100.000 LF
END ANCHOR-TYPE B 8052210 5.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B 8052230 10.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 8052235 3.000 EA
END TERMINAL - TYPE T 8052300 75.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 8052390 75.000 EA
THRIE BEAM G.R.BRIDGE CONN. 8052600 6.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 8052610 6.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 8053000 22.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 8053253 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 8053255 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 8055300 10.000 EA
END TREATMENT TYPE IA-1 8056501 2.000 EA
REMOVE AND REPLACE END TREATMENT TYPE IA-1 8056520 2.000 EA
Call No.: 120 16Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM 8057201 1.000 EA
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM 8057202 1.000 EA
GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER 8057203 1.000 EA
GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT 8057204 1.000 EA
2' CRASH CUSHION 2A 8057305 1.000 EA
2' CRASH CUSHION 2B 8057310 1.000 EA
2' CRASH CUSHION 2C 8057315 1.000 EA
WIDE CRASH CUSHION 2A 8057325 1.000 EA
WIDE CRASH CUSHION 2B 8057330 1.000 EA
WIDE CRASH CUSHION 2C 8057335 1.000 EA
2' CRASH CUSHION 3A 8057350 1.000 EA
2' CRASH CUSHION 3B 8057355 1.000 EA
2' CRASH CUSHION 3C 8057360 1.000 EA
WIDE CRASH CUSHION 3A 8057370 1.000 EA
WIDE CRASH CUSHION 3B 8057375 1.000 EA
WIDE CRASH CUSHION 3C 8057380 1.000 EA
Call No.: 130 17Page:
South Carolina Department of Transportation 3/1/2018
5214290SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT2 DBE Goal Percent: 0.00%
Completion Date:
Description: 2017-2018 NON-INTERSTATE GUARDRAILPROGRAM
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032298P032298PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 60.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 175.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 20,000.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 5,000.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 62.500 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 20.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 15.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 70.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 20.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 38.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
REMOVE AND REPLACE END TREATMENT TYPE IA-1 2.000 EA
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
2' CRASH CUSHION 3B 1.000 EA
Call No.: 130 18Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 140 19Page:
South Carolina Department of Transportation 3/1/2018
5247860SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT2 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 RPMS ON PRIMARY & SECONDARYROUTES - DISTRICT 2
10/15/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
750.0000
P037175P037175PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 8,085.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 6,930.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 80,850.000 EA
Call No.: 150 20Page:
South Carolina Department of Transportation 3/1/2018
5247930SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT2 DBE Goal Percent: 0.00%
Completion Date:
Description: 2017-2018 INTERSTATE GUARDRAILPROGRAM
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032297P032297PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 20.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 115.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 10,000.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 1,400.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 200.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 20.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 15.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 45.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 20.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
REMOVE AND REPLACE END TREATMENT TYPE IA-1 5.000 EA
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
2' CRASH CUSHION 3B 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
Call No.: 150 21Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 160 22Page:
South Carolina Department of Transportation 3/1/2018
5314300SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT3 DBE Goal Percent: 0.00%
Completion Date:
Description: 2017-2018 NON-INTERSTATE GUARDRAILPROGRAM DISTRICT-3
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032300P032300PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 1.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 275.000 EA
REMOVAL OF EXIST. GUARDRAIL 100.000 LF
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 100.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 15,000.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 4.000 LF
STEEL BEAM GUARDRAIL (THRIE) 200.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 210.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 200.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
END ANCHOR-TYPE B 10.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B 40.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 1.000 EA
END TERMINAL - TYPE T 10.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 158.000 EA
THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 30.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 200.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 4.000 EA
REMOVE AND REPLACE END TREATMENT TYPE IA-1 20.000 EA
Call No.: 160 23Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM 1.000 EA
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM 1.000 EA
GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER 1.000 EA
GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT 1.000 EA
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
2' CRASH CUSHION 3B 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 170 24Page:
South Carolina Department of Transportation 3/1/2018
5314310SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT3 DBE Goal Percent: 0.00%
Completion Date:
Description: 2017-2018 INTERSTATE GUARDRAILPROGRAM DISTRICT 3
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032302P032302PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 150.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 150.000 EA
REMOVAL OF EXIST. GUARDRAIL 100.000 LF
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 100.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 3,000.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 100.000 LF
STEEL BEAM GUARDRAIL (THRIE) 100.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 400.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 5.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
END ANCHOR-TYPE B 1.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B 15.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 1.000 EA
END TERMINAL - TYPE T 1.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 40.000 EA
THRIE BEAM G.R.BRIDGE CONN. 1.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 10.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 100.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 1.000 EA
REMOVE AND REPLACE END TREATMENT TYPE IA-1 12.000 EA
Call No.: 170 25Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM 1.000 EA
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM 1.000 EA
GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER 1.000 EA
GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT 1.000 EA
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
2' CRASH CUSHION 3B 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 180 26Page:
South Carolina Department of Transportation 3/1/2018
5347870SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT3 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 RPMS ON PRIMARY AND SECONDARYROUTES - DISTRICT 3
10/31/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
825.0000
P037176P037176PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 22,525.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 14,440.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 86,625.000 EA
Call No.: 190 27Page:
South Carolina Department of Transportation 3/1/2018
5414580SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT4 DBE Goal Percent: 0.00%
Completion Date:
Description: REPAIR/REPLACE OF INTERSTATE GR INDISTRICT 4
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032346P032346PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 30.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 75.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 10,000.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 800.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 10.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 10.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 10.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 40.000 EA
THRIE BEAM G.R.BRIDGE CONN. 10.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 10.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 10.000 EA
Call No.: 200 28Page:
South Carolina Department of Transportation 3/1/2018
5414590SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT4 DBE Goal Percent: 0.00%
Completion Date:
Description: REPAIR/REPLACEMENT OFNON-INTERSTATE GR IN DISTRICT 4
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032347P032347PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 100.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 100.000 EA
REMOVAL OF EXIST. GUARDRAIL 750.000 LF
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 6,000.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 1,500.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 100.000 LF
STEEL BEAM GUARDRAIL (THRIE) 2,000.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 300.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 100.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
END ANCHOR-TYPE B 4.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B 4.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 4.000 EA
END TERMINAL - TYPE T 60.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 60.000 EA
THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
ADDITIONAL LENGTH GUARDRAIL POST 700.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 1.000 EA
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM 1.000 EA
Call No.: 200 29Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM 1.000 EA
GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER 1.000 EA
GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT 1.000 EA
Call No.: 210 30Page:
South Carolina Department of Transportation 3/1/2018
5425771SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: CherokeeChesterfield FairfieldLancaster York
DBE Goal Percent: 0.00%
Completion Date:
Description: FY17 TRAFFIC SIGNAL REBUILDS INDISTRICT 4
10/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$10.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032153P032153PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 40.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 995.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 200.000 LF
REMOVAL OF PAVEMENT MARKINGS 60.000 LF
Flat Sheet, Type XI, Size Determined by MSG, Overhead 80.000 SF
FURNISH & INSTALL 1.0" GALVANIZED RIGID CONDUIT 40.000 LF
FURNISH & INSTALL 2.0" GALVANIZED RIGID CONDUIT 210.000 LF
FURNISH & INSTALL 3.0" GALVANIZED RIGID CONDUIT 20.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 610.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,440.000 LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 290.000 LF
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED) 835.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 6,815.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 9,830.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 5,180.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 730.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 5,980.000 LF
FURNISH & INSTALL FIBER OPTIC CABLE-SINGLE MODE 200.000 LF
FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER 2.000 EA
SAWCUT FOR LOOP DETECTOR 2,125.000 LF
FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 8.000 EA
F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 5.000 EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 12.000 EA
F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 13.000 EA
FURNISH & INSTALL 13" X 26' STEEL STRAIN POLE AND FOUNDATION 4.000 EA
FURNISH & INSTALL 13" X 28' STEEL STRAIN POLE AND FOUNDATION 7.000 EA
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 1,785.000 LF
Call No.: 210 31Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
FURNISH & INSTALL 4' BREAK-AWAY ALUMINUM PEDESTAL POLE 2.000 EA
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 9.000 EA
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001 8.000 EA
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 4.000 EA
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 61.000 EA
F&I - 1-WAY-1SECT.HAND/MAN EMBLEM PEDESTRIAN SIGNAL HEAD 48.000 EA
FURNISH & INSTALL PEDESTRIAN PUSH BUTTON AND SIGN (R-10-4B) 2.000 EA
F&I-PED PUSH BUTTON MICRO ASSEMBLY(9"X15")AND SIGN(R-10-3E or R10-4a) 40.000 EA
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 65.000 EA
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS
TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT 1.000 LS
F&I - VIDEO DETECTION SYSTEM W/ ONE CAMERA, HARDWARE & LEAD-IN 2.000 EA
FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN 1.000 EA
FURNISH & INSTALL CONCRETE CABINET FOUNDATION 7.000 EA
DETECTABLE WARNING MATERIAL 139.000 SF
CONCRETE MEDIAN 140.000 SY
PEDESTRIAN RAMP CONSTRUCTION 50.000 SY
SURFACE APPLIED DETECTABLE WARNING 200.000 SF
Call No.: 220 32Page:
South Carolina Department of Transportation 3/1/2018
5446760SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Cherokee York DBE Goal Percent: 0.00%
Completion Date:
Description: DRAINAGE REPAIR AND REPLACEMENT
11/30/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0900
P036896P036896PCN: Project No.:
P036906P036906PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING DROP INLET 1.000 EA
REMOVAL & DISPOSAL OF EXISTING CURB 100.000 LF
SITE EXCAVATION 1.000 LS
48" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 100.000 LF
36" SMOOTH WALL PIPE 16.000 LF
42" SMOOTH WALL PIPE 24.000 LF
48" SMOOTH WALL PIPE 100.000 LF
CATCH BASIN -TYPE 17 1.000 EA
MANHOLE WITH STANDARD 6' X 6' BOX 1.000 EA
CONCRETE COLLAR FOR UP TO 48" PIPE 2.000 EA
ADJUST CATCH BASIN 1.000 EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 100.000 LF
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 85.000 LF
CONCRETE FLUME 50.000 LF
RIP-RAP (CLASS B) 125.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 1)TYPE A 125.000 SY
PERMANENT GRASSING FOR SMALL PROJECTS 0.125 ACRE
TEMPORARY EROSION CONTROL BLANKET (CLASS A) 0.242 MSY
SILT FENCE 300.000 LF
STABILIZED CONSTRUCTION ENTRANCE 200.000 SY
Call No.: 230 33Page:
South Carolina Department of Transportation 3/1/2018
5447880SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT4 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 RPMS ON PRIMARY AND SECONDARYROUTES
10/31/2018
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
765.0000
P037177P037177PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 11,780.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 7,160.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 66,990.000 EA
Call No.: 240 34Page:
South Carolina Department of Transportation 3/1/2018
5514630SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT5 DBE Goal Percent: 0.00%
Completion Date:
Description: NON-INT REPAIR/REPLACEMENT OFGUARDRAIL & ATTENUATORS
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032348P032348PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 25.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 40.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 3,400.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 12,500.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 300.000 LF
STEEL BEAM GUARDRAIL (THRIE) 400.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 800.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
END ANCHOR-TYPE B 8.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B 8.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 8.000 EA
END TERMINAL - TYPE T 24.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 36.000 EA
THRIE BEAM G.R.BRIDGE CONN. 10.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 16.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
Call No.: 240 35Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
2' CRASH CUSHION 3B 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 250 36Page:
South Carolina Department of Transportation 3/1/2018
5514680SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT5 DBE Goal Percent: 0.00%
Completion Date:
Description: REPAIR/REPLACEMENT OF GUARDRAILAND ATTENUATORS INT
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032345P032345PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 20.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 30.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 200.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 3,200.000 LF
STEEL BEAM GUARDRAIL (THRIE) 200.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 800.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 16.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 12.000 EA
END TERMINAL - TYPE T 8.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 28.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 16.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
REMOVE AND REPLACE END TREATMENT TYPE IA-1 8.000 EA
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
Call No.: 250 37Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
2' CRASH CUSHION 3B 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 260 38Page:
South Carolina Department of Transportation 3/1/2018
5614750SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT6 DBE Goal Percent: 0.00%
Completion Date:
Description: ON CALL INTERSTAE GUARDRAIL INDISTRCIT SIX
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032384P032384PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 60.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 60.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 3,000.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 150.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 100.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 4.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 2.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 50.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 1.000 EA
POWDER COATING OF GUARDRAIL COMPONENTS 400.000 LF
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
2' CRASH CUSHION 3B 1.000 EA
Call No.: 260 39Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
WIDE CRASH CUSHION 3C 1.000 EA
Call No.: 270 40Page:
South Carolina Department of Transportation 3/1/2018
5614760SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT6 DBE Goal Percent: 0.00%
Completion Date:
Description: ON CALL GUARDRAIL DISTRICT SIX
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032385P032385PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 50.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 50.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 1,500.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 100.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 50.000 LF
MB TRAILING END TREATMENT 2.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 4.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 2.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 49.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 1.000 EA
THRIE BEAM GUARDRAIL BRACKET CONNECTION 1.000 EA
POWDER COATING OF GUARDRAIL COMPONENTS 200.000 LF
2' CRASH CUSHION 2A 1.000 EA
2' CRASH CUSHION 2B 1.000 EA
2' CRASH CUSHION 2C 1.000 EA
WIDE CRASH CUSHION 2A 1.000 EA
WIDE CRASH CUSHION 2B 1.000 EA
WIDE CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3A 1.000 EA
Call No.: 270 41Page:
South Carolina Department of Transportation 3/1/2018
Description Quantity Units
2' CRASH CUSHION 3B 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
WIDE CRASH CUSHION 3A 1.000 EA
WIDE CRASH CUSHION 3B 1.000 EA
Call No.: 280 42Page:
South Carolina Department of Transportation 3/1/2018
5625521SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Beaufort BerkeleyCharleston ColletonDorchester Jasper
DBE Goal Percent: 0.00%
Completion Date:
Description: 2017 RUMBLE STRIPES DISTRICT 6
5/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
121.1300
P028006P028006PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MILLED-IN RUMBLE STRIP 212.290 MI
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,253,551.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 92,606.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 685,171.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9,946.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,119,120.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 92,606.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 683,376.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 130.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 11.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 7,995.000 EA
REMOVAL OF PAVEMENT MARKINGS 1,905,047.000 LF
EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO. PROFILE 134,431.000 LF
Call No.: 290 43Page:
South Carolina Department of Transportation 3/1/2018
5714550SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT7 DBE Goal Percent: 0.00%
Completion Date:
Description: 2017-2018 INTERSTATE GUARDRAILPROGRAM - DISTRICT 7
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032339P032339PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 20.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 75.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
GUARDRAIL POST GR. POST 160.000 EA
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 5,650.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 480.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 230.000 LF
MB TRAILING END TREATMENT 2.000 EA
RESET GUARDRAIL RESET GR. 358.000 LF
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 15.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 15.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 60.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 8.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
END TREATMENT TYPE IA-1 8.000 EA
Call No.: 300 44Page:
South Carolina Department of Transportation 3/1/2018
5714560SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT7 DBE Goal Percent: 0.00%
Completion Date:
Description: 2017 - 2018 NON-INTERSTATE GUARDRAILPROGRAM
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.0000
P032340P032340PCN: Project No.:
Description Quantity Units
MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 15.000 EA
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 25.000 EA
REMOVE & DISPOSE SEMI-RIGID GR DEVICE 200.000 LF
GUARDRAIL POST GR. POST 100.000 EA
MT3 LEADING END TREATMENT TL3 2.000 EA
MT2 LEADING END TREATMENT TL2 2.000 EA
REMOVE AND REPLACE W BEAM GUARDRAIL 1,810.000 LF
REMOVE AND REPLACE THRIE BEAM GUARDRAIL 404.000 LF
REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL 70.000 LF
STEEL BEAM GUARDRAIL BRIDGE RAIL 300.000 LF
MB TRAILING END TREATMENT 2.000 EA
RESET GUARDRAIL RESET GR. 140.000 LF
MGS3 GR STANDARD SHOULDER 100.000 LF
MGS3CS GR COMPRESSED SHOULDER 100.000 LF
MGS2C GR BEHIND CURB 100.000 LF
REMOVE AND REPLACE END ANCHOR-TYPE B 10.000 EA
REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) 10.000 EA
REMOVE AND REPLACE END TERMINAL - TYPE T 30.000 EA
REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN. 10.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 2.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 2.000 EA
FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR 10.000 EA
2' CRASH CUSHION 2C 1.000 EA
2' CRASH CUSHION 3C 1.000 EA
Call No.: 310 45Page:
South Carolina Department of Transportation 3/1/2018
5725541SC File NO(S).:
April 10, 2018
02:00 PM
Letting Date: CO(S).: Aiken AllendaleBarnwell CalhounClarendon Hampton
Description:
2017 RUMBLE STRIPES DISTRICT7
Orangeburg
DBE Goal Percent: 0.00%
Completion Date: 6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
119.0600
P028007P028007PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MILLED-IN RUMBLE STRIP 261.610 MI
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 3,796.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,357,762.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 117,305.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 767,300.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 12,235.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,357,762.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 117,305.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 728,980.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 217.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 150.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 8,659.000 EA
REMOVAL OF PAVEMENT MARKINGS 2,216,281.000 LF
EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS
BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.
1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC 29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service.
2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No._______", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice.
PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeff Elliott at (803)737-1253.
STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.
MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.
In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "SupplementalSpecifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:
TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.
Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, andthe bidder should check with the SCDOT Engineering Publications office for the cost of plans when theplans are indicated to be available.
THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
Prepared by L. Stuckey