compendium of instructions related to inspections and...
TRANSCRIPT
Compendium ofInstructions related to Inspections
andCompetency Certificates in
Engineering Department
Compendium ofInstructions related to Inspections
andCompetency Certificates in
Engineering Department
October 2015October 2015
Indian Railways Institute of Civil EngineeringPune 411001
Indian Railways Institute of Civil EngineeringPune 411001
Price < 60/-
First Edition : October 2015
i
Compendium of
Instructions Related to Inspections
and
Competency Certificates in
Engineering Department
Compendium of
Instructions Related to Inspections
and
Competency Certificates in
Engineering Department
Indian Railways Institute of Civil Engineering,
Pune 411001
October 2015
ii
iii
Foreword
Inspections are an integral part of the various safety measures
undertaken by the Railways to make train-mode transport safe,
comfortable, efficient and punctual. Inspections in general means
visits to various work centres to carefully examine the working of
the system; find out the defects and to see that rules and
instructions are implemented according to their spirit. It is both
educative and corrective in nature.
The Civil Engineering assets comprise important part in Railway
system and its upkeep is very important from safety and comfort point
of view. This handbook containing compendium of instructions
related to inspection of civil engineering assets would be of great
help to all the inspecting officials. An attempt has been made in
formulating certain frame work which will be of help in facilitating
focussed and in-depth inspections of civil engineering asset.
The information presented in this book is in no way intended to
supersede or negate any existing rules, regulations, or instructions
contained in various codes and manual. Further, it is not intended to
conflict with any currently effective operating and maintenance
instructions and/or specifications. It also cannot be taken as
exhaustive. It should, however, always be kept in mind that
inspections are not merely fault finding. It is one of the most
effective tools that can be intelligently used to run the system
smoothly and safely.
It is hoped that all Engg officials will make use of present book
during their inspections in improving quality of inspections and
thereby bringing overall improvement in productivity and
performance enhancement of Civil Engg. assets in particular and Rly
system in general.
(Vishwesh Chaubey)
Director/IRICEN
iv
v
S.N. Title Page
1 Inspection schedule of Engineering Officials
A. Sr.DEN/DEN 1
B. ADENS 4
C. SSE/SE/JE (P.Way) 9
D. SSE (Works) 14
E. Bridge Organization 18
F. Track Machine Organization 20
2 List of Functionaries Authorise to issue Competency
Certificate for various track activities 23
3 Check List for different Registers for Track Maintenance 41
4 Check list for Inspection of Open Line Organization
A. Track 65
B. SSE (P.Way) Office/Store 82
C. USFD testing 83
D. AT Welding 91
E. Level Crossing 107
F. Tamping Machine 116
G. Ballast Cleaning Machine 131
H. Check List of Concrete Sleeper Plant 150
I. Bridges & Tunnels 157
J. Passenger Amenities 169
K. Colony And Other Buildings 187
CONTENTS
vi
L. Land matters 192
M. Steel Structures in Work Shops, Running Sheds &
P/F Covers 197
N. Steel Water Tank, Staging and Flood Light Towers 198
O. Water Supply Installation 200
P. Rain Water Harvesting System 203
5 Check List for New Construction Site
A. Worksite 204
B. Work in/near Electrified Area 206
C. Precautions within Station Premises 207
D. Track Ballast 207
E. Formwork in Concrete Work 210
F. Box Pushing Work 210
S.N. Title Page
1
CHAPTER - 1
INSPECTION SCHEDULES OF ENGINEERING OFFICIALSG
A. Inspection Schedules of Sr. DENs /DENs
S. Type of Schedule of Reference
N. Inspection Inspection
1. Push Trolley Once in four month.
Inspection Unimportant branch line
having less than 2 GMT
traffic – Once in 6 month
2. Foot Plate/ Brake Once in three month to
Van/Rear Window cover his entire section
either by footplate, rear-
window, TRC or OMS.
3. Points & Crossings At least one Point & Cross-
ing on passenger running
line as often as possible
4. Level Crossing Minimum one Level
Crossing per PWI every
three month
5. LWR/SEJs During routine motor
trolley/push trolley or
foot inspection
6 Hot Weather As and when required
Patrolling
RB No.
2013/CE-11/
CS/1 dated
20.06.2013
2
7. Curves Minimum one curve in
each ADEN’s section every
four month
8 Inspection of As much as possible
ongoing works of during Foot Plate/Trolley
construction and inspections to check quality
other organization and safety
e.g. RVNL etc
9. Land boundary During trolley inspection at
verification vulnerable locations
10. Track renewal/ As much as possible during
Deep Screening site Trolley inspection
11. AT welding site As much as possible during
Trolley inspection
12. Private sidings When referred
13. Review of Routine checking during
inspection by trolley inspection
subordinate
14. Bridge:
• Important Bridge • Once in a year
• On reference by • On reference
ADEN
• Bridge with • Once in a year Para 1104
Overall Rating of IRBM
number (ORN)
1,2,3
S. Type of Schedule of Reference
N. Inspection Inspection
RB No.
2013/CE-
II/CS/1 dated
20.06. 2013
3
15. Tunnel on on reference
reference
from ADEN
16. Inspection of Track
machines working
in the section
• CSM, BCM, FRM, • Once a two month when
P&C Tamper, DTS working in section
• T-28, PQRS • At least once in a month
• UT, UNO, DUO, • As per need
BRM
17. Night/surprise Minimum once in three
Inspection month. More intensive
during monsoon
18. Monsoon Patrolling Minimum once in two
month to evaluate
adequacy of safety
19. Gang Inspection Minimum one gang per .
SSE every three month
20. Railway Affecting Peruse the inspection
Works/ Tanks report of revenue /PWD
and forward, with name
of Tank (so marked) for
inspection by ADEN to
report upon.
21. TRC/OMS run Accompany each TRC run RB No. 2013/CE-
and alternate OMS run II/CS/1 dated
20.06.2013
S. Type of Schedule of Reference
N. Inspection Inspection
Para 1104
of IRBM
RB No. 2013/
CE- II/CS/1
dated
20.06.2013
Para 726 of
IRPWM
4
22 Inspection of Once a year IRPWM Para
waterworks 554 (d)
S. Type of Schedule of Reference
N. Inspection Inspection
S. Type of Schedule of Reference
N. Inspection Inspection
1. Push Trolley Entire section Main Line
Inspection – Once in 2 month
Unimportant branch Lines
having GMT < 2
– once in 3 month
2. Fast train Entire sub-division either Para 107 (2) of
inspection by engine / rear window IRPWM
of a fast train or by TRC/ (C.S. No. 132)
OMS - Once a month
3. Points & All Points & Crossings on
Crossings passenger lines once a year
& 10% of Points &
Crossings on other lines
4. Level Crossing All manned Level crossings Para 107(3) of
- Once in six month IRPWM (C.S. No.
132)
5. LWR Once in six month Para 8.1.5(ii) of
(Preferably in hottest and LWR Manual
coldest month)
6. Curves One curve each SSE Para 107(4) of
jurisdiction every quarter IRPWM
B. Inspection Schedule of ADEN
Para 107 (1) of
IRPWM
(C.S. No. 132)
Para 107(5) of
IRPWM
5
7. Bridge Once in a year after Para 102(a) of
monsoon IRBM
8 Inspection of Side Once in a year before
drains, Catch water on set of rains
drains and Water
ways of bridges &
culvert
9 Inspection of Once in a year before Para 1011 of
Cutting onset of rain IRBM C.S. NO.28
10. Tunnel Once in a year before Para 1004 of
Monsoon IRBM
11 Inspection of Track
machines working
in the section
• CSM, BCM, FRM, • Once a month when
P&C Tamper, DTS working in section
• T-28, PQRS, TRT • At least once in fortnight
& RGM
• UT, UNO, DUO, • At least once in a period
BRM of working in their section
12. Night foot plate Once in a month between Para 107 of
Inspection 0.0 – 4.00 hrs. IRPWM
13. AT Welding AT welding each site as Para 107 (11) of
much as possible but at IRPWM
least once in a month C S NO. 132.
S. Type of Schedule of Reference
N. Inspection Inspection
Para 223(C) of
IRPWM
CS no. 132
C.S. No.14 of
IRTMM
Para 5.3.3
6
14. Test check of USFD USFD checking few hours Para 4.3 of USFD
Inspection each month (min. two manual 2012
hours) during regular
Trolley Inspection.
15. Monsoon At night once in a month Para 107 (6) of
Patrolling either by train, push IRPWM
trolley, Motor trolley. (C.S. No. 132)
16. Private Sidings Min. once in a year S. NO.1.4
Inspection
Manual Rly.Bd.
17. Gang Inspection Min. one Gang each SSE Para 107 (1) of
every quarter IRPWM
(C.S. No. 132)
18. RAW/RAT Min. once in a year before Para 726 of
inspection monsoon IRPWM
19. Inspection of Sand Min. once in a year -
Humps
20. Inspection of Steel Once in 12 month Para 273(b)(7) of
Channel Sleepers alternately with SSE IRPWM
(P way) (C.S.No. 128)
21. TRC/OMS Run Every Run Para 111 of
IRPWM
S. Type of Schedule of Reference
N. Inspection Inspection
7
22. Inspection of
Steel Structures
• Structure such as work- • One fifth every year
shops, running sheds, on a programmed
platform covers and basis
foot over bridges
• Cast iron, wrought • As required
iron or pressed
steel plate water
tanks and
staging’s whether of
steel section or rails
• Structures with roof • 10-20% test check
trusses inspection of struc-
ture under each
group
• Other structures in • 10-20% test check
which timber, rail or inspection of
steel work is used to structure under
support any part of the each group
structure
• Tie rods of arched roof • 10-20% test check
excluding jack inspection of
structure under
each group
• Wrought iron or mild • 10-20% test check
steel tanks or sleeper inspection of
cribs at temporary structure under
watering kilometerage. each group
S. Type of Schedule of Reference
N. Inspection Inspection
Para 228(a)
of IRWM
8
23. Inspection of staff As many buildings
quarters & service (particularly those
buildings required heavy repairs)
24. Inspection of water Once in 3 month Para 554(c)
supply installations (i) of IRWM
25. Inspection of Land Once a year Para 813 of
boundary and IRWM
Encroachment
26. Inspection of colony Once in 2 month Para 225(b)
by care committee (iii) of IRWM
28. Inspection of colony by Once in 2 month Para 225(a)
Services Improvement of IRWM
Group (SIG)
29. Inspection and checking Minimum once a year Para 115 of
of stores and office of IRPWM
SSE
30. Small Track Machines Once in 6 month each Para 115(b)
PWI of IRPWM
31. Inspection of Canal and Joint inspection with Para 1103 of
Irrigation crossing state government IRBM
officers wherever
necessary
32 Inspection of washable Once in 6 month Railway Board
apron Lr.No.2010
CE-II/TK/11
dt.8.11.2010
S. Type of Schedule of Reference
N. Inspection Inspection
Para 224 (d)
of IRWM
9
C. Inspection Schedule of SSE/SE /JE (P.Way)
(Over all in-charge/Sectional)
S. Type of Schedule of Reference
N. Inspection Inspection
33 Joint Inspection for Annually
identifying trees which
are likely to endanger
safety of track along
with Junior scale
officers of S&T and
Electrical Department.
34 Inspection of station As prescribe and Para 302 of
and Colony by nominated by GM IRWM
sanitation committee.
S. Type of Schedule of Reference
N. Inspection Inspection
1 Foot Inspection
C.S. No. 132
of IRPWM
Over all in charge
– As much as possible
on pro-rata basis so as
to cover entire section
at least once a year
Not Over all in charge
– Once in a six month
in a systematic
manner (Every month
on pro rata basis so
as to cover entire
length of running
track)
Para 715 (c)
of IRWM
10
Over all in-charge
– Entire section by Push/
Motor Trolley – Once in a
month
Not Overall in charge
- Entire section by Push
trolley – Once in a
fortnight
SSE/JE –
Once in a month
Over all in charge – Night
Foot plate once in a
month between 00 to
4.00 hrs
Not over all in charge –
Once in a month
Over all in-charge – One
inspection every month by
train and inspection by
trolley – As per the schedule
laid down by the
administration
Not over all in charge – One
inspection every fortnight by
train and inspection by
trolley - As per the schedule
laid down by the
administration
2 Inspection of
Gangs / Trolley
Inspection
Para 124 of
IRPWM (C.S.
No. 132)
Para 139 of
IRPWM
(CS No.132)
3 Loco / Break van /
Rear window
Para 123 &
139 (6) of C.S.
132, IRPWM
5 Night Inspection Para 139 (8) of
IRPWM CS
no.132
6 Monsoon
Patrolling
Para 126 of
IRPWM
4 Night Foot plate
InspectionPara 124 & 139
of IRPWM
C.S. No. 132
S. Type of Schedule of Reference
N. Inspection Inspection
11
S. Type of Schedule of Reference
N. Inspection Inspection
Passenger & running line
– Once in three month by
rotation with JE / P. way.
Other lines & yards lines –
Once in a six month by
rotation with JE / P. way.
Once in a month by
rotation with JE / P. way
Once in fort night during
two coldest and two
hottest month otherwise
once in two month by
rotation with JE
Once in six month by
rotation with JE
Over all in charge - Once
in a year in prescribed
month before monsoon
Once in a year after
monsoon
Over all in charge - Once
in a year in Prior to
monsoon
Not Over all in charge -
Once in a year in the month
of April prior to monsoon
7 Points & Crossings
Para 126 of
IRPWM
8 Level Crossing
Para 8.1.5 of
LWR Manual
and Para 144
of IRPWM
9 LWR
Para 124 &
139 of IRPWM
(CS No. 132)
10 Curves
Para 1101 of
IRBM
11 Bridge
Para 1001 of
IRBM
12 Tunnel
Para 223 of
IRPWM
(CS no. 132)
13 Inspection of Side
drains, Catch
water drains and
Water ways of
bridges & culvert
12
SSE/JE - Once in a year
immediately after
Monsoon
Over all in charge –
Once at the time of taming.
Not Over all in charge –
Once at the time of pre
tamping, during tamping
and post tamping.
Over all in charge – As
much as possible but at
least once in a month
Not Over all in charge –At
least two inspections in a
month
SSE/JE - Once in three
month
Over all in charge -Once in
a year by rotation with
ADEN
SSE – Each run
JE - Alternate run
S. Type of Schedule of Reference
N. Inspection Inspection
14 Cutting Para 1011 of
IRBM
(C.S.No.28)
C.S. No.14 of
IRTMM
Para 5.3.3
15 Inspection of pre
tamping, during
tamping and post
tamping
operations during
working of track
machines
Para 127 (3)
and 139 (9) of
IRPWM
(CS No. 132)
16 Inspection of AT
Welding site
Manual of
Inspection
Schedule for
Engg. official
17 Private Sidings
Para 273(b)(7)
of IRPWM
(C.S. No. 128)
18 Inspection of Steel
Channel Sleepers
Para 139 (7)
of IRPWM
19 Accompany TRC/
OMS Run
13
S. Type of Schedule of Reference
N. Inspection Inspection
Over all in charge -
Once a year
SSE in charge - Once in 3
month
SSE/JE - As much as
possible during foot plate
and trolley inspection
Once in 3 month on
rotation basis by SSE/P.
Way (overall in charge) &
JE/P. Way (not in overall
in charge)
Once in 3 month with
Section Engineer (S&T) if
not done by sectional J.E.
Once in 6 month with
Section Engineer (S&T) if
not done sectional J.E.
20 Inspection of Land
boundary and
Encroachment
Para 813 of
IRWM
Para 1.5 of
IRSTM (CS No.2)
21 Small Track
Machines
Para 127 (4)
and 139 (10)
of IRPWM
(CS No.132)
22 Ongoing work of
construction and
other organization
e.g. RVNL etc.
Railway Board
Lr.No.2010/CE-
II/TK/11
dt.8.11.2010
23 Inspection of
Washable Apron
24 Joint Inspection of
Points & Crossings
Interlocked points
on passenger run-
ning lines
25 Joint Inspection of
Points & Crossings
Interlocked points
on other than
passenger running
lines.
14
S. Type of Schedule of Reference
N. Inspection Inspection
Once in three month
Once a year
Every year
26 Inspection of
Encroachment
Para 814 (d) of
IRWM
Para 813(c) of
IRWM
27 Inspection of Land
boundary
verification at
between stations
and unimportant
stations
Para 720 of
IRWM
28 Survey of
Surviving trees
S. Type of Schedule of Reference
N. Inspection Inspection
• Once a year during the
prescribed month.
1 Inspection of Steel
Structures
• Structure such
as workshops,
running sheds,
platform covers
and foot over
bridges
• Cast iron,
wrought iron or
D. Inspection Schedules of SSE/Works
• Once a year on a
Programmer basis.
Para 228 (a)
of IRWM
15
S. Type of Schedule of Reference
N. Inspection Inspection
pressed steel
plate water
tanks and
staging’s
whether of steel
section or rails
• Structures with
roof trusses
• Other structures in
which timber, rail
or steel work is
used to support
any part of the
structure
• Tie rods of arched
roof excluding jack
• Wrought iron or
mild steel tanks
or sleeper cribs at
temporary
watering
kilometerage
• Once a year during the
prescribed month.
• Once a year during the
prescribed month
• Once a year during
the prescribed month
• Once a year during
the prescribed
month
Para 224 (e)
of IRWM
2 All the buildings, water
supply installations,
sewerage installations
and drainage
arrangements once a
year.
Inspection of
Buildings
Para 228 (a)
of IRWM
16
S. Type of Schedule of Reference
N. Inspection Inspection
Para 552 (a)
of IRWM
3 FrequentlyInspection of all
water supply
installations & Pipe
lines
Inspection of Land
boundary
verification at
important stations
and staff colonies
Inspection of
Encroachment
Inspection of colony
by care committee
Inspection of colony
by Services
Improvement
Group (SIG)
Testing of yield of
tube well and other
source of water
Petty repair/
Complaint book
Joint Inspection of
Pumping machinery
along with staff of
Para 813 (c)
of IRWM
4 Once a year
Para 814 (d) of
IRWM
5 Once in three month
Para 225 (b)
(iii) of IRWM
6 Once in 2 month
Para 225 (e)
of IRWM
7 As prescribed
Para 119 (c )
of IRWM
8 Once a year in
coordination with
Electrical staff at the
time when the subsoil
water is at the lowest.
225 (a & b (i))
of IRWM
9 Frequently
554 c (i) of
IRWM
10 Once a year
17
S. Type of Schedule of Reference
N. Inspection Inspection
Mechanical/
Electrical
Department
Survey of Surviving
trees
Storage-tanks for
drinking water and
for flushing
purposes over
offices, bungalows
and quarters
Inspection of leaky
roofs.
Inspection of
bridges minor ,
major and
important including
ROB/RUB/FOB
(except track and
approaches)
(as per practice of
railways)
Detail inspection of
steel girder less
than 12.2 m clear
span ( as per
practice of railway)
Para 813 (c)
of IRWM
11 Every year
Para 552 (b) of
IRWM
12 Frequently
Annexure 2.7,
Para 5 of
IRWM
13 Preferably be done
during rainy season
Para 117 and
1101 of IRBM
14 Once a year prior to
monsoon
Para 1101 (a)
iv of IRBM
15 Once in five years
- 20% per year.
18
S. Type of Schedule of Reference
N. Inspection Inspection
Inspection of tunnel
(structural part
only)
Para 1001 of
IRBM
16 Once a year during the
prescribe month after
the monsoon season
S. Type of Schedule of Reference
N. Inspection Inspection
Steel work of
Bridges
Steel work of
Bridges
Para 1106 (2a)
of IRBM
1 Called for his inspection
after scrutiny of register
by DEN(Br) /AEN(Br)
As directed by CBE
E. Inspection Schedules of Bridge Organization
Inspection Schedules of Dy. CE (Bridge)
Para 1106 (2a)
of IRBM
1
2 Para 1106 (2b)
of IRBM
Inspection Schedules of Assistant (Bridge)
Engineer/Divisional Bridge Engineer
S. Type of Schedule of Reference
N. Inspection Inspection
Bridges Para 105 (2) of
IRBM
1 All overstressed girders
where camber loss is
noted and such bridges
which have been
referred to him by BRI
1
19
S. Type of Schedule of Reference
N. Inspection Inspection
Bridges Para 105 (2) of
IRBM
3
Called for his inspection
based on scrutiny of the
Bridge Inspector’s
registers.
10% test check of the
Bridges inspected by
Bridge Inspectors every
year.
All such steel structures
as ordered by the Chief
Engineer at specified
intervals.
Bridges Para 105 (2) of
IRBM
2
Bridges Para 105 (2) of
IRBM
4
Inspection Schedules of Bridge Inspector
S. Type of Schedule of Reference
N. Inspection Inspection
All welded, RCC,
PSC and composite
girders and their
bearings.
Girders kept under
observation
Floor system of
early steel girders
Para 107(1a)
of IRBM
1 Within one year of
Installation.
Para 107(1b)
of IRBM
2 Once a year or at intervals
specified by the CBE
Para 107(1c)
of IRBM
3 Once a year
20
S. Type of Schedule of Reference
N. Inspection Inspection
Superstructure
including bearings
of all steel girders
of span 12.2m and
above, RCC,PSC and
composite girder
bridges.
Other nominated
steel structures,
being maintained
by Bridge Inspector
Para 107 (1d)
of IRBM
4 Once in five years on
planned basis.
Para 107 (1e)
of IRBM
5 Once in five years.
F. Inspection Schedules of Track Machine Organization
Inspection Schedules of Dy.CE and Senior Engineer
In-charge of Track Machines
S. Type of Schedule of Reference
N. Inspection Inspection
Inspection of
Machines
Para 1.1 of
IRTMM
1 Frequently especially
where a group of
machines such as
tamping, ballast cleaning
machines are deployed.
21
Inspection Schedules of Assistant Engineer
(Track machine)
S. Type of Schedule of Reference
N. Inspection Inspection
Inspection of
Machines
• CSM
• Unimat
• BCM
• BRM
• SBCM
• DTS
• UNO
• DUO
• T-28
• PQRS
• TRT
1
Para 5.3.2 (ii)
of IRTMM
• Monthly
• Monthly
• Fortnightly
• Once in two month
• Monthly
• Once in two month
• Monthly
• Monthly
• Monthly
• Monthly
• Weekly
22
Inspection Schedules of SSE/Track Machine
S. Type of Schedule of Reference
N. Inspection Inspection
Inspection of
Machines
• CSM
• Unimat
• BCM
• BRM
• SBCM
• DTS
• UNO
• DUO
• T-28
• PQRS
• TRT
1
Para 5.3.2(ii)
of IRTMM
• Fortnightly
• Fortnightly
• Weekly
• Monthly
• Fortnightly
• Monthly
• Fortnightly
• Fortnightly
• Fortnightly
• Fortnightly
• Daily
Every Officer should ensure inspections as per 'Inspection
Schedules'.
Quality of inspection is as important as an inspection.
� � �
CH
AP
TE
R -
2
LIS
T O
F F
UN
CT
ION
AR
IES
AU
TH
OR
ISE
TO
IS
SU
E C
OM
PE
TE
NC
Y
CE
RT
IFIC
AT
E F
OR
VA
RIO
US T
RA
CK
AC
TIV
ITIE
S.
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Lift
ing
/Lo
we
rin
g o
f tr
ack
in
LW
R t
err
ito
ry
(Be
yon
d t
ha
t is
do
ne
in
no
rma
l
ma
inte
na
nce
of
tra
ck)
1A
NN
VI
Ite
m
1(C
) ii L
WR
Ma
nu
al
19
96
du
ly u
p d
ate
d
in C
S N
O.
14
Co
mp
ete
ncy
cert
ific
ate
sho
uld
be
issu
ed
by C
TE
PW
M
De
ep
Scr
ee
nin
g i
n L
WR
te
rrit
ory
2A
NN
VI
Ite
m
1(C
) ii L
WR
Ma
nu
al
19
96
du
ly u
p d
ate
d
in C
S N
O.
14
Co
mp
ete
ncy
cert
ific
ate
sho
uld
be
issu
ed
by C
TE
PW
M
23
24
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
3To
ca
rry
ou
t M
ain
ten
an
ce w
ork
un
de
r
the
ir p
ers
on
al
Su
pe
rvis
ion
in
LW
R/C
WR
.
Pe
rmit
ted
on
ly f
oll
ow
ing
wo
rk
1.
Ma
inte
na
nce
op
era
tio
n -
Lif
tin
g /
Low
eri
ng
of
tra
ck
2.
Ra
ils,
sle
ep
ers
an
d f
ast
en
ing
s
(a)
Ca
sua
l re
ne
wa
l if
sle
ep
ers
an
d
fast
en
ing
ove
r lo
ng
s
tre
tch
es
(b)
Re
ne
wa
l o
f d
efe
ctiv
e r
ail
s
3.
Min
or
rea
lig
nm
en
t o
f cu
rve
s
4.
Tem
po
rary
re
pa
irs
to r
ail
fra
ctu
re
Pa
ra 9
.1.3
(i),
9.2
.2 a
nd
9.2
.3 o
f LW
R
Ma
nu
al1
99
6
Co
mp
ete
ncy
cert
ific
ate
Issu
ed
by
Zo
na
l o
r
Div
isio
na
l
Tra
inin
g
ce
ntr
e t
o
wo
rk o
n
LWR
/CW
R
(va
lid
fo
r 3
yea
rs)
(W
ork
pre
scri
be
d i
n
AN
N V
I o
nly
)
PW
M
25
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
To c
arr
y o
ut
Ma
inte
na
nce
wo
rk u
nd
er
the
ir p
ers
on
al
sup
erv
isio
n i
n L
WR
/CW
R.
Pe
rmit
ted
on
ly f
ollo
win
g w
ork
s
1.
(a)
En
suri
ng
th
at
all
cre
ep
an
cho
rs
bu
tt a
ga
inst
sle
ep
ers
du
rin
g d
aily
rou
nd
s.
(b)
Re
ne
wa
l o
f fa
ste
nin
gs
no
t
req
uir
ing
lif
tin
g.
2.
Em
erg
en
cy r
ep
air
s to
Ra
il fr
act
ure
3.
Insp
ect
ion
an
d C
he
ckin
g o
f SE
J, o
ilin
g
an
d g
rea
sin
g a
nd
re
-tig
hte
nin
g /
ren
ew
al
of
fitt
ings
on
ce a
fo
rtn
igh
t.
(Po
stin
g o
f K
ey
me
n a
fte
r ge
ttin
g
valid
co
mp
ete
ncy
ce
rtif
ica
te b
y
Zo
na
l/ D
ivis
ion
al
tra
inin
g c
en
tre
wh
ich
will
be
va
lid f
or
thre
e y
ea
rs
fro
m t
he
da
te o
f is
sue
.)
4LW
R m
an
ua
l
19
96
Pa
ra
9.2
.2 a
nd
Pa
ra 9
.2.3
an
d A
NN
VI
Zo
na
l /
Div
isio
na
l
Tra
inin
g
cen
tre
.
(Va
lid f
or
3
yea
rs f
rom
th
e
da
te o
f is
sue
)
Ke
y m
an
26
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
a.
Ho
t w
ea
the
r p
atr
ollin
g a
s p
er
IRP
WM
an
d L
WR
ma
nu
al
b.
Co
ld w
ea
the
r p
atr
olli
ng
c.P
rote
ctio
n o
f tr
ack
an
d s
ecu
re s
afe
ty
of
tra
ins
in c
ase
of
bu
ckli
ng
, ra
il
fra
ctu
res,
or
an
y a
bn
orm
al
be
havi
ou
r o
f tr
ack
5P
ara
10
08
of
IRP
WM
an
d
AN
N V
I (p
ara
5 &
6)
of
LWR
Ma
nu
al
19
96
.
SSE
/P.
wa
y
(Exp
eri
en
ced
an
d t
rust
wo
rth
y m
en
fro
m t
he
Pe
rma
ne
nt
Ga
ng
to
wo
rk
as
pa
tro
lme
n/
Wa
tch
me
n.
Als
o b
e v
eri
fie
d
for
visi
on
te
st &
sha
ll n
ot
em
plo
yed
as
Pa
tro
lme
n
un
less
pa
sse
d
req
uis
ite
me
dic
al
test
.)
a.H
ot
We
ath
er
Pa
tro
lme
n
b.C
old
We
ath
er
Pa
tro
lme
n
c.P
atr
olm
an
/
Tra
ck
ma
n/
Ga
ng
Ma
te
27
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Au
tho
rise
le
vel
of
sup
erv
isio
n a
s p
er
LWR
Ma
nu
al
(1)
Me
cha
nis
ed
Ma
inte
na
nce
incl
ud
ing
Lif
tin
g,
alig
nin
g,
pa
ckin
g e
tc
in c
ase
of
em
erg
en
cie
s a
t
tem
pe
ratu
res
hig
he
r th
an
th
ose
pe
rmit
ted
. W
eld
ing
of
rail
join
t a
t
site
.
(2)
Re
ple
nis
hm
en
t o
f b
alla
st &
ch
eck
ing
balla
st
se
ctio
n
be
fore
on
set
of
sum
me
r.
(3)
Ma
jor
rea
lign
me
nt
of
curv
es
un
de
r
spe
cia
l in
stru
ctio
ns
fro
m
AE
N
(4)
Org
an
isin
g h
ot
we
ath
er
pa
tro
llin
g
du
rin
g s
um
me
r m
on
ths.
6C
ha
pte
r X
V o
f
IRP
WM
an
d
AN
N V
I o
f
LWR
Ma
nu
al
Su
bje
ct t
o
vari
ou
s in
itia
l
/re
fre
she
r/
Pro
mo
tio
na
l
cou
rse
at
ZR
TI
PW
I
(JE
/SS
E-
P. W
ay
)
28
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
(5)
Insp
ect
ion
in
su
mm
er
mo
nth
s a
nd
che
ckin
g o
n t
he
wo
rkin
g o
f h
ot
we
ath
er
pa
tro
ls
(6)
All o
pe
rati
on
s re
ga
rdin
g d
istr
ess
ing
(7)
Pe
rma
ne
nt
rep
air
s to
Ra
il fr
act
ure
(8)
Bu
ckli
ng
(
a) E
me
rge
ncy
re
pai
rs
(
b)
Pe
rman
en
t re
pai
rs
(9)
Act
ion
in
ca
se o
f d
am
age
to
tra
ck
foll
ow
ing
De
rail
me
nts
, b
rea
che
s e
tc.
(10
)In
spe
ctio
n &
Ch
eck
ing o
f SE
J
Pe
rmit
ted
to
use
tro
lley/L
orr
y /
do
lly7
As
pe
r
IRP
WM
Pa
ra
11
03
& 1
10
4
an
d G
& S
R
Ch
ap
XV
SR
15
.18
.3
Min
. JA
gra
de
off
ice
r fr
om
en
gin
ee
rin
g
de
pa
rtm
en
t.
(Va
lid
fo
r o
ne
yea
r)
Ga
ng
ma
te/
Se
ctio
n
Ma
tes
Ch
ap
ter
XV
of
IRP
WM
an
d
AN
N V
I o
f
LWR
Ma
nu
al
Su
bje
ct t
o
vari
ou
s in
itia
l
/re
fre
she
r/
Pro
mo
tio
na
l
cou
rse
at
ZR
TI
PW
I
(JE
/SS
E-
P. W
ay
)
29
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Re
spo
nsi
bil
ity
of
ke
ep
ing
le
ng
th o
f
lin
e s
afe
fo
r p
ass
ag
e o
f tr
ain
s a
nd
sig
na
l su
pp
lie
d a
re t
o b
e k
ep
t in
pro
pe
r o
rde
r a
nd
re
ad
y f
or
use
.
Co
rre
ct k
no
wle
dg
e o
f h
an
d s
ign
al
an
d d
eto
na
tin
g s
ign
als
an
d o
the
r
too
ls o
r im
ple
me
nts
as
ma
y b
e
pre
scri
be
d b
y s
pe
cia
l in
stru
cti
on
s.
Use
of
pri
va
te t
roll
ey
Pe
rmit
ted
ON
LY
in s
idin
g
Ce
rtif
ica
te o
f co
mp
ete
ncy
to
pe
rmit
use
of
Mo
tor
tro
lle
y
8G
en
era
l R
ule
15
.14
Insp
ect
or
of
P. W
ay
or
Wo
rks
Ga
ng
ma
te
Ge
ne
ral
Ru
le
15
.12
Insp
ect
or
of
P. W
ay
or
Wo
rks
Ga
ng
ma
n9
G&
SR
Ch
. X
V
Pa
ra S
R P
ara
15
.18
.(1
3)
On
ly b
y C
E,
CSO
& D
RM
No
n R
ly O
ffic
ial
(By
nam
e)
(use
of
pri
va
te t
roll
ey)
10
G&
SR
Ch
ap
ter
SR
15
.18
.3 a
nd
IRP
WM
11
03
an
d 1
10
4
Min
imu
m J
A
Gra
de
off
ice
r
of
Eng.
dep
t C
E,
CTE
, CB
E, D
RM
Mo
tor
tro
lle
y d
rive
r
11
30
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Co
mp
ete
ncy
ce
rtif
ica
te t
o G
ate
ma
n
Ce
rtif
ica
te o
f co
mp
ete
ncy
to
pe
rmit
usa
ge
of
tro
lley/M
T/Lo
rrie
s.
12
Pa
ra 9
12
of
IRP
WM
SR
16
.01
.1
Co
mp
ete
ncy
cert
ific
ate
issu
ed
by P
WI
&
Co
un
ters
ign
ed
by A
DE
N o
r b
y
Div
l Tr
ain
ing
Ce
ntr
e
(on
ly
tho
se p
ass
ed
A3
me
dic
al
exa
min
ati
on
)
Ga
tem
an
13
He
ad
tro
lley
ma
n
Min
imu
m J
A
Gra
de
off
ice
r o
f
en
gin
ee
rin
g
de
pa
rtm
en
t.
(Pe
rmit
sh
all b
e
valid
fo
r o
ne
As
pe
r G
&S
R
Ch
ap
ter
XV
SR
15
.18
.1n
d
IRP
WM
11
03
an
d
11
04
31
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
yea
r fr
om
th
e
da
te o
f is
sue
an
d R
en
ew
al
eve
ry y
ea
r.)
Ce
rtif
ica
te o
f co
mp
ete
ncy
to
pe
rmit
usa
ge
of
tro
lley/M
T/Lo
rrie
s.
14
As
pe
r G
&S
R
Ch
ap
ter
XV
SR
15
.18
.1 a
nd
IRP
WM
11
03
an
d 1
10
4
Min
imu
m J
A
Gra
de
off
ice
r,
DR
M,
CB
E,
CT
E.
(Pe
rmit
sh
all
be
va
lid
fo
r o
ne
yea
r fr
om
the
da
te o
f
issu
e a
nd
Re
ne
wa
l e
very
yea
r)
PW
I (S
SE
/
SE
/JE
) P.
Wa
y
32
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Su
pe
rvis
ion
of
wo
rk s
ite
of
ha
nd
he
ld
off
tra
ck t
am
pe
rs
Op
era
tio
n o
f O
n T
rack
Ma
chin
e
SS
E/S
E/J
E (
P.W
ay
) su
pe
rvis
ing
de
pa
rtm
en
tal
AT
we
ldin
g.
(aft
er
succ
ess
ful
com
ple
tio
n o
f tr
ain
ing
cou
rse
)
15
No
min
ate
d
by
AD
EN
JE/P
.Wa
y
16
Pa
ra 1
.4.1
&
4.2
.1
an
d 4
.3
of
IRT
MM
Issu
ed b
y D
y.C
E/
TM o
f th
e zo
nal
Ra
ilw
ay
* (V
alid
for
3
years
an
d s
hall
be
kep
t in
Pe
rso
na
l cu
sto
dy
of
the
op
erat
or)
Tra
ck M
ach
ine
Op
era
tor
17
Pa
ra 4
.1.2
.3&
an
ne
x .
I o
fM
an
ua
l fo
rF
us
ion
we
ldin
g o
fR
ail
s b
y t
he
Alu
min
o –
Th
erm
icP
roc
es
s
Issu
ed
by
TP
P/L
uck
no
w
or
TW
C/
Vij
aya
wa
da
De
pa
rtm
en
tal
AT
We
ldin
g
Su
pe
rvis
or
IRS
TM
pa
ra
8.1
.3.1
(ii
i)
33
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
We
lde
r fo
r d
ep
art
me
nta
l A
T w
eld
ing
(Pro
vis
ion
al
Ce
rtif
ica
te)
(Aft
er
sati
sfa
cto
ry c
om
ple
tio
n o
f
TW
1 c
ou
rse
at
TP
P/L
uck
no
w o
r T
WC
/
Vij
ay
aw
ad
a w
ith
va
lid
ity
up
to
fo
r
exe
cuti
ng
10
0 j
oin
t o
r 6
mo
nth
s
wh
ich
ev
er
is e
arl
ier)
Re
gu
lar
Co
mp
ete
ncy
Ce
rtif
ica
te f
or
de
pa
rtm
en
tal
we
ldin
g.
(aft
er
sati
sfa
cto
ry c
om
ple
tio
n o
f
TW
2 c
ou
rse
wit
h v
ali
dit
y u
p t
o 2
ye
ars
an
d a
fte
r tw
o y
ea
r
rea
sse
ssm
en
t v
ali
d f
or
5 y
ea
r.)
18
Par
a 4
.1.2
.3 &
An
nex
I o
f
Man
ual
fo
r
Fusi
on
we
ldin
g
of
Rai
ls b
y th
e
Alu
min
o –
Th
erm
ic
Pro
cess
Issu
ed
by
TP
P/L
uck
no
w
or
TW
C/
Vij
aya
wa
da
De
par
tme
nta
l
AT
We
lde
r
19
Par
a 4
.1.2
.3 &
An
nex
I o
f
Man
ual
fo
r
Fusi
on
we
ldin
g
of
Rai
ls b
y th
e
Alu
min
o –
Th
erm
ic
Pro
cess
Issu
ed
by
TP
P/L
uck
no
w
or
TW
C/
Vij
aya
wa
da
De
par
tme
nta
l
AT
We
lde
r
34
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Pro
vis
ion
al
Co
mp
ete
nc
y
ce
rtif
ica
te
for
we
ldin
g s
up
erv
iso
r a
nd
we
lde
r o
f
firm
.
(Iss
ue
d s
ep
ara
tely
fo
r w
eld
ing
of
52
kg
/
60
kg
wit
h s
tan
da
rd g
ap
, w
ith
wid
e g
ap
,
or
we
ldin
g o
f H
H/1
10
UT
S r
ail
s.)
Re
gu
lar
Co
mp
ete
nc
y c
ert
ific
ate
fo
r
we
ldin
g s
up
erv
iso
r a
nd
we
lde
r o
f fi
rm.
(Aft
er
2 y
ea
rs f
rom
iss
ue
of
Pro
vis
ion
al
Co
mp
ete
nc
y c
ert
ific
ate
fo
r w
eld
ing
sup
erv
iso
r a
nd
we
lde
r o
f fi
rm s
ha
ll b
e
rea
sse
sse
d b
y R
DS
O a
nd
D
G(M
&C
)
RD
SO
ext
en
de
d
va
lid
ity
fo
r 5
ye
ars
(Th
is c
ert
ific
ate
iss
ue
d s
ep
ara
tely
fo
r
we
ldin
g o
f 5
2kg
/60
kg
wit
h s
tan
da
rd g
ap
, w
ith
wid
e g
ap
, o
r w
eld
ing
of
HH
/11
0
UT
S r
ail
s.)
20
As
pe
r IR
ST-
19
/20
12
Pa
ra
16
.2 a
nd
16
.6
DG
(M&
C),
RD
SO
(va
lid
fo
r 2
yea
rs)
Co
ntr
act
or
AT
we
ldin
g
sup
erv
iso
r/
We
lde
r
21
As
pe
r IR
ST-
19
/20
12
Pa
ra
16
.2 a
nd
16
.6
DG
(M
&C
),
RD
SO
Co
ntr
ac
tor
AT
we
ldin
g
sup
erv
iso
r/
We
lde
r
35
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Superv
isio
n o
f FB w
eld
ing
(Min
dip
lom
a in m
ech
/ele
ct e
ngg o
rBSc
duly
pass
ing t
est
as
per
manual
pro
vis
ion)
Weld
er
for
FB w
eld
ing
(Min
cla
ss X
or
equiv
ale
nt
duly
pass
ing t
est
as
per
manual
pro
vis
ion)
22
Pa
ra 1
3.1
an
d
13
.2 o
f
Ma
nu
al
for
Fla
sh b
utt
we
ldin
g o
f
rail
s re
vise
d
Jan
ua
ry 2
01
2.
Zo
na
l R
ailw
ay
CT
E /
CE
(co
n)
(wit
ho
ut
exa
min
ati
on
if
qu
ality
of
we
ld i
s o
k)
De
par
tme
nta
l
FB
we
ldin
g
sup
erv
iso
r
23
Pa
ra 1
3.1
an
d
13
.2 o
f
Ma
nu
al
for
Fla
sh b
utt
we
ldin
g o
f
rail
s re
vise
d
Jan
ua
ry 2
01
2.
Zo
na
l R
ailw
ay
CT
E /
CE
(co
n)
(wit
ho
ut
exa
min
ati
on
if
qu
ality
of
we
ld i
s o
k)
De
par
tme
nta
l
FB
we
lde
rs
36
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
USFD
op
era
tor
of
de
pa
rtm
en
tal
US
FD
ma
chin
es
(In
itia
l ce
rtif
ica
tio
n)
(Du
ly t
rain
ed
by R
DS
O i
n t
he
te
chn
iqu
e o
f
US
FD
te
stin
g.
Init
iall
y v
ali
d f
or
3 y
ea
rs)
US
FD
op
era
tor
of
de
pa
rtm
en
tal
US
FD
ma
chin
es
(ext
en
de
d v
alid
ity a
fte
r in
itia
l
cert
ific
ati
on
).
(Ext
en
de
d v
alid
ity f
or
5 y
ea
rs a
fte
r
sati
sfa
cto
ry c
om
ple
tio
n o
f re
fre
she
r
cou
rse
.)
USFD
op
era
tor
of
con
tra
cte
d U
SFD
ma
chin
es
(Pro
visi
on
al
cert
ific
ate
)
(iss
ue
d i
n t
hre
e c
ate
go
rie
s w
hic
h R
ail
Test
ing
, W
eld
Te
stin
g a
nd
Ra
il a
nd
We
ld
test
ing
bo
th.
Pro
visi
on
al
cert
ific
ate
iss
ue
d
by R
DS
O v
alid
fo
r 6
mo
nth
s.)
24
Pa
ra 3
ma
nu
al
for
Ult
raso
nic
Ra
il T
est
ing
of
rails
& w
eld
s.
DG
(M
&C
),
RD
SO
De
pa
rtm
en
t
US
FD
Op
era
tor
Pa
ra 3
ma
nu
al
for
Ult
raso
nic
Ra
il T
est
ing
of
rails
& w
eld
s.
DG
(M
&C
),
RD
SO
De
pa
rtm
en
t
US
FD
Op
era
tor
25
Pa
ra 3
.1 a
nd
3.3
of
Pro
ced
ure
ord
er
issu
ed
by R
DSO
con
veye
d b
y
DG
(M
&C
),
RD
SO
US
FD
Test
ing
by
con
tra
cto
r
op
era
tor
26
37
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Ra
ilw
ayB
oa
rd
L.N
o.T
rack
/21
/
20
04/
09
02
/7
Vo
l –
II D
t.2
4/
10
/20
14
USFD
op
era
tor
of
con
tra
cte
d U
SFD
ma
chin
es
(Re
gu
lar
Ce
rtif
ica
te)
(Iss
ue
d i
n t
hre
e c
ate
go
rie
s w
hic
h R
ail
Test
ing
, W
eld
Te
stin
g a
nd
Ra
il a
nd
We
ld
test
ing
bo
th.
Re
gu
lar
com
pe
ten
cy c
ert
ific
ate
aft
er
veri
fyin
g e
xpe
rie
nce
of
op
era
tor
in U
SF
D
test
ing
10
0 n
o’s
we
ld j
oin
ts o
r 1
00
km
tra
ck (
20
0 K
m r
ails)
RD
SO
iss
ue
com
pe
ten
cy h
avi
ng
va
lid
ity o
f 3
ye
ars
.)
27
Pa
ra 3
.1 a
nd
3.3
of
Pro
ced
ure
ord
er
issu
ed
by R
DSO
con
veye
d b
y
Bo
ard
L.N
o.T
rack
/
21
/20
04/
09
02
/7 V
ol
–II
Dt.
24/
10
/
20
14
DG
(M&
C),
RD
SO
US
FD
Test
ing
by
con
tra
cto
r
op
era
tor
38
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Qu
ality
Co
ntr
ol
of
Co
ntr
act
USFD
(Co
ntr
act
or
sup
erv
iso
r h
avi
ng
min
imu
m
aca
de
mic
qu
alifi
cati
on
of
BS
c o
r
eq
uiv
ale
nt
wit
h p
hys
ics
as
on
e o
f th
e
sub
ject
or
Dip
lom
a/D
eg
ree
in
En
gin
ee
rin
g f
rom
an
y N
ati
on
al/
Inte
rna
tio
na
l U
niv
ers
ity.
He
sh
all
po
sse
ss r
eq
uis
ite
qu
alifi
cati
on
in
ND
T-
Test
ing
as
pe
r P
ara
7 o
f sp
eci
fica
tio
n.)
28
Pa
ra 3
.1 a
nd
3.3
of
Pro
ced
ure
ord
er
issu
ed
by R
DSO
con
veye
d b
y
Bo
ard
L.N
o.T
rack
/21
/ 2
00
4 /
09
02
/ 7
Vo
l –
II D
t.2
4 /
10
/
20
14
DG
(M
&C
),
RD
SO
Qu
ali
ty
con
tro
l U
SFD
sup
erv
iso
r
by
con
tra
cto
r
Pe
rio
d o
f h
ot
we
ath
er
pa
tro
llin
g
(PW
I/P
WM
sh
all b
e v
igila
nt
& s
ha
ll a
lso
intr
od
uce
d p
atr
ollin
g w
he
n t
em
pe
ratu
re
rise
s a
bo
ve t
d +
20
0C
or
as
pe
r A
NN
X A
of
LWR
Ma
nu
al)
29
Pa
ra 9
.1.2
(i)
& A
NN
X A
LWR
Ma
nu
al
Ch
ief
en
gin
ee
r
Pe
rio
d o
f
Ho
t w
ea
the
r
Pa
tro
llin
g
39
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
Co
ld W
ea
the
r P
atr
ollin
g (
Pe
rio
d a
nd
sect
ion
)
Op
era
tio
n &
ro
uti
ne
ma
ite
na
nce
of
sma
ll t
rac
k m
ac
hin
e
Sk
ille
d q
ua
lifi
ed
we
lde
rs,
fitt
ers
ap
pro
ve
d i
nd
ivid
ua
lly
by
M&
C
dir
ecto
r, R
DS
O,
(Ap
pro
val
& t
est
ing
of
we
lde
r sh
all b
e
tra
ine
d i
n a
cco
rda
nce
wit
h I
S 8
17
sub
ject
to
qu
alify
ing
te
st s
pe
cifi
ed
in
IS
73
10
(p
art
-1
)
30
Pa
ra 9
.1.2
(ii)
& A
NN
X B
LWR
Ma
nu
al
Ch
ief
en
gin
ee
r
Pe
rio
d o
f
CW
P
31
Sm
all t
rack
ma
chin
e
ma
nu
al
Pa
ra
1.3
.2 d
uly
up
da
ted
in
CS
no
.4
Div
l Tr
ain
ing
Ce
ntr
e/
Div
isio
na
l sm
all
tra
ck m
ach
ine
ma
inte
na
nce
cen
tre
Tra
ck
ma
inte
na
r
32
Pa
ra 2
0 o
f
Ind
ian
Ra
ilw
ays
sta
nd
ard
co
de
of
pra
ctis
e f
or
me
tal
arc
M&
C
dir
ect
ora
te
RD
SO
We
lde
r,
fitt
er
for
Bri
dg
e w
ork
sho
p
Init
ial
cou
rse
at
Ce
ntr
alise
d t
rain
ing
sch
oo
l o
f zo
na
l ra
ilwa
ys a
lon
g w
ith
pra
ctic
al
tra
inin
g i
n f
ield
33
Pa
ra 1
30
3
an
d 1
30
4 o
f
Bri
dg
e
Ma
nu
al
19
98
Ce
ntr
alise
d
tra
inin
g
inst
itu
te o
f
zon
al
railw
ays
Tra
inin
g f
or
Bri
dg
e K
ha
lasi
/Art
isa
ns
/
Bri
dg
e M
istr
y/
Bri
dg
e
Insp
ec
tors
we
ldin
g i
n
Str
uct
ura
l st
ee
l
bri
dg
e c
od
e.
S.
N.
Au
tho
rity
&
Re
fere
nce
fro
m M
an
ua
l/
Cir
cula
r/
G&
SR
Au
tho
rise
le
ve
l
of
Su
pe
rvis
ion
/
De
sig
na
tio
n
Fun
ctio
na
rie
s
au
tho
rise
to
issu
e
com
pe
ten
cy /
pe
rmis
sio
n f
or
wo
rk.
Na
ture
of
Act
ivit
y /
Wo
rk
� � �
40
41
CHAPTER - 3
ENGINEERING DEPARTMENT REGISTERS
(PHYSICAL/TMS)
1. Points & Crossing Register-Physical: This register is maintained by Senior Section Engineer / Section
Engineer (Permanent Way) [SSE/SE (P.Way)] of the section and it is kept in
his office. Detailed inspections of points & crossings and compliance are
recorded in this register.
TMS: Same register can be accessed through TMS.
Physical Register
S. Item Check Reference
N.
1 Whether chart for inspection is Yes/No Para 236(5) of
prepared in register? IRPWM
2 Whether compliance of each point Yes/No -
is recorded?
3 Whether yard diagram showing Yes/No -
Point No. and details prepared?
4 Whether proper entry has been Yes/No Ann 2/6 & 2/6
done in each column of point and (A) of IRPWM
crossing register?
42
1 Check Inspection Planning Report. Go to Report >
Inspection > 3. Inspection Planning. Choose PWI and
year, press GO. The asset number color indicates the
position of inspection.
Inspection planned Inspection planned
and done in in the month but
same month. inspection done in
later month.
Inspection planned Inspection planned
in the month and and not done so
month is not over. far
Note down the points and crossings to
be inspected during sample month.
2 Check whether planned inspections done by the
official or not. Go to Report > Inspection > 4. Inspection
Register > select ‘feature type’, ‘from date’, ‘to date’
and click on ‘Click here to see Inspections of individual
assets’ from the list choose same P&C no. and check
details of inspection done during the month or not.
3 Whether compliance of inspection note against
each point is recorded?
TMS
2. Curve Register
This register is maintained by SSE/SE (P.Way) of the section and it is kept
in his office. Versines, Super Elevation and Gauge in the curve are recorded
in the register along with compliance chart of inspections carried out by
Junior Engineer/Senior Section Engineer (Permanent Way) [JE/SSE (P.Way)]
and Assistant Divisional Engineer/Divisional Engineer (ADEN/DEN).
Yes/No
Yes/No
Yes/No
43
Physical Register
S. Item Check Reference
N.
1 Whether summary of inspections is Yes/No Annexure 4 / 5
mentioned in the register? of IRPWM
2 Whether inspection is being done Yes/No Para 420(2)
in each quarter? of IRPWM
3 Whether proper entry has Yes/No
been done in each column?
4 Whether compliance of each Yes/No
point is recorded?
1 Check Inspection Planning Report. Go to Report >
Inspection > 3. Inspection Planning. Choose PWI and
year, press GO. The asset number color indicates the
position of inspection.
Inspection planned Inspection planned
and done in in the month but
same month. inspection done in
later month.
Inspection planned Inspection planned
in the month and and not done so
month is not over. far
Note down the points and crossings to be
inspected during sample month.
TMS
Annexure 4 / 5
of IRPWM
Yes/No
44
2 Check whether planned inspections done by the
official or not. Go to Report > Inspection > 4. Inspection
Register > select ‘feature type’, ‘from date’, ‘to date’
and click on ‘Click here to see Inspections of individual
assets’ from the list choose same P&C no. and check
details of inspection done during the month or not.
3 Whether compliance of inspection note against each
point is recorded?
3. Long Welded Rail (LWR) - Continuous Welded Rail (CWR)
RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is
kept in his office. Details of inspections are recorded in the register.
It includes a detailed drawing of Switch Expansion Joint (SEJ) assembly,
Line diagram of LWR mentioning position of SEJs and other special
features viz. Level Crossings, Glued joints, Bridges, Curves, Gradients
etc. of each LWR/CWR
Physical Register
S. Item Check Reference
N.
1 Whether summary of inspections is Yes/No Para 8.2 and
mentioned in the register? Annexure-XI,
XII, XIII A,
and XIII B of
LWR manual
2 Whether inspections are up to Yes/No -
date?
3 Whether line diagram of LWR Yes/No -
is prepared?
Yes/No
Yes/No
45
1 Check Inspection Planning Report. Go to Report >
Inspection > 3. Inspection Planning. Choose PWI and
year, press GO. The asset number color indicates the
position of inspection.
Inspection planned Inspection planned
and done in in the month but
same month. inspection done in
later month.
Inspection planned Inspection planned
in the month and and not done so
month is not over. far
Note down the points and crossings to be
inspected during sample month.
2 Check whether planned inspections done by the
official or not. Go to Report > Inspection > 4. Inspection
Register > select ‘feature type’, ‘from date’, ‘to date’
and click on ‘Click here to see Inspections of individual
assets’ from the list choose same LWR no. and check
details of inspection done during the month or not.
3 Whether compliance of inspection note against
each point is recorded?
TMS
4 Whether action taken / compliance Yes/No Annexure- XIII
is recorded with date? A and XIII B of
LWR manual
S. Item Check Reference
N.
Yes/No
Yes/No
Yes/No
46
4. Level Crossing RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. It contains permanent features of a level crossing.
Physical Register
1 Check Inspection Planning Report. Go to Report >
Inspection > 3. Inspection Planning. Choose PWI and
year, press GO. The asset number color indicates the
position of inspection.
Inspection planned Inspection planned
and done in in the month but
same month. inspection done in
later month.
TMS
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Para 915 with
Ann 9/4 of
IRPWM
2 Whether length of check rail Yes/No Item 3 of Ann
is mentioned? 9/4 Para 904 of
IRPWM
3 Whether details of track Yes/No Item 16 of Ann
structure mentioned? 9/4 of IRPWM
4 Whether a detail of Train Vehicle Yes/No Para 919 &
Units (TVU) along with date is Item 15 of Ann
mentioned? 9/4 of IRPWM
Yes/No
47
Inspection planned Inspection planned
in the month and and not done so
month is not over. far
Note down the points and crossings to be
inspected during sample month.
2 Check whether planned inspections done by the
official or not. Go to Report > Inspection > 4. Inspection
Register > select ‘feature type’, ‘from date’, ‘to date’
and click on ‘Click here to see Inspections of individual
assets’ from the list choose same LC no. and check
details of inspection done during the month or not.
3 Whether compliance of inspection note against
each point is recorded?
5. Track Recording Car RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. It contains results of Track Recording Car (TRC) / Track Recording
Cum Research Car (TRRC) running in the section. One page is given for
each kilometer of track.
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Para 122, 210 of
IRPWM
2 Whether one page is allotted Yes/No Para 122, 210 of
to each kilometer IRPWM
3 Whether register is checked Yes/No Para 122, 210 of
by Engineering Officers? IRPWM
Yes/No
Yes/No
48
6. Section RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. It contains all important information including a brief history of
the section. A few pages for major unusual occurrences are also included.
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Para 210 of
IRPWM
2 Whether brief history of the Yes/No Para 210 of
section is mentioned? IRPWM
3 Whether all unusual Yes/No Para 210 of
occurrences are recorded IRPWM
with date?
4 Whether register is checked Yes/No Para 210 of
by Engineering Officers? IRPWM
1 Whether latest TRC report is uploaded on TMS. Go to Yes/No
‘Reports(M-Z)>TRC>TRC Report> select all Parameters
and check the date of latest run from drop down
menu
2 Check on locations needing attention based on TRC Yes/No
from ‘Reports (A-L)>Locations Needing Attention>
select indirect>TRC
TMS
49
1 Check for latest entry by going to ‘Reports(M-Z)>Misc Yes/No
Registers
TMS
7. Encroachment RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. In the register, one page is allotted to each encroachment, so
that about 15 years record is available at a glance regarding efforts made
in the removal of the encroachments.
Physical Register
1 Check on entries on encroachment from ‘Reports Yes/No
(A-L) > Land Management
TMS
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No
2 Whether a separate page is allotted Yes/No
for each encroachment?
3 Whether action taken / follow up Yes/No
action is recorded?
4 Whether any encroachment once Yes/No
mentioned is deleted?
Para 814(e)
Para 814 (e)
Ann 8/2 of
IRPWM
50
8. Land Boundary Verification RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. One page is allotted to record availability and location of boundary
stones in each kilometer. About 10 years record is available at a glance
about attentiveness exercised in maintenance and fixation of the land
boundary stones.
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No
2 Whether a separate page is allotted Yes/No ANNEXURE
for each encroachment? 8.1(a)
3 Whether land boundary diagram is Yes/No (Para 813
prepared? (d) of IRWM
4 Whether missing boundary stones Yes/No
recorded?
5 Whether missing stones are Yes/No
replaced?
1 Check on land offset file in excel and verify sample Yes/No
boundary pillars at site from ‘Reports(A-L)>Land
Management>Land Offset File (Excel file)
2 Whether land boundary diagram is prepared? Yes/No
3 Whether missing boundary stones recorded? Yes/No
4 Whether missing stones are replaced? Yes/No
TMS
51
9. Creep RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. A separate page is allotted for each kilometer of track to record
creep in fish plated/SWR Track.
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No
2 Whether a separate page is allotted Yes/No Ann 2/7
for each kilometer? Para 242
3 Whether proper entries are made Yes/Noof IRPWM
in each column?
4 Whether excessive creep is Yes/No
adjusted and recorded with date?
1 Check from ‘Inspection Register’> choose LWR Yes/No
on type of asset
2 Whether excessive creep is adjusted and Yes/No
recorded with date?
TMS
10. Gap Survey Register This register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. Record of Gap survey done in Short Welded Rail (SWR) track is
maintained in the register.
52
11. Sand Hump RegisterMaintained by SSE/SE (P.Way) of the section and kept in his office, details
of various Parameters of sand humps are recorded in this register.
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Ann 5/2 Para
510 of IRPWM
2 Whether gap survey is done in the Yes/No Ann 5/2 Para
month of February regularly? 510 of IRPWM
3 Whether gaps requiring gap Yes/No Ann 5/2 Para
adjustments are adjusted? 510 of IRPWM
4 Whether gap survey is done in Yes/No Ann 5/2 Para
rising trend of temperature? 510 of IRPWM
1 Check from ‘Reports(M-Z)> Misc Register> Gap Survey Yes/No
2 Whether gap survey is done in the month of February Yes/No
regularly?
3 Whether gaps requiring gap adjustments are Yes/No
adjusted?
4 Whether gap survey is done in rising trend of Yes/No
temperature?
TMS
53
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No -
2 Whether adequate loose sand is Yes/No -
available in sand hump?
3 Whether depth of sand above Yes/No -
rail level is mentioned?
4 Whether any deficiency noted Yes/No -
is complied?
1 Check from ‘Inspection Register’> Select Yes/No
feature type – Sand Hump
2 Whether adequate loose sand is available Yes/No
in sand hump?
3 Whether depth of sand above rail Yes/No
level is mentioned?
4 Whether any deficiency noted is complied? Yes/No
TMS
12. Casual Renewal RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is kept in
his office. Record of piece-meal renewals is maintained allotting a separate
page for each kilometer of track.
54
TMS
13. Corroded Rail Register: This register is maintained by SSE/SE(P.Way) of the section and it is kept in his office. One page is allottedfor each kilometer of track or each running line in yard to check extentof corrosion in rail flange and web.
Physical Register
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No
2 Whether a separate page is Yes/No
allotted for each kilometer?
3 Whether corroded rails are being Yes/No
replaced regularly?
4 Whether action taken is recorded Yes/No
and checked by officers?
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No
2 Whether reason for replacement Yes/No
is mentioned?
3 Whether complete detail of Yes/No
whole section is recorded?
1 Check from ‘Report(A-L)’>Asset Register Yes/No
2 Check from wire book whether all blocks taken
for rail renewal has been entered in TMS?
Physical Register
Para 205, 209,
210(xi) of
IRPWM
Yes/No
Ann 2/20,
Para 250(2)
of IRPWM
55
TMS --- This register is not available in TMS
14. Permanent Way DiagramRecord is kept in the office of SSE/SE (P.Way). A bar chart containing
complete details of the section of SSE In-charge is prepared by the
division/Sub division and a copy of the same is made available to each
SSE/P.Way, who keeps it duly updated.
Physical Register
S. Item Check Reference
N.
1 Whether Permanent Way Yes/No Ann 2/4, Para
diagram is up dated? 211 of IRPWM
1 Check from ‘Report(M-Z) Track Diagram Yes/No
TMS
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No
2 Whether proper entries have Yes/No
been done in each column?
3 Whether register is scrutinized Yes/No
by ADEN regularly?
15. Welding RegisterThis register is maintained by SSE/SE (P.Way) of the section and it is
kept in his office. All Alumino Thermit Welding (ATW) done in the section
is recorded in this register.
Physical Register
Ann 5 of
AT welding
manual
56
1 Check from ‘Report(A-L)’>Asset Register>AT Weld Yes/No
TMS
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Para 5.1.3 and
Ann V,VI,VII &
VIII of USFD
Manual
2 Whether USFD testing in the Yes/No Para 6.6.1.1
section is being done regularly of USFD Manual
as per frequency ?
3 Whether this register is Yes/No -
scrutinized by higher officers?
4 Whether action taken is Yes/No -
recorded with date?
16. Ultrasonic Flaw Detection (USFD) Testing Register:This register is maintained by SSE/SE (P.Way) of the section and it is
kept in his office. Results of USFD testing and action taken there upon
is recorded in this register.
Physical Register
1 Check from ‘Report(M-Z)>USFD>USFD due/Overdue Yes/No
2 Check monthly progress Yes/No
3 Check defect list Yes/No
TMS
57
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Ann V,VI & VII of
USFD manual
2 Whether date of last USFD Yes/No and Para
testing against each case is 210(X) of
recorded? IRPWM
3 Whether month-wise statement Yes/No
showing detail of rail/weld
fractures is recorded?
4 Whether USFD classification Yes/No
is recorded?
17. Rail / Weld Fracture Register:This register is maintained by SSE/SE (P.Way) of the section and it is
kept in his office. It contains records of Rail/Weld Fractures in his
section. A statement showing details of Rail/Weld fracture occurred
during the current and preceding years are also attached to have a
clear assessment of fracture prone areas and to have special watch
over those kilometers
Physical Register
1 Check from ‘Report(A-L)>Fracture>Fracture Yes/No
Analysis
2 Check whether all fracture reports have remarks Yes/No
of USFD PWI
3 Check whether all reports have photos Yes/No
TMS
58
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No -
2 Whether a separate page is Yes/No -
allotted for each glued joint?
3 Whether annual record of Yes/No -
performance is mentioned?
4 Whether track structure Yes/No -
mentioned along with ballast
cushion?
18. Glued Joints RegisterRegister is maintained by the sectional JE/P. Way and it is kept in the
office of SSE/SE (P.Way), in which details of glued insulated joints and
annual record of its maintenance and performance is kept. A separate
page is used for each Glued Joint.
Physical Register
1 Check from ‘Report(A-L)’>Asset Register> select Yes/No
feature type – Glued Joint
TMS
19. Tie Tamping Machine (TTM) Register:
This register is maintained by SSE/SE (P.Way) of the section and it
is kept in his office. Tamping record along with record of track
Parameters i.e. cross level and alignment before and after tamping is
maintained in the register.
59
20. PCDO Register: PCDO register is maintained as per the latest
instructions of division/Hd.Qr. from time to time.
Physical Register
TMS - This register is available from Sr.DEN (Cordination)
and above logins.
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No -
2 Whether assistance required is Yes/No -
highlighted?
3 Whether vacancy position is Yes/No -
highlighted?
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No -
2 Whether track Parameters are Yes/No Para 3.1.2 (i)
recorded before tamping of IRTMM
3 Whether track Parameters are Yes/No Para 3.1.4 (iv)
recorded after tamping? of IRTMM
4 Whether quality of work is Yes/No -
assessed and mentioned?
TMS
Physical Register
1 Check from ‘Report(M-Z)>Track Machine Yes/No
60
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No -
2 Whether action taken is Yes/No -
recorded against each item?
3 Whether timely action is taken? Yes/No -
4 Whether items pertaining to Yes/No -
higher officials brought to their
notice?
21. Inspection Notes of Higher Officials :
This register is maintained by SSE/SE (P.Way) of the section and it
is kept in his office. Inspection notes of higher officials and their
compliance is recorded in this register.
Physical Register
1 Check from ‘Miscellaneous’>Inspection Notes Yes/No
2 Whether action taken is recorded against each
item? Yes/No
3 Whether timely action is taken? Yes/No
4 Whether items pertaining to higher officials Yes/No
brought to their notice?
TMS
22. Rainfall Register:
Maintained by SSE/SE (P.Way) of the section, kept in his office,
extent of rainfall is recorded in this register.
61
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Para 210(c-i)
of IRPWM
2 Whether time and date of rain Yes/No -
fall is properly mentioned?
1 Check from ‘Report (M-Z)>Miscellaneous Yes/No
Register>5. Rainfall Register
2 Whether date wise rainfall for all measuring Yes/No
stations is entered for previous month?
TMS
S. Item Check Reference
N.1 Whether summary of inspection Yes/No -
is recorded in register?
2 Whether compliance of each Yes/No -
shortcoming noticed is recorded?
3 Whether inspection is being Yes/No -
done in each quarter?
4 Whether proper entry has been Yes/No -
done in each column?
23. Points & Crossing Joint Inspection Register of SSE/P.Way and SSE/
Signal and Telecommunication (S&T):
This register is maintained jointly by SSE/SE (P.Way) and SSE/SE(S&T) of
the section and it is kept in SS office/Power Cabin. A proper record of joint
inspections carried out along with compliances is maintained in this register.
Physical Register
Physical Register
62
1 Check from Report (A-L) > Inspection > 4.
Inspection Register > Choose Point & Crossing
(Joint) in drop down menu for type of register. Fill
all the relevant information.
TMS
2 Whether inspection is being done in each
quarter?
3 Whether proper entry has been done in each
column?
4 Whether compliance of each shortcoming
noticed is recorded?
Yes/No
Yes/No
Yes/No
Yes/No
24. Material Under Trial Register:
This register is maintained by SSE/SE (P.Way) of the section and it
is kept in his office. Complete and proper record of material which is
under trial (if any) in the section is maintained in this register.
Physical Register
S. Item Check Reference
N.
1 Whether any material is under Yes/No Para 212(iii)
trial in the section? of IRPWM
2 Whether proper entries are Yes/No
made in corresponding columns?
3 Whether register is brought Yes/No
up-to-date?
63
1 Check from ‘Register (M-Z)>Material Under Trial Yes/No
2 Whether any material is under trial in the Yes/No
section?
3 Whether proper entries are made in Yes/No
corresponding columns?
4 Whether register is brought up-to-date? Yes/No
TMS
1 Check from ‘Register (M-Z)>Miscellaneous Yes/No
Register> 7. Temperature Register
2 Whether register is up dated? Yes/No
3 Whether proper entries are made in Yes/No
corresponding columns?
TMS
S. Item Check Reference
N.
1 Whether register is up dated? Yes/No Para 505 (iii)
of IRPWM
2 Whether proper entries are Yes/No
made in corresponding columns?
25. Annual Temperature Record Register:
This register is maintained by SSE/SE (P. Way) of the section and it
is kept in his office.
Physical Register
64
S. Item Check Reference
N.
1 Whether assurance of having Yes/No Para 826 of
read all rules & guidelines has IRPWM
been recorded?
26. Assurance Register
Physical Register
1 Check from ‘Register (M-Z)>Miscellaneous Yes/No
Register> 10. Circular Viewed
TMS
� � �
65
CHAPTER - 4
CIVIL ENGINEERING INSPECTIONS
A PERMANENT WAY (TRACK)
1. Inspection of Track
S. Item to be inspected Remarks Reference
N.
1. Whether condition of Rail is good?
a) Vertical wear of rail is within
13/8 mm (60/52 kg)
b) Lateral wear of rail is within
i) 6/8 mm (A&B / C,D,E routes on Yes/No
straight track)
ii) 8/10 mm (A&B / C,D,E routes
on curved track)
2. Whether condition of Sleepers Yes/No
specially under rail seat is good
and their spacing is correct? (60/65
cm c/c for 1660/1540 sleeper
density)
3. Whether all track fittings are Yes/No
complete and tightened?
4. Whether ballast available is Yes/No IRLWRM
sufficient and properly boxed? para 4.2
IRPWM
Para 302
(iii) & (iv)
66
S. Item to be inspected Remarks Reference
N.
5. Whether oiling and greasing of Yes/No IRPWM
fishplate joints is being done as per Para 241(3)
annual schedule? (once in 12 month)
6. Whether there is any blowing/ Yes/No
pumping joint?
7. Whether knowledge of staff regarding Yes/No
safety of track is up to the mark?
8. Whether proper protection is resorted Yes/No IRPWM Para
to at track work site as per prescribed 806,807,808
norms?
9. Whether P.Way material is properly Yes/No
stacked and is away from running
track and marked wherever required?
10. Is the Machine tamping overdue Yes/No
(in Mechanised maintained track)?
11. Whether “Location needing Yes/No
Inspection” are being regulated by
field official?
12. Whether all field officials are entering Yes/No
their irregularities in Track
Management System (TMS)?
13. Whether resources/work planning Yes/No
has been done with respect to
“Location needing attention” as per
TMS?
67
2. Gang Inspection
1. Whether gang is working under proper Yes/No IRPWM Para
track protection? 806, 807,
808
2. Whether all the Trackmen are in Yes/No
uniform?
3. Whether Gang charts, Mates diary, Yes/No IRPWM Para
attendance sheet are available with 232(1)
gang?
4. Whether all equipments i.e. Gang
tools, first aid box, Safety equipments
are available and in working
condition? (In good condition /Not in
good condition)
4.1 Powrah (Spade) Yes/No
4.2 Crowbar Yes/No
4.3 Pan mortar Yes/No
4.4 Pick Beater Yes/No
4.5 Pick Axe Yes/No
4.6 Shovel Yes/No
4.7 Ballast Rake Yes/No
S. Item to be inspected Remarks Reference
N.
IRPWM
Para
232(2)(c)
68
S. Item to be inspected Remarks Reference
N.
4.8 Bar Straightening Yes/No
4.9 Bar Claw Yes/No
4.10 Tommy Bar Yes/No
4.11 Wire Claw Yes/No
4.12 Punches Yes/No
4.13 Wire Basket Yes/No
4.14 Spanners Yes/No
4.15 Hammer Yes/No
4.16 Rail drilling Ratchet Yes/No
4.17 Track Bond Drill/ Drill Twist Yes/No
4.18 Chisel Yes/No
4.19 Rail hole chamfering kit Yes/No
4.20 Tools for Lubrication of ERCs Yes/No
4.21 ERC Extractor / Applicator Yes/No
4.22 Rail Tongues Yes/No
4.23 Rail Shunt-Cable (Jumper) Yes/No
4.24 Cutting Blowpipe Yes/No
4.25 De-stressing Roller Yes/No
4.26 Rail Roller Yes/No
IRPWM
Para
232(2)(c)
69
S. Item to be inspected Remarks Reference
N.
4.27 Rammer Yes/No
4.28 Ballast Profile Template Yes/No
4.29 Hump Cord Yes/No
4.30 Wooden Mallet Yes/No
4.31 Hand Signal Flag Yes/No
4.32 Staff suitable for exhibition of red
lamp or red flag Yes/No
4.33 Detonators Yes/No
4.34 Whistle thunderer Yes/No
4.35 Battery operated LED based Torch
Light-cum Hand-Signal Lamp Yes/No
4.36 Safety Helmet Yes/No
4.37 Safety Jacket Yes/No
4.38 Safety Gloves Yes/No
4.39 Shoes Yes/No
4.40 First aid box Yes/No
4.41 Safety goggle Yes/No
5. Whether previous day work is as Yes/No IRPWM
per data entered in Gang chart/ Para 232(1)
diary? Is it as per expected quality?
IRPWM
Para
232(2)(c)
70
S. Item to be inspected Remarks Reference
N.
6. Knowledge of Mate and Gang Yes/No IRPWM
regarding safety and quantity of Para 232 (3)
work is adequate?
7. Whether PME of Mate, Keyman and Yes/No IRMM Vol I
Trackman is being done regularly as Para 514(B)
per norms? (On attaining the age
of 45 years and thereafter at the
termination of every period of
five years)
8. Whether compliance of various Yes/No
points noted during last inspection
have been made?
9. Whether Gang Progress/work is Yes/No
being entered in TMS?
3. Checklists for Curve
1. Whether curve board is properly
provided at both ends of curve with
adequate details of Degree, Radius,
Super Elevation (SE) etc.?
2. Whether marking of cant & stations
no. and versines is indicated on rail
and is legible? (10 m apart on inside
of web of inner/outer rail)
S. Item to be inspected Remarks Reference
N.
Yes/No
Yes/NoYes/No
IRPWM
Para 409(1)
IRPWM
Para
409(3)
71
3. Shoulder width on outer rail on LWR
track.
(350/500 mm shoulder ballast on
straight and inside of curve/ outside
of curve)
4. Whether rail posts are available at
Transition Tangent Point (TTP) and
Common Tangent Point (CTP)?
5. Whether extra clearance for curves
have been provided?
1.On platforms -
Inner side of curve – 27330/R + 5L/4 –
51 mm
Outside of curve – 29600/R – 25 mm
2. Adjacent Track–27330/R+29600
R+2L/4 mm Where R is radius of curve
in meter and L is Lean
6. Whether compliance of various
points noted during last inspection
have been made?
7. Whether the inspection of curve has
been done as per schedule by ADEN
SSE(P.Way)/JE(P.Way)?
(one curve every quarter in each SSE/
JE (P.Way)
jurisdiction for ADEN/ once in 6
months by rotation for SSE/JE(P.Way) )
S. Item to be inspected Remarks Reference
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
LWR Manual
Para 4.2
IRPWM Para
409(2)
IRPWM
Para 417 &
Appendix of
SOD
Yes/No
IRPWM
Para 122(l)
IRPWM
Para 107(4),
124 (4)
72
S. Item to be inspected Remarks Reference
N.
8. Whether Curve Inspections are
being entered by SSE/P.Way in TMS
9. Does the curve require local
complete realignment? (20% or
more stations are having versines
variations beyond limits as per
speed band)
<140 - ≥110 kmph :- 10 mm (15mm
for 110kmph) or 20% of average
versines whichever is more ;
<110 - ≥50 kmph :- 20 mm or 20% of
avg. versines whichever is more ;
< 50 kmph :- 40 mm or 20% of avg.
versines whichever is more;
10. Permissible Gauge on curve -
radius ≥ 440 m :- -6 to +15 mm
radius < 440 m :- upto +20 mm
Yes/No
Yes/No
Yes/No
IRPWM
Para 421(2)
IRPWM
Para
224(2)(e)(v)
4. Points & Crossings
1. Whether entries are recorded in
Points & Crossing's register by SSE/JE
as per their inspection schedule?
(once in 3 months on running lines
and once in 6 months on non-running
lines by rotation)
S. Item to be inspected Remarks Reference
N.
Yes/No
IRPWM Para
124(3)
73
2. Whether condition of stock rail and
tongue rail of switch is damaged or
worn out?
a. Tongue rail is chipped/crack within
200 mm length in 1000 mm from ATS
b. Vertical wear of Tongue rail is
within 8/5 mm at 13 mm head width
and level point (60/52 kg)
c. Lateral wear of tongue rail at Q
point and Level point is within 8/6
mm(60/52 kg)
d. Vertical wear of Stock rail is within
13/8 mm (60/52 kg)
e. Lateral wear of Stock rail is within
i. 6/8 mm (A&B / C,D,E routes on
straight track)
ii. 8/10 mm (A&B / C,D,E routes on
curved track)
3. Whether tongue rails are out of
square?
4. Whether tongue rail houses properly
against stock rail?
5. Whether throw of switch is within
tolerance limit? (Straight switch-
95mm, Curved switch-115mm, Thick
web switch-160mm)
Yes/No
IRPWM
Para 237(2)
& 302
S. Item to be inspected Remarks Reference
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No SOD Ch.2
Item 16
74
Yes/No IRPWM Para
237(1)(g)
S. Item to be inspected Remarks Reference
N.
6. Whether correct gauge and cross
level is maintained at toe of switch
in both the settings i.e., Normal and
Reverse? (nominal gauge + 6 mm for
T/out having SEA> 0020’00” & nominal
gauge for T/out having SEA ≤0020’00”)
7. Whether all tongue rail fittings are
intact and effective?
8. Whether correct gauge and cross
level is maintained in lead portion?
9. Wear at Actual Nose of Crossing
(ANC) is within the Permissible
limits? (Rajdhani/Shatabdi route-
Built Up Xing: 6mm, CMS Xing:8mm;
Other routes all xings:- 10mm).
10. Whether proper clearance between
vee and wing rail at nose of crossing
is maintained properly? (44-48 mm
in B/Up xings)
11. Whether correct clearance of check
rail opposite the crossing is
maintained? ( 41-45 mm for Fan
shaped T/out; 44-48 mm for other T/
outs)
12. Whether correct gauge and crosslevel is maintained at nose ofcrossing?
Yes/No
Yes/No IRPWM Para
237(8)
Yes/No IRPWM Para
237(3)
Yes/No SOD Ch.2
Item 14 &
15
Yes/No SOD Ch.2
Item 12 &
13
Yes/No IRPWM Para
237(8)
75
S. Item to be inspected Remarks Reference
N.
13. Whether proper packing is given in
switch and crossing portion?
14. Whether length of turnout is standard
or not? (28613 mm for 1 in 8.5 &
39975 mm for 1 in 12 Fan shaped T/
out)
15. Whether compliance of various
points noted during last inspection
have been made?
16. Is Machine tamping overdue?
17. Whether inspections are entered
regularly in TMS as per laid down
schedule?
Yes/No IRPWM Para
237(1)
Yes/No RDSO Drg.
No.-4865,
4218&
4732
Yes/No
Yes/No
Yes/No
5. Insulated Joints (Conventional), Glued Joints and Rail Joints
1. Whether condition of rails, sleepers
and packing of Insulated Joints/Glued
Joints is satisfactory?
2. Whether there is metal flow on the
Insulated/Glued Joint rail ends?
3. Whether rails at joint are battered/
hogged?
S. Item to be inspected Remarks Reference
N.
Yes/No IRPWM Para
280 & 281
Yes/No
Yes/No
76
4. Whether drainage is good on the
Insulated/Glued Joints?
5. Whether inspections are entered
regularly in TMS?
S. Item to be inspected Remarks Reference
N.
Yes/No
Yes/No
1. Whether work is being done under
competent supervisor? (JE/P.Way or PWS
now a days, redesignated subject to
competency certificate issued by CTE)
2. Whether stipulated speed
restrictions are imposed at work site?
3. Whether level pegs are provided for
initial/final rail level restoration? (At
every 30 M)
4. Whether screened muck is thrown
away from running track?
5. Whether proper wooden blocks and
other packing are used for passing the
trains?
6. Whether cess is cross-sloped and
repaired?
7. Whether Deep screening is being
entered in TMS?
6. Deep Screening
S. Item to be inspected Remarks Reference
N.
Yes/No C.S. 128 of
IRPWM
Yes/No IRPWM Para
238(2)(f)
Yes/No IRPWM Para
238(2)
Yes/No IRPWM Para
238(2)(e)
Yes/No IRPWM Para
238(2)(e)
Yes/No IRPWM Para
238(2)(e)
Yes/No
77
1. Whether all drains were cleaned
before monsoon and its silt was
taken away from track?
8. Drainage in Station Yards/Block Sections
S. Item to be inspected Remarks Reference
N.
Yes/No IRPWM
Para 239 &
240
1. Whether SE/P.Way is present at the
site of lifting of track?
2. Whether proper speed restrictions
are imposed at site?
3. Whether track protection is done at
site?
4. Whether level pegs are provided for
finalising the required level? (At every
30M)
5. Whether lifting is being done from
down-hill end?
6. Lifting of track should not more than
75mm at a time. Whether these
instruction followed?
7. Whether work done is being entered
in TMS?
7. Lifting of Track.
S. Item to be inspected Remarks Reference
N.
Yes/No C.S. 128 of
IRPWM
Yes/No IRPWM Para
233(3)
Yes/No IRPWM Para
806,807,808
Yes/No IRPWM Para
233 & 234
Yes/No IRPWM Para
233(4)
Yes/No IRPWM Para
233(3)
78
1. Whether adequate leveled spacious
ground is available at specific ballast
depot?
2. Whether all testing equipments are
available and in working order at
depot laboratory?
3. Whether all records including
registers, challans are updated and
intact?
4. Whether all qualitative and
quantitative measures are being
followed?
5. Whether adequate space is available
between the stacks?
9. Ballast Depot
S. Item to be inspected Remarks Reference
N.
Yes/No IRPWM Para
266(2)
Yes/No
Yes/No IRS-GE-1
2004
Yes/No
Yes/No
S. Item to be inspected Remarks Reference
N.
Yes/No
Yes/No
IRPWM Para
239 & 240
2. Whether cleaning of shoulder ballast,
and removal of vegetation/weeds has
been ensured before monsoon?
3. Whether all side drains, catch water
drains are intact and desilted before
monsoon?
4. Whether work done has been
entered in TMS?
IRPWM Para
239 & 240
Yes/No
79
1. Whether all inspections are done by
SSE/JE as per laid down stipulations
and properly recorded in LWR
register? (Fortnightly in 2 hottest & 2
coldest months individually by SSE/JE ;
once in 2 months by rotation by SSE/JE
in other months)
2. Whether gaps of SEJ are within
permissible limits? (should be within
10 mm from specified value as per
Annexure V of LWR Manual)
3. Whether conditions of SEJ i.e. tongue
rail, stock rail, sleepers & fittings are
good?
4. Whether speed restriction imposed
as per condition of track?
5. Whether destressing is done at
stipulated periods, date and
temperature are recorded on LWR
board?
10. Long Welded Rails (LWR)
S. Item to be inspected Remarks Reference
N.
Yes/No
Para 5.6
LWR Manual
Yes/No
Yes/No
C.S. 15, LWR
Manual
Yes/No Annexure III
LWR Manual
Yes/No LWR Manual
Para 8.2.2
S. Item to be inspected Remarks Reference
N.
Yes/No6. Whether unloading facilities are
adequate?
80
6. Whether staff is aware about rules?
7. Whether Hot/Cold Weather Patrolling
is being practiced at prescribed
temperatures?
td + 25 for HWP on LWR with PSC
sleeper & density 1540 or more
td + 20 for LWR in other cases for HWP
td - 30 for Cold weather patrolling
8. Whether Hot Weather Patrolmen is
equipped with all stipulated tools
mentioned in LWR Manual?
9. Whether the condition of sleepers is O.K?
10. Whether all fittings are available and
tight?
11. Whether reference posts are
available?
12. Whether temperature record is being
maintained on daily basis in SSE/
P.Way office?
13. Whether LWR needs destressing?
14. Whether all inspections, work done
and changes are being entered in TMS?
15. Whether cold/Hot weather patrolling
introduced?
S. Item to be inspected Remarks Reference
N.
Yes/No LWR Manual
Para 8.1.3,
Yes/No Annexure
X-A, LWR
Manual
Yes/No Annexure X-
A & X-B of
LWR Manual
Yes/No
Yes/No
Yes/No Para 5.2,
LWR
Manual
Yes/No Para 6.4.1,
LWR Manual
Yes/No Para 1.17
LWR Manual
Yes/No
Para 5.9 of
LWR Manual
Yes/No
81
1. Whether work is being done as per
approved plan, estimate, tender
conditions, and location section?
2. Whether Railway Supervisor is
available at site of work?
3. Whether SR is imposed at the
worksite?
4. Whether track is adequately
protected?
5. Whether all material is kept ready
before commencement of traffic block?
6. Whether inventory of released
material is being ensured?
7. Whether all track-parameters within
permissible limits work at the end of
the day?
8. Whether there is any infringement of
new/released material with running
track?
9. Whether quality of laying is as per
stipulated rules?
10. Whether a thermit welding done in
situ is joggle fish platted with two
clamps till tested as good by USFD?
11. Complete Track Renewal (CTR) Work
S. Item to be inspected Remarks Reference
N.
Yes/No
IRPWM Para
826
Yes/No
Yes/No
IRPWM Para
309 A
Yes/No
IRPWM Para
308
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No Para 8.10 of
USFD
Manual
IRPWM Para
806,807,808
IRPWM Para
316(2)
Yes/No
82
11. Whether all work is being entered in
TMS?
S. Item to be inspected Remarks Reference
N.
Yes/No
1. Whether all entries made in TMS?
2. Whether all codes, manuals,
circulars, inspections notes are
available?
3. Whether Store and Office is neatly
maintained?
4. Whether all Consumable and
Perishable (C&P), Tools and Plants
(T&P) are recorded in ledgers?
5. Whether disposal of scrap, including
proper weighment is being ensured?
6. Whether submission of Material At
Site (MAS), revenue returns, test
check of stores being complied by
SSE?
7. Whether Periodical Medical
Examination (PME) of all Safety
category staff/Supervisors are
ensured by SSE?
B. SSE (P.Way) Office/Store
S. Item to be inspected Remarks Reference
N.
Yes/No
Yes/No
Yes/No IRPWM Para
119
Yes/No
Yes/No
Yes/No
Yes/No IRPWM Para
133(1)
83
8. Whether all service records, leave
staff are neatly maintained?
9. Whether all C&P and T&P available
as per scale?
10. Whether proper water supply,
electric supply and toilet facilities
are available?
S. Item to be inspected Remarks Reference
N.
Yes/No
Yes/No
Yes/No
C. Check list for USFD testing
(Issued by RDSO. Vide Letter no. CT/Welding/Policy dt.28.10.14)Date of Inspection: …………..
S E C T I O N . . . . . . . . . . . . . . . . . . . . . . . . D I V I S I O N . . . . . . . . . . . . . . . . . . . . . . . . K M /
TP........................LINE.......................
Machine used for testing: Single Rail Tester / Double Rail Tester
Machine make and number:
Track Structure on test location:
Whether Stretch is having D-Marked Rails: Yes / No
S. Item of Works Observation/
N. Values Recorded
A. USFD Team
1. Operator (s)
(a) Name
(b) Competency Certificate Details
(c) Competency Certificate valid Yes / No
84
2. Adequate staff for handling /
lifting of machines Yes / No
B. USFD Machines & Condition
1. Machine used is RDSO approved Yes / No
2. Availability of requisite tools & plants
i Sensitivity block Yes / No
i i IIW block for calibration Yes / No
iii Standard Rail test piece Yes / No
3. Visual Condition of electronic unit Proper / Not proper
4. Visual condition of Trolley Proper / Not proper
5. Condition of Probes & shoes
a Right Hand Side
i 0 degree Proper / Not proper
i i 70 degree (F) Proper / Not proper
iii 70 degree (B) Proper / Not proper
b Left Hand Side
i 0 degree Proper / Not proper
i i 70 degree (F) Proper / Not proper
iii 70 degree (B) Proper / Not proper
S. Item of Works Observation/
N. Values Recorded
85
S. Item of Works Observation/
N. Values Recorded
c For Flange testing
i 70 degree 2 MHz Proper / Not proper
i i 70 degree 2 MHz (Side looking probe) Proper / Not proper
iii 45 degree 2 MHz Proper / Not proper
d Alignment probes & Lifting System
with respect to centre line Central / eccentric
6. Check on Characteristics of Machine
a Date of Check
b Whether due or not (Monthly check) Due / Not Due
7. Condition of Battery Charged/Not Charged
8. Condition of Audio Alarm Sounding /
Not Sounding
9. All Controls of electronic unit i.e.
depth range, gain, reject etc.
properly functioning Yes / No
10. Whether watering arrangement for
Probes is functional Yes / No
11. Availability of spares
i 00, 4 MHz Double crystal Probes : 8No. Yes / No
i i 00, 2 MHz Double crystal Probes : 8 No. Yes / No
Iii 700 (F&B) probes, 2 MHz Single
crystal : 8 No. Yes / No
86
iv 450, 2 MHz Single crystal Probes : 2 No. Yes / No
v 700, 2 MHz Single crystal Probes : Yes / No
4 No.
vi 700, 2 MHz Single Crystal Probes Yes / No
(SLP) : 2 No
vii 00, 2/2.5 MHz Single crystal Yes / No
Probes : 2 No.
viii Connecting Cable (Flaw detector Yes / No
with junction box.) : 6 No
ix BNC Connector : 6 No. Yes / No
x IIW Block (as per IS : 1408) :2 Yes / No
xi 60x50x50 mm steel block (as per steel Yes / No
grade 45 C8 to IS : 1875-1992) : 1 No.
xii Battery Charger : 1 No. Yes / No
xiii Fuse : 12 No. Yes / No
xiv Step gauge : 1 No. Yes / No
C Check on sensitivity settings and calibration
1. Calibration Check
a Calibration for 300/200 mm longitudinal Proper /
wave using 00, Double crystal Probe Not Proper
b 165 mm Direct shear wave Proper /
calibration for 700, 2 MHz Single Not Proper
crystal Probe
S. Item of Works Observation/
N. Values Recorded
87
S. Item of Works Observation/
N. Values Recorded
2. Sensitivity setting of equipment
and probes with help of standard Proper / Not Proper
rail piece
a Whether gain is locked after setting Yes / No
3. Check on function & sensitivity
of probes
a Normal Probe
(Back wall echo adjusted to full Proper / Not Proper
screen height)
b Angle probe 700 (Centre forward &
backward) (Amplitude of 12 mm dia. Proper / Not Proper
hole to be set to 3 div. i.e. 60% of
full screen height)
c Gauge face & Non gauge face
corner probe 700 (Forward &
Backward) Proper / Not Proper
(Signal amplitude from 5 mm FBH
to be set 60% of full height)
d 450 probe Proper / Not Proper
4. Whether adjustment in sensitivity
setting was done for variation in Proper / Not Proper
rail temperature
5. Whether gain has been increased Yes / No
by 10 db. for D Marked rails
88
S. Item of Works Observation/
N. Values Recorded
6. Check on equipment characteristic
a Linearity of time base of flaw Proper / Not Proper
detector
b Linearity of Amplification of flaw
detector Proper / Not Proper
c Penetrative Power Proper / Not Proper
d Resolving Power Proper / Not Proper
e Probe index Proper / Not Proper
f Burn angle Proper / Not Proper
7. Whether scheduled maintenance Yes / No
of USFD machine was done
D. Check on Work
1. Whether equipment is in proper Yes / No
working order duly calibrated
a Battery is fully charged Yes / No
b All controls of electronic unit Yes / No
properly functioning
c Calibration & sensitivity setting Yes / No
done
d Whether the gap between probing
face and probe shoe is proper Yes / No
(0.2 mm)
89
S. Item of Works Observation/
N. Values Recorded
e Whether alignment of probes is Yes / No
proper
f Adequate supply of water for
coupling for all the probes is Yes / No
ensured
2. Check on previous day’s work
(i) Date of testing
(ii) Location of testing (From Km to Km)
(iii) Rail testing
a Whether all IMR defects confirmed Yes / No
b If No, number of additional defects
1. Over Reported
2. Under Reported
(c) Whether preventive action taken Yes / No
on all defects
(d) Whether all OBS defects confirmed Yes / No
(e) If No, number of additional defects
1. Over Reported
2. Under Reported
(f) Whether preventive action taken Yes / No
on all defects
90
S. Item of Works Observation/
N. Values Recorded
(iv) Weld testing
(a) Type of Welds
(b) Whether all defects confirmed
(c) If No, number of additional defects
1. Over Reported
2. Under Reported
(d) Whether preventive action taken Yes / No
on all defects
(v) Whether the A-scans of all defects Yes / No
preserved in machine
3. Check on day's work
(a) Type of Testing Rail / weld
(b) The A-Scans of all defects being
preserved Yes / No
(c) The defects details are properly Yes / No
logged in machine
(d) Defects are properly entered in Yes / No
Register
E. Schedule of USFD testing and adherence
1. Date of last USFD Testing of
Inspected Stretch
(a) Rail testing
91
(b) Weld testing
2. Stipulated frequency of section
(a) Rail testing
(b) Weld testing
3. Whether testing is done as per Yes / No
Schedule
4. Proper up keep of defects register Yes / No
has been done
S. Item of Works Observation/
N. Values Recorded
D. Check list for Inspection of AT Welding
(Issued by RDSO. Vide Letter No. CT/Welding/Policy dt.28.10.14)Date of Inspection:
S E C T I O N . . . . . . . . . . . . . . . . . . . . . . . . D I V I S I O N . . . . . . . . . . . . . . . . . . . . . . . . K M /
TP........................LINE.......................
Brief of Welding Technique
(Rail Section/UTS/Heating Technique/Mould/Tapping)
S. Item of Works Observation/
N. Values Recorded
A. Storage of Welding Material at Store
1. AT Welding Portion
(a) Secured Building Yes / No
(b) Ventilation Good / Poor
(c) Dampness Yes / No
92
S. Item of Works Observation/
N. Values Recorded
(d) Properly Packed Yes / No
2. Igniters
(a) Storage different from portion Yes / No
(b) Stored in locked steel cupboard Yes / No
3. Prefabricated Moulds
(a) Dampness Yes / No
(b) Properly Packed / Neatly stacked Yes / No
B. Preparatory Arrangements at Site
1. Availability of complete T & P and
consumables at site
(A) Preheating Equipment
A-1 Air-Petrol Heating
1. Pressure Tank with Pressure Yes / No
gauges : 1 No.
2. Vaporizers ( Burner ) complete : 1 No. Yes / No
3. Nozzle Pricker : 2 Nos. Yes / No
4. Nozzle Keys : 1 No. Yes / No
5. Vaporizer stand : 1 No. Yes / No
6. Goose neck attachment to Yes / No
vaporizers : 2 No.
A - 2 Compressed Air - Petrol Pre-Heating
93
S. Item of Works Observation/
N. Values Recorded
1. Compressor system with Pressure Yes / No
gauge : 1 No.
2. Torch ( Burner ) complete :2No. Yes / No
3. Torch ( Burner ) Keys : 1 No. Yes / No
4. Torch ( Burner ) Stand : 2 No. Yes / No
5. Goose neck attachment to Yes / No
vaporizers : 2 No.
A - 3 Oxy - LPG Pre-Heating
1. Oxy - LPG Torch ( Burner ) : 1 No. Yes / No
2. Oxygen Cylinder with Pressure Yes / No
gauge : 1 No.
3. LPG Cylinder with Pressure Yes / No
gauge : 1 No.
4. Torch ( Burner ) Stand : 1 No. Yes / No
5. Connecting Hose Pipe : 2 No. Yes / No
B. Sufficient quantity of fuel
(Petrol / LPG-Oxygen as required Yes / No
from authorized sources )
(Indicate Source) →
C. Crucible and accessories :
1. Crucible Complete : 1 No.
(a) Crucible shell Yes / No
94
S. Item of Works Observation/
N. Values Recorded
(b) Crucible Lining (Availability of
Magnesite powder & sodium
silicate )
2. Crucible cap : 1 No. Yes / No
3. Crucible forks : 1 No. Yes / No
4. Crucible stands : 1 No. Yes / No
5. Crucible rings : 1 No.
D. Mould fixing arrangement
1. Mould Pressure ( Clamp ) : 1 set Yes / No
2. Mould Shoes : 2 Pairs Yes / No
E. Weld Trimmer with power pack: 1 No.
( From Approved source ) Yes / No
Indicate Source →
F. Rail profile weld grinder: 1 No.
( From Approved source ) Yes / No
Indicate Source →
G. Measuring Tools :
1. Straight Edge 1m long : 1 No. Yes / No
2. Straight Edge 10 cm long : 1 No. Yes / No
3. Gap gauge & Height Gauge : 1 No. Yes / No
4. Filler gauge : 1 No. Yes / No
95
S. Item of Works Observation/
N. Values Recorded
5. Pyrometer / Thermal chalk for Pyrometer /
measurement of Rail Temperature Thermal Chalk
: 1 No.
6. Stop watch : 1 No. Yes / No
H. Other tools / Equipments
1. Cleaning rod round : 1 No. Yes / No
2. Tapping rod : 1 No. Yes / No
3. Aluminum / steel rod for thermal
plugging : 1 No, Yes / No
4. Leather washers for pump : 2 No. Yes / No
5. Tool for punch marking : 1 set Yes / No
6. Mirror 150 X 100mm with Yes / No
handle : 1 No.
7. Wooden wedges for rail Yes / No
alignment : 12 No.
I. Tool box Containing following :
1. Hot Sets (Chisels): 2 No. Yes / No
( For Emergency use only )
2. Rail file 350 X 40-6 mm: 2 No. Yes / No
( For Emergency use only )
3. Funnel tin for pouring petrol : 1 No. Yes / No
4. Adjustable spanner : 1 No. Yes / No
96
5. Hammer 1 kg : 1 No. Yes / No
6. Sledge hammer double panel 5 kg : 2 No. Yes / No
7. Steel wire brush : 1 No. Yes / No
8. Blue goggles : 2 pairs Yes / No
9. Paint brush 50 mm : 1 No. Yes / No
10. Slag container (bowl) : 1 No. Yes / No
11. Asbestos gloves : 2 pairs Yes / No
12. Hose clips : 4 No. Yes / No
13. Pliers : 1 No. Yes / No
J. Insulation hood for control cooling Yes / No
(for HH rail, 110 UTS rail welding ) Required /
Not Required
2. Welding Technique used is proper Yes / No
as per extant provisions
(Compressed Air/Oxy-LPG Heating,
3 piece mould & Auto Tapping
Thimble for 52 kg 90 UTS rails and
above)
(Indicate Technique being used) →
2.1 Technique is approved for the firm Yes / No
3. Welding Portion & consumable
(a) Portion as per Rail section /UTS to Yes / No
be welded & of proper technique
S. Item of Works Observation/
N. Values Recorded
97
1. Supplier / Firm
2. Batch No.
3. Portion No.
4. IC No.
5. Date of Manufacture
6. Results of Reaction test, if the Required / Not
portion is 2 years old Required
Nature of Reaction Normal / Boiling
7. Condition of Packing
(b) Three piece Mould
1. Condition of Mould Damp / Dry Cracked
/ Intact
2. Condition of vents in mould Blocked / Clear
(c) Proper quality looting sand,
ignition etc. are properly inspected Yes / No
(d) Other consumables Indicate Material &
Condition
4. Welding Team
(a) Whether full contingent of welding
team is available at site
(i) Welder : 1 No. Yes / No
(ii) Skilled Artisan : 2 No. Yes / No
S. Item of Works Observation/
N. Values Recorded
98
(iii) Helper Khalasi / Khalasi : 5 No. Yes / No
(iv) Track Man: As required for site Yes / No
protection.
Name of Welder
Details of competency certificate
(b) (certificate no. & validity )
Whether competency is for Yes / No
technique to be used & is valid
Name of supervisor
Details of competency certificate
(c) (certificate no. & validity )
Whether competency is for Yes / No
technique to be used & is valid
(d) Welding of Rails being welded
5. Details of Rails being welded
(a) Section / UTS
(b) Old or new
(c) In case old Rails,
1. Anticipated balance service life
2. Rail is free from corrosion or Yes / No
excess wear.
3. Result of USFD testing.
S. Item of Works Observation/
N. Values Recorded
99
4. General Condition of rails
6. General Condition of Rail ends
1. Condition of Rail Ends Hogged / Battered
Straight
2. Battering / Hogging in mm
3. End Bends of the rails in mm Vertical :
( Vertical : +0.5mm/ -0.0 mm Lateral :
Lateral : 0.5 mm )
4. End cuts are truly vertical Yes / No
5. Ends are cleaned by K-oil & wire
brush Yes / No
6. Fish bolt holes have been
eliminated Yes/No
If no. distance of fish bolt holes
from rail end being welded
C. Execution of Welds
1. Traffic Block Time
2. Gap between rail in mm
(25mm + 1for normal welds
50 + 1 and 75 + 1 for wide gap welds)
3. Alignment of rail with 1m straight
edge
S. Item of Works Observation/
N. Values Recorded
100
a Lateral
(+0.5mm)
b Vertical
(The joint shall be kept higher by :
3 to 4 mm for 72UTS and 2 to
2.4 mm for higher UTS)
4. Whether proper clear working
space of 250 mm is available and Yes / No
fastening of 5 adjacent sleepers
removed
5. Proper Fixing of Prefabricated
Mould
(a) Mould aligned Centrally Yes / No
(b) The gap between mould and rail Yes / No
packed firmly with luting sand
6. Proper Fixing of Mould shoes : Yes / No
perfectly vertical, not skew
7. Pressure in Preheating
arrangement
(a) Air Petrol : Compressor tank
Pressure (7+0.7 Kg/cm2)
(b) Compressed Air Petrol : Air Pressure
(0.2 to 0.3 Kg/cm2)
(c) Oxy - LPG Pre heating :
S. Item of Works Observation/
N. Values Recorded
101
(i) Pressure for Oxygen Cylinder
(7 to 8 Kg/cm2)
Pressure for LPG Cylinder
(2 to 2.5 Kg/cm2)
8. Whether pre heating torch is Yes / No
properly placed
9. Proper fixing of crucible
9(a) Whether the crucible has been
repaired properly with no loose Yes / No
sand particles
10. Specific check on AT welding Dry / Wet
portion before pouring in crucible
11. Preheating time (in minutes)
(a) Air Petrol Heating (10 to 12 minutes)
(b) Compressed air petrol (4 to 4.5
minutes)
(c) Oxy - LPG preheating (2 to 2.5
minutes)
12. Reaction of AT welding portion on Normal / Boiling
ignition violent
13. Tapping time in seconds
(Manual Tapping: (20+3) sec,
Auto Tapping L As per approval)
(a) Tapping done at time
S. Item of Works Observation/
N. Values Recorded
102
14. Mould waiting time
(4-6 minutes for 25 mm weld
12 minutes for 75 mm welds)
(a) Mould Removed at time
15. Trimming of weld done by weld Yes / No
trimmer with alignment wedges
in position
a . Wedges was removed fastening Yes / No
re-fixed and sleeper spacing
corrected
b. Wedges removed at time
16. All the removed fastening
re-fixed and sleeper spacing Yes / No
corrected
17. Provision of wooden block
below the weld for support Yes / No
before passing first train
18. Removal of Risers & Runners
(a) Whether weld has completely Yes / No
cooled
(b) Removed by knocking towards Yes / No
the rail
19. First train was passed after 30
min of pouring weld metal and Yes / No
completion of weld trimming
S. Item of Works Observation/
N. Values Recorded
103
(a) First Train passed at time
(b) First train passed with speed
restriction of
20. Grinding of Weld
Whether Grinding done with Profile Grinder /
profile grinder or manually Manual
Grinding was done after how
much time
Grinding of location as required Yes / No
D. Inspection of Weld
1. Visual Inspection Satisfactory /
Not satisfactory
2. Tolerances of finished weld
(a) Vertical (with 1m straight edge)
(Variation not more than +1mm/
-0.0 mm)
(b) Lateral (with 1m straight edge)
(Variation not more than +0.5mm)
(c) Finished of top surface at the
end of 10cm straight edge
(+0.4 mm /-0.0mm)
(d) Finished on sides of rail head at
the centre of 10cm straight
edge (+0.3mm)
S. Item of Works Observation/
N. Values Recorded
104
3. Numbering of Weld
(a) Serial number of Weld
(b) Marking on weld done on NGF Yes / No
side as per provisions
4. Whether USFD testing of weld was Yes / No
done
(a) If yes, result of USFD testing
Action Plan for Re-welding in case
the weld found defective
(b) If no, necessary precautions taken
at site
(Protection of weld by joggled
fish plates)
5. Whether painting of thermit weld Yes / No
done or not
6. Whether the details of weld was Yes / No
properly entered in weld Register
E. Miscellaneous Items
1. Whether sample test joint are due
to be made for testing. (One out of
100 joints to be tested for Load
deflection, Hardness & porosity
tests)
(a) If, yes Indicate details viz. Joint
No. etc.
S. Item of Works Observation/
N. Values Recorded
105
(b) Action Taken for testing of sample
joints
2. In case of contractual welding
2.1 Contract Details
(a) Name of firm
(b) CA No.
(c) Validity of contract
2.2 Total number of welds done so far
2.3 Details of USFD Testing
(a) Total no. of weld found defective in
USFD Testing
(b) Total no. of welds failed in service
during guarantee period
(c) Total Percentage of defective Welds
(d) The % of defective weld is within
the permissible range
2.4 Load Deflection Test, Hardness &
Porosity test
(a) Total No. of samples Required to
be tested @ 1 sample per 100 welds
(b) No. of test weld tested in Load
deflection, hardness & porosity test
S. Item of Works Observation/
N. Values Recorded
106
S. Item of Works Observation/
N. Values Recorded
(c) Test Weld Samples results Yes / No
satisfactory
(d) Action taken in case of
unsatisfactory results
3. Proper Maintenance of Weld Yes / No
Register
107
1. Is the number of the Level Crossing (LC)
mentioned at the LC Gate?
2 Is class of the gate mentioned on the
gate?
3 Whether Traffic/Engineering is written
on the gate?
4 Whether no. of G.K. sanctioned is
written on the gate?
5 Whether lifting barrier is provided or
not?
6 Whether the focusing of gate lamps is
all right, when observed from an
adequate distance from the middle of
the road?
7 Whether sufficient quantity of
kerosene oil, wicks and match boxes
are available at the gate?
8 Whether the gateman is on duty as per
duty roster or not?
9 Whether height gauge is provided at
the level crossing (in electrified
sections)?
E. Level Crossing.
1. Manned Level Crossing.
S. Item to be inspected Remarks Reference
N.
IRPWM PARA
909
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
IRPWM
Annexure 9/1
IRPWM
Annexure
9/1
IRPWM Para
910
IRPWM Para
910(4)
108
S. Item to be inspected Remarks Reference
N.
10 Whether the knowledge of gate man
is up to the mark?
11 Whether in the electrified section, the
clearance between the height gauge
and the road surface is as per
stipulation? (4.67 meter)
12 Whether the condition of gate and its
locking arrangements are all right?
13 Whether cross levels/gauge are in
order?
14 Whether adequate ballast cushion is
available at the gate?
15 Whether interlocking as per Train
Vehicle Units (TVU) criteria arecarried
out or not? (Spl., A and B1 class)
16 Are the whistle boards corroded?
17 Whether the condition of the
drainage is all right at the gate?
18 Whether the station working rule
book is available in Hindi?
19 Whether a ramp has been provided at
both ends of the road?
20 Whether the gate man has undergone
medical checkup? (At the termination
of every period of four years,
IRPWM Para
914
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
IRPWM
Annexure 9/1
IRMM Vol I
Para 514(A)
Yes/No
109
S. Item to be inspected Remarks Reference
N.
calculated from the date of
appointment, until they attain the age
of 45 years, and then every two years
until the age of 55 years and then there
after annually, until the conclusion of
their service.)
21 Whether safety banners and other
related items have been displayed at
the gate?
22 Has the gate man undergone the
refresher course as per
periodicity?(Every 5 years)
23 Is the condition of the approach road
good?
24 Does the gate man have extra chains
in case of failure of the gate barrier for
immediate and prompt action?
25 Whether gate working Rules are
available at Gate?
26 Whether gate working rules are as per
provision of Station working rules?
27 Are Safety equipments such as hand
signal lamp, hand signal detonators,
pad locks and safety chains available
at LC gate as per equipment list
provided on the gate?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
IRPWM
Annexure
9/1
CS No. 113 of
IRPWM
IRPWM
Annexure 9/1
IRPWM
910.(1)(e)
IRPWM
Annexure9/1
110
S. Item to be inspected Remarks Reference
N.
28 Is the gate man fully acquainted with
the use of the equipments?
29 Whether overhauling of the gate has
been done and is not overdue? (Once
in 2 years on PSC sleepers. Every year
for other than PSC sleepers)
30 Whether night inspections are being
carried out regularly?
31 Whether the TVU data is updated as
per three years schedule?
32 Whether the speed breakers are
provided on both sides of the road? (20
m from gate post)
33 Is the revolving unit of the lifting
barrier in working order?
34 Is the communication to the gate
proper by means of telephone?
35 Whether Station Master is responding
to rings from the gate?
36 Whether private number are being
recorded correctly at gate?
37 Has a hand pump for drinking water
provided at the site?
38 Whether fencing has been provided
along the track, at the level crossing
gate? (15 Meters)
Yes/No
Yes/No IRPWM Para
914(1)(b)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
IRPWM Para
914(1) (d)
IRPWM
Annexure
9/1
IRPWM
Annexure 9/1
IRPWM
Annexure 9/1
IRPWM
Para 919
111
S. Item to be inspected Remarks Reference
N.
39 Has the cleaning of the check rails being
done properly at the gate?
40 Whether Check rail clearance is in
order? (Clearance 51–57mm Clear
depth-38mm )
41 Are the road signs on the approaches
properly maintained?
42 Whether the protection diagram has
been exhibited at gate?
43 Whether detonators are available at
LC Gate in adequate numbers with
valid date? (Validity 5 years and
extended up to 8 years).
44 Whether competency certificate of the
gate man is current and valid?
(Once in 3 years)
45 Whether condition of check rail, check
rail blocks proper or not?
46 Whether adequate ballast cushion is
available below sleeper or not?
47 Whether proper bend/flair in check
rails end portion has been provided?
48 Whether extra shoulder ballast has
been provided in the approaches of
level crossing track to arrest the extra
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
SOD Ch. I
item 5 & 6
IRPWM
Annexure 9/1
G&SR CS. No
30
112
S. Item to be inspected Remarks Reference
N.
stress in rails during extreme hot
weather?
49 Whether painting and fitting of rails
and check rails has been done? (Along
with over hauling)
50 Whether adequate longitudinal slope
has been given in the approach road of
level crossing?
51 Whether adequate width has been
provided on the road in the
approaches, as well as on the track
portion i.e. as per class of road?
52 Are the W/L boards provided at
adequate distance? (600 m)
53 Is the gate lodge as per standard of the
type plan?
54 Whether the wall clock in working
condition?
55 Have the Safety posters been
displayed?
56 Whether the train time tables have
been displayed at the gate lodge?
Yes/No
57 Whether the inspection book of level
crossings is available at the gate?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
IRPWM
Annexure 9/1
IRPWM
Annexure 9/1
IRPWM
916/1
113
S. Item to be inspected Remarks Reference
N.
58 Whether the complaint book is
available at the gate?
59 Whether level crossing registers are
available at the gate?
60 Whether the gate booms/gate leaves
are properly functioning?
61 Whether the gate man is aware of the
safety rules in case of emergency?
Yes/No
IRPWM
Para 915
Yes/No
Yes/No
Yes/No
2. UNMANNED LEVEL CROSSINGS
S. Item to be inspected Remarks Reference
N.
1 Is the number of LC mentioned at LC
Gate?
2 Is the type of gate mentioned on the
gate?
3 Whether the road surface is well
maintained between gate posts and
approaches as regards level &
gradient?
(The uneven or broken surface of
road should be leveled as early as
possible. And patch work should be
done immediately, so that the road
surface can be made leveled and
Yes/No
IRPWM
Annexure 9/1
Yes/No
Yes/No
114
S. Item to be inspected Remarks Reference
N.
smooth. Hexagonal concrete blocks may
be provided, which are durable against
wear and tear in gauge conversion and
new construction. It has been proved
more useful and durable for maintaining
the road surface. Secondly it gives better
appearance to the road surface and
having high resisting power during
monsoon season. It should be provided
in between the two gates. Outside the
gate road surface can be maintained by
black top road. Hence it is easy to
maintain and easy to prepare a smooth
road surface quickly. Road surface is
made smooth in such a way that vehicles
are not struck to the track)
4 Are the road signs on the approaches
properly maintained?
(Generally indicators and warning
boards get faded with time when
ordinary paint is used. Hence as for as
possible luminous paints / luminous
strips should be used. As far as
luminous strip and luminous paint are
concerned, for speed breakers sign
boards, whistle boards and stop boards
etc. the luminous strip are more
effective rather than luminous paint as
it is just a like a pre-cast concrete which
cannot be deteriorated immediately.)
IRPWM
Annexure
9/1
Yes/No
115
S. Item to be inspected Remarks Reference
N.
5 Whether check rail clearance is in
order? (Clearance 51-57 mm Clear
depth 38 mm )
6 Whether track gauge and Cross-Level
are in order?
7 Whether W/L board provided on both
sides of the gate at a proper location,
at a distance of 600 m from level
crossings on either side of the road?
8 Whether the condition of the approach
track of level crossings is in good
condition?
9 Whether visibility requirement for
road users of 600 m along the track from
5 m from nearest track center.
10 Whether road users are taking
precautions of stopping on the whistle
of the train?
11 Whether stop board is provided on the
both ends of the road approaching in
case of unmanned gate? (5 m from
center line of nearest track)
12 Whether speed breakers are provided
on both sides of the road? 20 m from
gate post
SOD Ch. I
item 5 & 6Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
IRPWM Para
916(1)
IRPWM
Annexure 9/1
IRPWM Para
917
IRPWM
916(2)
CS No. 128 of
IRPWM
116
F. Inspection for Tamping Site
(3X/CSM/Duomatic/UNIMAT)
S. Item to be inspected Obser- Reference
N. vation
1 a) Machine Type
(CSM/Duomatic/Unimat)
b) Machine No. & Make
c) Base station/Division
d) Manufacturer
e) Year of manufacturing
f) Last major Maintenance schedule
(POH/IOH) undertaken
g) Next POH/IOH due on
h) Month/year of last POH/IOH
i) Depot of last POH/IOH
POH/
IOH
S. Item to be inspected Remarks Reference
N.
13 Whether warning boards have been
provided at the proper location?
14 Is the census being carried out
regularly after three years?
Yes/No IRPWM
Annexure 9/1
Yes/No IRPWM Para
919
POH____
IOH___
Railway
Board
Letter
No.98/
Track-III/Tk/
27-Pt
dated 20-
05-2003
117
S. Item to be inspected Remarks Reference
N.
j) Rated output of the machine
(No. of Sleepers/Hour)
k) Name of SSE/TM/In-charge
l) Name/designation of the operator
2 Is there any tamping tool(s) missing
or worn-out?
(Wear to be < 20% of cross sectional
area)
3 Is the Condition of tamping tools
satisfactory and fitting tight?
4 Is the condition and adjustment of
track lifting rollers satisfactory?
5 Is the condition of lifting hooks
(UNIMAT) satisfactory?
6 Availability of Camping coach
7 Is the condition of the Camping
Coach satisfactory?
8 Are all safety equipment as per list
annexed available?
9 Has it been ensured that stabling
siding for machine’s coaches is having
adequate water supply, power supply
& resting facility?
Yes/No
Checklist iss-
ued by RDSO
Yes/No
Yes/No
Yes/No Para 3.1.1(i)
(IRTMM)
Checklist
issued by
RDSO
Para 7.2 (i)
IRTMM
Para 3.1.3
(V)
(IRTMM)
Yes/No Para 3.1.3
(V) (IRTMM)
Yes/No
Yes/No/
NA
Checklist iss-
ued by RDSO
Yes/No
118
S. Item to be inspected Remarks Reference
N.
10 Pre-tamping Inspection
i) Location of inspection
KM.
Line
Blocksection
Route
Division
ii) Availability of
a) Clean Cushion (minimum 150 mm)
b) Adequate ballast for min. 20 mm
lift in shoulder / crib
iii) Month & Year of Last Deep
Screening
iv) Is the condition of track drainage
satisfactory, pumping locations
attended & rounded ballast replaced
with clean angular ballast?
v) Is the condition of cess satisfactory
and low cess made-up?
vi) Is the speacing of sleeper’s
uniform?
vii) Are fittings in good Condition and
tightened?
Para 3.1.1(iv)
(IRTMM)
Yes/No
Yes/No
Para 3.1.2
(vi)
(IRTMM)
Yes/No Para 3.1.2(v)
(IRTMM)
Yes/No Para 3.1.2
(vi)
(IRTMM)
Yes/No
Yes/No Para 3.1.2(iv)
(IRTMM)
119
viii) Has all missing/broken fittings
been replaced?
ix) Is the condition of sleepers
satisfactory?
x) Has all damaged/broken sleepers
been replaced?
xi) Are all the sleepers square?
xii) Has attention to hogged/battered
joints been given?
xiii) Was Pre-tamping survey done as
per guidelines (IRTMM/Anne. 5.3) for
design mode working?
xiv) Is the solutions for Realignment
of curves with interpolation of slews
for feeding (with correction values, as
applicable) available? (as per
Annexure 5.3of IRTMM)
xv) Are the beginning and end of
circular and transitions of curves
marked on sleepers?
xvi) Is the plotting of existing profile
after pre-survey done and working
sheet for slew & lift values and
interpolation for feeding (with
correction values, as applicable)
prepared? (as per Annex. 5.3 of IRTMM)
S. Item to be inspected Remarks Reference
N.
Yes/No Para 3.1.2
(vii) (IRTMM)
Yes/No Para 3.1.2
(viii) (IRTMM)
Yes/No Para 3.1.2
(ix)(IRTMM)
Yes/No/
NA
Para 3.1.2
(iv) (IRTMM)
Yes/No Para 3.1.2 (i)
(IRTMM)
Yes/No/
NA
Para 3.1.2(i)
(IRTMM)
Yes/No/
NA
Para 3.1.2(ii)
(IRTMM)
Yes/No Para 3.1.2 (i)
(IRTMM)
Yes/No Para 3.1.2
(ix) (IRTMM)
120
xvii) Are the reference markings
along the track available?
xviii) Has slew values, lift values and
SE values written on sleepers?
xix) Is ballast heaped in tamping
zone?
xx) Are the level crossing road
surface opened for tamping?
xxi) Are the check rails on level
crossings removed for tamping?
xxii) Are the guard rails on bridge
approaches removed?
xxiii) Is the Removal/marking of
obstructions such as rail lubricators,
signal rods, cable pipes, glued joints
etc. done?
xxiv) Are the marking of OHE bonds/
removal done? (in electrified
sections)
xxv) Are the joggled fishplates,
wooden blocks etc. removed?
xxvi) Is the sufficient lighting at work
site arranged for working during
night?
xxvii) Has the availability of OHE and
S. Item to be inspected Remarks Reference
N.
Yes/No/
NA
Para 3.2.1
(xi) (IRTMM)
Yes/No/
NA
Para 3.2.1
(xi) (IRTMM)
Yes/No Para
3.2.2(xii)
(IRTMM)
Yes/No/
NA
Para
3.2.2(xiv)
(IRTMM)
Para 3.1.2
(vii)
(IRTMM)
Yes/No Para 3.1.2 (i)
(IRTMM)
Yes/No Para 3.1.2 (ii)
(IRTMM)
Yes/No/
NA
Para 3.1.2
(IRTMM)
Yes/No Para 3.2.2
(xiii) (IRTMM)
Yes/No/
NA
Yes/No Para 3.1.2
(iii) (IRTMM)
121
S. Item to be inspected Remarks Reference
N.
S&T staff been ensured, as required?
xxviii) Has adjustment of gaps in
joints / creep adjustment been
done?
xxix) UNIMAT working
a) Turnout No.
b) Station
c) Angle of crossing
d) LH/RH
e) When was it last Tamped?
(Month/ Year )
f) Is the layout including spacing of
sleepers as per relevant drawings?
g) Is the battered or worn Crossing
attended? (Reconditioning/
Replacement)
h) Are the S&T gears likely to infringe
during tamping cleared?
LWR
i) Destressing temperature of LWR
ii) Last destressing date
Yes/No/
NA
Para 3.2.2 (v)
of IRTMM
Yes/No/
NA
Para 3.1.2 (x)of IRTMM
Yes/No Para 3.2.1 (i)
(IRTMM)
Yes/No Para 3.2.1 (ii)
(IRTMM)
Yes/No Para 3.2.2 (v)
(IRTMM)
122
iii) Is the temporary de-stressing
done at higher/lower temperature?
iv) Likelihood of temperature
exceeding td+20°C
9 Section of work
i) Division
ii) ADEN
iii) SSE Section
10 Section of work / Traffic block
i) Block section and lines blocked
ii) Timing and total Duration (minutes)
iii) Travel time to work spot (minutes)
iv) Actual working time (minutes)
v) Travel time to clear block (minutes)
vi) Total ineffective time (minutes)
(Max ineffective time = 0.45 Hrs.)
(27 minutes)
S. Item to be inspected Remarks Reference
N.
Yes/No
Temp
td= °C
Yes/No
Para 3.1.2(x)
(IRTMM)
Para 6.2.1 (i)
(a) (LWR
Manual)
Railway
Board
Letter
No.98/
Track-III/Tk/
27-Pt dated
20-05-2003
123
S. Item to be inspected Remarks Reference
N.
11 Operations During Tamping
i) Has the protection of the site of
work and adjoining track done as per
G&SR?
ii) Working alignment .
(Straight/curve)
iii) Degree & Length of curve
iv) Is there any Points & Crossings
present in planned stretch for
tamping?
v) Are there points and crossing
being tamped in same block?
vi) Is the Lining being done in Design
mode?
vii) Lining Working Method adopted
viii) Is the Levelling being done in
Precision mode?
ix) Has the Setting of tamping depth
been done as per track structure?
The gap between top edge of the
tamping blade and the bottom edge
of the sleeper in closed position of
the tamping tool should be adjusted
Para 4.2.2
(IRTMM)Yes/No
Degree=
Length=
in meter
Yes/No
Yes/No
Yes/No
3 Point
4 Point
Yes/No
Para 3.1.3 (i)
(IRTMM)Yes/No
124
S. Item to be inspected Remarks Reference
N.
depending upon the type of rail and
sleepers.
(For Metal sleeper: 22-25 mm, for
Flat bottom sleeper : 10-12 mm)
x) Is the Squeezing pressure of
tamping unit correctly set?
a) PSC sleepers (110-120 kg/cm2),
b) ST, Wooden sleepers (100-110 kg/
cm2),
c) CST-9 sleepers (90-100 kg/cm2)
xi) Minimum Slew Value (mm)
xii) Maximum Slew Value (mm) ( Not
more than 50 mm)
xiii) Maximum lift value (mm) ( Not
more than 50 mm)
xiv) Has it been ensured that a
minimum 15-20 mm general lift is
given at high point?
xv) Is no. of insertion commensurate
with lift?
(up to 30mm lift – single insertion,
30mm to 50mm – two insertions for
PSC sleeper track)
mm
Yes/No
Yes/No
Para 3.1.3
(iii) (IRTMM)Yes/No
mm
mm
Para 3.1.1
(i) (IRTMM)
Para 3.1.3
(iii) (d)
(IRTMM)
Para 3.1.3
(viii) (IRTMM)
Para 3.1.3
(viii) (IRTMM)
125
S. Item to be inspected Remarks Reference
N.
xvi) Is the squeezing time set
correctly? (0.4 to 0.6 sec)
xvii) Are the feeding of correction
values on transitions of curves (Vm/
F) being done? (In 4 point system of
lining only)
xviii) Is the feeding of SE values done
as per feeding location?
xix) Is the correction for new SE, (K)
being done?
xx) Is the feeding of ‘X’ correction for
vertical curve being done?
xxi) Is the ramping of 1 in 1000
given before closing the day's work
and obligatory points being done?
(The next day's work shall begin from
the point of commencement of
previous day's ramp)
xxii) Are the parameters of tamped
track checked after tamping?
xxiii) UNIMAT working
a) Length of approaches covered
along with turnout (m)
b) Direction of tamping
(Switch → Crossing)
Yes/No
Yes/No
Yes/No
Yes/No
Para 3.2.3
(iv) (IRTMM)
Yes/No/
NA
Annexure
2.1
(IRTMM)
Yes/No/
NA
Track Machine
Documentation
Track Machine
DocumentationYes/No/
NA
Track Machine
DocumentationYes/No/
NA
Para 3.1.3
(vi) (IRTMM)
Para 3.1.3
(ix) (IRTMM)
Para 3.2
IRTMM------m
126
c) Is the Sequence of tamping is first
on main line then on turnout side?
(ML → LL)
d) Is the turnout side rail supported
after lifting on mainline; till it is
tamped
e) Has the Squeezing pressure been
set correctly?
(i) ST/wooden sleepers : 110-115 kg/
cm2
(ii) PSC sleepers: 135-140 kg/cm2
f) Has it been ensured that a
minimum of 10 mm general lift is
given at high points in the turnout?
g) Has the turn in curve been tamped
along with turnout?
12 Post Tamping Operations
i) Location of inspection :-
KM:-
Line:-
Block section:-
Route:-
Division:-
Yes/No
Yes/No/
NA
Yes/No
Yes/No/
NA
Para 3.2.2
(i)
(IRTMM)
Para 3.2.2
(i)
(IRTMM)
Para 3.2.2
(iii)(IRTMM)
Para 3.2
(IRTMM)
Yes/No Para 3.2.1
(iii) (IRTMM)
S. Item to be inspected Remarks ReferenceN.
127
ii) Has all loose fittings been
tightensd?
iii) Has all broken fittings been
replaced?
iv) Has the ballast been dressed
neatly?
v) Has the ballast between the
sleepers and on shoulders been
consolidated?
vi) Has all track parameters been
recorded with the help of recorders
provided in the tamping machine?
vii) Whether Value of Track Parameter
recorded satisfies IRTMM provisions?
Alignment
a) Not more than 10 peaks exceeding
+/- 4 mm.
b) Any peak not more than +/- 6 mm.
Cross level Not more than 10 peaks
exceeding +/- 6 mm.
Unevenness
a) Not more than 10 peaks exceeding
6 mm.
b) Any peak not more than 10 mm.
viii) Has all check rails/guard rails
been re-fixed?
Yes/No
Para3.1.4
(iii) IRTMM
Yes/No Para3.1.4 (i)
IRTMM
Yes/No Para3.1.4 (ii)
IRTMM
Yes/No
Para 3.1.4
(iv) IRTMMYes/No
Para 3.1.4
(iv) IRTMMYes/No
Para 3.1.4
(iv) IRTMMYes/No
Para 3.1.4
(vi) IRTMM
Yes/NoPara 3.1.4
(iv) IRTMM
Yes/No
S. Item to be inspected Remarks ReferenceN.
128
ix) UNIMAT working – Has all S&T/
Electrical connections been
restored?
13 Has it been ensured that adequate
ballast is trained out for complete
ballast profile as per IRPWM and
profiling done?
14 Is the actual Output of the machine
matches with rated Progress of the
Machine?
Duomatic -
CSM - 1.2 Km/effective block hour
T EX - 1.6 Km/effective block hour
UNIMAT - 75/90 min for each turnout
15 Any other specific Observation (not
covered above):
Para 3.2.3
(IRTMM)Yes/No
Para 263
(IRPWMYes/No
Railway
Board Letter
No.98/Track-
III/Tk/27-Pt
dated 20-05-
2003
Yes/No
S. Item to be inspected Remarks ReferenceN.
129
1 Detonators in a tin case 1 Box
2 H.S. flag red 2 Nos.
3 H.S. flag green 1 Nos.
4 H.S. Tri colour lamps (LED) 2 Nos.
5 Chain & Padlock 1 Set
6 Clamp with Padlock 2 Nos.
7 10 t jack ( CSM / UNIMAT ) 1 No.
8 20 t jack ( Tamping Express ) 1 No.
9 Crow bars 4 Nos.
10 Wooden blocks off sizes 8 Nos.
11 Gauge cum level 1 No.
12 Rail thermometer (dial type) 1 No.
13 Banner flag 2 Nos.
14 Portable Control Phone 1 No.
15 Walky Talky 2 Nos.
16 First Aid Box 1 No.
17 Skids 2 Nos.
Safety Equipment
S. Description Quantity
N.
130
S. Description Quantity
N.
18 Working time table of section where machine
working
19 G&SR book with upto date amendment slips 1 Copy
20 4 Cell Flasher Light / LED Torch, 6 Watt 1 No.
21 LED Petromax / Led Lamps 1 No.
22 Safety Helmets Machine
Staff
23 Protective Clothing, Safety Shoes and Safety Machine
Gloves Staff
24 Track Machine Manual (with updated C.S) 1 No.
25 Accident Manual (with updated C.S) 1 No.
26 Fire Extinguisher 1 No.
27 Hooter (Manual / Remote) 2 Nos.
28 Hydraulic Hand Pump 1 No.
29 Emergency pneumatic/Hydraulic hose of
sizes suiting to different machines(complete 1 No.
with end fittings)
1 Copy
131
G. Inspection for Ballast Screening Site (BCM Working)
1 a) Machine Type (BCM)
b) Machine No.
c) Base station/Division
d) Manufacturer
e) Year of manufacturing
f) Last major Maintenance schedule
(POH/IOH)
g) Month/Year of last IOH/POH
h) Rated output of the machine (m/
Hour)
i) Name of SSE/TM/In-charge
j) Name/designation of the operator
2 Availability of Camping coach?
3 Is condition of the Camping Coach
satisfactory?
4 Has it been ensured that stabling
siding for machine’s coaches is having
adequate water supply, power supply
& resting facilities?
5 Has it been ensured that OHE Block is
taken or OHE is disconnected for
maintenance of BCM in stabling
siding?
S. Narration
N.
Observa-
tionsReference
POH/IOH
Yes/No
Yes/No
Yes/No Para 7.2 (i)
(IRTMM)
Yes/No Para 7.2 (vi)
(IRTMM)
RB’s
Leeter No:
98/track/
III/TK/27-
Pt.
dated.20/
05/2003.-
132
S. Narration
N.
Observa-
tionsReference
6 Has it been ensured that the gas cutting
equipments is available on the machine?
7 Are all safety equipment as per list
annexed available?
Preliminary Works
8 Location of inspection
9 Availability of cushion (Total cushion
shall not be less than 250 mm)
Clean cushion =
10 i) Month & Year of Last Deep Screening
ii) GMT passed after last deepscreening
11 Has all preliminary works including
survey for marking of the longitudinal
levels for lifting and proper cross fall
to avoid formation of water traps etc.
been ensured?
12 Has the final longitudinal levels as per
redesigned profile been worked out &
marked on the pegs/OHE mast
alongside the track?
13 Has it been ensured that adequate
ballast is available on track for requisite
cushion and to avoid ballast deficiency
immediately after screening?
14 Has it been ensured that adequate
ballast is available on cess/depot for
Yes/No Para 3.3.2
(xi) (IRTMM)
Yes/No Para 3.3.2
(i) & (ii)
(IRTMM)
Yes/No
Yes/No
Yes/No Checklist iss-
ued by RDSO
IRPWM Para
238 (5)-
Para 3.3.2
(iii)
(IRTMM)
Yes/No
mm
133
S. Narration
N.
Observa-
tionsReference
supplementing the ballast for
complete profile as per IRPWM?
15 Are Sleeper fittings in good Condition
and tightened?
16 Has all missing/broken fittings and
Damaged/broken sleepers been
replaced?
17 Has it been ensured that entire ballast
beyond the reach of cutter chain is
transferred in its cutting width?
18 Has it been ensured that a trench of
300mm depth & 1 meter width is
prepared lowering of cutter bar in
advance?
In case of screening of turnout,
whether requisite trench for
installation of extension pieces on right
side is prepared?
19 Has it been ensured that proper
lighting arrangement are made for
night working on machine and/or OHE
Mast?
20 Has it been ensured that there is no
obstruction (including LWR pegs, creep
post, signal rodding/cables etc.) in the
width of 4100mm to avoid
infringement to cutter chain?
Para 5.3.5
(viii)
(IRTMM)
Yes/No
Para 3.3.2
(v) & (vii)
(IRTMM)
Yes/No
Yes/No Para 3.3.1
(iv) (IRTMM)
Yes/No Para 3.3.2
(x) (IRTMM)
Yes/No
Yes/No Para 3.3.2
(iv) (IRTMM)
Yes/No
Para 3.3.2
(xiii)
(IRTMM)
Para 3.3.2
(x) (IRTMM)
Yes/No
134
S. Narration
N.
Observa-
tionsReference
21 Has it been ensured that L-Xing should
be opened in advance so as to enable
machine to work?
22 Has it been ensured that in OHE
section distance of mast foundation
from track centre is accurately
measured and checked for free
movement of cutting chain?
23 Has it been ensured that approaches
to bridges which cannot be screened
by the machine screened manually in
advance of the machine working?
24 Has it been ensured that all the
obstruction i.e., rail pegs, broken PRCs,
foundation etc. are removed in advance?
25 Has it been ensured that Tamping
machine & DGS is available while
doing deep screening by BCM?
26 LWR
i) Destressing temperature of LWR
ii) Last distressing date
iii Is the temporary de-stressing done
at higher/lower temperature?Temp td=
iv) Likelihood of temperature
exceeding td + 20°C
Yes/No
Yes/No
Para 3.3.2
(viii)
(IRTMM)
Yes/No
Para 3.3.2
(v)
(IRTMM)
Yes/No
Para 3.3.2
(ix)
(IRTMM)
Para 3.3.2
(vi)
(IRTMM)
Yes/No
Yes/No
°CPara 3.1.2(x)
(IRTMM)
Yes/No Para 6.2.1 (i)
(a) (LWR
Manual)
135
S. Item to be inspected Remarks Reference
N.
During Working of BCM
27 Location of work
i) Division
ii) ADEN
iii) SSE Section
28 Traffic block
i) Block section and lines blocked
ii) Timing and total Duration (minutes)
iii) Travel time to work spot (minutes)
iv) Actual working time (minutes)
v) Travel time to clear block (minutes)
vi) Total ineffective time (minutes)
(Max ineffective time = 60 minutes)
29 i) Has it been ensured that proper
protection of worksite done with
banner flag & detonators during block
to follow the lookout caution on
adjacent line?
ii) Whether speed restriction on
adjacent track has been imposed
while block working?
Rly. Bd.
Letter
No.98/
Track-iii/Tk/
27-pt dated
20-05-2003
Yes/No
Yes/No
Para 4.6.1
(IRTMM)
136
S. Item to be inspected Remarks Reference
N.
30 Has it been ensured that hooter in
working condition is available at the
BCM site and everybody is sensitized
to ensure safety?
31 Has it been ensured that a person on
either side of BCM/SBCM is nominated
and available to watch for any
obstruction & stop machine
immediately?
32 Has all staff working with machine
provided with helmets and masks?
33 Has it been ensured that cutter chain is not
cutting/disturbing the formation and
necessary lifting of track done as required?
(If total cushion, less than 250 mm)
34 Are the S&T gears likely to infringe
cleared in case of Turnouts?
35 Is the availability of S&T / Electrical
Staff ensured? (If required)
36 Is the Ramping of 1 in 1000 given
before closing the day's work and
obligatory points being done?
37 Has it been ensured that vertical and
lateral clearances of OHE, signal post
& any other structure is checked and
adjusted before clearing BCM block?
Yes/No
Yes/No
Para 4.6.8 (i)
(IRTMM)
Yes/No
Para 3.3.3 (ii)
(IRTMM)
Para 3.3.3
(vi) (IRTMM)
Yes/No
Yes/No
Para 3.3.1
(i) (IRTMM)
Para 3.3.2(v)
(IRTMM)
Yes/No Para 3.1.3(vi)
(IRTMM)
Yes/No
NA
Para 3.3.2 (v)
Para 7.2 (vi)
(IRTMM)
Yes/No Para 3.1.4(ii)
(IRTMM)
137
S. Item to be inspected Remarks Reference
N.
38 Has it been ensured that a round of
tamping with DTS is carried out
immediately after deepscreening to
resume trafficat aspeed of 40 Kmph?
Post BCM Working
39 Has all loose fittings been tightened?
40 Has all broken fittings been replaced?
41 Has all check rails/guard rails been re-
fixed?
42 Has it been ensured that adequate
ballast is trained out for complete
ballast profile as per IRPWM and
profiling done?
43 BCM working – Has all S&T/OHE
connections restored?
44 Is the actual Output of the machine
matches with rated Progress of the
Machine?
(BCM - 0.2 Km/effective hour of working)
45 Has it been ensured that watchman is
posted after the block or round the clock
at the location while cutter bar & chain
are left at site?
46 Any other specific observation (not
covered above):
Yes/No
Yes/No Para 3.3.4(v)
(IRTMM)
Para 3.1.4 (i)
(IRTMM)
Yes/No
Para 3.1.4
(ii) (IRTMM)
Para 3.3.4
(iii) (IRTMM)
Yes/No Para 3.2.3
(IRTMM)
Railway Board
Letter No.98/
Track-iii/Tk/27-
Pt dated 20-
05-2003
Yes/No
Yes/NoPara 3.3.4
(iv) (IRTMM)
138
Safety Equipment
S. Description Quantity
N.
1 Detonators in a tin case
2 H.S. flag red
3 H.S. flag green
4 H.S. Tri colour lamps (LED)
5 Chain & Padlock
6 Clamp with Padlock
7 10 T jack
8 Crow bars
9 Wooden blocks off sizes
10 Gauge cum level
11 Rail thermometer (dial type)
12 Banner flag
13 Portable Control Phone
14 Walky Talky
15 First Aid Box
16 Skids
1 Box
2 Nos.
1 Nos.
2 Nos.
1 Set
2 Nos.
1 No.
4 Nos.
8 Nos.
1 No.
1 No.
2 Nos.
1 No.
2 Nos.
1 No.
2 Nos.
139
17 Working time table of section where
machine working
18 G&SR book with upto date
amendment slips
19 4 Cell Flasher Light / LED Torch, 6 Watt
20 LED Petromax / Led Lamps
21 Safety Helmets
22 Protective Clothing, Safety Shoes and
Safety Gloves
23 Track Machine Manual (with updated C.S)
24 Accident Manual (with updated C.S)
25 Fire Extinguisher
26 Hooter (Manual / Remote)
27 Hydraulic Hand Pump
28 Emergency pneumatic/Hydraulic hose
of sizes suiting to different machines
(complete with end fittings)
1 Copy
1 Copy
1 No.
1 No.
Machine Staff
Machine Staff
1 No.
1 No.
1 No.
2 Nos.
1 No.
1 No.
S. Description Quantity
N.
140
S. Item
N.
Check Reference
A. Personal
1 Is valid Track Machine competency
certificate issued by Dy.CE/Machine
available with operator?
2 4 Are all safety equipment as
indicated in IRTMM available?
3 Is Operator Carrying Extra pair of
spactacles, if wearing?
4. Are all safety equipment as indicated
in IRTMM available?
5 Is Operator conversant with the
system of working and having route
learning of the section?
6 Is the machine staff self-declared that
liquor / intoxication not taken by him
prior to reporting ON Duty? -
7 Is the machine equipped with
prescribed head & tail light, LV board,
marker light and flasher light?
8 Is the machine equipped with
prescribed equipment in working
condition as per IRTMM?
Yes/No
Yes/No
Yes/No
NA
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Para 4.3.2
(IRTMM)
Para 4.3.1
(IRTMM)
Para 4.4.1
(IRTMM)
GR
3.78
Para 4.4.2
(IRTMM)
Para 4.4.3
(IRTMM)
Para 4.3
(IRTMM)
Checklist for Machine Operator for Safe Operation of Track Machine
141
S. Item to be inspected Remarks Reference
N.
B. Yard
1 Is Track Machine stabled clear of
fouling mark, sand traps and not
obstructing adjacent line(s)?
2 Are necessary precaution taken
against rolling down such as pinning
down hand brakes, chaining and
provision of skids and temporary
buffers?
3 Are concerned points set against the
line on which track machine(s) is
stabled and such points are secured
with clamps or cotter bolts and
padlocks?
4 Is brake feel test conducted before
proceeding from siding?
5 Is the shunting order issued by on duty
SM to move the machine in running line
to/from the siding/stabling line?
6 Is shunting staff with proper shunting
order available during shunting?
7 Is track machine having proper
authority to proceed?
8 Is special caution order issued by SM
duly signed by JE/SE (P.Way) and
Operator?
Yes/No Para 4.6.5
(IRTMM)
Yes/No
Yes/No
Para 4.5.1(i)
(IRTMM)
Para 4.6.6
(IRTMM)
Yes/No GR 4.31
Yes/No Para 4.5.1
(ii)(IRTMM)
Yes/No GR 5.13
Yes/No Para 4.5.1
(iii)(IRTMM)
Yes/No Para 4.5.1
(IRTMM)
142
S. Item to be inspected Remarks Reference
N.
9 Is authority issued to work all
machines working in convoy as per
Subsidiary Rule of Railway?
10 Is facing point locked by clamp for
movement of machines?
C. Block Section Working.
1 Is proper line block taken for working
the Track Machine indicating number
of machines to work duly endorsed by
SM with special instruction to proceed,
work and return via right or wrong
direction?
2 Is the adjacent line also blocked (and
permitted by control and SM) in case of
some BRM, T-28 etc. likely to foul
adjacent line(s).
3 Is SE (P.Way) available on machine for
working in block section?
4 Are all restriction followed as detail
given in caution order?
5 Is continuous whistling being done
approaching to L-Xing?
6 Is safe distance of 120m between the
machines moving in convoy
maintained?
Yes/No GR0 4.65
Yes/No Para 4.6.6
(IRTMM)
Yes/No Para 4.5.1
(IRTMM)
Para 4.6.2
(IRTMM)
Yes/No Para 4.2.2
(IRTMM)
Yes/No GR 4.09
Yes/No Para 4.6.4
(IRTMM)
Para 4.6.4
(IRTMM)
Yes/No
Yes/No
143
S. Item to be inspected Remarks Reference
N.
7 Is the machine moving cautiously at
very low speed which shall under no
circumstances exceed 10 kmph in foggy
weather / poor visibility/dust storm
etc.?
8 Is minimum 120 meter distance kept
machine to machine while travelling &
50 meter while working?
9. Is protection of work site in block
section and also for adjoining track(s),
in case of infringement, carried out by
SE/JE (P.Way)?
10 Is temporary whistle board is provided
by SE/JE/P.Way on adjoining track at
Track Machine work site?
11 Are hooter available with the track
machine deployed at site?
12 Are all trains passing adjoining track
issued a caution order to "OBSERVE
HAND SIGNAL, WHISTLE FREELY AND
STOP IF REQUIRED"
13 Is PTW issued by OHE supervisor for
working of machine in electrified area?
14 Are all physical locking of working unit
of machines checked after availing
block?
Yes/No GR 9.07(5)
Yes/No Para 4.6.4
(IRTMM)
Yes/No Para 4.6.1
& 4.6.2
(IRTMM)
Yes/No Para 4.6.8
(ii)(IRTMM)
Yes/No Para 4.6.8
(i)(IRTMM)
Yes/No Para 4.6.8
(iii)(IRTMM)
Yes/No Para 3.6.2
(IRTMM)
Yes/No As per
RDSO’s
inspection
checklist
144
S. Item to be inspected Remarks Reference
N.
15 Has it been ensured that the
clearances (vertical and lateral) for
OHE, Signal Post and any other
structure are checked and there is no
infringement to SOD before clearing the
block?
16 Is the track certified fit and cleared for
normal train operations subject to
observation of speed restrictions?
17 Did JE/SE (P.Way) travel on last machine
in work & proceed mode & first
machine in work & return mode?
18 Sanction of CRS for working of the track
machine
NOTE:-
Yes/No Para 4.6.8
(iv)
(IRTMM)
Yes/No Para 4.5.2
(IRTMM)
Yes/No Para 4.5.2
& Para
4.5.3
(IRTMM)
Yes/No Para 3.1.1
(ii) (IRTMM)
1 Please refer to GR 4.65, and subsidiary rules thereunder for
working of Track Maintenance Machines
2 Any other safety rule not covered above, shall also be followed
by the machine operator in letter and spirit.
145
Maintenance Instructions & Guidelines for
Different On-Track Machines.
Report is also available at: http://www.rdso.indianrailways.gov.in/
view_section.jsp?lang=0&id=0,2,465,610,1073
S.
N.
1 Ballast
Cleaning
Machine
(BCM-RM-80)
2 Ballast
Regulating
Machine
(BRM-
Kershaw)
3 Ballast
Regulating
Machine (PBR-
400R)
4 Continuous
Tamping
Machine (CSM
09-32)
Name of
Machine
Document Issue
Date
Report
No.
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual (English)
Trouble-Shooting
Manual(Hindi)
Inspection Check List
Maintenance
Schedule
Inspection Check List
Maintenance
Schedule (English)
Maintenance
Schedule (Hindi)
Nov.2004
Jan.2005
Jan.2002
Feb.2006
Jun.2005
Jul.2004
Jul.2004
Feb.2011
Dec.2010
Oct-14
Jul.2004
Jul.2004
TM-73
TM-77
TM-42
TM-96
TM-87
TM-70
TM-70
TM-156
TM-153
TM-74 Rev.-1
TM-69
TM-69
146
S.
N.
Name of
Machine
Document Issue
Date
Report
No.
5 Dynamic
Track
Stabilizer(DGS-
Plasser-62N)
6 Shoulder
Ballast
Cleaning
Machine(FRM-
80)
7 Shoulder
Ballast
Cleaning
Machine
(FRM-85F)
8 Multipurpose
Track Tamping
Machine
(UNIMAT
Compact-M)
Trouble-Shooting
Manual
List of Critical Spare
Parts(Rev.01)
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual
List of Critical Spare
Parts
Inspection Check List
Maintenance
Schedule
Critical Spare Part
list of Shoulder
Ballast Cleaning
Machine (FRM-80)
Inspection Check List
Maintenance
Schedule
Inspection Check List
Maintenance
Schedule
List of Critical Spare Parts
Mar.2004
Jul.2012
Oct.2005
Aug.2005
Sept.2010
Aug.2004
Sept.2005
Feb.2005
Dec. 2014
Dec.2009
Nov.2008
Dec.2006
Jun.2006
Aug.2004
TM-62
CSP
TM-92
TM-90
TM-148
CSP
TM-91
TM-79
CSP
TM-136
TM-125
TM-105
TM-100
CSP
147
S.
N.
Name of
Machine
Document Issue
Date
Report
No.
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual
List of Critical Spare
Parts
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual
List of Critical Spare
Parts
Inspection Check List
Maintenance
Schedule
List of Critical Spare
Parts (Rev.01)
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual
Inspection Check List
Maintenance
Schedule
Mar.2015
Mar.2015
Feb.2009
Aug.2004
Sept.2006
Aug.2006
Mar.2007
Aug.2004
Dec. 2014
May.2005
Jul.2012
Jul.2011
Jul.2011
Feb.2009
Feb.2007
Oct.2006
TM-108 Rev.-1
TM-101
Revision-1
TM-128
CSP
TM-103
TM-102
TM-110
CSP
TM-106Rev.-1
TM-85
CSP
TM-160
TM-159
TM-128
TM-107
TM-104
9 Plasser Quick
Relaying
System
(PQRS)
10 Point And
Crossing
Changing
Machine
(AMECA T-28)
11 Tamping
Express
(09-3X)
12 Track
Relaying
Equipment
(TLE-SIMPLEX)
13 Track
Relaying
Train (TRT)
148
S.
N.
Name of
Machine
Document Issue
Date
Report
No.
14 Point &
Crossing
Tamping
Machine
(UNIMAT)
15 Unomatic Tie
Tamping
Machine
16 Utility Track
Vehicle
(Phooltas
Make)
17 Worksite
Tamping
Machine
(METEX Make)
18 Worksite
Tamping
Machine
(8049
Critical Spares Parts
list of Track Relaying
Train
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual
List of Critical Spare
Parts
Inspection Check List
Maintenance
Schedule
Trouble-Shooting
Manual
Inspection Check List
Maintenance
Schedule
Critical Spares Parts
Inspection Check List
Maintenance
Schedule
Inspection Check List
Maintenance
Schedule
Dec. 2014
Sept.2004
Jun.2013
Mar.2006
Aug.2004
Dec.2004
May.2005
Jul.2005
Jun.2009
Jun.2008
Jul.2014
Aug.2010
Jun.2010
Mar.2009
Mar.2009
CSP
TM-71
TM-175
TM-99
CSP
TM-76
TM-83
TM-88
TM-132
TM-121
CSP
TM-144
TM-141
TM-129
TM-130
149
Onwards)
19 UNIMAT-4S
20 Rail Grinding
Machine
21 Ballast
Cleaning
Machine
(BCM-RM-80-
92U)
22 Worksite
Tamping
MachineVPR-
02M
(Kalugaputmash
Make)
23 Inspection
Check List
Trouble-Shooting
Manual
List of Critical Spare
Parts
Maintenance
Schedule
Inspection Check List
Critical Spares Part
list of Unimat-4S
Maintenance
Schedule
Maintenance
Schedule
List of Critical Spare
Parts
Inspection Check List
Inspection Check List
Maintenance
Schedule
INSPECTION OF
UNIMAT-SPLIT HEAD
MFI
Feb.2008
2013-14
May-12
Dec. 2014
Apr-15
Jan. 2014
Feb. 2014
Nov.2013
Mar- 2015
Mar-15
Mar-15
Aug-15
TM-117
CSP
TM-168
TM-169Rev.1
CSP
TM-180
TM -178
CSP
TM-186
TM-183
TM-187
TM-184
S.
N.
Name of
Machine
Document Issue
Date
Report
No.
150
H. Check list for Inspection of Concrete Sleeper Plant:
Ref: IRS-T-39 August 2011, IRS-T-45- 1996 and Schedule of Technical
Requirement (STR) issued by Rly. Bd. Vide letter no. 2010/Track-II/22/
11/4 (STR) dtd 27-5-2011
A About Plant
1 Whether plant is approved for production?
2 Whether plant is approved for production of 1 in 8.5
T/out sleepers?
3 Whether plant is approved for production of 1 in 12
T/out sleepers?
4 Whether plant is approved for production of any
other type of sleepers?
B Quality Assurance Plan & ISO Certification
5 Whether QAP is approved by RDSO?
6 Whether Plant is having ISO: 9001-2008?
C About Organisation
7 Whether plant is having at least one Graduate Civil
Engineer?
8 Whether plant is having at least one Diploma Civil
Engineer for each shift per casting shed?
9 Whether plant is having one Mechanical/Electrical
diploma Engineer for maintenance of equipments?
S. Item Remark
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
151
S. Item Remark
N.
D Layout Requirement
10 Whether Cement godown capacity is as per STR?
(Minimum covered area 576 Sqm.)
11 Whether HTS storage capacity is as per STR?
(Minimum covered area 100 Sqm.)
12 Whether Insert godown capacity is as per STR?
(Minimum covered area 100 Sqm)
13 Whether Steam curing chambers numbers and
capacity are as per STR?
14 Whether Submerged water curing tank numbers and
capacity are as per STR?
15 Whether Stacking area for finished sleepers is as per
STR?
16 Is Area of Laboratory is as per STR? (General- 40 Sqm.
& sleeper testing-30 Sqm.)
17 Whether Lab is climate controlled?
18 For inspection of turnout sleeper set- Whether
minimum two platforms of 70 x 6m with gantry
arrangements for handling of inspection of two sets
at a time is available?
19 Minimum requirements of Plant and Machinery as
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
152
S. Item Remark
N.
Yes/Noper STR for production line are available or not?
20 Whether Laboratory equipments are available as
per STR?
E Raw Material Details :
E1 Cement
21 Whether current cement source is approved by
RDSO?
Name of Supplier:___________________.
22 Whether stacking of cement is as per IS code?
23 Whether placards are displaying week number,
name of manufacturer?
24 Whether cement is being used on “first in first out”
basis?
25 Whether manufacture’s test certificate is available?
E2 HTS Wire
26 Whether HTS wire is procured from BIS approved
source?
27 Whether HTS wire is inspected by railway’s
inspecting Authority?
28 Whether HTS wire coils are wrapped in Jute/plastic
cloths?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
153
S. Item Remark
N.
Yes/No29 Whether Manufacture’s tag & seal of Inspecting
Authority available on coils?
30 Whether HTS wire coils are stacked in covered
godown?
E3 Aggregates (CA1 & CA2)
31 Whether source is approved by RDSO?
E4 Inserts
32 Whether Inserts are being procured from RDSO
approved source?
33 Whether Inserts are inspected by RITES with lead seal
on every bag?
34 Whether dimensional checking of each & every
inserts is done before use in Plant?
35 Whether Inserts are stacked in covered godown /
heat no wise& supplier wise?
E5 PVC Dowel
36 Whether PVC Dowels are procured from RDSO
approved source?
37 Whether PVC Dowels are inspected by RDSO?
F Production Shed
38 Whether regular cleaning of mould’s by cup wired
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
154
S. Item Remark
N.
Yes/Nobrush is being done before use?
39 Filling of black putty for sealing the gap between end
plates & mould is being done properly or not?
40 Whether Greasing for inserts pockets in moulds is
done?
41 Whether labours are doing hand pulling of HTS wire
for removal of sag before tensioning?
42 Is Calibration of tensioning m/c as per schedule being
done?
43 Whether Tensioning m/c is equipped with auto cut-
off?
44 Whether tensioning supervisor is measuring the
elongation of HTS wire of each & every bench and
entering it in register regularly?
45 Whether Calibration of bottom vibrators as per
schedule is done?
46 Whether Calibration of automatic batching plant as
per schedule is done?
47 Whether Pouring of cement in mixture is through
screw conveyor?
48 Whether calibration of thermometers of steam
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
155
chambers as per schedule being carried out?
49 Whether Keeping & maintaining half hourly record
of temperature of each & every chambers by
supervisor, as per steam cycle?
50 De-tensioning of benches after required release
strength is done or not?
51 Whether Paint marking of batch no and date of
casting on every demoulded sleeper is done?
52 Whether end painting of every demoulded sleeper
before submerged for curing is done?
53 Whether casted sleeper in submerged water curing
tanks are kept in layer wise just after demoulding?
54 Whether stacking of sleepers is batch wise & type
wise (not more than 25 layers in each stack) in
stacking yard?
55 2nd coat end painting of sleepers after submerged
water curing
56 Is Critical dimensional checking of sleepers done
completely? (100 %)
57 Is 10% General dimensional checking of sleepers
done?
S. Item Remark
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
156
58 FTC checking of sleepers done or not?
G Record Keeping & Documentation
59 Whether Lab tests of raw materials are being done?
60 Whether Production registers maintained properly?
61 Whether Inspection certificates of raw materials
available?
62 Whether Steam curing records available?
63 Whether Dimensional checking register of sleepers
updated?
64 Whether Dimensional checking of moulds & benches.
Its repair register is maintained properly?
65 Whether Calibration of Machines, pressure gauges
& Proving rings is done?
66 SBT testing of sleepers, 15days water cured cubes
and released cubes register is maintained upto date?
67 Whether Statistical analysis report register is
available?
S. Item Remark
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
157
1 Whether the bridge is Minor
(Individual span < 12 m & Total Linear
Waterway < 18 m)? Span=………m
2 Whether the bridge is Major
(Individual span >12 m or Total Linear
Waterway > 18 m)?
Span=………m
3 Whether the bridge is Important
bridge (Total Linear waterway 300 m
OR Total Waterway 1000 m2 OR those
classified as "IMPORTANT BY CE/CBE")?
Span=………m
4 Whether the date of Inspection is
indicated on the bridge?
If so, what is Last date of Inspection?
Date=…………
5 Whether the date of Painting is
indicated on the bridge? If so, what
is Last date of Painting? Date→
6 Whether the date of Cleaning &
Greasing is indicated on the bridge?
If so, what is Last date of Cleaning &
Greasing? Date→
I. CHECK LIST FOR BRIDGE & TUNNEL:
S. Description Remarks Reference
N.
Yes/No IRBM-1103
(3) (c)
IRBM-1103
(3) (b)
IRBM-1103
(3) (a)
IRBM-203 (1)
IRBM-203 (1)
IRBM-1107
(4) (v)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
158
S. Description Remarks Reference
N.
Yes/No
Yes/No
7 Whether the date of lubrication of
bearing is indicated on the bridge?
If so, Last date of lubrication done?
Date=…………
8 Whether bridge / FOB is over railway track,
whether clearances are as per SOD?
If so, what is the vertical clearance
(5870 mm / 6350 mm)?
Vertical clearance=……………………
9 What is the clear horizontal distance
between respective centre of track and
any other structure (limiting value
2135 mm)?
10 Whether Trolley refuge is provided?
If so, Nos. required ______________ and
Nos. provided ____________.
11 Whether creep of bridge girder is
notice?
12 Whether condition of the footpath is
good?
13 Whether condition of drainage
arrangement is good?
14 Whether the Camber has been
recorded at the time of Inspection?
IRBM-1107
(4) (v)
SOD CH-
1(10) (iii)
IRBM-1107
(14) (a) (ii)
SOD CH-1 (8)
IRBM- 1107
(8)
------
IRBM-1107
(9)
IRBM-210
(2)
IRBM-212
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
159
S. Description Remarks Reference
N.
.....mm
If so, What is the method of recording
Camber?
What is the Camber
a) As per Drawing?
b) As per time of Last inspection?
c) At the time of Present Inspection?
15 Whether the bridge is to be inspected
at increased frequency?
If so, What is the frequency?
16 Whether the entries are made in
Bridge history Book?
17 Whether the Steel members are free
from distortion?
18 Whether the Steel members are free
from Corrosion?
19 Percentage of Defective, Broken,
Loose, Corroded & Badly Driven rivets
a) Boom Flanges
b) Web
c) Main Joints
d) Cross Girders
IRBM-1107
(15) (b)
IRBM-107
(1)
IRBM-107
(2)
IRBM-1107
(5)(c)
IRBM-216
.....mm
.....mm
Yes/No
Yes/No
Yes/No
Yes/No
.....%
.....%
.....%
.....%
160
S. Description Remarks Reference
N.
Yes/No
e) Stringers
f) Bracing& Foot Path
g) Base Plate
20 Whether any member of steel girder
is overstressed? (As advised by CBE)
21 Whether steel members are free from
cracks?
22 Whether Early steel girder floor
system is inspected once in a year?
If so, what is the Last inspection
date? →
23 Whether Welded girder is inspected
once in a three years?
If so,what is the last inspection date?→
24 Whether proper scraping done
wherever required?
25 Whether there is any local or uniform
corrosion over large area?
26 Whether some pitting/corrosion is
formed?
If so, Location of Pitting/ corrosion?
27 Whether the average thickness of
paint film is as per following
IRBM-215
(3)
IRBM-212
(a)
IRBM-213
(1)
IRBM-107
(1) (c),
1102-(1) (e)
IRBM-1102-
(1) b
IRBM-217-
(1) b
IRBM-216-
(3) (i)
IRBM-216-
(3) (ii),
1107 (5) (f)
(xvii)
IRBM-218-
(1) (ii) (b)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
.....%
.....%
.....%
161
S. Description Remarks Reference
N.
Yes/No
requirement?
a) Metalising (150 Micron)
b) Epoxy Painting (200 Micron)
28 Whether the Painting has been done
as per schedule (1 to 6 years)?
If so, What is the last date of Painting?
29 Whether all Holding Down (HD) Bolts
are intact?
What is the percentage of intact bolts
per bearing?
30 Whether locking strips and guide strips
are in good condition?
31 Whether bearing strip butts with
locking strip?
32 Whether schedule of greasing (once in
3 years) of bearings has been carried
out?
Date of greasing…………….
33 Whether there are any cracks in
Knuckle slab, Saddle Plate and Roller?
34 Whether bearing is centralized?
35 Whether replacement of oil in oil bath
bearing is done? (once in 5 yrs)
IRBM-218-
(2) (ii)
IRBM-217-
(5)
IRBM-1107-
(4)(ii)
------
------
IRBM-222-
(2) (a)
BS-102-
(3.2.3.1)
------
IRBM-222-
(2) (f)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
-----------
------%
162
S. Description Remarks Reference
N.
Yes/No
Yes/No
Date of oil replacement…………….
36 Whether connection of saddle plate
with bottom boom is intact?
37 Whether condition of elastomeric
bearing is examined?
If so, than
a) Is shear deformation more than
50% of height of pads?
b) Is compression more than 5% of the
height of Pads?
c) While in rotation any loss of contact
between bearing and girder?
38 Whether any tilting/settlement is
reflected in cracks in substructure?
39 Whether there is any unusual scour
around the piers?
40 Whether water way is free from
obstruction?
41 Whether flooring, drop wall & curtain
wall are provided?
What is the condition of componenet?
42 Whether (for foundation perennially
underwater) underwater inspection
------
BS-102-
(3.5.3)
IRBM-1107
(1) (a) (ii)
IRBM-
1107(1) (a) (i)
IRBM-117(1)
(f) IRBM-
1107(3)(ii)
IRBM-
1107(1) (b)
IRBM-
1107(2) (d)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
163
S. Description Remarks Reference
N.
Yes/No
done?
Date of inspection--_______________
43 Whether the Pitching of Guide bund/
groins is intact?
44 Whether there is any erosion of bank
in the vicinity of abutment?
45 Whether there is any displaced / crack
in bed block?
46 Whether any bed block is shaken?
47 Whether there is any crushing mark
under bed plate?
48 Whether any inspection platform is
available?
49 Whether there is any crack in masonry?
50 If yes, whether the crack is progressive?
51 Whether there is any weathering and
leaching of mortar?
52 Whether there is any vegetation
growth in masonry?
53 Whether there is any crack in
abutment face?
IRBM-809 (4)
(a)IRBM-
1107(3) (a)
IRBM-1107
(1)(a)
IRBM-(221)
(514)
IRBM-1107
(4/a/iii)
IRBM-
1107(1) (a)
IRBM-1107-
(2) (a)
IRBM-1107-
(2)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
164
54 Whether backfill materials are intact
in case of horizontal crack on abutment
face?
55 Whether any bulging/tilting is noticed
in ballast wall on abutment?
56 Whether there is Highest Flood Level
(HFL) with year & Danger Level (D L)
marking in abutments and gauge
marking on shore piers on important
bridges?
57 Whether bridge tablet is showing
direction of flow, Bridge Number, span
arrangement, Rail level etc. has been
provided?
58 Whether ballast retainer is leaning?
59 Whether cracks in Arch Barrel with
special reference to its direction of
propagation & length of the crack
observed?
60 Whether any cracks in the intrados are
observed to be propagating in
transverse direction i.e. direction
perpendicular to traffic?
61 Whether immediate rehabilitation
measures for repair of cracks in the
intrados planned & such cracks have
been kept under close observation?
S. Description Remarks Reference
N.
IRBM-1107-
(2)
IRBM-1107-
(10) & 203
(2 & 3)
IRBM-
1107(10) d,
f, h & 203 (2
to 9)
------
IRBM-208-
(1) (i)
IRBM-
1107(2) (e)
IRBM-208-
(1) (ii)
IRBM-
1107(2) (e)
IRBM-209
IRBM-
1107(2) (e)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
165
62 Whether crushing of masonry of Arch,
loosening of Key stone etc. noticed?
63 Whether any leaning of Parapet wall
noticed and weep holes in Parapet wall
are cleared?
64 Whether any tell-tale marks of repairs
earlier conducted?
65 Whether there are any loose boulders
at tunnel approaches & cutting and
major discontinuities?
66 Whether any weep holes are choked
in retaining walls and side drains?
67 Whether any tree is precariously
standing on the top of approach cutting
and slopes?
68 Are catch water drains on the
approaches and on the top of tunnel
cleaned?
69 Whether any portal has cracks in the
masonry or has shaken bulging
masonry?
S. Description Remarks Reference
N.
IRBM-208-
(1), (iv).IRBM-
1107(2) (e)
(viii)
IRBM-208-
(3)
IRBM-1107
(2) (e) (xi)
IRBM-1107
(2) (c)
IRBM-1007
(2)
IRBM-1012
IRBM-1008
(1.4)
IRBM-1012
IRBM-1007
(2) & para
1012 (5)
IRBM-1007
(2)
IRBM-1007
(2)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
166
70 Whether there are any loose boulders
in tunnel wall and roofing?
71 Whether there is any seepage inside
tunnel through rock joints in tunnel
wall and roof noticed?
72 Whether side drain and drainage inside
the tunnel is clean?
Whether ventilation shafts and adits,
are free from vegetation?
Whether there is any water logged area
near heavy seepage zone of tunnel?
73 Whether all fittings of steel sleepers
and rails particularly in heavy seepage
zone are intact?
74 Whether any infringements in moving
dimension are noticed?
75 Whether tablets on top of tunnel at
entrance indicating length, year of
construction and other information
are available?
76 Are water-ways clear at the bridge?
77 Whether SWR is continued over bridge
(span< 13.1 m), what is actual span?
78 Is any fish plate joint is on bridge or
within 6 M. of abutment? (None
allowed)
S. Description Remarks Reference
N.
IRBM-1007
(4, 2)
IRBM-1007
(4)
IRBM-1007
(5, 6, 7)
IRBM-1007
(9)
IRBM-1007
(3)
IRBM-1003
IRPWM-723 (2)
IRPWM Para
272 (4)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
167
79 For 26 m long rolled rails, whether 1 m
long fish plates with 6 bolts are
provided.
80 Whether permissible gaps at joints (as
per Zone and temperature range) are
given?
81 Is there any creep at joints noticed? If
yes,
LH side
RH side
82 Whether at approach two well
anchored standard rail lengths are
provided?
83 Whether LWR is continuing on the
bridge (span ≤ 20 m, 20 m to 43 m, >43
m), what is actual span?
84 a) Whether rail free fastenings are
provided from pier to pier with SEJ?
b) Whether SEJ is provided at the far
end of the bridge?
85 Whether all the provisions of LWR
manual were followed in continuing
LWR on the bridge?
S. Description Remarks Reference
N.
C/slip No.
125 & Para
272(4/a) of
IRPWM
IRPWM Para
510(3)
IRPWM Para
No.272 (6)
Para No.
272 (6) of
IRPWM
Para No.
272 (5) of
IRPWM
.....mm
Yes/No
Yes/No
.....mm
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
168
86 C/C spacing between sleepers (450
mm), what is actual value?
87 Clear spacing between sleepers.
88 Whether guard rail are provided on
girder bridges?
89 Clearance between guard rail and
running rail?
(250+50/ 250-50 mm)
90 Straight length of guard rail beyond the
span L1 (1875 mm)?
91 Length of flared portion of guard rail L2
(4875 mm)?
92 How much below is the top table of
guard rail from top of running rail (< 25
mm)?
93 Whether the ends of guard rails are
vertically bent and buried and block of
timber is provided
94 Whether pathway has been provided
at the centre of the track with
chequered plates?
95 Whether all AT welds on bridge as well
as on approaches of 100 M of both ends
S. Description Remarks Reference
N.
C/slip No.
102 & para
273 (B/iii) of
IRPWM
IRPWM Para
no.275
IRPWM Para
no.275/2
IRPWM C/
slip No. 102
C/slip No.
131 of
IRPWM
Yes/No
......mm
Yes/No
Yes/No
Yes/No
Yes/No
-----mm
-----mm
-----mm
-----mm
169
are provided with joggled fish plates
and clamps or with fish bolts at two far
end bolts?
96 Whether trolley refuses are provided?
(at every 100 m or on every pier)
97 Whether track Parameters like gauge,
cross level, cant, versines are within limits?
98 Whether condition of track fittings and
their tightness, particularly rubber
pads in case of steel channel sleeper
are good?
99 Whether guard rail are bent down in
the ballast at approach?
100 Whether tightness and correct osition
of lips of hook bolts checked by actually
touching with hand?
101 Whether steps are provided for
inspection of bridge?
102 Whether anti sabotage/theft fittings
are provided on the bridge?
103 Whether zero toe load track fastening
(rail free fastening) of LWR on bridge
and box anchoring of 2 to 4 sleepers in
the Centre of girders are provided as
per LWR manual?
104 Whether arrow mark of hook bolts is
aiming towards c/l of track?Percentage of hook bolts not holding
flange of girder--_______ .
S. Description Remarks Reference
N.
CS No. 119 of
IRPWM
IRBM-1107-
(7) (g) (i)
------
IRBM-1107-
(e) iii
IRBM-1107-
(c)
------
------
------
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
170
J. ITEMS PERTAINIG TO PASSAENGERS AMMINITIES
A. ADARSH STATION.
Ref: Commercial circular no 50 of 2013 circulated vide Rly Bd.’s Letter
no. 2009/TG-IV/10/PA/Adarsh Stns dated. 13-08-2013.
1. FACILITIES AT ADARSH STATIONS (‘A1, A, B & C’ CATEGORY)
1 Whether improvements in facade of station building
are done?
2 Whether retiring room available? (Except ‘C’
category, for ‘B’ category GM can sanction based on
need & demand)
3 Whether waiting room (with bathing facility)
available for upper class with TV? ( Except ‘B’ & ‘C’
category)
4 Whether waiting room (with bathing facility)
available for other classes with TV? ( Except ‘C’
category)
5 Whether separate ladies waiting room (with bathing
facility) available? (Except ‘B & C’ category)
6 Whether cloak room available? (Except ‘C’ category,
for ‘B’ category GM can sanction based on need &
demand)
7 Whether computer based public address system is
available?
S. Item to be Inspected REMARK
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
171
S. Item to be Inspected REMARK
N.
8 Whether circulating area is available with
necessary lighting?
(refer Table at Pg. no.186,187 for required
illumination level)
9 Whether landscaping and circulating area is
available? (If space is available)(Except ‘C’ category)
10 Whether earmarked parking is available?
11 Whether prepaid taxi/radio taxi booth available?
(Except ‘B & C’ category)
12 Whether electronic train indicator board/ plasma
TV train indicator system is available?
13 Whether lifts/escalator (if feasible) is available?
(Except ‘B’ & for ‘C’ category, GM can sanction based
on need & demand)
14 Whether standard signage are available?
15 Whether ‘Pay & Use’ toilets are available in
circulating area/ concourse area? (If not feasible,
departmental toilets are to be provided)
16 Whether ‘High level’ platforms are available?
17 Whether air conditioned VIP lounge is available?
(Only for ‘A1’ category)
18 Whether coach indicator board is available? (Only
for ‘A1’ & ‘A’ category)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
172
19 Whether FOB is available? (For ‘C’ category – Wider FOB)
20 Whether ‘water coolers’ are available?
21 Whether ‘PRS’ is available? ( Except ‘C’ category)
22 Whether ‘UTS’ is available?
23 Whether energy efficient, adequate lighting is
available on platform. FOB, circulating and
concourse etc.? (Refer table at Pg. no.186,187 for
required illumination level)
24 Whether ‘Battery car’ is available? (Only for ‘A1’
category)
25 Whether ramp at entry to station for PH and Sr.
citizens is available?
26 Whether separate parking for disabled person is
available?
27 Whether ‘Non slippery’ walkway from parking lot to
station building is available?
28 Whether toilet for PH is available?
29 Whether ‘May I help you’ booth is available?
30 Whether trolley path/end pathway for inter platform
movement of wheel chair for PH is available?
31 Whether ‘Wheel chair’ is available?
32 Whether mobile charging points are available? (If
electric power is available).
S. Item to be Inspected REMARK
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
173
2. FACILITIES AT ADARSH STATIONS (‘D & E’ CATEGORY)
1 Whether suitable face lift given to station building?
2 Whether waiting room for other than upper classes
(without bathing facility) is available? (For ‘D’
category only and for ‘E’ category seating cluster/
enclosure on main platform)
3 Whether computer based public address system is
available? (For ‘D’ category only)
4 Whether circulating area is available with necessary
lighting? (For ‘D’ category only)
(refer Table at Pg. no.186,187 for required
illumination level)
5 Whether landscaping and circulating area is
available? (If space is available)
6 Whether earmarked parking is available? (For ‘D’
category only)
7 Whether standard signage are available?
8 Whether ‘Pay & Use’ toilets are available in
circulating area/ concourse area? (If not feasible,
deptt. toilets are to be provided)
9 Whether high level for category ‘D’ and medium level
for category ‘E’ platforms are available?
10 Whether FOB is available?
S. Item to be Inspected REMARK
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
174
S. Item to be Inspected REMARK
N.
11 Whether ‘water coolers’ are available?
12 Whether ‘UTS cum PRS’ is available?
(for category ‘E’ GM can sanction based on need &
demand)
13 Whether energy efficient, adequate lighting is
available on platform. FOB, circulating and
concourse etc.? (Refer table at Pg. no.186,187 for
required illumination level)
14 Whether ramp at entry to station for PH and
Sr.citizens is available?
15 Whether separate parking for disabled person is
available?(For ‘D’ category only)
16 Whether ‘Non slippery’ walkway from parking lot to
station building is available? (For ‘D’ category only)
17 Whether trolley path/end pathway for inter platform
movement of wheel chair for PH is available?
18 Whether ‘Wheel chair’ is available?
19 Whether mobile charging points are available?
(If electric power is available).
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
175
B. FACILITIES AT STATION NOMINATED AS MODEL STATION
1. For categories ‘A1, A & B’
Ref: Comprehensive instructions issued by Rly. Board vide letter no.
2012/LM (PA)/3/5 dated 11-09-2012.
1 Whether Retiring Rooms are provided?
2 Whether Waiting Rooms with bathing facilities are
provided?
a . Upper class (Except ‘B’ category)
b. 2nd Class
c. Separate For ladies (Combined upper & 2nd Class)
(Except ‘B’ category)
3 Whether Cloak Room is provided?
4 Whether enquiry & computer based announcement
is provided?
5 Whether National Trains Enquiry System (NTES) is
provided? (Except ‘B’ category)
6 Whether Interactive Voice Response System (IVRS)
is provided?
7 Whether Public Address System is provided?
8 Whether Book Stalls / other stalls of essential goods
are provided?
9 Whether Refreshment Room is provided?
S. Item to be Inspected REMARK
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
176
S. Item to be Inspected REMARK
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
10 Whether Parking / Circulatory Area is provided?
(High mast with light is to be provided if feasible)
11 Whether washable apron with jet cleaning machines
are provided?
12 Whether electronic train indicator boards are
provided?
13 Whether touch screen enquiry system is provided?
14 Whether watering vending machines are provided?
(Optional for category ‘A & B’)
15 Whether FOB is provided?
16 Whether escalator is provided? (Except category ‘B’)
17 Whether travellator is provided?
(Except category ‘B’)
(Subject to space available and feasibility)
18 Whether standardized signage are provided?
19 Whether modular catering stalls are provided?
20 Whether automatic vending machines are provided?
(Optional for category ‘A & B’)
21 Whether pay & use toilets are provided on platforms
and circulating area?
22 Whether cyber cafes are provided?
(Except category ‘A & B’, subject to space available
and feasibility)
Yes/No
Yes/No
177
S. Item to be Inspected REMARK
N.
23 Whether ATMs, preferably with ticketing facilities
have been provided?
24 Whether at least one AC VIP/Executive lounge is
provided? (Except category ‘A & B’)
25 Whether Food Plaza is provided? (Except category ‘A
& B’)
26 Whether train coach indication system is provided?
(Except category ‘A & B’)
27 Whether Close Circuit Television (CCTV) for
announcement and security purpose is provided?
(Except category ‘A & B’)
28 Whether coin operated ticket vending machines are
provided?
29 Whether pre-paid taxi service facility is provided?
(Only at category ‘A1’ with GM’s approval)
30 Whether high level platforms available?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
178
C. MINIMUM ESSENTIAL AMENITIES AT STATIONS OF
DIFFERENT CATEGORIES.
Ref: Comprehensive instructions issued by Rly. Board vide letter no.
2012/LM (PA)/3/5 dated 11-09-2012.
1. MINIMUM ESSENTIAL AMENITIES AT ‘A-I & A’ CATEGORY STATION
1 Booking facility
(No. of counters)
(To operate round the
clock except if there
is no night working)
2 UTS
3 Drinking water (on
each platform)
4 Waiting Hall
(marginally lower up
to 5 Sqm allowed)
5 Seating arrangement
(No. of seats per
platform)
6 Platform shelter :
on each platform
Urinals
Yes/NoAs per norms
20 taps
250 Sqm. 125 Sqm.
150 125
500 Sqm. 400 Sqm.
15 10 Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
S.
N.
Facilities As per Norms Facilities
providedA 1 A
179
7 Urinals
i. includes provision in waiting rooms/hall
ii. 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for ladies
and gents
iii. Includes ‘Pay & Use’ toilets also.
8 Latrines
i. includes provision in waiting rooms/hall
ii. 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for ladies
and gents
iii. Includes ‘Pay & Use’ toilets also.
12 nos 10 nos
12 nos 10 nos
9 Foot Over Bridge
(with cover, new FOB-
minimum width 6m)
10 Water Cooler
11 Signage
12 Platform
Minimum one FOB
per station
Two on each platform
As per standard (Refer
Railway Board’s circular No.
97/TG II/39/11/signage dated
11.03.99)
All platforms should be of
high level
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
S.
N.
Facilities As per Norms Facilities
providedA 1 A
180
14 Fans
15 Time Table Display
16 Clock
17 Public address
system/ Computer
based announcements
18 Parking cum
circulatory area ,
with lights
19 Electronic train
indicator board
20 Public phone booth
One row of fans/Bay of COP
for 6 to 9 m wide shed.
Two rows of fans/Bay of COP
for shed wider than 9 m.
Yes/No
As per extent instructions Yes/No
Yes/No
As decided by Zonal Rlys.
Yes/No
As per extent instructions
Yes/No
As per extent instructions
At station entrance/
concourse, on foot over
bridge (At landing location)
and on platform at suitable
locations.
As per extent instructions
Yes/No
Yes/No
As per extent instructions
Refer Rly Bd.’s letter no.
2004/Elec (G)/109/1 dated
18-05-2007 – Extract at Pg.
no.186,187
Yes/No13 Ligting
Yes/No
S.
N.
Facilities As per Norms Facilities
providedA 1 A
181
2. MINIMUM ESSENTIAL AMENITIES AT ‘B, C & D’ CATEGORY
STATION
S.
N.
1 Booking facility -
(No. of Counters)
(To operate round the
clock except if there
is no night working)
2 UTS
3 Drinking water (taps
on each platform)
4 Waiting Hall
(marginally lower up
to 5 Sqm allowed)
5 Seating arrangement
(seats per platform)
6 Platform shelter (on
each platform)
7 Urinals
Yes/No
Facilities As per Norms Facilities
providedB C D
6 4 4
As per norms Yes/No
20 nos 06 nos 08 nos Yes/No
75 Sqm NIL 30 Sqm.
100 10 50
200 Sqm 200 Sqm 50 Sqm
6 nos 4 nos 4 nos
Yes/No
Yes/No
Yes/No
Yes/No
i. includes provision in waiting rooms / hall
ii. 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for
ladies and gents
iii. Includes ‘Pay & Use’ toilets also.
8 Ltrines(Nos) 6 2 4 Yes/No
182
Yes/No
02
i. includes provision in waiting rooms / hall
ii. 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for
ladies and gents
iii. Includes ‘Pay & Use’ toilets also.
9 Foot Over Bridge Minimum one FOB
per station
1. New FOB-minimum width 6m.
2. For ‘D’ category FOB to be provided during
doubling/Gauge conversion for crossing
stations.
10 Water Cooler - on
each platform.
Ref: Rly Bd.’s letter
no. 69/Elect (g)/730/8
dt.30-03-1971.
11 Signage (Refer
Railway Board’s
circular No. 97/TG II/
39/11/signage dated
11.03.99)
12 Platform (Level)
13 Lighting
02 01 Yes/No
As per standerd
(Expect ‘C & D’ category)
Yes/No
Medium High Medium Yes/No
Ref: Rly Bd.’s letter no. 2004/
Elect(G)/109/1 dated 18-05-
2007 , extract at page no.
186,187
Yes/No
S.
N.
Facilities As per Norms Facilities
providedB C D
183
S.
N.
Facilities As per Norms Facilities
providedB C D
14 Fans
15 Time Table Display
16 Clock
17 Public address
system/ Computer
based
announcements
One row of fans/Bay of COP
for 6 to 9 m wide shed.
Two rows of fans/Bay of COP
for shed wider than 9 m.
As per extent instructions
As decided by Zonal Rlys.
As per extent instructions
(Except ‘C & D’ category)
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
3. MINIMUM ESSENTIAL AMENITIES AT ‘E & F’ CATEGORY
STATION
As per Norms Facilities
providedFacilitiesS.
N.
1 Booking facility – (No.
of counters)02 01
To operate round the clock except if there is no night
working.
2 UTS
3 Drinking water- nos of
taps on each platform
As per norms NIL Yes/No
If piped water is not available separate
arrangement of potable water as approved by GM,
to be made.
02 Appropriate
facility
4 Waiting Hall 15 Sqm 10 Sqm
Yes/No
Yes/No
Yes/No
184
7 Urinals
10
Yes/No
NIL
50 Sqm (Min.) Shady trees
1 no. NIL
i. includes provision in waiting rooms / hall
ii 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for ladies
and gents
iii Includes ‘Pay & Use’ toilets also.
8 Latrines Yes/No1 Number NIL
i. includes provision in waiting rooms / hall
ii 1/3rd to be reserved for ladies. In case of 2 toilets
existing, one each should be earmarked for ladies
and gents
iii Includes ‘Pay & Use’ toilets also.
9 Platform
10 Lighting
11 Fans
Rail level Yes/No
Ref: Rly Bd.’s letter no. 2004/
Elec (G)/109/1 dated 18-05-
2007, extract at Pg. no.186,187
One row of fans/
Bay of COP for 6
to 9 m wide
shed.
Two rows of
fans/Bay of COP
for shed wider
than 9 m.
NIL
Yes/No
Yes/No
NIL Yes/No
Yes/No
Yes/No
5 Seating
arrangement (No of
seats per platform)
6 Platform shelter
S.
N.
Facilities As per Norms Facilities
providedB C D
185
12 Time Table Display As per extent instructions Yes/No
13 Clock As Decided by Zonal Rlys. Yes/No
1 Concourse
2 Circulating area
3 Waiting Hall
4 Retiring Room
5 Platform
a. Open
b. Covered
6 Enquiry cum Reservation office
a . General
b. Counter
7 Covered Passage way
a . Corridors
b. FOB
c. Stairs
Extract of Rly Bd.’s letter no. 2004/Elec (G)/109/1 dated
18-05-2007: Lighting arrangement at different areas:-
S.
N
Lux
level
Location
100
30
100
100
30
100
100
150
50
50
50
S.
N.
Facilities As per Norms Facilities
providedB C D
186
S.
N.
Facilities As per Norms Facilities
providedB C D
8 Parcel/luggage office
a . General
b. Counter
9 Time table- using task lighting
10 Outdoor car parking
11 Restaurant area
a . Kitchen
b. Stores
c. Dining Hall
12 Other service buildings at station
13 Cloak Room
a. General
b. Counter- using task lighting
14 Public Utility Services - Toilet/ Bathroom
100
150
200
30
150
100
150
200
100
150
75
187
K. ITEMS PERTAINIG TO COLONY AND OTHER BUILDINGS
Ref: Rly Bd.’s letter no. 2014/LMB-II/1/1 dated 25-07-
2014 and 2014/LMB-II/1/1 (A) dated 25-07-2014.
(A) COLONY INSPECTION BY ‘COLONY INSPECTION GROUP
(CIG)’
1. General:
S.
N.
1 Whether ‘CIG’ formulated as per latest
instructions?
2 Whether ‘CIG’ inspection & meetings are held
regularly once in THREE months?
3 Artisans training: Initial and refresher arranged
regularly?
4 Whether modern tools & equipment are available
with artisans?
5 Whether standard ‘Tool kit ’ is available with
artisans?
6 Whether ‘Valve’ operation is automised?
7 Whether old quarters, planned for replacement has
been inspected thoroughly and it has been ensured
that repair is not economical?
Yes/No
Particular Remarks
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
2. Items to be inspected by ‘COLONY INSPECTION GROUP (CIG)’:
S.
N.
1 Whether Cleanliness of colony is upto mark? Yes/No
Particular Remarks
188
2 Whether quarters are maintained in sound
condition having structural integrity?
3 Whether leaky roofs are attended properly?
4 Whether outside door & windows are maintained
properly?
5 Whether water supply is maintained properly?
6 Whether sanitation and drainage arrangements
are maintained properly?
7 Whether repair to floors is done properly?
8 Whether repairs to pathways is done properly?
9 Whether repairs to fencing and other items is done
properly?
10 Whether improvement of substandard quarters
done?
11 Whether disposal of waste from colony is arranged
properly?
12 Whether encroachment is prevented properly?
13 Whether cattle nuisance is prevented properly?
14 Whether subletting of quarters is checked &
prevented properly?
15 Whether security arrangements for colony are
proper?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
S.
N.
Particular Remarks
189
(B) MAINTENANCE SCHEDULE FOR STAFF QTRS. AND COLONY:
1. Schedule for finishing items: For type II to V Qtrs.
S.
N.
1 Whether exterior colour washing & Interior white
washing including ceiling done once in a year?
2 Whether white washing of Kitchen & pantry done
once in a year?
3 Whether painting with plaster paint, synthetic
enamel, Oil bound distemper, acrylic paint and
acrylic distemper done once in TWO years?
4 Whether polishing/painting of interior wood work
and painting of steel work done once in THREE years?
5 Whether premix, semi dense carpeting of roads
done once in FIVE years?
6 Whether collection of water samples and analysis
done for:
a . Physical & bacteriological test – Every month.
b. For chemical test – Six monthly.
Yes/No
Particular Remarks
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
2. Schedule for sanitation items: For residential buildings
and colonies:
S.
N.
1 Whether cleaning and disinfection of water
storage/distribution tanks & water mains done
once in SIX months?
Yes/No
Particular Remarks
190
2 Whether cleaning of manholes/gully chambers/
inspection chambers and flushing of building
sewers done once in a YEAR before monsoon?
3 Whether cleaning of storm water drains done once
in a YEAR before monsoon?
4 Whether cleaning of wet drains meant to serve as
quarter drains done at least once in a FORTNIGHT?
5 Whether clearing of rank vegetation done at least
once in a MONTH during monsoon?
6 Whether clearing of rank vegetation done as per
requirement in period other than monsoon?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
(C) CHECKLIST FOR TAKING OVER BUILDING / QUARTER AFTER
CONSTRUCTION:
S.
N.GENERAL ITEMS
1 Whether proper drains and drain pipes has been
provided for the disposal of water.
2 Whether the surrounding area cleared off, of unused
materials and construction debris/waste etc. ?
3 Whether plinth protection has been provided for
the building?
INSIDE BUILDING ITEMS
WALLS
1 Are there any cracks in walls?
2 Are there any signs of dampness/leakage on walls?
3 Whether finishing of wall surface is smooth and proper?
Yes/No
Description of item Remarks
Yes/No
Yes/No
Yes/No
S.N.
Particular Remarks
191
FLOORS
1 Are there any cracks in floors, skirting and dado?
2 Are the floors laid to proper slopes?
3 Is there a stagnation of water in WC, bath and verandahs?
4 Whether finishing of floor surface is smooth and proper?
ROOFS
1 Are there any leakages in roofs?
2 Whether ‘Golas’ are properly made?
3 Is the slope of roof proper?
4 Are the traps and rain water pipes proper to drain
water without ponding?
DOORS, WINDOWS AND VENTILATORS
1 Are all the fittings viz. locking arrangement, tower
bolts, pull bolts, door stoppers, hooks, stays and
hinges etc. are provided & functioning properly?
2 Whether quality of wood is as per specification?
3 Whether surface of frame and shutter is smooth?
FINISHING
1 Is the plastering of walls and ceiling satisfactory,
smooth and free from cracks and other defects?
2 Is the painting of walls / doors and windows proper?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
S.N.
Particular Remarks
Yes/No
192
WATER SUPPLY AND SANITATION
1 Is there any leakage in the sewer lines, drainage
pipes etc.?
2 Are flushing cisterns, wash basins etc. correctly
fitted and working properly?
3 Are the covers of manholes, gully traps and floor
traps etc. provided?
4 Is the slope of sanitary pipes proper?
5 Is the condition of water overhead tank proper
including float valve & cleaning of tank?
6 Any other deficiency noticed in the building
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
L. ITEMS PERTAINING TO LAND MATTER.
S.
N.
1. Whether village-wise
land records i.e.
Jamabandi, Shajra, and
mutation documents
available?
2 Whether land plans are
authenticated?
3 Whether authenticated
land plans are available
and micro filming done.
Yes/No
Item to be inspected ReferenceRemarks
Yes/No
Yes/No
Para 806 (a) to (c) of
IRWM for Land record
and for micro filming
Para 806 (d)
S.N.
Particular Remarks
193
S.
N.
Yes/No
Item to be inspected ReferenceRemarks
4 Whether land boundary
post is being provided
at 50 m on either side?
5 Whether within the
boundary, the
demarcation of offsets
is done at change point?
6 Whether land boundary
post is visible?
7 Whether land boundary
post/boundary wall is
missing/damaged?
8 Whether periodical
verification of land
boundary is being done?
9 Whether land boundary
verification registers
are available?
10 Whether there is any
encroachment of
jhuggies /permanent
structures?
11 Is the encroachment
register maintained?
12 Whether any
encroachment has been
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Para 808 (v) of IRWM
Para 809 (b) of IRWM
Para 813 (a to e) of
IRWM
Para 814 (C) of IRWM.
Yes/No Para 814 (e & f) of IRWM
& Ann 8.2
194
S.
N.
Yes/No
Item to be inspected ReferenceRemarks
dealt under Public
Premises (Eviction of
Unauthorized
occupants) Act (PPE
Act)?
13 Whether any action is
being taken for removal
of encroachment?
14 Whether there is any
case registered in the
Court regarding
encroachments?
15 Whether there is any
unauthorized Religious
structure in the
premises?
16 Whether Religious
structure register is
maintained?
17 Whether track crossing
register is maintained?
18 Whether there is any
unauthorized track
crossing?
19 Whether realization of
way leaves charges
done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Para 818 of IRWM
-
-
Para 1033 of ENGG
CODE.
195
S.
N.
Yes/No
Item to be inspected ReferenceRemarks
20 Whether validity period
of any track crossing
expired?
21 Whether agreements
are available for track
crossing?
22 Is there any private
siding?
23 Are there any
commercial plots?
24 Are there any Shops/
Tehbazari?
25 Whether license fee has
been updated for the
current year?
26 Whether license fee has
been updated on the
basis of market value of
land after 5 years?
27 Whether land is licensed
to Railway Staff for Grow
More Food (GMF)
purposes?
Yes/No
Yes/No
Yes/No
Yes/No
Para 1830 and 1139 of
Engg. Code. OR refer
liberalized siding
policy vide boards
various letters.
Yes/No
Yes/No
Yes/NoYes/No
Para 821 (c) of IRWM.
Para 821 (f) of IRWM.
Refer Rly Bd updated
policy.
No. 2009/LML/16/3
dated 16/07/2010
Para 1033 of
Engg. Code
196
S.
N.
Yes/No
Item to be inspected ReferenceRemarks
28 Whether any land is
licensed to Container
Corporation of India /
International Container
Depot (CONCOR)?
29 Whether execution of
land license agreement
has been done for all
cases?
30 Whether validity of any
agreement has expired?
31 Whether any tree is
infringing signal / OHE /
track?
32 Whether matured trees
are being processed for
sale?
33 Whether tree register is
maintained?
34 Whether any action has
been initiated for de
notification of protected
forest?
35 Whether master data
entry in land module has
been done or not?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Refer Rly Bd updated
policy.
Para 715 of IRWM
Para 721 of IRWM.
Para 720 of IRWM
Para 721 (2) of IRWM.
N0.2014/LML-II/2/3
dated 28/07/2014
197
1. Whether truss/column is in sound condition?
2. If not, whether any remedial action is being taken?
3. Whether the timber is decaying?
3(a) If so, whether any remedial action is being taken?
4. Whether bed blocks or pedestals are in sound
condition?
4(a) If not, whether any remedial action is being taken?
5. Whether all fixtures are intact in bed blocks or
pedestals?
5(a) If not, whether any remedial action is being taken?
6. Whether the condition of paint is in good condition?
6(a) If not, whether any remedial action is being taken?
7. Whether date of painting is mentioned on the
structure?
8. Whether corrosion of steel is taking place?
8(a) If so, whether any remedial action is being taken?
9. In the case of steel work built into masonry, such as
tie rods of arched buildings, whether any corrosion
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
M. STEEL STRUCTURES IN WORKSHOPS, RUNNING SHEDS AND
PLATFORMCOVERS IN WHICH ROOF TRUSSES ARE FIXED
TO BUILT UP STANCHIONS
Ref: Para229 IRWM
Item to be inspected RemarksS.
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/NoYes/No
Yes/No
Yes/No
Yes/No
198
Yes/No
Yes/No
Yes/No
Item to be inspected RemarksS.
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
is apparent near the masonry?
9(a) If so, whether any remedial action is being taken?
10 Whether the condition of rivets, bolts and tie rods
particularly of water storage tanks are in sound
condition?
10(a) If not, whether any remedial action is being taken?
11. Whether any crack have developed in cast iron tank
plates?
11(a) If so, whether any remedial action is being taken?
12. Whether any deformation of the structure has
occurred?
12(a) If so, whether any remedial action is being taken?
13. Whether anchor-bolts are tightly fastened to
foundations & bearings?
13(a) If not, whether any remedial action is being taken?
1. Whether any crack has developed in CI/WI/Pressed
up steel/tank plates?Yes/No
N. CI/WI/PRESSED UP STEEL WATER TANK & STAGING & FLOOD
LIGHTTOWERS
Ref: Para229 IRWM
Item to be inspected RemarksS.
N.
199
Yes/No
Yes/No
Yes/No
Yes/No
Item to be inspected RemarksS.
N.
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
1(a) If so, whether any remedial action is being taken?
2. Whether corrosion in steel is taking place?
2(a) If so, whether any remedial action is being taken?
3 In the case of steel-work built into masonry, such
as tie rods of arched buildings and roof trusses,
whether any corrosion is apparent near the
masonry?
3(a) If so, whether any remedial action is being taken?
4 Whether the condition of rivets, bolts and tie rods
particularly of water storage tanks are in sound
condition?
4(a) If not, whether any remedial action is being taken?
5 Whether bed blocks or pedestals are in sound
conditions?
5(a) If not, whether any remedial action is being taken?
6 Whether all fixtures are intact in bed blocks or
pedestals?
6(a) If not, whether any remedial action is being taken?
7 Whether the condition of paint is good?
7(a) If not, whether any remedial action is being taken?
8 Whether date of painting is mentioned on the
structure?
Yes/No
Yes/No
Yes/No
200
Yes/No
Yes/No
Yes/No
Item to be inspected RemarksS.
N.
Yes/No
Yes/No
Yes/No
9 Whether anchor-bolts are tightly fastened to
foundations & bearings?
9(a) If not, whether any remedial action is being taken?
10 Whether any deformation of the structure has
occurred?
10(a) If so, whether any remedial action is being taken?
11 Whether decay in timber is taking place in case of
wooden staging?
11(a) If so, whether any remedial action is being taken?
12 Whether any sign of leakage has been detected in
water tank?
12(a) If so, whether any remedial action is being taken?
Yes/No
Yes/No
1 Are inspections of the various water supply
installations being done as per IRWM i.e. Once
in THREE months by ADEN and joint inspection
once in a year by SSE/W with MECH/ELE dept.?
2 Are records of inspections of the various water
supply installations being maintained properly
in registers?
Yes/No
O. WATER SUPPLY INSTALLATION
1. List of Check Points on Quality of Water supply – General:
Item to be inspectedS.
N.
Remarks
IRWM
Para
554/c/i
Yes/No IRWM
Para
554/e
Ref.
201
Yes/No
Yes/No
Yes/No
Item to be inspected RemarksS.
N.
Yes/No
Yes/No
Yes/No
Yes/No
3 Whether storage tank (Underground & elevated)
is clean and date of cleaning is mentioned?
4 Whether tube well is protected against
contamination from surface water?
5 Whether water samples tested from filtration
plant every MONTH?
6 Whether water samples tested for chemical
examination SIX MONTHLY (or once before & after
monsoon)?
7 Whether samples collected as per specified
manner?
8 Whether collected samples sent to medical
department or lab duly leveled, sealed without
delay?
9 Whether leakage detection test conducted?
1 Whether chlorination plant is in good working
condition?
2 Whether records like log book, and plant failure
register of the chlorination plant properly
maintained and up to date?
Yes/No
2. Inspection of Chlorination Plant
Item to be inspected RemarksS.
N.
Ref.
IRWM
Para 537
IRWM
Para 554/a
Yes/No
IRWM
Para 554/a
IRWM
Para 532
IRWM
Para
532/e
IRWM
Para 546
202
Yes/No
Yes/No
Yes/No
Item to be inspected RemarksS.
N.
Yes/No
Yes/No
Yes/No
Yes/No
3 If the plant is maintained and operated through
contract, are all records of operation and
maintenance properly maintained?
4 Are plant failures promptly attended?
5 If the plant is maintained and operated
departmentally, are spares of all critical
components in stock?
6 Whether chlorine demand of the raw/untreated
water is being regularly tested?
7 Whether equipment/disinfectant chemicals in
chlorination plant are stored properly in safe
condition?
8 Whether proper record of date of receipt, date of
testing and date of consumption of the hypochlorite
solution maintained?
9 Are all components of chlorination plant
functioning properly including proportionate dozing
system (if provided)?
10 Whether contact period of 30 to 60 minutes is
maintioned?
11 Whether residual chlorine of 0.2 ppm is available
in normal condition?
Yes/No
Yes/No
203
P. RAIN WATER HARVESTING SYSTEM (RWH)
Yes/No
Yes/No
Yes/No
Item to be inspected RemarksS.
N.
Yes/No
Yes/No
Yes/No
Yes/No
1 Whether new buildings which are being provided
with suitable RWH structures as per local bye laws?
2 Whether recharged water is silt free and properly
maintained?
3 Whether well/trench used for RWH is being cleaned
periodically?
4 Whether the recharge shafts for RWH are being
constructed 10-15 m away from the building for the
safety of building?
5 Whether there is an approved plan for RWH
installation?
6 Has the RWH system been checked before
monsoon?
7 Has the RWH system been checked after monsoon?
� � �
204
CHAPTER NO – 5
Inspection at New construction Site
A. CHECK LIST FOR WORK SITES
Infringement to Running Line by Construction Machinery Vehicles
1 Vehicle to ply minimum generally 6m
clear from center line of track, if
required, upto 3.5 m only with the
permission of Engineer – in – charge.
Has this been done?
2 If required to work within less than 3.5
m clearance from the center line of
track, whether the presence of
authorized Railway Inspector is
ensured?
3 Whether proper barricading or 150
mm thick line (of lime) marking at a
distance of 3.5m from the centre of
track has been provided or not?
4 Is nominated vehicl is plying between
sunrise & sunset?
Para 826
of IRPWM,
For
dimensional
details
refer ann-
ii of PCE/
ECR
circular
no. 16 /
2010/
Track
Yes/No
S. Items to be checked Remarks Reference
N.
Yes/No
Yes/No
Yes/No
205
S. Items to be checked Remarks Reference
N.
5 Whether trained drivers are being
utilized and the presence of at least
one flag man and one supervisor
certified for such work?
6 If night working is done, whether it has
been permitted by AEN/XEN in writing
any by deputing one inspector?
7 Whether walkie talkie sets or mobile
phones have been provided at the
site of work?
8 Whether S & T and electrical staff
have been informed before starting
of work along the track?
9 Whether vehicle / tractor drivers
trained by the Railway Officers/
Supervisors to work along the track
as per safety guide lines?
10 For night working whether sufficient
light has been provided?
Yes/No
Para 826
of IRPWM,
For
dimensional
details
refer ann-
ii of PCE/
ECR
circular
no. 16/
2010/
Track
Yes/No
206
S. Items to be checked Remarks Reference
N.
1 Whether work is being done in
presence of authorized Over Head
equipments (OHE) staff with proper
power block & permit to work?
2 If track bonds, feeder connection etc.
have been disturbed, whether they
have been re-connected properly
after completion of work?
3 Whether mast foundation is exposed
and track level raised/slewed beyond
permissible limits?
4 Whether a minimum distance of 2
met. has been maintained between
live OHE wire and body parts of the
worker or tools or metallic supports,
etc.?
B. Work in /near Electrified Territory :
Yes/No
Para 283
(2)of
IRPWM
Yes/No
Yes/No
Yes/No
207
D. Check list for Track Ballast:
S. Items to be checked Remarks Reference
N.
1 Whether the track ballast is hard, well
graded machine crushed and angular
in shape.
2 Physical properties of the ballast
a . Is the abrasion value of the track
ballast done is less than 30%
Yes/No
Yes/No
Specification
of ballast as
per IRS GE-
1, June
2004
corrected
upto CS no 3
dtd 05-1-
09GCC
S. Items to be checked Remarks Reference
N.
1 Whether contractor has ensured
proper barricading and protection at
the site of work?
2 Whether sufficient free space for
movement of passenger traffic
provided, to avoid any untoward
incidents for all works done within
station premises, especially on
passenger platform?
3 Whether proper signage has been
provided?
C. Precautions within station Premises
Yes/No
Yes/No
Yes/No
Para 34(3)
& 34(4) of
GCC
208
b. Is the impact value of the ballast is
less than 20%
c. Is Water absorption in less than 1%
(In exceptional cases on technical and
economic ground, can be relaxed up to
35% and 25% respectively by CTE in
open line and CAO/C for construction
projects.)
Size and gradation:
Is the ballast satisfy the following size
and gradation:
a . Retained on 65 mm Sq. mesh sieve
5% Maximum
b. Retained on 40 mm Sq. mesh sieves
40% - 60%
c. Retained on 20 mm Sq. mesh sieve
Not less than 98% for machine
crushed. Not less than 95% for hand
broken.
Oversize Ballast:
a . In case retention on 65 mm square
mesh sieve exceeds 10%, the stack
shall be rejected.
b. In case retention on 40 mm square
mesh sieve exceeds 70%, the stack
shall be rejected.
Yes/No
Yes/No
Specification
of ballast
as per IRS
GE-1, June
2004
corrected
upto CS no
3 dtd 05-1-
09GCC
Yes/No
Yes/No
Yes/No
Yes/No
3
209
Under size Ballast:
The ballast shall be treated as under
size and shall be rejected if:-
a. Retention on 40 mm sq. mesh sieve
is less than 40%
b. Retention on 20 mm sq. mesh sieve
is less than 98%
(For machine crushed) or 95% (for hand
broken.) Has this been done?
Stack measurement
Stacking if done on a neat, plain and firm
ground with good drainage. The height
of stack is not less than 1 m except in
hilly area where it may be 0.5 mm.
Cubical content of each stack should
normally be not less than 30 cum in plain
area and 15 cum in hill area.
The screen for sieving the ballast shall
be of square mesh. If Mesh in not less
100 X 70 X 10 cm (LXBXH). The following
tolerances in the size of the hole for 65,
40 and 20mm nominal size shall be
permitted.
Specification
of ballast
as per IRS
GE-1, June
2004
corrected
upto CS no
3 dtd 05-1-
09GCC
Yes/No
4
Yes/No
210
Specification
of ballast
as per IRS
GE-1, June
2004
corrected
upto CS no
3 dtd 05-1-
09GCC
a. 65 mm sq. mesh plus/minus 1.5 mm
b. 40mm sq. mesh plus/minus1.5 mm
c. 20mm sq. mesh plus/minus 1.0 mm
E. Form Work in Concreting Work :
S.N. Items to be checked Remarks
1 Whether proper temporary support e.g.
shoring, timbering and strutting has been
checked before concreting works?
2 Whether stability and safety of all structures,
excavation and works has been ensured?
3 Whether form work is water tight?
4 Whether dimensions are checked and found
correct?
Yes/No
Yes/No
Yes/No
Yes/No
F. Box Pushing Work. :
S.N. Items to be checked Remarks
1 Whether box pushing work is to be done in parts
of 10 to 20 cm to minimize disturbance to track?
2 Are trains permitted to pass during actual box
pushing operation?
Yes/No
Yes/No
211
Yes/No
Yes/No
3 Whether track parameter has been checked
and recorded before the passing of first train?
4 After close of box pushing work whether the
speed of first train passed at speed of stop
dead and 10 kmph and subsequent trains were
upto 30 kmph?
5 Whether track parameter has been checked
after each round of box pushing by the
supervisor In-charge before leaving site?
6 Whether posting of proper look out Man with
banner flags and other protection equipments
has been ensured when box pushing is not in
progress?
Yes/No
Yes/No
� � �
212
Notes
213
Notes
214
Notes
215
Notes
216
Notes
217
Notes
218
Notes
This book is compilation of updated instructions on different subjects, kindly also refer to latest correction slips, if any. Although due care has been taken while preparing this compilation. In case of any doubt/discrepancies, users are advised to kindly refer to original document/correction-slips, as indicated therein. The same may be brought to the notice of IRICEN, Pune at e-mail id: [email protected]
Published by :
Indian Railways Institute of Civil Engineering, Pune 11-A, South Main Road, Koregaon Park, Pune - 411001.
Price < 60/-
Design by :HUMA Adds, Pune.
Printed by :Kalyani Corporation, Sadashiv Peth, Pune - 30.