ONLY THE BEST COMPANIES SURVIVE
COMPANY PROFILE
Table of Contents
Chairman letter Introduction Vision Mission Objective Capabilities Design Electrical Design Automation Design Mechanical DesignErection Electrical ErectionMechanical Erection Commissioning and start up Electrical panels workshopProject management Technical supportPES organization chart Facilities Erection equipment’s Testing equipment’sReference list Projects Photos Contact us
34555 6777899101112131314151515162244
Page 2Company Profile 2017
Chairman Letter.
In today’s global economy, only the best companies survive. Our company is able to do so by adopting approaches that meet and surpass the important challenges caused by Extreme Changes in our country and Middle East .
Our mission statement stands as a reflection of our unbroken commitment to do the best for customer satisfaction
Our company created by a group of professional engineers with Integrated experiences in the Electromechanical Infrastructure, MEP & Industrial work especially cement Industry and other heavy industries
Our commitment to improve efficiency and build reputation in the Field of electromechanical contracting
I invite you to read through this document and to have more information about our esteemed company
SincerelyEng.Tarek El Feshawy
PES Chairman
Page 3Company Profile 2017
Introduction
PES Egypt - is stock company Foundation accordance with the provisions of Egyptian law No.159 of 1981 and established according to the provisions of Egyptian law No.95 of 1992, contained in commercial registration no. 27368, executed before secretary of commercial register, Authorized share capital50,000,000 L.E and the issued and fully paid share Capital of the company at 4 August 2009 amounted to 5,000,000 L.Edistributed over 50,000 shares with par value 100 L.E each, at December 2016 PES Raised the company capital from 5,000,000 to 10,000,000 L.E.
Company Profile 2017
PES staff are aware of the international codes and standards, safety, with high technical and personal skills.PES staff are able to coordinate between various contractors in site, able to manage and control the job with time schedules and periodic reports. PES Policy, in carrying out all its activities, is to pursue a Sound Health, safety and Environmental System and Program in order to protect the safety and health of employees, contractors, customers and the community at large. The main goal is to minimize the impact to environment, in compliance with the Federal and Local Legislation concerning HSE and the applicable international rules and standards. We are looking ahead to the future needs of industry, and we are ready for all the challenges
Page 4
Vision
To be one of the Top Electromechanical contractors in the Market and its related services
Mission
To fill the gap of professional contractors in the market and supply the service in a professional, well organized wayTo give the best of the new electromechanicalservices to everyone, everywhere, at any time
Objectives
Improve workplace health and safetyDevelop our peopleTo fulfill the 3 corners of the project managementtriangle in our projects Time, Cost, Quality
Page 5Company Profile 2017
Capabilities
PES have a group of the best engineers, supervisors, electricians, and fitters with high experience in the Electromechanical work inside and outside Egypt.
PES have all the necessary tools and equipments, and capable of buildingsite facilities for erection.
Design
Page 6Company Profile 2017
Professional Engineering Services
Erection
Commissioning
Project Management
Technical Support
Panels Builder
Design
Electrical Design
MV single line diagramCable calculation and cables routingVoltage drop calculationShort circuit calculationSelectivity studyMotor control center and low voltage distribution boardPower factor improvementHeat dissipation studyAuxiliary control panelMarshalling panelPLC panelNetwork and Junction boxesLighting panel and socket boxesEarthing SystemFire Alarm SystemMaterial lists and bill of quantitySensor, Signal, Cable and Consumer listTrouble shooting drawing.
Automation Design
Expertise, analyseImprovement and optimization…Logic / loop diagrams and Marshalling Panels.Control room layout and arrangement drawings.Programming standardsSystem configurationMimic & visualization systemsPLC programmingDesign and / or implementing communications
Company Profile 2017 Page 7
Company Profile 2017 Page 8
Mechanical Design
HVAC
DX & Package systems Chilled water systemsVentilation (supply & exhaust Fans)Air ducts sizing & calculationsCompressed air systems
Plumbing
Domestic water networksDrainage networksInfrastructure networksIrrigation system
Fire Fighting
Fire fighting pumps & hydraulic calculationsFM200 , CO2 hydraulic calculations.Foam fire suppression systems.Fire cabinets.
Erection
Electrical Erection
Installation of transformers, panels…etcCables laying and termination (MV, LV, LC)Cable ways (trays, ladder, conduits ,….etc) Lighting (indoor ,outdoor & street lighting)Wiring devices & safety switchesEarthing & lightning protectionCathodic protection Industrial instrumentationsPatch panels & fiber optics cables Fire Alarm systemTelephone and data systemCCTV & surveillance systemAccess control systemSound & public address systemFalse floor and False ceilingInfrastructure & underground gridsManpower supply with complete Tool’s and Equipment’s, and safety tools.
Company Profile 2017 Page 9
Schneider Electric - Sudan
South Valley Cement – Egypt
Arabian Cement Company- Egypt
Tourah Cement - Egypt
Mechanical Erection
Diesel generators & air CompressorsDX & package unitsChilled water systems (water / air cooled)Expansion tanks & air separators Water treatment systemAir handling units, fan coil units & hookup Fresh air & exhaust fans.Air ducts (galvanized & black steel)Filters (pre-filter, HEPA ,…….etc)Air outlets (SCD, RCD, EXCD,….etc)Thermal insulation for ducts & pipesBuilding management system BMSDomestic water & drainage systemIrrigation networkDrainage & water supply Infrastructure Sanitary fixtures & ancillariesPump room (diesel ,electrical, jokey ,booster & sump pumps)Sprinkler system including zone control valve Fire standpipe system (Fire hydrant , Siamese connection & hose cabinets.FM200 ,CO2 & foam fire suppression systems
Company Profile 2017 Page 10
Linking Plaza- Egypt
Cairo Festival City - Egypt
Twin Towers - Egypt
Twin Towers - Egypt
Commissioning and Start-up.
Distribution transformers up to 2500 KVAMP, MCC, ACC and Lighting panelsUPS and battery charger systemsTesting all types of cables (low voltage, medium voltage, and control)Variable speed drivesMV switch gear Relay TestingStart up all the equipment on the field like belts,screw conveyors, air blowers, compressors, fans, water and oil pumps , generators , chillers , pumps …… etcCheck and adjust all types of instrumentation like limit switches, water and oil Levels, speed monitor, pressure and temperatureCold run test , sequence test & load testLight Current Systems loop tests, commissioning and Start-upHVAC testing, balancing and startupFire and Water Pumps commissioning and start up.Fire and domestic water hydraulic test.
Company Profile 2017 Page 11
Sinai Grey -Egypt
Amreyah -Egypt
South Valley -Egypt
Electrical panels workshop
Located in the industrial Zone – 15th May City – Cairo , certified from Schneider Electric as panel builder in cement Industry , example ofproduced panels :
Motor Control CentersMarshalling panels & PLCsDistribution boardsLighting & sockets panels
Company Profile 2017 Page 12
Project Management
Projects cost estimateProject time schedulesResources needs and allocationwork follow up including coordination meeting
Technical Support
After sales servicesTender preparationTender evaluation for work which done by othersPreventive maintenance
Company Profile 2017 Page 13
PES Organization Chart
Company Profile 2017 Page 14
Facilities
Erection Equipments:
Clark.
Diesel engine generators 40 KVA.Diesel engine generators 125 KVA.1-phase welding Machines3-phase welding MachinesGrinding machines 9"Grinding machines 4"3-phase cutting desk 14"Big drilling deskHydraulic press for cablesHiltiDrilling machines 16mmHydraulic bending machinesScaffoldingsManual press up to 185mm2
Cable cuttersPuncher setRopes, spring, cable rollers
Testing Equipments:
Insulation testers
Meg OhmmetersEarth resistance testerDigital multi-metersDigital clamp metersDigital phase indicatorMultifunction calibratorsInfrared thermometerFog machines for ducts testHydraulic test pump setsPressure , temperature & flow meters
Company Profile 2017 Page 15
Company Profile 2017 Page 16
Reference List (1/5)2007-2015 (Main Project List)
No Client Project Scope Year Man‐hours
1 Pertech South valley cement plant (4200T/D) Line 1 Erection and commissioning 2008 484 K
2 Riga Royal El‐Minya white cement plant (900T/D) Technical support, erection and commissioning.
2008 306 K
3 RHI Pyramids panel’s factory Materials supply, design, erection and commissioning
2008 112 K
4 Interpharm Interpharm medical devices factory Panels assembly, erection, commissioning 2008 21 K
5 ESCC P&G warehouse ‐ Nigeria Design for lighting and socket and BOQ For material
2008 210
6 ESCC El Masry EL yom newspaper Design of cable routing, earthing, lighting 2009 330
7 ACC Arabian cement company workshop Supply and erection 2009 6.4 K
8 RHI Sinai Grey Line 1 new clinker vibration system
Design, supply, erection and commissioning 2009 10.6 K
9 Argonaut Cairo festival city (Al‐Futtaim Group) Erection, commissioning for CDC Buildings 2009 36 K
10 Schneider Schneider electric ‐ SudanTermination, commissioning for 33KV MV Cables
2009 520
11 Zelog Tourah cement company air lift ofLine 8&9 filters
PLC programming and graphic S.W modification
2009 210
12 Royal Royal Elminya white cement main substation
Supply, erection and commissioning 2009 10.2 K
13 ITCGR Tourah cement upgrading cement silos bag filter
Supply Panels, erection and commissioning 2009 6 K
14 Riga Sinai white line 2 new palletizer plant Supply, erection and commissioning 2009 5.4 K
15 ABB Tourah cement Mill 11 upgrading Supply, erection and commissioning 2009 11.2 K
16 Aresco Sinai white line 2 kiln shell cooling FansEngineering, supply, erection and commissioning
2009 3.6 K
17 SCC Sinai grey line 1 new by pass hopper Supply, erection and commissioning 2009 6 K
18 SWCC Sinai white line 2 new WF and bulk loading Supply, erection and commissioning 2009 3.8 K
19 ITCGR Helwan cement Mill MVSG and Cables Supply, erection and commissioning 2009 4 K
20 ITCGR Helwan cement mill rehabilitation Supply, erection and commissioning 2009 1.2 K
Reference List (2/5)
Company Profile 2017 Page 17
No Client Project Scope Year Man‐hours
21 SGGESaint‐Gobain MVSG, transformers and cables
Supply, erection and commissioning 2009 19.8 K
22 ACC Arabian cement company (6000T/D) line II Erection and commissioning 2009 468 K
23 SchneiderSchneider electric Dubai Borogue 2 project ‐ UEA
Technical support and Commissioning 2009 1.3 K
24 FlexFlex P. films Egypt lighting, Earthingand fire alarm
Supply, erection and commissioning 2009 32 K
25 CPC Royal cement plant Las Vegas – USA Technical support and Tender Preparation 2009 260
26 PEPSIPepsi Cola Nasr city factory electrical capacity upgrade
Supply, erection and commissioning 2009 14.5 K
27 RHI Amreyah cement company 5 packing machines upgrading
Supply, erection and commissioning 2010 11.6 K
28 WNCCWadi El‐Nile cement company central control room CCR
Design, supply, erection and commissioning 2010 18.8 K
29 NHDAl‐Nahda cement company service buildings
Engineering and BOQ 2010 580
30 ACCArabian cement company line I new cement & packing
Erection and commissioning 2010 186 K
31 WNCCWadi El‐Nile cement company administration building
Design, supply, erection and commissioning 2010 22.6 K
32 ACCArabian cement company Line II Road Lighting
Supply, erection and commissioning 2010 9.7 K
33 Aresco Aresco sukari gold mine Erection and commissioning 2010 136 K
34 Cemex Cemex supply and Install for Rice Straw Supply, erection and commissioning. 2010 10.6 K
35 ITCGR Helwan CM8 and CCR civil Civil Works 2011 3.4 K
36 ABB ABB abu zenima capacitors Supply, erection and commissioning. 2011 220
37 Schneider Schneider al‐shabab and damietta stations Design, supply, erection and commissioning 2011 86 K
38 WNCCWadi el‐nile cement company fence and road lighting
Supply, erection and commissioning. 2011 7.6 K
39 ITCGR Tourah ‐ kiln camera installation kiln 8&9 Supply, erection and commissioning. 2011 1.3 K
40 Flex Flex P. films egypt turn Key Project Supply, erection and commissioning 2011 134 K
Reference List (3/5)
Company Profile 2017 Page 18
No Client Project Scope Year Man‐hours
41 Schneider Gamasa stations Erection and commissioning 2011 32 K
42 Schneider CFC bus‐way installation Erection and commissioning 2011 14.5 K
43 Galaxy Galaxy chemicals E&I Supply, erection and commissioning 2011 178 K
44 MSGC Main substation MV switch gear and transformer
Supply, erection and commissioning 2012 116 K
45 FLS New phosphate terminal ‐ Jordan Erection and commissioning 2012 337 K
46 MCG Manaseer cement factory electrical supervision ‐ Jordan
Supervision and technical assistance 2012 108 K
47 GIP Tourah complete line upgrading Supply, erection and commissioning 2012 83 K
48 Energya EIPIT CHIPS – Chemicals E&I Supply, erection and commissioning 2012 289 K
49 Cemex Cemex ‐MSW materials handling Design, supply, erection and commissioning 2012 7.5 K
50 United United calcium carbon Design, supply, erection and commissioning 2012 38.7 K
51 Schneider Installation of MCC helwan CM9 Erection and commissioning 2012 129 K
52 El Qsrawee Twin tower sheikh zayedElectro‐Mechanical design, supply, erection and commissioning
2012 208 K
53 Lafarge Lafarge PLC upgrade ‐ ZimbabwyAutomation, supply, erection and commissioning
2013 19.6 K
54 RHI AMCC alternative fuel continuous Automation, Supply, Erection and commissioning
2013 14.7 K
55 TI Film TI ‐ Films Supply, erection and commissioning 2013 131 K
56 Knauf Knauf engineering suez gypsum factory Erection and commissioning 2013 94.5 K
57 ACC Alternative fuel feeding line 2 Supply, erection and commissioning 2013 21 K
58 Mariout ACC new coal mill Supply, erection and commissioning 2013 88 K
59 Lafarge IBITEC CM 8 to petcoke mill Supply, erection and commissioning 2013 16.5 K
60 NLS NLS ‐ NCC long belt conveyors upgrading Supply, erection and commissioning 2014 18 K
Reference List (4/5)
Company Profile 2017 Page 19
No Client Project Scope Year Man‐hours
61 INPECINPEC ‐Mopco zero liquid discharge phase I&II
Supply, erection and commissioning 2014 21 K
62 Boldrocch Boldrocch ‐ Elminya filter conversion Supply, erection and commissioning 2014 18 K
63 ACC ACC ‐ hot disc line 1 Supply, erection and commissioning 2014 21 K
64 ITCGR Change the OHTL to underground cables Supply, erection and commissioning 2014 11 K
65 SWDY El Sewedy cement factory new coal mill Design, supply, erection and commissioning 2014 88 K
66 WNCC Wadi El‐Nile cement factory new coal mill Design, supply, erection and commissioning 2014 88 K
67 SWDY El Sewedy cement factory new cement mill and packing
Design, supply, erection and commissioning 2014 102 K
68 FLS Qena cement new coal mill Supply, erection and commissioning 2015 88 K
69 FLS Qena cement new cement mill Supply, erection and commissioning 2015 102 K
70 HAL Schlumberger Integration project Design, supply, erection and commissioning 2015 192 K
71 Royal Royal cement new coal mill Supply, erection and commissioning 2015 62 K
72 Royal Royal cement new cement mill Supply, erection and commissioning 2015 88 K
73 ITCGR Helwan alternative fuels line 1 Supply, erection and commissioning 2016 92 K
74 FIC FIC ‐ SGGE furnace booster project Supply, erection and commissioning 2016 75 K
75 TITAN Titan cement mill upgrade Supply, erection and commissioning 2016 89 K
76 ECOBAT ECOBAT‐ Gypsum powder MCC Supply LV Panels 2016 65 K
77 BoldrochiBoldrocchi ‐ Suez electrical work for filters conversion
Supply, erection and commissioning 2016 98 K
78 Al FahdAl Fahd ‐MOD Building cable routing , cables and Termination
Supply and Erection 2016 105 K
79 IMSAT IMSAT ‐ BMC new coal mill Supply, erection and commissioning 2016 96 K
80 NLS NLS ‐WNCC upgrade Supply, erection and commissioning 2016 75 K
Reference List (5/5) NEW
Company Profile 2017 Page 19Page 20
No Client Project Scope Year Man‐hours
81 RIS RIS ‐ LV Panels Supply and commissioning 2016 90 K
82 RIS RIS ‐main substation MV, TR, RMU Supply, erection and commissioning 2016 98 K
83 WNCC WNCC ‐ Coal storage electrical works Supply, erection and commissioning 2016 112 K
84 FLS FLS ‐WNCC Rejects bin for atox 45 raw mill Supply, erection and commissioning 2016 77 K
85 RIS RIS ‐ LV Panels Supply and commissioning 2017 65 K
86 Veolia Veolia ‐ Helwan power generation Erection 2017 86 K
87 MODMOD ‐ Hikestep building cable routing , cables and Termination
Supply and Erection 2017 98 K
Company Profile 2017 Page 21
Arabian cement company (6000T/D) line II
Page 22Company Profile 2017
Pyramids Badr Factory
Page 23Company Profile 2017
U Felx Film Plastic Factory
Page 24Company Profile 2017
Sukari Golden Mines
Page 25Company Profile 2017
Saint Gobain Glass Factory
Page 26Company Profile 2017
Cairo Festival City (Admin Building)
& Infrastructure Project
Page 27Company Profile 2017
Cairo Festival City (Linking PLAZA )-MEP Project
Page 28Company Profile 2017
Cairo Festival City (Linking PLAZA )-MEP Project
Page 29Company Profile 2017
ACC Road Lighting and High Mast
Page 30Company Profile 2017
Royal el minya white cement plant (900T/D)
Page 31Company Profile 2017
South valley cement plant (4200T/D) Line 1
Page 32Company Profile 2017
Galaxy – Chemicals
Page 33Company Profile 2017
FLS – New Phosphate Terminal – Jordan
Page 34Company Profile 2017
Cemex – Alternative Fuel Project
Page 35Company Profile 2017
Amreyah– Alternative Fuel Project
Page 36Company Profile 2017
ACC New Coal Mill line II
Page 37Company Profile 2017
Inter farm Factory
Page 38Company Profile 2017
Twin Tower Sheikh ZayedMEP Project
Page 39Company Profile 2017
Twin Tower Sheikh ZayedMEP Project
Page 40Company Profile 2017
Manresa (Zimbabwe) Plant DCS Upgrade
Page 41Company Profile 2017
COAL MILLS
Page 42Company Profile 2017
PES –Panel Building Workshop (Several Projects in Cement Industry)
Page 43Company Profile 2017
Contact us
Chairman
Eng. Tarek El feshawy
E-mail: [email protected]
Tel: +20100-6617137
Commercial Manager
Eng. Mohamed Hamdy
E-mail: [email protected]
Tel : + 20128-4071010
Head office
Tel: (+202) 29820534– (+202) 27538235Fax: (+202) 25175226E-mail: [email protected]
(Days of business: Sunday - Thursday )
Company Profile 2017 Page 44
Address: 4Z/3 Sayed Dawoud – Teba Building Ellaselky Division -New Maadi - Cairo – Egypt
Tel: (+202) 29820534 – (+202) 27538235Fax: (+202) 25175226
E-mail: [email protected]
Web Site: www.pes-egy.com
Company Profile 2017 Page 45