ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 1
COMPANY PRESENTATION
![Page 2: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/2.jpg)
AMAL WAS STABLISHED IN APRIL 1984
32 Aniversári
o
Introduction of AMAL
Main Activities
Peniche Industrial Cluster
AGENDA JETM 2016
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
![Page 3: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/3.jpg)
3
Frequency and Severity Coefficients are calculated for 1.000.000 Hours
SAFETY COEFFICIENTS
Heerema Talisman Project
550.000 safety hours
![Page 4: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/4.jpg)
Location Founded Factory Area Personnel
1- Moita 1984 40,000 m2 175
2 - Setúbal 2008 25,000 m2 93
3 – Sines 1999 15,000 m2 82
4- AMY 2015 95.000 m2 38
Paris Bratislava
Tunis
Algiers Tripoli
Abuja
São Tomé
Maputo
Caracas
R. Janeiro
São Paulo Lima
Yaoundé
Luanda
1
2
3
Major Fields of Activity Manufacturing and Branch Network
Tanks, silos and stacks Equipment manufacturing & erection
Piping prefabrication & erection Modules
AMAL ACTIVITIES
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
![Page 5: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/5.jpg)
S. Paulo
Luanda
Sines, est.1998
Setúbal, est. 2007
Bratislava
S. Tomé
Maputo
Algiers
Tunis
Tripoli
Paris
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 5
AMAL IN THE WORLD
Moita, est. 1984
Luanda, est. 2004
v
Lima
Limbe Abuja
Nacala
Caracas
R. Janeiro
Itajaí
Malabo
Congo- Point
Noire
![Page 6: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/6.jpg)
6
CLIENTS
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
![Page 7: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/7.jpg)
AMAL PRODUCTION
FACILITIES
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
7
![Page 8: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/8.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 8
AMAL SETUBAL FACILITIES
![Page 9: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/9.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 9
“This is the best piping workshop I have ever seen”
We proudly quote,
Mr. BEN CHAVEZ (FLUOR Director,
Material Management, Improvement
Initiative).
Quality / Inspection visit conducted in
September 2009 to the facilities and
management systems.
AMAL SETUBAL WORKSHOP
![Page 10: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/10.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
10
AMAL SINES FACILITIES
![Page 11: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/11.jpg)
ANGOLA FACILITIES
![Page 12: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/12.jpg)
MOZAMBIQUE COMPANY- INDUSTRIAL COMPLEX
![Page 13: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/13.jpg)
ALGERIA COMPANY- CONSTRETAL ( UNDER REVAMPING)
![Page 14: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/14.jpg)
CURRENT AND
RECENT WORKS
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 14
![Page 15: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/15.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
15
CLIENT DESCRIPTION DURATION DATE VALUE (€)
Sonangol Oceanic Terminal of Cabinda. Storage tanks,
LPG tanks, Sea-line and Pipeline. 36 Months 2008-2017 87.200.000
TOTAL/ TR Optara Refinery- Modules Installation,
Mechanical installation / Piping – Contract
2A-Total Refinery, Belgium.
10 Months 2014- 2015
28.700.000
S.O.NA.R.A-
FOSTER
WHEELER
Limbe Refinery Major Revamping – Storage
tanks, Offsites; Piping Prefabrcation;
interconnecting and underground piping,
equipment installation, heaters erection.
27 Months 2013-2017
(On-Going) 87.252.130
Heerema /
Talisman
Offshore Work. Material management, pre-
fabrication, and installation on the platform. 14 months
2013-2016
33.874.251
General Electric Modules Fabrication in Brazil 20 Months 20013-2016 77.500.000
CURRENT PROJECT AND CONTRACTS
![Page 16: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/16.jpg)
TANK FARM TURN-KEY CLC / GALP, AVEIRAS
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
16
![Page 17: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/17.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 17
LNG TERMINAL
BECHTEL / BESIX
EQUAT. GUINE
![Page 18: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/18.jpg)
VUVB FLUOR / GALP PORTO
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT
18
![Page 19: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/19.jpg)
HARBORING THE MODULAR CONSTRUCTION CLUSTER FOR OIL & GAS
AMAL MODULAR YARD
![Page 20: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/20.jpg)
FOCUS ON ATLANTIC OPPORTUNITIES- 70% OF NEW DISCOVERIES
PORTUGUESE SPEAKING COUNTRIES
NEW PFSO / SPAR`S / TANKERS
![Page 21: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/21.jpg)
the
cluster the value
the
solutions
the
partners
PENICHE – INDUSTRIAL CLUSTER
![Page 22: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/22.jpg)
SOLUTION
FAST TRACK
PROJECTS
WHAT IS THE AMAL MODULAR YARD (AMY) CLUSTER ?
MODULAR
FABRICATI
ON
OIL &
GAS
ENERGY
MARITIME
EXPERT
PARTNERS
PREMIUM
LOCATIO
N
ONE COMPANY
SYNERGIC
PARTNERS
ONE LOCATION
FULL SERVICES
![Page 23: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/23.jpg)
WHAT IS THE AMAL MODULAR YARD (AMY) CLUSTER ?
SYNERGY FOR
FULL EPC
PERFORMANCE
2.800 m2 STEEL
STRUCTURES
5.000 m2 PRE-
FABRICATION
INTEGRAT
ED KNOW-
HOW
INTEGRAT
ED
FACILITIE
S
TOTAL YARD AREA – 85.000 m2
WORKSHOP AREA – 17.300 m2
3.000 m2 COATING &
PAINTING
ENGINEERING
PROJECT
MANAGEMEN
T
PROCUREMEN
T
PARTNERING
UNIVERSITIES
RESEARCH &
DEVELOPMEN
T
![Page 24: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/24.jpg)
WHAT IS THE AMAL MODULAR YARD (AMY) CLUSTER ?
15.500 m2 EQUIPMENT
ASSEMBLY
QUALITY
CONTROL SUPPORT
SERVICES
LAND
TRANSPORT
SEA
TRANSPORT
QUICK ON
SITE ASSEMBLY
& TESTS
PROJECT
HAND-
OVER
![Page 25: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/25.jpg)
MODULE YARD- PORTUGAL
![Page 26: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/26.jpg)
WHAT IS THE AMAL MODULAR YARD (AMY) CLUSTER ?
Hydro-Lift
Vessel/structure
loading capacity:
700 ton
Dry Dock
Vessel capacity:
20 × 140 m
Transfer area
Offices and Labs
Assembly Area
Pre-Fab
Including controlled temperature and
humidity warehouse for composite works
Coating Area Equip. Assembly
Area
Steel structures
Module Barge
Loading
![Page 27: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/27.jpg)
WHO IS THE AMAL MODULAR YARD (AMY) CLUSTER ?
CLUSTER DEVELOPER AND COORDINATOR EPC contractor | Plant and Equipment Supplier & Erection| Piping
AMAL
EXPERT PARTNERS
ENP CLUSTER PARTNER Ship Building| Repair Services
TECHNOEDIF CLUSTER PARTNER Engineering Services | Process Industry | Energy Industry
TCPI CLUSTER PARTNER Electrical Contractor | Electrical, Instrumentation & Control
![Page 28: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/28.jpg)
AMAL Group – MAIN REFERENCES
Project Scope : FPSOs’ construction
AMAL Scope: Fabrication, Supply and
Installation of 3 modules for the FPSOs’
Client: General Electric
Location: Itajaí, Brazil
Project Scope :Limbe Refinery Major Revamping
AMAL Scope: Construction of Storage Tanks; Offsites;
Piping Prefabrication; Interconnecting and
Underground Piping;
Equipment Installation; Heaters Erection
Client : SONARA / Foster Wheeler
Location: Limbe, Cameroon
Project Scope :Construction of the Oceanic Terminal of
Cabinda
AMAL Scope: Construction of Storage Tanks,
LPG Tanks, Sea-line and Pipeline
Client : Sonangol
Location: Cabinda, Angola
Project Scope :Porto’s Refinery
conversion project
AMAL Scope: Erection of the
Visbreaker Unit
Client : Galp Energia
Location: Porto, Portugal
![Page 29: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/29.jpg)
TCPI – COMPANY ID
KEY INDICATORS
2014 Income:
38.788 k€
Productive capacity:
1.024.212 hours/year
CLIENTS
SCOPE OF SERVICES
ELECTRICAL, INSTRUMENTATION, CONTROL AND AUTOMATION SERVICES
INDUSTRIAL I&C
AUTOMATION SYSTEMS
ELECTRICAL SYSTEMS
WORK FORCE
552 Direct
HYSTORY
Founded in Lisbon, 1986
WORLD PRESENCE
Europe, Africa and Central
and South America
CERTIFICATIONS
ISO 9001 / ISO 14001 /
OSHAS 18001 / MASE /
SCC**2008/5.1/VCA
![Page 30: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/30.jpg)
ENP – COMPANY ID
KEY INDICATORS
Capacity:
Hydrolift: 700 ton
& 50m ships
Slipway for up to
100m ships
WORK FORCE
60 Direct
HYSTORY
Founded in Peniche, 1994
WORLD PRESENCE
Portugal
CERTIFICATIONS
ISO 9001
SCOPE OF SERVICES
SHIPBUILDING AND REPAIR SERVICES
WORK/UTILITY MILITARY/SURVEILLANCE PASSENGERS FISHING
CLIENTS
![Page 31: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/31.jpg)
ENP – MAIN REFERENCES
Project Scope : Construction of two 56m
Landing Vessels
ENP Scope: Full EPC
Client : Mozambique Government
Location: Mozambique
Project Scope :Construction of two 17m
Workboats
ENP Scope: Full EPC
Client : Sonangol
Location: Angola
Project Scope :Construction of a 27m
Fishing Vessel
ENP Scope: Full EPC
Client : Socipesca
Location: Angola
Project Scope : Oil Tanker Construction
ENP Scope: Equipment supply and
assembly
Client: Galp / Sacor Marítima
Location: Portugal
![Page 32: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/32.jpg)
TECHNOEDIF – COMPANY ID
KEY INDICATORS
2014 Income:
11.000 k€
2014 Production
Volume:
280.000 hours
WORK FORCE
200 Direct
HYSTORY
Founded in Lisbon, 1965
WORLD PRESENCE
Europe, Africa, Middle East,
Asia and South America
CERTIFICATIONS
ISO 9001 / ISO 14001 / OSHAS
18001
SCOPE OF SERVICES
ENGINEERING SERVICES FOR THE PROCESS AND ENERGY INDUSTRY
O&G /
PETROCHEMICAL
ENERGY PULP AND PAPER OTHER PROCESS IND.
CLIENTS
![Page 33: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/33.jpg)
WHAT DOES AMAL MODULAR YARD (AMY) OFFER ?
Vessels
(Production & Aux.)
RIGs
Petrochemical
Power Plant
Refinery
MODULAR SOLUTIONS
POWER UNITS
FILTRATION UNITS
SKIDS
VESSELS
BOILERS PIPE RACKS
HYDROGEN / NITROGEN
UNITS
PRESSURE VESSELS / TANKS
SUPPORTING STEEL
STRUCTURES
PUMPING / COMPRESSION
STATIONS
HEAT/COLD PRODUCTION
UNITS
ONSHOR
E APPLICATION
S
OFFSHO
RE APPLICATIONS
![Page 34: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/34.jpg)
WHY CHOOSE AMAL MODULAR YARD?
Technology Owners
Oil&Gas Clients
Link to European
Highways
Geographic
Center
Supplier/Client
Logistic
Optimization
PREMIUM
LOCATIO
N
![Page 35: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/35.jpg)
COMMERCIAL
ADVANT
AGE
WHY CHOOSE AMAL MODULAR YARD?
IMPROVED
WORKS
CONTROL
IMPROVED
QUALITY
CONTROL
STANDARD
METHODS TECH
NICAL EFFICIENCY
STABLE SOCIAL
ENVIRONMENT
MANPOWER
AVAILABILITY
LESS NEED OF
INTERFACES
TRANSPORT &
LOGISTICAL
OPTIMIZATION
IMPROVED
CONSTRUCTABIL
ITY
LESS REWORK
OPTIMIZATED
MODULAR
EXPEDITION
![Page 36: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/36.jpg)
COMMERCIAL
ADVANTAGE
WHY CHOOSE AMAL MODULAR YARD?
SINGLE
POINT OF
CONTACT
LOWER RISK
LEANER
STRUCTURE
FASTER
EXECUTION
![Page 37: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/37.jpg)
ALBA PROJECT MARATHON- OFFSHORE PLATFORM
![Page 38: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/38.jpg)
CYGNUS PROJECT- GDF SUEZ- OFFSHORE PLATFORM
![Page 39: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/39.jpg)
CRUDE HEATERS & PIPING WORKS - NESTE OIL
![Page 40: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/40.jpg)
40
HYCO 3 MODULES AND GAS PLANT ASSEMBLED,
AIR LIQUIDE, ESTARREJA
![Page 41: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/41.jpg)
41
BASF- HYDROGEN PLANT FABRICATION
![Page 42: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/42.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 42
![Page 43: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/43.jpg)
43
OFFSHORE
PLATFORM
NORWAY
(Piping Work)
Recommendation
Letter
HEREEMA- VALHALL
![Page 44: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/44.jpg)
TALISMAN- MONTROSE PROJECT
![Page 45: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/45.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 45
INTEGRA/ GE- PIPE RACK MODULE AND ELECTRIC
![Page 46: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/46.jpg)
EMPTY LAND…TO A MODULE YARD IN LESS THAN 6 MONTHS (
WITH PROJECT ON GOING)
![Page 47: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/47.jpg)
INFRASTRUCTURE- OFFICE AND WAREHOUSE
![Page 48: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/48.jpg)
ZERO ACCIDENTS……...........….NO HARM TO THE ENVIRONMENT 48
Construir ( Construction)- Consolidar ( Consolidate)- Crescer ( Grwoth);
Sustain Current network / locations;
Ensure stable workload;
Enhance efficiency / cost levels / proficiencies;
Consolidate fabrication plants in Algeria and Mozambique;
Develop strategic partnerships with major EPC contractors and Oil & Gas Contractor in
Modular Solutions;
GROWTH-DEVELOPMENT STRATEGY
CCC- AMAL STRATEGIC PLAN
![Page 49: COMPANY PRESENTATION€¦ · Location Founded Factory Area Personnel 1- Moita 1984 40,000 m2 175 2 - Setúbal 2008 25,000 m2 93 3 – Sines 1999 15,000 m2 82 4- AMY 2015 95.000 m2](https://reader031.vdocuments.us/reader031/viewer/2022011901/5f06183d7e708231d416432c/html5/thumbnails/49.jpg)
49
End of Presentation.
Thank You. AMAL