community workshop presentation links/community workshop presenta… · title: microsoft powerpoint...

23
Bow Bow - - Concord Interstate 93 Transportation Planning Study Concord Interstate 93 Transportation Planning Study www.i93bowconcord.com www.i93bowconcord.com Community Community Transportation Transportation Workshops Workshops May 18 & 20, 2006 May 18 & 20, 2006

Upload: others

Post on 27-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

CommunityCommunity

TransportationTransportation

WorkshopsWorkshops

May 18 & 20, 2006May 18 & 20, 2006

Page 2: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Source: Society for the Protection of NH Forests, 2005.

A Changing New HampshireA Changing New Hampshire

Page 3: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Demographic and Travel TrendsDemographic and Travel Trends

Vehicle Miles TraveledVehicle Miles Traveled

(Freight)(Freight)

+3.5%+3.5%Vehicle Miles TraveledVehicle Miles Traveled

(Passenger)(Passenger)

+3.0%+3.0%

JobsJobs

+2.0%+2.0%

PopulationPopulation

+1.1%+1.1%

Page 4: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

20002000 2030 Forecast2030 Forecast

Allenstown Allenstown 4,8544,854 6,1006,100

BoscawenBoscawen 3,6843,684 5,1005,100

BowBow 7,1687,168 11,30011,300

CanterburyCanterbury 1,9911,991 3,4003,400

ChichesterChichester 2,2592,259 3,6003,600

ConcordConcord 40,78540,785 53,50053,500

DunbartonDunbarton 2,2522,252 3,7003,700

EpsomEpsom 4,0514,051 6,7006,700

HopkintonHopkinton 5,4125,412 7,0007,000

LoudonLoudon 4,5104,510 7,4007,400

PembrokePembroke 6,9176,917 9,0009,000

WebsterWebster 1,5911,591 3,1003,100

TotalTotal 85,47485,474 120,000120,000

Central NH Central NH

PopulationPopulation

20302030

Concord Concord –– 45%45%

All Others All Others –– 55%55%

(40% Increase)(40% Increase)

Page 5: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

20002000 2030 Forecast2030 Forecast

Allenstown Allenstown 1,0401,040 1,8721,872

BoscawenBoscawen 1,7601,760 3,0923,092

BowBow 4,7414,741 10,07210,072

CanterburyCanterbury 336336 606606

ChichesterChichester 729729 1,1721,172

ConcordConcord 46,42346,423 87,51887,518

DunbartonDunbarton 244244 688688

EpsomEpsom 1,3871,387 2,2732,273

HopkintonHopkinton 2,2062,206 3,5283,528

LoudonLoudon 1,8261,826 2,7162,716

PembrokePembroke 2,6002,600 3,9323,932

WebsterWebster 134134 138138

TotalTotal 63,42663,426 117,616117,616

Central NH Central NH

EmploymentEmployment

20302030

Concord Concord –– 74%74%

All Others All Others –– 26%26%

(85% Increase)(85% Increase)

Page 6: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

2005, PM Peak2005, PM Peak

Contoocook

Village

Canterbury

Center

Epsom

Circle

Suncook

Village

Downtown

Concord

18

20

20

15

Travel Time Travel Time -- 20052005

Page 7: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

2030, PM Peak2030, PM Peak

Contoocook

Village

Canterbury

Center

Epsom

Circle

Suncook

Village

Downtown

Concord

50

30

28

40

Travel Time Travel Time -- 20302030

Page 8: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Context Sensitive SolutionsContext Sensitive Solutions

Planning StepsPlanning Steps

ProblemProblem

StatementStatement

GoalGoal

StatementStatement

Screening Screening

CriteriaCriteria

Brainstorm Brainstorm

AlternativesAlternatives

Screen Screen

AlternativesAlternatives

Determine Determine

Range of Range of

Reasonable Reasonable

AlternativesAlternatives

Page 9: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Context Sensitive SolutionsContext Sensitive Solutions

CommunityCommunityEnvironmentEnvironment

TransportationTransportation

The context The context

sensitive solutionsensitive solution

Page 10: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

BowBow--Concord Planning GroupConcord Planning Group

Bow Bow -- ConcordConcord

TransportationTransportation

CommunityCommunityEnvironmentEnvironment

FHWA

NHDOT

Central NH Regional Planning

NHDRED – Travel & Tourism

NH Office of Energy & Planning

Concord Area Transit

Concord Trailways

Guilford Rail

NE Southern Railroad

Town of Bow

City of Concord

Town of Pembroke

Concord 2020

River Connection

Environmental Protection Agency

Army Corp. of Engineers

US Fish & Wildlife

NH Dept. of Environmental Services

NH State Historic Preservation Office

NH Fish & Game

Conservation Law Foundation

Society for the Protection of NH Forests

Jordan Institute

NH Celebrates Wellness

Page 11: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Project Problem StatementProject Problem Statement

"Marked by aging infrastructure and limited transportation "Marked by aging infrastructure and limited transportation

options, the Bowoptions, the Bow--Concord IConcord I--93 Corridor neither meets the 93 Corridor neither meets the

varied transportation and safety demands of interstate varied transportation and safety demands of interstate

highway users, nor appropriately balances those demands highway users, nor appropriately balances those demands

against the interests of the Capitol Region communities in against the interests of the Capitol Region communities in

their unique identities and visions, their economic vitality, their unique identities and visions, their economic vitality,

preservation of and access to their natural and historic preservation of and access to their natural and historic

resources, and their quality of life. Future population and resources, and their quality of life. Future population and

economic growth, in the region and beyond, will increase economic growth, in the region and beyond, will increase

transportation demand and further exacerbate this problem."transportation demand and further exacerbate this problem."

Page 12: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Project Goal StatementProject Goal Statement

““The BowThe Bow--Concord IConcord I--93 Corridor should balance the needs of 93 Corridor should balance the needs of

all users and the surrounding communities by providing a all users and the surrounding communities by providing a

safe, affordable, reliable, environmentally acceptable and safe, affordable, reliable, environmentally acceptable and

community compatible transportation system. The system will community compatible transportation system. The system will

offer mobility choices and complement the unique character offer mobility choices and complement the unique character

of the Capitol Region communities. It will support their of the Capitol Region communities. It will support their

economic initiatives, preserve and/or enhance their natural economic initiatives, preserve and/or enhance their natural

and historic resources, facilitate nonand historic resources, facilitate non--vehicular access, and vehicular access, and

sustain the communitiessustain the communities’’ quality of life, now and into the quality of life, now and into the

future.future.””

Page 13: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Screening Screening

CriteriaCriteria

Page 14: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Known AlternativesKnown Alternatives

•• No Build No Build

•• Travel Demand Management (TDM) Travel Demand Management (TDM)

•• Interstate 93Interstate 93

�� Four LanesFour Lanes

�� Five LanesFive Lanes

�� Six LanesSix Lanes

�� Eight LanesEight Lanes

•• Opportunity Corridor ConceptOpportunity Corridor Concept

•• II--89 to Route 106 Connector89 to Route 106 Connector

•• II--93 to Route 106 Connector93 to Route 106 Connector

•• Exit 12 to Route 106 ConnectorExit 12 to Route 106 Connector

•• Passenger Rail ServicePassenger Rail Service

•• 1992 Feasibility Study1992 Feasibility Study

•• Separate through and local trafficSeparate through and local traffic

•• Interstate 93 Interstate 93

�� Shift to east side of riverShift to east side of river

�� Shift westShift west

�� HOV LanesHOV Lanes

�� Toll LanesToll Lanes

�� Place it undergroundPlace it underground

•• New Exit 16New Exit 16--1/2 on I1/2 on I--9393

(at Sewalls Falls Rd)(at Sewalls Falls Rd)

•• New Exit 11New Exit 11--1/2 on I1/2 on I--9393

•• New Exit 2New Exit 2--1/2 on I1/2 on I--393393

(at Portsmouth St)(at Portsmouth St)

•• Exit 14 Grade ReversalExit 14 Grade Reversal

•• Langley Parkway (NW Bypass) Langley Parkway (NW Bypass)

•• Storrs & Commercial Streets ExpansionStorrs & Commercial Streets Expansion

•• Expanded Bus and/or Transit ServiceExpanded Bus and/or Transit Service

•• Access to Merrimack RiverAccess to Merrimack River

•• Bicycle and Pedestrian AccessBicycle and Pedestrian Access

AlternativesAlternatives ComponentsComponents

Page 15: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

AlternativesAlternatives

•• No BuildNo Build

•• TDM TDM

�� Ride SharingRide Sharing

�� Alternative modesAlternative modes

�� VanpoolsVanpools

�� Shift work hoursShift work hours

�� Congestion toll Congestion toll

pricingpricing

•• Interstate 93Interstate 93

•• Opportunity CorridorOpportunity Corridor

•• Route 106Route 106

ConnectorsConnectors

•• Passenger Rail Passenger Rail

ServiceService

•• 1992 Feasibility 1992 Feasibility

StudyStudy

•• Separate through Separate through

and local trafficand local traffic

Page 16: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Interstate 93Interstate 93

•• Four LanesFour Lanes

•• Five Lanes Five Lanes

(reversible)(reversible)

•• Six LanesSix Lanes

•• Eight LanesEight Lanes

Page 17: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Opportunity Opportunity

Corridor ConceptCorridor Concept

•• Six Lanes on ISix Lanes on I--9393

•• Westerly Shift of IWesterly Shift of I--93 93

•• Lower ILower I--93 b/w Exits 13 & 1593 b/w Exits 13 & 15

•• Reconfigure Exits 14 & 15Reconfigure Exits 14 & 15

•• Maintain Rail CorridorMaintain Rail Corridor

•• Extend Storrs StreetExtend Storrs Street

•• Local connection over ILocal connection over I--9393

•• MultiMulti--modal centermodal center

•• Enhanced pedestrian & Enhanced pedestrian &

bicycle connectionsbicycle connections

•• Enhance river accessEnhance river access

Page 18: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Route 106 Route 106

ConnectorsConnectors

Page 19: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Passenger Rail ServicePassenger Rail Service

Page 20: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

1992 Feasibility Study1992 Feasibility Study

Page 21: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

•• Interstate 93Interstate 93

�� Shift to the eastShift to the east

�� Shift westShift west

�� HOV lanesHOV lanes

�� Toll lanesToll lanes

�� Underground Underground

•• New Exit 16New Exit 16--1/2 on I1/2 on I--9393

(at Sewalls Falls Rd)(at Sewalls Falls Rd)

•• New Exit 11New Exit 11--1/2 on I1/2 on I--9393

•• New Exit 2New Exit 2--1/2 on I1/2 on I--393393

(at Portsmouth St)(at Portsmouth St)

•• Exit 14 Grade ReversalExit 14 Grade Reversal

•• Langley ParkwayLangley Parkway

(NW Bypass) (NW Bypass)

•• Storrs & Commercial Storrs & Commercial

Streets ExpansionStreets Expansion

•• Expanded Bus ServiceExpanded Bus Service

•• Access to RiverAccess to River

•• Bicycle and Pedestrian Bicycle and Pedestrian

AccessAccess

ComponentsComponents

Page 22: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

““Pinch PointPinch Point””

Page 23: Community Workshop Presentation Links/Community Workshop Presenta… · Title: Microsoft PowerPoint - Community Workshop Presentation.ppt Author: jcrisanti Created Date: 5/22/2006

BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com

Comments?Comments?

Other Ideas?Other Ideas?

www.www.

i93bowconcord.comi93bowconcord.com