community workshop presentation links/community workshop presenta… · title: microsoft powerpoint...
TRANSCRIPT
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
CommunityCommunity
TransportationTransportation
WorkshopsWorkshops
May 18 & 20, 2006May 18 & 20, 2006
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Source: Society for the Protection of NH Forests, 2005.
A Changing New HampshireA Changing New Hampshire
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Demographic and Travel TrendsDemographic and Travel Trends
Vehicle Miles TraveledVehicle Miles Traveled
(Freight)(Freight)
+3.5%+3.5%Vehicle Miles TraveledVehicle Miles Traveled
(Passenger)(Passenger)
+3.0%+3.0%
JobsJobs
+2.0%+2.0%
PopulationPopulation
+1.1%+1.1%
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
20002000 2030 Forecast2030 Forecast
Allenstown Allenstown 4,8544,854 6,1006,100
BoscawenBoscawen 3,6843,684 5,1005,100
BowBow 7,1687,168 11,30011,300
CanterburyCanterbury 1,9911,991 3,4003,400
ChichesterChichester 2,2592,259 3,6003,600
ConcordConcord 40,78540,785 53,50053,500
DunbartonDunbarton 2,2522,252 3,7003,700
EpsomEpsom 4,0514,051 6,7006,700
HopkintonHopkinton 5,4125,412 7,0007,000
LoudonLoudon 4,5104,510 7,4007,400
PembrokePembroke 6,9176,917 9,0009,000
WebsterWebster 1,5911,591 3,1003,100
TotalTotal 85,47485,474 120,000120,000
Central NH Central NH
PopulationPopulation
20302030
Concord Concord –– 45%45%
All Others All Others –– 55%55%
(40% Increase)(40% Increase)
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
20002000 2030 Forecast2030 Forecast
Allenstown Allenstown 1,0401,040 1,8721,872
BoscawenBoscawen 1,7601,760 3,0923,092
BowBow 4,7414,741 10,07210,072
CanterburyCanterbury 336336 606606
ChichesterChichester 729729 1,1721,172
ConcordConcord 46,42346,423 87,51887,518
DunbartonDunbarton 244244 688688
EpsomEpsom 1,3871,387 2,2732,273
HopkintonHopkinton 2,2062,206 3,5283,528
LoudonLoudon 1,8261,826 2,7162,716
PembrokePembroke 2,6002,600 3,9323,932
WebsterWebster 134134 138138
TotalTotal 63,42663,426 117,616117,616
Central NH Central NH
EmploymentEmployment
20302030
Concord Concord –– 74%74%
All Others All Others –– 26%26%
(85% Increase)(85% Increase)
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
2005, PM Peak2005, PM Peak
Contoocook
Village
Canterbury
Center
Epsom
Circle
Suncook
Village
Downtown
Concord
18
20
20
15
Travel Time Travel Time -- 20052005
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
2030, PM Peak2030, PM Peak
Contoocook
Village
Canterbury
Center
Epsom
Circle
Suncook
Village
Downtown
Concord
50
30
28
40
Travel Time Travel Time -- 20302030
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Context Sensitive SolutionsContext Sensitive Solutions
Planning StepsPlanning Steps
ProblemProblem
StatementStatement
GoalGoal
StatementStatement
Screening Screening
CriteriaCriteria
Brainstorm Brainstorm
AlternativesAlternatives
Screen Screen
AlternativesAlternatives
Determine Determine
Range of Range of
Reasonable Reasonable
AlternativesAlternatives
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Context Sensitive SolutionsContext Sensitive Solutions
CommunityCommunityEnvironmentEnvironment
TransportationTransportation
The context The context
sensitive solutionsensitive solution
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
BowBow--Concord Planning GroupConcord Planning Group
Bow Bow -- ConcordConcord
TransportationTransportation
CommunityCommunityEnvironmentEnvironment
FHWA
NHDOT
Central NH Regional Planning
NHDRED – Travel & Tourism
NH Office of Energy & Planning
Concord Area Transit
Concord Trailways
Guilford Rail
NE Southern Railroad
Town of Bow
City of Concord
Town of Pembroke
Concord 2020
River Connection
Environmental Protection Agency
Army Corp. of Engineers
US Fish & Wildlife
NH Dept. of Environmental Services
NH State Historic Preservation Office
NH Fish & Game
Conservation Law Foundation
Society for the Protection of NH Forests
Jordan Institute
NH Celebrates Wellness
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Project Problem StatementProject Problem Statement
"Marked by aging infrastructure and limited transportation "Marked by aging infrastructure and limited transportation
options, the Bowoptions, the Bow--Concord IConcord I--93 Corridor neither meets the 93 Corridor neither meets the
varied transportation and safety demands of interstate varied transportation and safety demands of interstate
highway users, nor appropriately balances those demands highway users, nor appropriately balances those demands
against the interests of the Capitol Region communities in against the interests of the Capitol Region communities in
their unique identities and visions, their economic vitality, their unique identities and visions, their economic vitality,
preservation of and access to their natural and historic preservation of and access to their natural and historic
resources, and their quality of life. Future population and resources, and their quality of life. Future population and
economic growth, in the region and beyond, will increase economic growth, in the region and beyond, will increase
transportation demand and further exacerbate this problem."transportation demand and further exacerbate this problem."
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Project Goal StatementProject Goal Statement
““The BowThe Bow--Concord IConcord I--93 Corridor should balance the needs of 93 Corridor should balance the needs of
all users and the surrounding communities by providing a all users and the surrounding communities by providing a
safe, affordable, reliable, environmentally acceptable and safe, affordable, reliable, environmentally acceptable and
community compatible transportation system. The system will community compatible transportation system. The system will
offer mobility choices and complement the unique character offer mobility choices and complement the unique character
of the Capitol Region communities. It will support their of the Capitol Region communities. It will support their
economic initiatives, preserve and/or enhance their natural economic initiatives, preserve and/or enhance their natural
and historic resources, facilitate nonand historic resources, facilitate non--vehicular access, and vehicular access, and
sustain the communitiessustain the communities’’ quality of life, now and into the quality of life, now and into the
future.future.””
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Screening Screening
CriteriaCriteria
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Known AlternativesKnown Alternatives
•• No Build No Build
•• Travel Demand Management (TDM) Travel Demand Management (TDM)
•• Interstate 93Interstate 93
�� Four LanesFour Lanes
�� Five LanesFive Lanes
�� Six LanesSix Lanes
�� Eight LanesEight Lanes
•• Opportunity Corridor ConceptOpportunity Corridor Concept
•• II--89 to Route 106 Connector89 to Route 106 Connector
•• II--93 to Route 106 Connector93 to Route 106 Connector
•• Exit 12 to Route 106 ConnectorExit 12 to Route 106 Connector
•• Passenger Rail ServicePassenger Rail Service
•• 1992 Feasibility Study1992 Feasibility Study
•• Separate through and local trafficSeparate through and local traffic
•• Interstate 93 Interstate 93
�� Shift to east side of riverShift to east side of river
�� Shift westShift west
�� HOV LanesHOV Lanes
�� Toll LanesToll Lanes
�� Place it undergroundPlace it underground
•• New Exit 16New Exit 16--1/2 on I1/2 on I--9393
(at Sewalls Falls Rd)(at Sewalls Falls Rd)
•• New Exit 11New Exit 11--1/2 on I1/2 on I--9393
•• New Exit 2New Exit 2--1/2 on I1/2 on I--393393
(at Portsmouth St)(at Portsmouth St)
•• Exit 14 Grade ReversalExit 14 Grade Reversal
•• Langley Parkway (NW Bypass) Langley Parkway (NW Bypass)
•• Storrs & Commercial Streets ExpansionStorrs & Commercial Streets Expansion
•• Expanded Bus and/or Transit ServiceExpanded Bus and/or Transit Service
•• Access to Merrimack RiverAccess to Merrimack River
•• Bicycle and Pedestrian AccessBicycle and Pedestrian Access
AlternativesAlternatives ComponentsComponents
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
AlternativesAlternatives
•• No BuildNo Build
•• TDM TDM
�� Ride SharingRide Sharing
�� Alternative modesAlternative modes
�� VanpoolsVanpools
�� Shift work hoursShift work hours
�� Congestion toll Congestion toll
pricingpricing
•• Interstate 93Interstate 93
•• Opportunity CorridorOpportunity Corridor
•• Route 106Route 106
ConnectorsConnectors
•• Passenger Rail Passenger Rail
ServiceService
•• 1992 Feasibility 1992 Feasibility
StudyStudy
•• Separate through Separate through
and local trafficand local traffic
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Interstate 93Interstate 93
•• Four LanesFour Lanes
•• Five Lanes Five Lanes
(reversible)(reversible)
•• Six LanesSix Lanes
•• Eight LanesEight Lanes
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Opportunity Opportunity
Corridor ConceptCorridor Concept
•• Six Lanes on ISix Lanes on I--9393
•• Westerly Shift of IWesterly Shift of I--93 93
•• Lower ILower I--93 b/w Exits 13 & 1593 b/w Exits 13 & 15
•• Reconfigure Exits 14 & 15Reconfigure Exits 14 & 15
•• Maintain Rail CorridorMaintain Rail Corridor
•• Extend Storrs StreetExtend Storrs Street
•• Local connection over ILocal connection over I--9393
•• MultiMulti--modal centermodal center
•• Enhanced pedestrian & Enhanced pedestrian &
bicycle connectionsbicycle connections
•• Enhance river accessEnhance river access
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Route 106 Route 106
ConnectorsConnectors
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Passenger Rail ServicePassenger Rail Service
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
1992 Feasibility Study1992 Feasibility Study
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
•• Interstate 93Interstate 93
�� Shift to the eastShift to the east
�� Shift westShift west
�� HOV lanesHOV lanes
�� Toll lanesToll lanes
�� Underground Underground
•• New Exit 16New Exit 16--1/2 on I1/2 on I--9393
(at Sewalls Falls Rd)(at Sewalls Falls Rd)
•• New Exit 11New Exit 11--1/2 on I1/2 on I--9393
•• New Exit 2New Exit 2--1/2 on I1/2 on I--393393
(at Portsmouth St)(at Portsmouth St)
•• Exit 14 Grade ReversalExit 14 Grade Reversal
•• Langley ParkwayLangley Parkway
(NW Bypass) (NW Bypass)
•• Storrs & Commercial Storrs & Commercial
Streets ExpansionStreets Expansion
•• Expanded Bus ServiceExpanded Bus Service
•• Access to RiverAccess to River
•• Bicycle and Pedestrian Bicycle and Pedestrian
AccessAccess
ComponentsComponents
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
““Pinch PointPinch Point””
BowBow--Concord Interstate 93 Transportation Planning StudyConcord Interstate 93 Transportation Planning Study www.i93bowconcord.comwww.i93bowconcord.com
Comments?Comments?
Other Ideas?Other Ideas?
www.www.
i93bowconcord.comi93bowconcord.com