community meeting – trafficsteinerranchna.org/wp-content/uploads/2017/01/srna-2017-meeting.pdf ·...
TRANSCRIPT
Community Meeting – Traffic
January 25, 2017
For meeting interactive go here on your phone: steinerranchna.org/meeting
January 25 2017, steinerranchna.org 1
Community Meeting AgendaBrian Thompto, SRNA Chairman
Welcome and Introduction
Paul Workman, Texas State RepresentativeCapital Update
Jimmy Flannigan, Austin City Councilman – District 6Austin Transportation Bond Update
Brigid Shea, Travis County Commissioner ‐ Precinct 2CAMPO Transportation Funding
David Greear, Travis County Engineering Division ManagerNew Signal: Steiner Ranch Blvd @ RM620
Bruce Byron, TxDOT Project Manager / Public InvolvementRM620 / FM2222 Improvement OverviewRM620 Corridor Options
January 25 2017, steinerranchna.org 2
Steiner Ranch Neighborhood Association
A Voice For Everyone in the “Land Between the Lakes”
Partnering in West Austin and Four Points
Advocacy for Important Issues • Traffic• Development• Annexation• Utilities• and More
January 25 2017, steinerranchna.org 3
Thank you SRNA Board of Directors Current Board (2016)
• H Lobdell – since 2012• Rick Rivera – since 2012• David Sandal* – since 2012 • Brian Thompto – since 2012• William Farrell – since 2014
Recent Directors (2014+)• Brian Clifton* – 2012‐2016• Erhard Sudermann* – 2012‐2015• Loree Leboeuf* – 2014‐2016• Yasmeen Siddiqui* – 2014‐2016• David Thate* – 2014‐2015
• Daniel Hodges – 2012‐2014• Richard Piotrowski – 2012‐2013• Cindy Thompson – 2012‐2014• Greg Milligan – 2012‐2014
• Scott Nuessner – 2013• Paul O’Brien – 2012• Deb Lovett
Past Directors* = rolling off since last nomination process
January 25 2017, steinerranchna.org 4
Thank YOU For Your Support• Your involvement matters – stay engaged – register with SRNA
• We Depend on the Support of Members steinerranchna.org/join‐now
• Board of Directors Nominationsteinerranchna.org/board
• Meeting Feedback for This Meetingsteinerranchna.org/feedback
All of these are linked to from our meeting interactive page:
steinerranchna.org/meeting
January 25 2017, steinerranchna.org 5
Paul Workman Texas State Representative
January 25 2017, steinerranchna.org 6
Jimmy Flannigan Austin City Councilman
January 25 2017, steinerranchna.org 7
Brigid SheaTravis County Commissioner
January 25 2017, steinerranchna.org 8
David GreearTravis County Engineering Division Manager
January 25 2017, steinerranchna.org 9
Steiner Ranch 2017
Future projects affecting Steiner Ranch area
Travis County
Pedestrian Hybrid BeaconLocated at school crossing in front of Steiner Ranch Elementary
Construction completed in December…. Waiting on Austin Energy to energize
Steiner Ranch Elementary
Vehicles………. 20,000 vpdPedestrians…..350/day
Operation of PHB
New Traffic Signal on RM620 at Steiner Ranch Blvd.
Asphalt Overlay this Summer
Also have magnets with contact information to report potholes,
missing signs, etc.
512‐854‐9433
Questions?
Bruce ByronTexas Department of TransportationProject Manager / Public Involvement
January 25 2017, steinerranchna.org 17
RM 620 Improvement Study
2222 BYPASS & RM 620 STUDYUPDATE
For Steiner Ranch Neighborhood Association
January 25, 2017
RM 620 Improvement Study
RM 620/RM 2222 BYPASS (CONNECTOR)
RM 620 Improvement Study
620/2222 Bypass Project Area
20
RM 620 Improvement Study
620/2222 Bypass Projects
21
Project 1 – RM 2222 ImprovementsProject 2 - 620 to 2222 Connector
RM 620 Improvement Study
Steiner Ranch Blvd Improvements
22
New Traffic SignalSignals linked
Too Steep for connection
Additional eastbound lane
RM 620 Improvement Study
Proposed 620 Lane - Steiner Ranch Blvd to Connector Road
23
Steiner Ranch Blvd
Additional eastbound lane
RM 620 Improvement Study
Proposed 620/2222 Connector
24
Connector
RM 620 Improvement Study
RM 2222 Improvements from Connector to Ribelin Ranch Road
25
Additional auxiliary lanes and raised medians with turn bays
RM 620 Improvement Study
River Place Blvd Improvements at RM 2222
26
RM 620 Improvement Study
RM 2222 Improvements from Connector to RM 620
27
RM 620 Improvement Study
RM 620 – 2222 Bypass Major Features
28
Project 1: Additional WBD auxiliary lane from Ribelin Ranch Rd. to River Place Blvd.Additional EBD auxiliary lane Connector Rd to McNeil Dr.Raised concrete median and turn lanes along much of 2222Dual simultaneous left turn lanes on River Place Blvd @ 2222
Project 2: New connector road with two lanes WBD and two merging to one EBDNew traffic signals at where connector road intersects with 620 and 2222Add EBD lane from Steiner Ranch Blvd to connector road (5-8’ shoulders)
Steiner Ranch Blvd New Traffic signal synchronized with Comanche Trail signal
RM 620 Improvement Study
620/2222 Bypass Schedule
29
Project 1: Construct a six-lane section on RM 2222 from the bypass intersection location to Ribelin Ranch
o Anticipated environmental decision: spring 2017o Right-of-way acquisition: anticipate winter 2017/2018o Utility coordination and relocation: anticipate summer 2018o Ready to go out to bid: anticipate summer 2018o Construction cost estimate: $11 million
Project 2: Construct connector road from RM 620 to RM 2222 and improvements to RM 620
o Preliminary biological study along bypass road has been completedo Anticipated environmental decision: anticipate summer 2017o Right-of-way acquisition: anticipate summer 2018 o Utility coordination and relocation: anticipate summer 2018 o Ready to go out to bid: anticipate summer 2018o Construction cost estimate: $7 million
RM 620 Improvement Study
RM 620 IMPROVEMENT STUDY
RM 620 Improvement Study
RM 620 Study Area
31
Divided into six study sections
RM 620 study limits:
US 183 to SH 71(approximately 18 miles)
RM 620 serves a dual function:
urban thoroughfare&
state highway
Connects: Cedar ParkAustinLakewayBee Cave
RM 620 Improvement Study
Existing and Forecasted Traffic Volumes
32
Counts of vehicles per day
24-hour counts collected by HDR in 2015, shown in yellow
Average annual daily traffic counts by TxDOT in 2015, shown in green
HDR’s daily traffic projections:
• 2% annual growth through 2035
• 1% annual growth between 2025 and 2035 in central sections near RM 2222
• Forecasted conditions for 2035shown in parentheses
RM 620 Improvement Study
Crashes (2010 – 2015)
Section # of Crashes
1 305
2 398
3 285
4 173
5 556
6 191
Total 1,908
Each circle on the map (along RM 620) represents a crash that occurred at that location between 2010 and 2015.
33
RM 620 Improvement Study
Existing Traffic Conditions
Factors:
Traffic volumes
Levels of Service (LOS)
Travel times
Travel speeds
34
LOS Example
A/BLight traffic, minimal delay
C/DModerate congestion,
moderate delay
E/FHeavy congestion and
delay, long queues
A1A2
Slide 34
A1 Use this version for presentation?Author, 10/17/2016
A2 Yes or let Bruce chooseAuthor, 10/18/2016
RM 620 Improvement Study
Existing vs. No Build Level of Service
35
IntersectionExisting 2035 No Build
AM Peak PM Peak AM Peak PM PeakSection 1
RM 620 Westbound / Pecan Park Boulevard C C D ERM 620 Eastbound / Pecan Park Boulevard B C C CRM 620 / Deerbrook Trail A A C BRM 620 / Great Valley Drive / Lake Creek Parkway C D F FRM 620 / Hatch Road B B E CRM 620 / El Salido Parkway D D F FRM 620 / Anderson Mill Road (RM 2769) F F F FRM 620 / Plaza Volente / H-E-B B E F F
Section 2RM 620 / Buckner Road / Boulder Lane D E F FRM 620 / Boulder Lane (South) C D F FRM 620 / Concordia University Drive B D F FRM 620 / Wilson Parke Avenue/Rock Harbour Drive C B F DRM 620 / Four Points Drive A C D E
Section 3RM 620 / RM 2222 F F F FRM 620 / Comanche Trail E D F ERM 620 / Quinlan Park Road C D D ERM 620 / Marshall Ford Road B B B BRM 2222 / River Place Boulevard F D F CRM 2222 / Sitio Del Rio Boulevard E A E ARM 2222 / McNeil Drive C C F C
RM 620 Improvement Study
Existing vs. No Build Level of Service
36
IntersectionExisting 2035 No Build
AM Peak PM Peak AM Peak PM PeakSection 4
RM 620 / Hudson Bend Road C D D FRM 620 / General Williamson Drive B D D D
Section 5RM 620 / Debba Drive F E F FRM 620 / Kollmeyer Drive B B E ERM 620 / Lakeway Boulevard C C E FRM 620 / Lohmans Crossing Drive / Ameno Drive E F F FRM 620 / Lohmans Spur Road B B D ERM 620 / Flint Rock Road B B F FRM 620 / Spillman Loop / Honey Creek Court D A F ERM 620 / Cavalier Drive / Aria Drive F C F F
Section 6RM 620 / Falcon Head Boulevard C C D ERM 620 / Ladera Boulevard B C D FRM 620 / Bee Cave Parkway E E F FRM 620 / SH 71 C D D F
RM 620 Improvement Study
Proposed Roadway Configuration – Mid-Term
37
Colorado River Bridge to Quinlan Park Road
Quinlan Park Road to US 183
RM 620 Improvement Study
Proposed Road Configuration – Mid-Term
38
Lakeway Boulevard to Colorado River Bridge
SH 71 to Lakeway Boulevard
RM 620 Improvement Study
Left-In/Right-In/Right-Out Driveways (RM 1431, Cedar Park)
39
RM 620 Improvement Study
2035 No-Build vs. Build Level of Service – Mid-Term Improvements
40
IntersectionNo Build Build
AM Peak PM Peak AM Peak PM PeakSection 1
RM 620 Westbound / Pecan Park Boulevard D E C DRM 620 Eastbound / Pecan Park Boulevard C C C CRM 620 / Deerbrook Trail C B B ARM 620 / Great Valley Drive / Lake Creek Parkway F F B DRM 620 / Hatch Road E C B BRM 620 / El Salido Parkway F F D DRM 620 / Anderson Mill Road (RM 2769) F F F FRM 620 / Plaza Volente / H-E-B F F B C
Section 2RM 620 / Buckner Road / Boulder Lane F F D DRM 620 / Boulder Lane (South) F F D DRM 620 / Concordia University Drive F F B DRM 620 / Wilson Parke Avenue/Rock Harbour Drive F D C BRM 620 / Four Points Drive D E B C
Section 3RM 620 / RM 2222 F F E ERM 620 / Comanche Trail F E B CRM 620 / Quinlan Park Road D E C CRM 620 / Marshall Ford Road B B B BRM 2222 / River Place Boulevard F C E CRM 2222 / Sitio Del Rio Boulevard E A D ARM 2222 / McNeil Drive F C F C
RM 620 Improvement Study
2035 No-Build vs. Build Level of Service – Mid-Term Improvements
41
IntersectionNo Build Build
AM Peak PM Peak AM Peak PM PeakSection 4
RM 620 / Hudson Bend Road D F C ERM 620 / General Williamson Drive D D D D
Section 5RM 620 / Debba Drive F F F DRM 620 / Kollmeyer Drive E E E ERM 620 / Lakeway Boulevard E F C CRM 620 / Lohmans Crossing Drive / Ameno Drive F F C DRM 620 / Lohmans Spur Road D E B BRM 620 / Flint Rock Road F F B BRM 620 / Spillman Loop / Honey Creek Court F E C ARM 620 / Cavalier Drive / Aria Drive F F E C
Section 6RM 620 / Falcon Head Boulevard D E B BRM 620 / Ladera Boulevard D F A BRM 620 / Bee Cave Parkway F F F ERM 620 / SH 71 D F D F
RM 620 Improvement Study
Possible Road Configurations – Long-Term (At-grade)
42
Between RM 2222 and US 183
RM 620 Improvement Study
Possible Road Configuration – Long-Term (Elevated)
43
Between RM 2222 and US 183
RM 620 Improvement Study
2035 Build Level of Service – Long-Term Improvements
44
IntersectionMid-Term Long-Term
AM Peak PM Peak AM Peak PM PeakSection 1
RM 620 Westbound / Pecan Park Boulevard C D B CRM 620 Eastbound / Pecan Park Boulevard C C B CRM 620 / Deerbrook Trail B A A ARM 620 / Great Valley Drive / Lake Creek Parkway B D C CRM 620 / Hatch Road B B A ARM 620 / El Salido Parkway D D B CRM 620 / Anderson Mill Road (RM 2769) F F E DRM 620 / Plaza Volente / H-E-B B C A A
Section 2RM 620 / Buckner Road / Boulder Lane D D B BRM 620 / Boulder Lane (South) D D C BRM 620 / Concordia University Drive B D A BRM 620 / Wilson Parke Avenue/Rock Harbour Drive C B B ARM 620 / Four Points Drive B C A B
Section 3RM 620 / RM 2222 E E D ERM 620 / Comanche Trail B C B CRM 620 / Quinlan Park Road C C C CRM 620 / Marshall Ford Road B B B BRM 2222 / River Place Boulevard E C A ARM 2222 / Sitio Del Rio Boulevard D A D ARM 2222 / McNeil Drive F C C C
RM 620 Improvement Study
2035 Build Level of Service – Long-Term Improvements
45
IntersectionMid-Term Long-Term
AM Peak PM Peak AM Peak PM PeakSection 4
RM 620 / Hudson Bend Road C E B CRM 620 / General Williamson Drive D D C B
Section 5RM 620 / Debba Drive F D C BRM 620 / Kollmeyer Drive E E B ARM 620 / Lakeway Boulevard C C C CRM 620 / Lohmans Crossing Drive / Ameno Drive C D C DRM 620 / Lohmans Spur Road B B B BRM 620 / Flint Rock Road B B B BRM 620 / Spillman Loop / Honey Creek Court C A C ARM 620 / Cavalier Drive / Aria Drive E C E C
Section 6RM 620 / Falcon Head Boulevard B B B BRM 620 / Ladera Boulevard A B A BRM 620 / Bee Cave Parkway F E F ERM 620 / SH 71 D F D F
A3A4
Slide 45
A3 Need long-term values for these sections (was unable to locate this info in previous presentations)Author, 10/17/2016
A4 DoneAuthor, 10/18/2016
RM 620 Improvement Study
Cost Estimates
DISCLAIMER: Cost estimates are for planning purposes only, and actual construction costs may differ.
46
Improvement Cost
Mid-Term Build $173 million
Mid-Term ROW $30 million
Long-Term (Elevated) $620 million
Total $823 million
A5A6
Slide 46
A5 Need updated table: show mid-term and long-term per Bruce's commentAuthor, 10/17/2016
A6 Taken from the reportAuthor, 10/18/2016
RM 620 Improvement Study
CONTACT INFORMATION
For further information, contact:Bruce ByronProject [email protected](512) 832-7107
RM 620 Improvement Study
620/2222 Bypass Project
48
Thank You For Attending!
• Your involvement matters – stay engaged – register with SRNA
• We Depend on the Support of Members steinerranchna.org/join‐now
• Board of Directors Nominationsteinerranchna.org/board
• Meeting Feedback for After This Meetingsteinerranchna.org/feedback
January 25 2017, steinerranchna.org 49