In late 2018, the Victorian Government committed $318.3m to duplicate four kilometres of Barwon Heads Road between Settlement Road and Reserve Road, including a bridge over the Melbourne-Warrnambool railway line at Marshall.
The Government is also investigating the potential for duplication of a further six kilometres from Reserve Road to Lower Duneed Road.
The City of Greater Geelong is undergoing rapid urban expansion, experiencing the largest population increase of any area in regional Victoria.
Most of this expansion is concentrated in the Armstrong Creek Urban Growth Area which will provide housing for between 55,000 to 65,000 homes over the next 10-25 years.
The scale and pace of urban development to the south east of Geelong needs well considered solutions that will help reduce congestion, improve safety and stand the test of time.
COMMUNITY UPDATE
BARWON HEADS ROAD DUPLICATION
MARCH 2019
We’re upgrading Barwon Heads Road between Settlement Road and Reserve Road
A bridge will be built over the railway line at Marshall.
Major Road Projects Victoria (MRPV) is focused on getting the Barwon Heads Road Duplication right, and design teams are developing solutions that will deal with residential access, 14 intersections and the removal of the level crossing at the Melbourne-Warrnambool railway line.
Revised concept designs are now available to view. Please contact us if you would like to see a copy.
Authorised by the Victorian Government, 1 Treasury Place, Melbourne
SIGN UP FOR PROJECT UPDATES roadprojects.vic.gov.au
Major Roads Project Victoria (MRPV) is a dedicated government body charged with planning and delivering major road projects for Victoria, including the Barwon Heads Road Duplication.
VicRoads completed the initial planning studies for the Barwon Heads Road Duplication project, which were presented in November 2017.
MRPV is now the responsible body, charged with refining the concept design and minimising the impact to adjoining landowners, based on community and stakeholder feedback, in advance of construction.
What to expect from March 2019 onwards Consultants will be on site undertaking a survey of the existing road, and studying geology, topography, trees, drainage, utilities and services. They may also need to carry out surveys inside properties near Barwon Heads Road.
The surveys will assist in the continued development of the road design. The revised concept design will be made available to the community.
A Planning Scheme Amendment (PSA) process will commence in mid 2019, providing the opportunity for the community to review and formally comment on the concept design.
We will then seek approval from the Minister for Planning to amend the planning scheme. More information about the PSA will be made available before the process begins.
Geelong Ring Road
Boundary Road
Reserve Road
Tannery Road
Barw
arre
Roa
d
Breakwater Road
Portarlington Road
Barwon H
eads Road
Barwon Heads Road
Bluestone School Road
Beach Road
Gru
bb R
oad
Lower Duneed Road
Mt Duneed Road
High Street
Angl
esea
Roa
d
Princes Highway
Sur
fcoa
st H
ighw
ay
Bellarine Highway
ARMSTRONG CREEK
MARSHALL
GROVEDALE
ST ALBANS PARK
MOOLAPBREAKWATER
GEELONG
CONNEWARRE
BARWON HEADS
OCEAN GROVE
Barwon River
Barw
on River
Rail line
Train StationMap not to scale
Map not to scale
Duplicating 4 kilometres of Barwon Heads Road from Settlement Road to Reserve Road, including a bridge over the railway line at Marshall.
Planning for the duplication of a further 6 kilometres from Reserve Road to Lower Duneed Road.
Duplication constructed between Settlement Road and Reserve Road
Bridge over railway line
Planning for the future duplication between Reserve Road and Lower Duneed Road
6 kilometre duplication for planning
4 kilometre duplication for construction
Marshalltown Road
Marshall
SOUTH GEELONG
Features of the project • Extra lanes between Settlement
Road and Reserve Road
• Upgrade Settlement Road and Breakwater Road intersections
• Install traffic lights at Crows Road, Barwarre Road, Marshalltown Road and Reserve Road intersections
• Build new cycling lanes
• Install new street lighting, road signage and drainage
• Plan for upgrades between Reserve Road and Lower Duneed Road
When we complete the upgrade, it will: • Make your journey along
Barwon Heads Road safer
• Give you easier access to Barwon Heads Road and intersecting roads
• Improve traffic flow in the area by making your journey more reliable and predictable
• Reduce congestion in the area
• Make it easier and safer for you to walk or cycle in the area.
March / April 2019
Revised concept design available
Mid 2019
Begin the PSA process
2020
Start construction on the project
2023
Project completed
Project timeline
0444
Follow us on social media @roadprojectsvic
CONTACT [email protected]
1800 105 105
Major Road Projects Victoria GPO Box 4509, Melbourne VIC 3001
For languages other than English, please call 9280 0780.
Please contact us if you would like this information in an accessible format.
If you need assistance because of a hearing or speech impairment, please visit relayservice.gov.au