commissioning, startup, and training of booster … learned from recent pump stations commissioning,...
TRANSCRIPT
![Page 1: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/1.jpg)
Lessons Learned from Recent Pump Stations
Commissioning, Startup, and Training of Booster Pump Stations:
Nicholas Augustus, P.E.(OR), ENV SPProject Engineer
![Page 2: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/2.jpg)
22
Project Location
Thompson Pump Station
Ridgewood View Park Reservoir and Pump Station
![Page 3: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/3.jpg)
33
Thompson Pump Station (Future Site)
• Pump Station Design
– Site Selection
– System Operations / Design Functions
– Neighborhood impacts
– Future Expansion
![Page 4: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/4.jpg)
44
Testing, Startup, & Commissioning - Overview
• Terminology
– Planning
– Functional Testing
– Startup
– Commissioning
Planning Testing Startup Commissioning
![Page 5: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/5.jpg)
55
Testing, Startup, & Commissioning - Planning
• Timing of plan – Final form well in advance
• Proper schedule – Does it follow the plan?
• Responsibilities
• Operator training – is it included in the plan and schedule?
![Page 6: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/6.jpg)
66
Testing, Startup and Commissioning Planning
• Schedule
– Complete & Independent of Project Schedule
– Details for each phase
• Understanding startup for each piece of equipment
– Surge anticipator device
– Surge tank
– Seismic valving
– Main and secondary generators w/ additional battery backup
![Page 7: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/7.jpg)
77
Functional Testing
• Planning for functional testing
– Coordination with all equipment and component reps
– Integrator
• Functional testing
– Appurtenances
– Equipment
– Pumps
– Systems- moving into startup
![Page 8: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/8.jpg)
88
Functional testing- Items to consider
• Checklists
– Testing items
– System checks
– Responsibilities
o Contractor
o Commissioning agent / integrator
o Engineer
o Owner / Operator
![Page 9: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/9.jpg)
99
Startup
• Startup
– Systems
o HVAC, Electrical (Including backup power), Water Quality, Pumping, etc.
– Full functionality
– Verification of design
– Training of operators
– Extreme Events
![Page 10: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/10.jpg)
1010
Commissioning
• Commissioning
– Operators to spend additional time at the site
– Attention to details
– Is there anything out of the ordinary?
– Anything that “bugs” the operators?
![Page 11: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/11.jpg)
1111
Supplementary Systems- Lessons Learned
• Schedule
• Checklists
• Generator
• Electrical / ATS
![Page 12: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/12.jpg)
1212
Lessons Learned
• Pumps
– Vibration
– Flow
– Pump Shut-off / power outage simulation
• Valve Testing
– Motorized
– Specialty valves
![Page 13: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/13.jpg)
1313
Lessons Learned
• Appurtenances
– Sensors
o Pressure
o Level
![Page 14: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/14.jpg)
1414
Lessons Learned
• What went well with Thompson:
– Pump efficiency testing
– Pressure testing (motorized valve, leak in reservoir)
– Plan was executed
– No major issues during
startup or commissioning
• What could be better:
– Checklists
– Detailed schedule with
responsibilities
![Page 15: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/15.jpg)
1515
Things to remember
• Multi-functional testing
• Resiliency & Training
• Surge testing
• Vibration testing
• Flushing / clean pipe prior to firing pumps
• Responsibilities
• Full Schedule – Specifications requirements
• Checklists!
![Page 16: Commissioning, Startup, and Training of Booster … Learned from Recent Pump Stations Commissioning, Startup, and Training of Booster Pump Stations: Nicholas Augustus, P.E.(OR), ENV](https://reader031.vdocuments.us/reader031/viewer/2022021821/5b09e03a7f8b9a992a8e6615/html5/thumbnails/16.jpg)