Page 1: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

ALBA, Status and Operation

Francis Perez

Page 2: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Introduction to ALBA

Status

Operation

Page 3: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Introduction to ALBA

Page 4: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

The ALBA TeamWe are today ~150

Page 5: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

and I got new responsibilities!

Responsibilities

associated with

ties!!

Page 6: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

� 3 GeV electron Storage Ring

� 31 beamlines (7 on day one)

� Funding is 50% Spanish – 50% Catalan Governments

� Designed for sub-micron stability and top-up operation

ALBA Synchrotron Light Source

Page 7: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

ALBA founded April 2003

ALBA 1st worker Dec 2003

Design work 2004-2005

Start main building works July 2006

Start Linac installation Feb 2008

Linac commissioning Sept - Oct 2008

Booster and SR installation Feb – Dec 2009

Booster commissioning Jan – Oct 2010

SR Installation Feb – Dec 2010

Storage Ring commissioning March – Nov 2011

Beamlines commissioning Oct 2011 – Dec 2012

Start of Users Operation May 2012

ALBA History

Page 8: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Workshop

Electricity

Cooling - HVAC

Offices

Parking

Warehouse

Main Building

Page 9: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

ALBA Accelerators

LINAC100 Mev

BOOSTER100 MeV – 3 GeV

STORAGE RING3 GeV

Page 10: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

SR and BOOSTER sharing the tunnel

BoosterSR

In vacuum undulatorRF cavitiesBending

Page 11: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Storage Ring: Main Parameters

Electron beam energy 3.0 GeV

Storage Ring Circumference 268.8 m

Number of cells 16

Symmetry 4

Straight section lengths 4 x 8.0 m (3 ID’s+Inj)

12 x 4.4 m (12 ID’s)

8 x 2.6 m (2 ID’s+RF+Diagn)

Beam current 400 mA

Emittance 4 nm.rad

Lifetime > 10 h

Page 12: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Phase 1:

7 Beamlines under commissioning

6 ID’s and 1 bending magnet port

In addition, 2 bending magnet ports for Electron Beam Diagnostic

Phase 2:

8 proposal have been evaluated

2 new beamlines are approved but pending financial budget

In total:

Capability for 17 ID beamlines

And 14 bending magnet beamlines

ALBA BEAMLINES

Page 13: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Bending: e- Diagnostics

SCW30

EXAFS

Bending

Microscopy

IVU21

Macromolecular CristalographyIVU21

Non Cristaline Diffraction

W65

XAS

EU62

Photoemission

spectroscopies

EU71

Polarization dependent

spectroscopiesBending: e- Diagnostics

ALBA BEAMLINES

Page 14: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Status

Page 15: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Multibunch mode

4 nC at linac exit

Main linac parameters:

� All parameters within specs

� Operation modes: single bunch & multibunchFew bunches mode

0.25 nC/bunch at linac exit

εεεεx (norm.) ≈ 9 mm·mrad∆∆∆∆E/E = 0.16% (rms)

Parameters Specifications Working

E MeV 100-130 110

∆E/E rms < 0.50 0.16

Norm. εx,y mm·mrad < 30 < 15

LINAC

Page 16: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Main BO parameters:

� C = 249.6 m, shares tunnel with SR

� E = 110 MeV to 3.0 GeV

� εx ≈ 10 nm·mrad

� Repetition rate: 1 Hz for comm.

3.125 Hz for operation

� Good agreement with the model

0 50 100 150 200 2500

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

BPM position, s [m]

horiz

onta

l dis

pers

ion

func

tion,

ηx [m

]

modelmeasured

3 GeV200 MeV

BOOSTER

Page 17: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

STORAGE RING

Nominal Achieved

Energy 3 GeV 3 GeV

Max. Current 400 mA 200 mA

Tunes 18.18, 8.37 18.15, 8.37

Emittance 4.3 nm·rad 4.4 ± 0.4 nm·rad

Energy spread 1.05·10-3 1.00·10-3

Coupling < 1 % 0.5 %

Lifetime @ 100 mA >10 h 10 h

Ah accumulated >100

Page 18: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

INSERTION DEVICES

13.07.2012

Phase I beamlines: 6 x IDs All IDs fully operational

1 x Bending

� Spectral range: from UV (80 eV) to hard x-rays (50 keV)

� High brilliance: 1020 at 2 keV

Page 19: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

BBA: Beam based alignment.

→ align BPM to center of quad

Raw orbit without correctors after BBA

Horizontal orbit < 3mm

Vertical orbit < 2 mm

Good alignment

CLOSED ORBIT

Page 20: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

SOFB (Slow Orbit FeedBack)

� Running every 3 s

� With RF frequency included on SOFB

RMS-Values:

σx = 0.5 µm

σy = 0.2 μm

Beam Stability over 24 h

-0.005

-0.004

-0.003

-0.002

-0.001

0.000

0.001

0.002

0.003

0.004

0.005

0 4 8 12 16 20 24

Time [h]

BP

M [

mm

]

0

25

50

75

100

125

Cu

rrent [m

A]

BPMx [8,2] BPMy [8,2] Current

ORBIT STABILITY

Page 21: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Long term drift @ MSPD

Vertical plane

Projection

eBPMs

Front End

E XBPM 90 umChange of RF freq since Feb 2012

PHOTON BEAM STABILITY

Page 22: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

“BUILDING” STABILITY

Change in RF frequency

~ 3 kHz

Change in Circumference

~ 2 mm

Page 23: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Operation

Page 24: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

TRANSITION

End 2011: Transition to Operation

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

oc

tob

er

no

ve

mb

er

de

ce

mb

er

Month 2011

ho

urs

of

op

era

tia

on

BLs

injections

down time

SR comm.

Page 25: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

4300 h of operation

3200 h for Beamlines

1100 h for accelerators

development

OPERATION 2012

� Running 3 shifts/day

� Runs of 24 days on average

� Monday: Accelerators start-up

� Tuesday 07h00 – Monday 07h00 Beam for users

� 2 long shut downs, 5 short (1 w) shut downs

Page 26: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

7th May 2012: First users

Page 27: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Statistics Jan-Sept 2012

� Beamline operation:

� 2073 planned

� 1950 delivered

� 94 % beam availability:

OPERATION 2012

Hours for BLs: Planed vs. Delivered

0

100

200

300

400

500

RU

N_

01

RU

N_

02

RU

N_

03

RU

N_

04

RU

N_

05

RU

N_

06

RU

N_

07

RU

N_

08

RU

N_

09

Run #

Ho

urs

[h

]

Planned

Delivered

Hours for BLs: % Delivered vs Planned

75%

80%

85%

90%

95%

100%

RU

N_

01

RU

N_

02

RU

N_

03

RU

N_

04

RU

N_

05

RU

N_

06

RU

N_

07

RU

N_

08

RU

N_

09

Run #

Ho

urs

[h

]

Page 28: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

OPERATION 2012

BEAM FOR BEAMLINES:

By Number of Failures

BL

3%CT

5%

DI

1%

EPS

2%

ID

3%

INF

2%

LI

1%

MML

1%

OE

3%

OI

2%OT

7%

PM

2%

PS

10%

PSS

3%

RF

53%

VC

1,0%

WI

1,0%

BL

CT

DI

EPS

ID

INF

LI

MML

OE

OI

OT

PM

PS

PSS

RF

VC

WI

Page 29: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

OPERATION 2012

BEAM FOR BEAMLINES:

By Downtime

BL

4%CT

3%

DI

1%

EPS

2%

ID

1%

INF

4%

LI

2%

MML

1%

OE

1%

OI

1%

OT

12%

PM

11%

PS

27%

PSS

3%

RF

27%

VC

0,4%

WI

0,4% BL

CT

DI

EPS

ID

INF

LI

MML

OE

OI

OT

PM

PS

PSS

RF

VC

WI

Page 30: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

SUMMARY

� Main specifications for ALBA have been reached

� ALBA is already open to users

� 2013 will have:

� 3600 hours for BLs (2800 for users)

� 1400 hours for Accelerators

� Future work:

� FOFB

� Top-up

� Fast Feedback system

� Increase operation current

Page 31: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Thank you