Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
Commercialization of ECOPRO® for Utilization of Low Rank Coal
September 10th , 2014
Nippon Steel & Sumikin Engineering Co.,ltd.
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
2
High efficiency coal gasification is the key technology for the energy shift from petroleum or natural gas to coal.
Gasoline, kerosene,
Heavy oil, etc,.
Cracking Ethylene/Propylene
Synthesis reaction
Power generation
GTL Diesel
Naphtha For chemical industry
Cokes For steel making
Tar, BTX COG
C2H4、C3H6
Shift
Chain of Oil & Gas
Chain of Coal
Naphtha
Naphtha
Diesel CTL
IGCC
Methanation
Syngas(H2/CO)
Coke production
Syngas
Production
Refining
Chemical products
Plastic
Fertilizer, Rubber,
Chemicals etc,.
Transportation
fuel
City gas
(for industrial use)
Electricity
Natural gas
Crude
Oil
Coal
Power generation
For chemical
industry
Gasification
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
ECOPRO
85%~
Dry Feed + Pyrolysis
75~80% 70~75% 50~60% Cold Gas
Efficiency
Shell GE Lurgi Process
Outline
Dry Feed Slurry Feed
Fixed Bed,
Fluidized Bed
Slug
Coal(CWM)
Oxygen
Gas
Oxygen Coal
Slug
Gas
Heat Recovery Car
RG Char
Gas
Slug Oxygen
Coal
Coal
Pyrolysis Gas
Coal
Oxygen
Ash
1st~2nd Generation 3rd Generation 5th Generation 4th Generation
(SHELL)
Entrained Flow Bed
Trend of Technology
Batch Treatment , Low Efficiency
Continuous Treatment、Large Scale、 Higher Efficiency、Applicability to Low Rank Coal
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
<Target >
・ Applicability to Low Rank Coal
・ Large Scale
・ High Efficiency
< Facility >
・ Entrained Flow Gasifier
・ Dry Feed & Oxygen Blown
・ 2 Chambers(Pyrolysis Process)
<Operation>
・ Operational Knowhow
(Coal Handling、
Control of Ash Content)
O2
Coal Fuel ・Chemical
SNG, FT-oil、
Hydogen、Ammonium ,Methanole
Syngas (H2 , CO, CH4)
Slag Inorganic materials
Cement, etc
Char
【Partial Oxdation】
Coal + O2, Steam
CO,H2 + Heat + α
【Pyrolysis】
Coal + Heat
CO,H2, CH4+ α
Synthesis Process
Producing Valuable Fuel or Chemical Materials from Abundant Low Rank Coal in Coal Mining Site.
Experience in Steel Making
Characteristics
of ECOPRO
Drying Pulverizing
1. Applicability to Low Rank Coal
2. Stability of Operation
3. World Highest Energy Efficiency ( 85%~ )
4. “Pyrolysis” in Upper Chamber
・ Methane Content in Syngas ⇒ High Efficiency in Production of SNG
・ No Oxygen needed in Pyrolysis⇒ Reduction of cost of ASU and electricity by
saving Oxygen Consumption
High
Efficiency of
Producing
SNG
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
ECOPRO 20t/d Pilot Plant at Nippon Steel & Sumikin Yahata Works
1995~ Basic Research and Development
2003~2008
Basic Process Design Development with Pilot Plant , as subsidized by METI Coal Div. of Japanese Government
2009 ~ Development of Scale-up Demonstration Schemes under the Project “Utilization of Brown Coal (Lignite) in Victoria, Australia.”
2012~ Development of Demonstration in China Schemes
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
1. Where has Coal Gasification Market been Realized? (1) The coal gasification market is being linked with
the natural gas market. (2) The stable supply of natural gas is becoming increasingly difficult. (3) The coal gasification is attracting growing interest and attention world-wide.
It is only in China that the coal gasification market has been realized.
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
2. Why has Coal Gasification Market been Realized in China?
(1) Shortage of supply of oils and natural gas and serious increase of the domestic energy demand ⇒ Government Policy of Coal Gasification Promotion. (2) Widely available domestic coal resources as combined with neighboring industrial centers (3) Lower capital cost of coal gasification plants
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
3. Why do Coal Gasification Projects Remain Unrealized in Countries other than China?
(1) Prices of natural gas have come to stay at low levels (at natural gas producing countries, except Indonesia where such prices have rapidly become high) or remain uncertain (at LNG/ natural gas importing countries). (2) Insufficient investment environment ・ Incomplete infrastructure ・ Absence of related industries ・ Insufficient industry promotion policies (3) Higher capital cost of coal gasification plants
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
For speedy commercialization of ECOPRO, essential is ① to complete its demonstration in China where the ② coal gasification market has been realized, cooperating with ③ partners who are planning coal gasification projects.
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
Category Project Programming
StageⅠ
1. Period: 2014 and on 2. Goal : Undertake Demonstration and Projects on commercial scale, jointly with Chinese Partner “Shandong Energy Zaozhuang Mining Gr” Step1 Middle Size (200t/d) = Model Plant for Demonstration of ECOPRO® Performance Characteristics Step2 Large Scale (more than 1000t/d) =Commercial Project ⇒ Establish Low-cost Procurement and Fabrication System in China through Step1 and 2
StageⅡ
1.Period: 2018 and on 2.Goal : Undertake commercial scale projects in coal mining countries other than China: ・ Australia ・ Indonesia ・ Others ( India, Mozambique, and Mongolia. )
SNG⇒LNG to Japan
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
☆ Shandong Energy Zaozhuang Mining Gr, prospective Chinese Partner for ECOPRO Demonstration, possesses interests for the lignite mines in the eastern region of Inner Mongolia and is planning to launch a lignite-based SNG production project in the site adjacent to the group chemical factory located in Hulunbeier City ☆ The ECOPRO® Demonstration is being planned to be executed in this site.
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
Scheme for Commercial SNG project NSENGI : Nippon Steel & Sumikin Engineering CO.,LTD.
Value Chain
Ex. PetroChina
Own Funds+Loan byShandong Energy Zaozhuang Mining Gr
Shandong Energy Zaozhuang Mining Gr
NSENGI or Group Company
Value Chain
Own Funds (NSENGI、Shandong Energy Zaozhuang Mining Gr)+Subsidies
Scheme for Demonstration of ECOPRO®
山東棗荘
Off-taker of Products O&M EPC Finance Upstream Interest
Off-taker of Products O&M EPC Finance Upstream Interest
Shandong Energy Zaozhuang Mining Gr
Shandong Energy Zaozhuang Mining Gr
Shandong Energy Zaozhuang Mining Gr
Shandong Energy Zaozhuang Mining Gr or others
NSENGI or Group Company
Copyright©2012 NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD. All Rights Reserved.
Aug. Sep. Oct. Nov. Dec.
China
Other
than
China
2015 2016 2017
Ⅰ
Preparatory Work
Execution ofDemonstration
Item 2018 2019 2020 2021 2022
ⅡCommercial
Projects
▽Signing Contract on Demonstration
PlanningEPC
of Deonstration PlantDemonstration
Operation Shifted Commercial Operation
Feasibility Study Commercial Unit#1
Feasibility Study
Additional PP Testby Demonstration Coal