Topics:
Customers
Projects
Orders
Batch Setup
Batching
Change Materials
Inventory Receipts
Ticket Editor
End of Day procedures
-
24/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Customers: the main form components
Grid section showing Grid section showing
all current records in all current records in
the databasethe databaseDetails of the record Details of the record
selected (>>) selected (>>)
You may use the scroll You may use the scroll
bar to move through bar to move through
the list of customersthe list of customers
The Main tab The Main tab
has contact has contact
informationinformation
The Shipping tab The Shipping tab
has items which can has items which can
affect Order Entryaffect Order Entry
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Customers: adding a new one
Scroll to the bottom of the Scroll to the bottom of the
Customer list, click on the Customer list, click on the
* to start a new record (n)* to start a new record (n)1
-
34/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Customers: adding a new one
2 3
4
Enter a Customer Enter a Customer
referencereferenceEnter Customer Enter Customer
namename
Enter a Customer Enter a Customer
address if knownaddress if known
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Customers: adding a new one
5Enter Contact Enter Contact details if requireddetails if required
-
44/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Customers: adding a new one
6 7 8
9
Save the record, then click on the Shipping tab of your new customer:
Tick this box if you Tick this box if you
must have a PO for this must have a PO for this
customer when you customer when you
make an Ordermake an Order
Tick this box if the Tick this box if the
Orders can only Orders can only
have Project Mixeshave Project Mixes
Tick this box if Tick this box if
you can allow you can allow
ReRe--shipped shipped
concreteconcrete
Save the record
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: the main form components
Grid section showing Grid section showing
all current records in all current records in
the databasethe database
You may use the scroll You may use the scroll
bar to move through the bar to move through the
list of customerslist of customers
Details of the record Details of the record
selected (>>) selected (>>)
The Products The Products
tab has Mix tab has Mix
informationinformation
The Shipping tab The Shipping tab
has items which can has items which can
affect Order Entryaffect Order Entry
The Main tab The Main tab
has contact has contact
informationinformation
-
54/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
Scroll to the bottom of the Scroll to the bottom of the
Customer list, click on the Customer list, click on the
* to start a new record (n)* to start a new record (n)1
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
2 Use the pullUse the pull--down box to down box to enter the Customerenter the Customer
-
64/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
3 Enter the Cemex Project ID Enter the Cemex Project ID and a name if requiredand a name if required
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
4 Enter line 1 of the Enter line 1 of the Project addressProject address
Click the + to see lines 2 Click the + to see lines 2
and 3 if you need themand 3 if you need them
-
74/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
Click OK to enter the address details
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
5Complete any of the optional fields - City , State , Postal ,
Instructions , PO Num
-
84/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
Enter Start Date and Expires Date Enter Start Date and Expires Date
using the pullusing the pull--down boxes to help youdown boxes to help you6
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
Enter contact information for Enter contact information for
the Project if requiredthe Project if required7 Save the record8
-
94/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
Select the Products tab -
Use the pullUse the pull--down box to down box to
enter the Mixes (Products) enter the Mixes (Products)
required on this Projectrequired on this Project9
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
Enter more Mixes as required Enter more Mixes as required
for the Project (no need to for the Project (no need to
enter enter EstEst Qty)Qty)10 Save the record11
-
10
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Projects: adding a new one
Select the Shipping tab -
Tick this box if you Tick this box if you
must have a PO for this must have a PO for this
customer when you customer when you
make an Ordermake an Order
Tick this box if the Tick this box if the
Orders can only Orders can only
have Project Mixeshave Project Mixes
Tick this box if Tick this box if
you can allow you can allow
ReRe--shipped shipped
concreteconcrete
Save the record
12 13
15
14
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: the main form components
Grid section showing all orders Grid section showing all orders
for Date and Status selected for Date and Status selected
(like an Order Index)(like an Order Index)
Details of the Order Details of the Order
selected (>>) selected (>>)
The Tickets button would The Tickets button would
show all loads batched for show all loads batched for
the selected Orderthe selected Order
Date will Date will
default to todaydefault to todayStatus will default to Status will default to
Open OrdersOpen Orders
-
11
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: adding a new one for today
If there are existing orders shown, If there are existing orders shown,
scroll to the bottom of the Order list, scroll to the bottom of the Order list,
click on the * to start a new record (n)click on the * to start a new record (n)
(you could enter an (you could enter an
Order for tomorrow by Order for tomorrow by
changing the date first)changing the date first)
Use the pullUse the pull--down box down box
to enter the Customerto enter the Customer
1
2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: adding a new one for today
Use the pullUse the pull--down box down box
to select the Projectto select the Project3
-
12
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: adding a new one for today
Use the pullUse the pull--down box down box
to select the Mix ***to select the Mix ***
*** Note that if the Project or Customer forms restrict to Only Project Products
a full list of Mix Designs will not be shown
4
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: adding a new one for today
Enter the volume required for this Order, Enter the volume required for this Order,
then press the Enter or Tab keythen press the Enter or Tab key5
-
13
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: adding a new one for today
The Products tab will The Products tab will
show the Mix and show the Mix and
volume orderedvolume orderedSave the record
Enter the On Job time, Enter the On Job time,
Spacing and Estimated TravelSpacing and Estimated Travel6
7
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: adding a new one for today
The Order will now be displayed on the Order Grid , sorted with any others, into the time to load
the next Ticket for an Order
-
14
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: other things to look for
The + box can be ticked if the final The + box can be ticked if the final
total shipped quantity is unknown (then total shipped quantity is unknown (then
the order will still show)the order will still show)
The Orders will go away from the Order Grid , once completed (show them by changing the Status from
Open Orders to Show All)
You can set to an Order You can set to an Order
Status to Cancelled or Status to Cancelled or
CompletedCompleted
These times (and the loading time) are used to estimate the time for the next Ticket on any Order
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
Lets show how to copy an Order from yesterday (4th) to today (5th)
Click on the Date pull-down box 1
-
15
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
Click on the date you want to Click on the date you want to
copy from (4copy from (4thth in our example)in our example)2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
If you canIf you cant see the Order you want to t see the Order you want to
copy, change the Status to All Orderscopy, change the Status to All Orders3
-
16
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
Highlight the Order you wish to copyHighlight the Order you wish to copy 4
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
Either Either rightright--clickclick in this area of the form, in this area of the form,
or use the Edit menu, then select Copyor use the Edit menu, then select Copy5
-
17
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
The The Copy OrderCopy Order poppop--up up
form will appear, click on form will appear, click on
the Date pullthe Date pull--down boxdown box
Click on the 5Click on the 5thth or the red or the red
circle marked circle marked Today:Today:
Enter the new On Job Enter the new On Job
time, then click on the time, then click on the
Copy buttonCopy button
6
7
8
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
Click on the 5Click on the 5thth or the red or the red
circle marked circle marked Today:Today:9
-
18
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Orders: copying an order from another day
The Order form will now show your new Order for today
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup: (from an Order)
If you donIf you dont see the Batch Setup button t see the Batch Setup button
here, open up the Batch Setup formhere, open up the Batch Setup form
Make sure you have the cursor (>>) pointing to
the right Order
Click on Create Ticket
1
2 3
-
19
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup:
4
5Use the pullUse the pull--down box to select the down box to select the
Truck you want to use for this LoadTruck you want to use for this Load
Change the Load Size Change the Load Size
if you need toif you need to
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup:
6Click the Dispatch button if Click the Dispatch button if
you want to you want to stackstack the loadsthe loads
Click the Batch Setup button if Click the Batch Setup button if
you want to batch it nowyou want to batch it now6
-
20
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup:7
8
Open up the Batch Setup formOpen up the Batch Setup form
Make sure the cursor (>>) is pointing Make sure the cursor (>>) is pointing
to the right Load you want, if there are to the right Load you want, if there are
multiple loads on the multiple loads on the StackStack
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup:
9Change the Water Trim, or Adjust, or Change the Water Trim, or Adjust, or
In Truck, to adjust the Water targetIn Truck, to adjust the Water target
-
21
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup:
10Click on the Ticket Setup tab Click on the Ticket Setup tab
if you want to check where if you want to check where
the Load is going to the Load is going to ..
Click on the Start button Click on the Start button
when you ready to make when you ready to make
concrete!concrete!11
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup:
The Batch Graphic form will open automatically, and the BATCH WILL START
-
22
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup: Returned (re-shipped) Concrete
Let us say you need to return concrete on the 3rd load shown ..
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup: Returned (re-shipped) Concrete
Highlight the Load you Highlight the Load you
want to modifywant to modifyCheck this is the Truck Check this is the Truck
with returned concretewith returned concrete1 2
-
23
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup: Returned (re-shipped) Concrete
Click on the Returned tab Click on the Returned tab
(this will be in Red if the (this will be in Red if the
concrete is older than 90mins)concrete is older than 90mins)
You will see the Mix that was You will see the Mix that was
last batched into this trucklast batched into this truck
This is the age of the This is the age of the concrete in MT103, and concrete in MT103, and
the Ticket number it the Ticket number it was made onwas made on
3
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup: Returned (re-shipped) Concrete
Enter the quantity of Enter the quantity of
returned concrete in returned concrete in
the truckthe truck4 Save the changes5
-
24
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batch Setup: Returned (re-shipped) Concrete
Notice the Target quantities will have Notice the Target quantities will have
reduced, to be for 6m3 of new concrete reduced, to be for 6m3 of new concrete
(1m3 is in the truck already)(1m3 is in the truck already)
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Batch Graphic FormNo. of Loads batchingNo. of Loads batching
Load Running indicatorLoad Running indicator
Load Hold buttonLoad Hold button
Load buttonLoad button
Load Abort buttonLoad Abort button
Notification MessageNotification Message
-
25
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Batch Graphic FormDevice graphicDevice graphic
DeviceDevice
ProgressProgress
BarBar
Material Material
NameNameGraph Graph
with with
progress progress
barsbars
Load SummaryLoad SummaryTruck Discharge Rate Truck Discharge Rate --
speed up or slow down speed up or slow down
the material loading ratethe material loading rate
MoistureMoisture
TargetTarget
ActualActual
Scale Scale
Weight & Weight &
discharge discharge
rate rate
(kg/s)(kg/s)
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Individual Device Hold
RightRight--click on the Device, click on the Device,
select Hold when you select Hold when you
need to (or just Click on need to (or just Click on
the Device)the Device)
1
-
26
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Individual Device Hold
RightRight--click on the click on the
Device, select Release Device, select Release
when you need towhen you need to
2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: to Hold the Load Click on HoldClick on Hold 1
-
27
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: to Hold the Load Click on Resume to Click on Resume to carry on batchingcarry on batching 2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Individual Device Abort
RightRight--click on the click on the
Device, select Abort Device, select Abort
when you need towhen you need to
1
-
28
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Individual Device Abort
The Device will stop, The Device will stop,
and log as an error if and log as an error if
out of toleranceout of tolerance
2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: to Abort the Load Click on AbortClick on Abort1
-
29
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: to Abort the LoadClick on Cancel to carry Click on Cancel to carry
on batching, or OK to on batching, or OK to
Abort the loadAbort the load
2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Change Truck
RightRight--click on the click on the
Truck, select Truck, select
Change TruckChange Truck1
-
30
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Change Truck
Enter the new Enter the new
Truck details, then Truck details, then
click Saveclick Save
2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: DischargingClick Load to start Click Load to start
discharge when discharge when
materials are readymaterials are ready1
-
31
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: DischargingLoad changes to Load changes to
Loading while Loading while
activatedactivated2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Change Material
RightRight--click on the click on the
Device, select Device, select
Change MaterialChange Material
1
-
32
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Change Material
The The Change MaterialChange Material poppop--up up
form will appear, click on the form will appear, click on the
New Material pullNew Material pull--down boxdown box
Select the New Material Select the New Material
required to be batched using required to be batched using
this Devicethis Device
Note: you can also use this Note: you can also use this
form to disable a Device if form to disable a Device if
requiredrequired
(set to Active/not Active)(set to Active/not Active)
Click on Save when changes Click on Save when changes
are madeare made
2
3
4
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Change Material The change is effective The change is effective for the next batchfor the next batch
-
33
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Inventory Receipts
RightRight--click on the click on the
Device, select Device, select
Inventory ReceiptsInventory Receipts
1
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Inventory Receipts
The Inventory Receipts form opens, The Inventory Receipts form opens,
enter the Quantity receivedenter the Quantity received2
-
34
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Batching: Inventory Receipts
Enter any additional data you require Enter any additional data you require
to be recorded (at least the Ticket #)to be recorded (at least the Ticket #)
Save the record
3
4
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Ticket Editor:
View Weights button will allow you to View Weights button will allow you to
reprint a copy of the Batch Weightsreprint a copy of the Batch Weights
Highlight the Ticket you Highlight the Ticket you
want to look atwant to look at
Click on the Date pull-down box, if you need to look at another day
View Ticket button will allow you to View Ticket button will allow you to
reprint a copy of the Ticketreprint a copy of the Ticket
You could change the You could change the
Truck for example, Save, Truck for example, Save,
then print a new Ticketthen print a new Ticket
-
35
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Ticket Editor: view Weights
Click Print to get a copyClick Print to get a copy
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Ticket Editor: view Ticket
Click Print to get a copyClick Print to get a copy
-
36
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Ticket Editor: to Cancel a Ticket
Use the Notes tab to enter a reason for cancelling the Ticket1
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
Ticket Editor: to Cancel a Ticket
Use the pullUse the pull--down Status box down Status box
to select Cancelledto select Cancelled Save the record2 3
-
37
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Day
Open Reports/Utilities form, the Open Reports/Utilities form, the
default process will be End Of Daydefault process will be End Of Day1
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Day
Use the scroll bar to move to the end of the Use the scroll bar to move to the end of the
list of process steps, and click on Run Grouplist of process steps, and click on Run Group2
-
38
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Day
Reports will start to print, and the Backup and Purge Database step will start
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Day
At the process step to Restart RTC , At the process step to Restart RTC ,
Notifications will pop up to tell you about Notifications will pop up to tell you about
communication loss to the RTC, communication loss to the RTC,
acknowledge them, they are normal hereacknowledge them, they are normal here
3
-
39
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Day
.. the RTC is nearly back up and running, .. the RTC is nearly back up and running,
continue to acknowledge Notificationscontinue to acknowledge Notifications4
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Day
you are done when there are no more Notifications, have a green 01 at the top of the screen, and you see Running. Completed!
-
40
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Material Export
Open Reports/Utilities form, highlight Open Reports/Utilities form, highlight
the Material Record processthe Material Record process1
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Material Export
Use the pullUse the pull--down box on down box on
Company Code to select 01Company Code to select 01
Click Run Click Run
SectionSection2 3
-
41
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Material Export
The Material Record export file will be The Material Record export file will be
created at this location, so go and check created at this location, so go and check
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Material Export
On Cemex PC, click on your On Cemex PC, click on your
desktop shortcut to get to a desktop shortcut to get to a
location on D: drivelocation on D: drive
DoubleDouble--click on the click on the Mat_RecMat_Rec
file with todayfile with todays date ons date on
You should see data You should see data
similar to thissimilar to this
Close the windows when Close the windows when
you are done lookingyou are done looking
4
5
6
-
42
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Ticket Export
Open Reports/Utilities form, Open Reports/Utilities form,
scroll and then highlight the scroll and then highlight the
Ticket Export processTicket Export process
Click on Click on
Run SectionRun Section1 2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Ticket Export
The Ticket Export file will be created at this The Ticket Export file will be created at this
location, we will check location, we will check
-
43
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Ticket Export
On Cemex PC, click on your On Cemex PC, click on your
desktop shortcut to get to a desktop shortcut to get to a
location on D: drivelocation on D: drive
DoubleDouble--click on the ticket fileclick on the ticket file
You should see data You should see data
similar to thissimilar to this
Close the windows when Close the windows when
you are done lookingyou are done looking
3
4
5
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
Open Reports/Utilities form, Open Reports/Utilities form,
select the End Of Month processselect the End Of Month process1
-
44
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
Use the scroll bar to move to the end of the list Use the scroll bar to move to the end of the list
of process steps, and click on Run Group , of process steps, and click on Run Group ,
make sure you have a blank CD in the drivemake sure you have a blank CD in the drive2
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
Reports will start to print, and the Backup and Purge Database step will start
-
45
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
the CD Writing Wizard will start
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
Enter a short and meaningful Enter a short and meaningful
name for the CD backupname for the CD backupClick Click
NextNext3 4
-
46
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
data will start to be written to CD
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
Click on Click on
FinishFinish5
-
47
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: run End of Month
End of Month is complete, End of Month is complete,
close the formclose the form6
4/7/20074/7/2007 Command Alkon Inc.Command Alkon Inc.
End of Day Procedures: Normal notifications during RTC Re-start Process Steps
1
2
3
4
5
6