    Command Center Kick-off for Frito Lay Wave 1

    January 11, 2012

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    2/13

    Ticket Management

    Deployment Wave stabilization support

    PCC Ticket Lifecycle

    PCC Roles

    Ticket Approval and Release Management Process

    R7 Ticket Meeting

    Shift Schedule and PCC Ground Rules

    Appendix

    2Agenda 2

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    3/13

    Deployment Wave Stabilization Support 3

    End users will report issues to an on-site support team member.

    Issues not resolved by the on-site support team member will be raised to Plano Command Center

    support for further analysis and resolution.

    Plano Command Center involvement will be based on the type of issues found and the scope of

    the issues.

    If it is discovered that the end users questions can not be answered, the On-Site Support team

    member must capture all information in an Issue Resolution Form (IRF) and send it to the PlanoCentral Command SPA box

    R7 support during Wave 1 will remain with same strategy implemented for Pilot: on-site

    support core process team member(s) will be located in the sites where we go-live. On-sitesupport begins the issue flow process when an end user raises a question/issue

    3

    So, how is CC going to work on each issue once ticket is created?

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    4/13

    4

    Ticket ApprovalTicket Testing

    Charm

    Management/

    Star Team

    Ticket Analysis

    and resolution

    Process change or

    clarification

    System changeneeded

    Plano Command Center Ticket Life Cycle

    Incident ticket creation

    in SM7 from IRF

    Ticket assignment to

    CC Groups

    Ticket Analysis by CC Triage team (Primary

    Assignee + solution input from Hypercare

    Integrated Solution Team (HIST) If process related, workaround is identified and

    is communicated to sites

    If system update is required, Charm/StarTeam

    requirement is triggered to start system update

    ES Baseline can own NABQ Tickets and work

    independent of the R7 tickets, but share with

    HIST for visibility

    Charm requirement

    (orStar Team) is

    created and

    communicated to

    Developer

    Changes are

    transported to testing

    environment

    UAT Testing is

    executed in D11/Q11

    (SAP) or FLL1,DEV7

    (Legacy)

    Ticket assignee willbe accountable for

    making sure that

    testing is completed

    and properly

    documented

    Retrofit to Triage

    Team for additional

    changes if required

    Business Readiness

    approval is requested

    before migrating

    change to PRD (Both

    FL and NABQ must

    approve)

    Incident ticket is

    resolved

    Incident ticket is

    closed Criticalstep

    BASIS

    Security

    AI `

    BW

    SAP Development

    DBA

    Portal Development

    TIBCO Admin

    ECG

    DRF

    Tech PMs

    BPM

    Archiving

    Process: Order Management; Distribution Management;

    Inventory Management

    ES: SAP Sales; SAP Inventory Management; SAP Logistic

    Execution

    DMO

    Ticket Creation and

    Assignment

    CC

    Gro

    ups

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    5/13

    5Plano Command Center Roles

    Command Center Roles were designed to focus resources in the different stages of a ticket lifecycle:

    Assignee

    (Sustain/Hypercare)

    Work with HIST to identify RCA, solution, and

    test cases. No ability to enable change (no

    Charm/Configuration. Prep for and execute all

    testing. Learn the detailed solution for every

    ticket they own

    Fixer/Change Enabler(FD Analyst; ES Baseline; ESFS)

    Works along with HIST team enabling change

    via Charm/Configuration

    Charm Lead/Star Team Lead

    (ES Baseline Sub-leads and Legacy

    Analyst)

    Creates charm/star team object and follow up

    on transport creation and migration

    Charm/Star Team Analyst

    (FD Analyst; ES Baseline;

    ESFS)

    Tester(Sustain/Hypercare)

    Executes test for all fixes made to solve

    tickets

    Testing Environment Analyst

    Ensures that R7 + NABQ + Transaction

    can flow E2E in the testing

    environments

    Business Approver(R7 Business Readiness)

    Approves changes and provide the go

    to take them to PRD

    Support for Assignee

    (R7 Core Process)

    Provides any type of documentation,

    screen shoots, etc. to speed approval

    Ticket Dispatcher

    (ES Baseline

    Sub-leads)

    Focus on ticket assignment to

    the accurate team and/or person

    Dispatch Assignment

    Support(R7 Core Process)

    Assists Ticket Dispatcher on

    routing tickets as per R7

    functionality and skill sets of R7

    resources

    Supports Charm/Star Team Lead on

    transport management

    WIT Project Analyst (all phases of

    project lifecycle)

    Leads all tasks to complete WIT items

    R7 Hypercare Integrated Solution

    Team (HIST)

    Deep solution experts. No ticket assigned to

    them only assist. Work with ticket assignee to

    identify root cause/solution, identify the test

    conditions/negative testing and validate the AT

    and ST results. Integrate issues across HIST

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    6/13

    Testing scenarios and appropriate business approvers are identified

    Testing scope needs to be approved by business leads in D11 before migration to Q11.

    Peer review approval is also required before migration to Q11

    Ticket Assignee will work with CC leadership to determine the right business resources

    to engage

    Ticket is analyzed with required team

    A solution (system/process related is identified)

    If no system update is required. A end-state workaround is communicated to sites

    If system updates are required. A n interim workaround might be communicated to sites

    Assignee of the ticket ensures completion of data sheet with data requirements

    Assignee reviews E2E tool to validate/select data values available in non-production

    environment

    Assignee will create email request to data request SPA box (SPA OneUp R7 Master

    Data System Test Team ) adding the DMO SUPPLY CHAIN group as the assistgroup, only if they determine there is a gap in the data required or a gap for a

    particular scenario

    Melanie Nicholson will contact the appropriate Data owner resources to validate the

    data request and if required, fulfill the data request

    When complete, data owners need to notify Melanie Nicholson/SPA box.

    Melanie will in turn notify Assignee that request has been fulfilled and will update the

    SM7 ticket "Complete" with the assist group

    Ticket ApprovalTicket Testing

    Charm

    Management/

    Star Team

    Ticket Creation and

    Assignment

    Ticket Analysis and Resolution: Assignee* Role 6

    Ticket Analysis

    and Resolution

    Ticket Triage

    Testing scenarios

    Master Data

    Requirements

    * Assignee might complete or monitor completion of these tasks

    Assignee will ensure that fix is taking place and at the same time Assignee will confirm:

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    7/13

    PR1 and PR2 are by default UC.

    PR3 tickets will only be consideredas UC if business cannot wait toget changes in PRD until next

    scheduled bundle (impact over

    operations is relevant if so).

    Ticket ApprovalTicket TestingTicket Analysis

    and Resolution

    Charm Management: Change Request and Corrections 7

    Ticket Creation and

    Assignment

    Create Change Request (CR) in Charm

    Create correction to be linked to CR. Different type of

    corrections can be used depending on the type of issue:

    Once required system update has been identified:

    Used for most of the SAP system

    changes. Will be migrated to PRD on

    scheduled bundles

    Normal

    Correction (NC)

    Used to manage exceptions, thisrefers to changes that cannot wait for

    scheduled bundles (emergency or

    critical)

    MCs can be assigned to a UC

    Urgent

    Correction (UC)

    Will be used for MW changes .

    Assigned to schedule bundles formigration unless change cannot wait

    Manual

    Correction (MC)

    Charm

    Management/Star Team

    !

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    8/13

    Ticket ApprovalTicket Testing

    Ticket Approval and Release Management Process 8

    Approval from FLNA and NABQ is requested over UAT Test scripts. In addition to this, additional approvals might be

    required to migrate changes to PRD:

    Once Testing has been completed:

    Business (FLNA and NABQ) and Manager

    Approval is required (Satya Mullapudi orBridget Friswell)

    Must be assigned to a scheduled Bundle

    Normal Correction(NC)

    Business (FLNA/NABQ), Manager and

    Directors approval is required

    Once approvals have been received, ticket

    assignee and Baseline support must contact

    CAB (Change Approval Board); Release

    Management and Migration Team

    Urgent Correction

    (UC)

    Business and Manager approval is required

    If handled as UC, Business, Manager and

    Director approval is required

    Should be assigned to a scheduled Bundle

    unless its an exception

    Manual Correction

    (MC)

    Before starting the UC process

    Create & obtain approval for RFC.

    Create a corresponding TSR with

    approved

    Will be assigned to RFC and TSR

    created for scheduled bundles. No

    need for additional ones

    No need to create a TSR for this,

    since NO SAP migration is required

    Charm

    Management/

    Star Team

    Ticket Analysis

    and Resolution

    Ticket Creation and

    Assignment

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    9/13

    Plano Command Center: R7 Daily Ticket Meeting 9

    R7 Ticket Meeting To be held daily at 9am and 3pm CST

    Agenda Participants Tools

    Review open PR3 tickets focusing on site top tickets

    Review critical PR4 tickets

    Discuss any change recommendations to the ranks

    Plano CC BCL (Facilitator)

    Plano CC Lead (Co-Facilitator)

    Plano CC Process Team Lead (Facilitator)

    SAP Functional Team (ES)

    Frito-Lay Functional Team

    Other divisional representation Field Site Leads (As Needed)

    Field BCLs

    EHT Representation

    GES Recovery Team (Optional If applicable)

    SM7 Ticket

    Two daily meetings will be scheduled to discuss PR3 and critical PR4 tickets

    As Go Live progresses, daily meetings might be reduced to one (P.M.)

    IF PR1 or PR2 tickets are created they will be worked until they are resolved (Handoff between shifts is possible

    but must ensure understanding of ticket status and pending actions)

    SM7 will be the tool used during ticket discussion hence it is critical that tickets are

    updated with latest status prior to each meeting

    9

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    10/13

    10

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    11/13

    Shift Schedule 11

    The Plano Central Command center exists to evaluate and troubleshoot any issues

    found in the field that can not be solved on site

    Command Center support personnel will be available 24x7 in the Plano Command Center:

    To see which shift you have been assigned to please check:

    https://teamwork1.pepsico.com/eRoom/OneUpFLNA/OneUpRelease7/0_3d917

    Assessments will be made at the end of each week to determine staffing levels required for

    weekend coverage and the next weeks staffing model

    The PepsiCo Support Center (PSC) will staff resources in the Command Center across the

    business week and weekend to field calls from R7 on site support team members.

    Shift coverage during the week and weekend rotation will be available all weeks of

    stabilization.

    3 4 5 commuters will have to align their travel plans with their assigned shifts accordingly

    All priority 1, priority 2, and priority 3 tickets require a live handoff between shifts for

    resolution.

    11

    !

    https://teamwork1.pepsico.com/eRoom/OneUpFLNA/OneUpRelease7/0_3d917https://teamwork1.pepsico.com/eRoom/OneUpFLNA/OneUpRelease7/0_3d917
  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    12/13

    Plano Command Center Ground Rules 12

    .Last but not least., some ground rules that will help us provide the On-Site Supportteams with the most efficient support

    Ensure you are managing your phone. Turn off Send Calls when not at your desk.

    Ensure you are making your ticket updates Visible to Customer. This allows our On-Site Support

    to get up to date statuses at all times.

    Ensure you adhere to the shift and role that you are assigned to.

    Ensure you are seated in the correct location based on the corresponding team cards on eachmonitor.

  • 7/29/2019 Command Center_R7 Wave 1_Kick Off

    13/13

    ` 13