cogen power & control cable schedule_kwale on 20.10.12
TRANSCRIPT
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
1/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE
DOCUMENT ID
Sr No. FROM TOConnected
Load (kW)
Full Load
Current
(Amp.)
Cable Size (Sq.mm)No. of
Run
Route
Length
(Mtr.)
A
1 PCC-1 ID Fan-1 (VFD) 225.00 391.30 3C x 240 2 50
2 ID Fan-1 (VFD) ID Fan Motor 225.00 391.30 3C x 240 2 155
LPBS 10C x 1.5 Cu. 1 155
RPM METER 2C x 1.5 Cu.Sc. 1 155
Space Heater 2C x 2.5 Cu. 1 155
3 PCC-1 ID Fan-2 (VFD) 225.00 391.30 3C x 240 2 47
4 ID Fan-2 (VFD) ID Fan Motor 225.00 391.30 3C x 240 2 145
LPBS 10C x 1.5 Cu. 1 145
RPM METER 2C x 1.5 Cu.Sc. 1 145
Space Heater 2C x 2.5 Cu. 1 145
5 PCC-1 FD Fan-1 (VFD) 45.00 78.26 3C x 50 1 45
6 FD Fan - 1 (VFD) FD Fan Motor 45.00 78.26 3C x 50 1 87
LPBS 10C x 1.5 Cu. 1 87
RPM METER 2C x 1.5 Cu.Sc. 1 87
Space Heater 2C x 2.5 Cu. 1 87
7 PCC-1 FD Fan-2 (VFD) 45.00 78.26 3C x 50 1 55
8 FD Fan - 2 (VFD) FD Fan Motor 45.00 78.26 3C x 50 1 90
LPBS 10C x 1.5 Cu. 1 90
RPM METER 2C x 1.5 Cu.Sc. 1 90
Space Heater 2C x 2.5 Cu. 1 90
9 PCC-1 SA Fan-1 (VFD) 110.00 191.30 3C x 185 1 40
10 SA Fan-1 (VFD) SA Fan Motor 110.00 191.30 3C x 185 1 95
LPBS 10C x 1.5 Cu. 1 95
RPM METER 2C x 1.5 Cu.Sc. 1 95
Space Heater 2C x 2.5 Cu. 1 95
11 PCC-1 SA Fan-2 (VFD) 110.00 191.30 3C x 185 1 45
12 SA Fan-2 (VFD) SA Fan Motor 110.00 191.30 3C x 185 1 98
LPBS 10C x 1.5 Cu. 1 98
RPM METER 2C x 1.5 Cu.Sc. 1 98
Space Heater 2C x 2.5 Cu. 1 98
13 PCC-1 BFP-1 (VFD) 285.00 495.65 3C x 300 2 55
14 BFP-1 (VFD) BFP-1 Motor 285.00 495.65 3C x 300 2 65
LPBS 10C x 1.5 Cu. 1 65
RPM METER 2C x 1.5 Cu.Sc. 1 65
Space Heater 2C x 2.5 Cu. 1 65
15 PCC-1 BFP-2 (VFD) 285.00 495.65 3C x 300 2 57
16 BFP-2 (VFD) BFP-2 Motor 285.00 495.65 3C x 300 2 67
LPBS 10C x 1.5 Cu. 1 67RPM METER 2C x 1.5 Cu.Sc. 1 67
Space Heater 2C x 2.5 Cu. 1 67
17 PCC-1 BFP-3 (VFD) 285.00 495.65 3C x 300 2 60
18 BFP-3 (VFD) BFP-3 Motor 285.00 495.65 3C x 300 2 70
LPBS 10C x 1.5 Cu. 1 70
RPM METER 2C x 1.5 Cu.Sc. 1 70
Space Heater 2C x 2.5 Cu. 1 70
19 PCC-1 BFP-4 (VFD) 285.00 495.65 3C x 300 2 65
20 BFP-4 (VFD) BFP-4 Motor 285.00 495.65 3C x 300 2 75
LPBS 10C x 1.5 Cu. 1 75
RPM METER 2C x 1.5 Cu.Sc. 1 75
Space Heater 2C x 2.5 Cu. 1 75
21 PCC-1 MCW Pump-1 (VFD) 160.00 278.26 3C x 120 2 45
22 MCW Pump-1 (VFD) MCW Pump motor 160.00 278.26 3C x 120 2 130LPBS 10C x 1.5 Cu. 1 130
RPM METER 2C x 1.5 Cu.Sc. 1 130
S H t 2C 2 5 C 1 130
COGEN PCC-1
M/s. KWALE INTERNATIONAL SUGAR COMPANY LTD., KENYA
M/s. JP MUKHERJI & ASSOCIATES PVT. LTD.,
ISGEC HEAVY ENGINEERING LIMITED
1 X 18 MW CO-GEN POWER PLANT
POWER CABLE SCHEDULE FOR COGEN PCC
IKE-KISC-PCS-001
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
2/24
27Drum & Stroker Feeder
VFD - 1Drum Feeder - 2 7.50 13.04 3C x 2.5 Cu. 1 48
LPBS 10C x 1.5 Cu. 1 48
RPM METER 2C x 1.5 Cu.Sc. 1 48
Space Heater 2C x 2.5 Cu. 1 48
28
Drum & Stroker Feeder
VFD - 1 Stroker Feeder - 1 1.50 2.61 3C x 2.5 Cu. 1 50
LPBS 10C x 1.5 Cu. 1 50
RPM METER 2C x 1.5 Cu.Sc. 1 50
Space Heater 2C x 2.5 Cu. 1 50
29 PCC-1Drum & Stroker Feeder VFD-2 (2 x
7.5KW & 1 x 1.5KW)16.50 28.70 3C x 10 1 30
30Drum & Stroker Feeder
VFD - 2Drum Feeder - 3 7.50 13.04 3C x 2.5 Cu. 1 48
LPBS 10C x 1.5 Cu. 1 48
RPM METER 2C x 1.5 Cu.Sc. 1 48
Space Heater 2C x 2.5 Cu. 1 48
31Drum & Stroker Feeder
VFD - 2Drum Feeder - 4 7.50 13.04 3C x 2.5 Cu. 1 48
LPBS 10C x 1.5 Cu. 1 48
RPM METER 2C x 1.5 Cu.Sc. 1 48Space Heater 2C x 2.5 Cu. 1 48
32Drum & Stroker Feeder
VFD - 2Stroker Feeder - 2 1.50 2.61 3C x 2.5 Cu. 1 50
LPBS 10C x 1.5 Cu. 1 50
RPM METER 2C x 1.5 Cu.Sc. 1 50
Space Heater 2C x 2.5 Cu. 1 50
33 PCC-1 CT MCC 345.00 600.00 3.5C x 150 3 30
34 PCC-1 ESP MCC 127.21 221.23 3.5C x 185 1 40
B
35 PCC-2 Fuel handling MCC 280.00 486.96 3.5C x 240 2 100
36 PCC-2 Fire Fighting MCC 143.25 249.13 3.5C x 150 4 400
37 PCC-2 TG MCC 172.20 299.48 3.5C x 95 2 45
38 PCC-2 Motorised Valve MCC 18.76 32.63 3.5C x 25 1 40
39 PCC-2 Boiler MCC-3 136.88 238.05 3.5C x 95 2 3540 PCC-2 Ash handling MCC 45.50 79.13 3.5C x 50 1 30
41 PCC-2 WTP MCC 160.43 279.01 3.5C x 150 4 350
42 PCC-2 100 KVA LTG TRAFO 80.00 139.13 3.5C x 95 1 40
43 100 KVA LTG TRAFO MLDB I/C-1 60.00 104.35 3.5C x 95 1 40
44 PCC-2 MLDB I/C-2 60.00 104.35 3.5C x 95 1 40
45 PCC-2 ETP MCC 151.43 263.36 3.5C x 185 2 300
46 PCC-2 Air Conditioner MCC 180.00 313.04 3.5C x 120 2 75
47 PCC-2 AUX. MCC 149.20 259.48 3.5C x 120 2 40
48 PCC-2 Sugar Emergency MCC 280.00 486.96 3.5C x 240 2 45
49 PCC-2 Battery Charger I/C-1 0.00 0.00 3.5C x 150 1 50
50 PCC-2 Battery Charger I/C-2 0.00 0.00 3.5C x 150 1 50
51 PCC-2 UPS-1 0.00 0.00 3.5C x 50 1 30
52 PCC-2 UPS-2 0.00 0.00 3.5C x 50 1 30
53 PCC-2 UPS-3 0.00 0.00 3.5C x 50 1 30
55 PCC-2 ACBD 0.00 0.00 3.5C x 240 1 50
56 PCC-2 PDB-1 0.00 0.00 3.5C x 240 1 40
57 PCC-2 PDB-2 0.00 0.00 3.5C x 240 1 40
58 PCC-2 River water MCC 60.00 104.35 3.5C x 185 1 360
59 PCC-2 Ventilation MCC 0.00 0.00 3.5C x 150 1 100
60 PCC-2 Workshop 0.00 0.00 3.5C x 150 1 100
61 MLDB SLDB (Lumsump) 0.00 4C x 10 1 2000
Cable Size Length (Mtr.) Runs
4C x 10 Sq. mm 2000 12
3.5C x 240 Sq. mm 1990 10
3.5C x 185 Sq. mm 1530 8
3.5C x 150 Sq. mm 3390 15
3.5C x 120 Sq. mm 830 6
3 5C x 95 Sq mm 360 9
Summary
COGEN PCC-2
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
3/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE POWER CABLE SCHEDULE FOR RIVER WATER MCC
DOCUMENT ID IKE-KISC-ELE-000
Sr No. FROM TO
Motor
Rating
(KW)
Starter TypeIFL
(Amp.)
IPH
(Amp.)
Cable Size
(Sq.mm)
No. of
Run
CABLE
CURRENT
(Amp.)
1 RIVER WATER MCC River water pumps-1 30.00 DOL 52.2 30.14 3c x 25 1 96
LPBS 4C x 1.5 Cu. 1
2 RIVER WATER MCC River water pumps-2 30.00 DOL 52.2 30.14 3c x 25 1 96
LPBS 4C x 1.5 Cu. 1
3 RIVER WATER MCC River water pumps-3 30.00 DOL 52.2 30.14 3c x 25 1 96
LPBS 4C x 1.5 Cu. 1
4 RIVER WATER MCC River water pumps-4 30.00 DOL 52.2 30.14 3c x 25 1 96
LPBS 4C x 1.5 Cu. 1
5 RIVER WATER M CC Outgoing feeder 200A MCCB
FEEDER3.5c x 150 1
Cable Size Length (Mtr.) Runs
3C x 25 Sq. mm 120 4 20.5 82
4C x 1.5 Sq. mm Cu. 120 4 13.5 54
136
Summary
M/s. JP MUKHERJI & ASSOCIATES PVT. LTD.,
ISGEC HEAVY ENGINEERING LIMITED
1 X 18 MW CO-GEN POWER PLANT
RIVER WATER MCC
M/s. KWALE INTERNATIONAL SUGAR COMPANY LTD., KENYA
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
4/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE POWER CABLE SCHEDULE FOR FFS MCC
DOCUMENT ID IKE-KISC-ELE-000
Sr No. FROM TO
Motor
Rating
(KW)
Starter
Type
IFL
(Amp.)IPH (Amp.)
Cable Size
(Sq.mm)
No. of
Run
CABLE
CURRENT
(Amp.)
D
App
1 FFS MCC Main Pump 132.00 DOL 229.68 132.61 3C x 185 1 337
LPBS 4C x 1.5 1
2 FFS MCC Jockey pump 11.00 DOL 19.14 11.05 3C x 10 1 67
LPBS 4C x 1.5 1
3 FFS MCC Auxillary supply for Diesel pump 0.250 MCCB 0.435 0.25 3C x 2.5 1 30
LPBS 4C x 1.5 1
Cable Size Length (Mtr.) Runs
3C x 185Sqmm 25 1 44.5 44.5
3C x 10 30 1 18 184C x 1.5Sqmm Cu. 90 3 13.5 40.5
3C x 2.5 Sq. mm cu. 35 1 14 14
117
Summary
M/s. JP MUKHERJI & ASSOCIATES PVT. LTD.,
ISGEC HEAVY ENGINEERING LIMITED
1 X 18 MW CO-GEN POWER PLANT
FFS MCC
M/s. KWALE INTERNATIONAL SUGAR COMPANY LTD., KENYA
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
5/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE POWER CABLE SCHEDULE FOR TG MCC
DOCUMENT ID IKE-KISC-ELE-000
Sr No. FROM TO
Motor
Rating
(KW)
Starter
Type
IFL
(Amp.)IPH (Amp.)
C
(S
1 TG MCC Main Oil pump 30.00 DOL 52.2 30.14 3CLPBS 4C
2 TG MCC Auxillary Oil pump 30.00 DOL 52.2 30.14 3C
LPBS 4C
3 TG MCC Barring Gear motor 30.00
125A
MCCB
FEEDER
52.2 30.14 3C
4 TG MCC Condensate extraction pump- 1 18.50 DOL 32.19 18.59 3C
LPBS 4C
5 TG MCC Condensate extraction pump- 2 18.50 DOL 32.19 18.59 3C
LPBS 4C
6 TG MCC Condensate extraction pump- 3 18.50 DOL 32.19 18.59 3C
LPBS 4C
7 TG MCC Oil vapour extraction pump- 1 1.50 DOL 2.61 1.51 3C
LPBS 4C7 TG MCC Oil vapour extraction pump- 2 1.50 DOL 2.61 1.51 3C
LPBS 4C
8 TG MCC Gland steam blower motor-1 1.50 DOL 2.61 1.51 3C
LPBS 4C
8 TG MCC Gland steam blower motor-2 1.50 DOL 2.61 1.51 3C
LPBS 4C
7 TG MCC Oil centrifugal 15.00
125A
MCCB
FEEDER
26.1 15.07 3C
8 TG MCC Oil tank heaters 15.00
125A
MCCB
FEEDER
26.1 15.07 3C
9 TG MCC Generator space heater 4.00
125A
MCCB
FEEDER
6.96 4.02 3C
10 TG MCC Exiter space heater 0.20
125A
MCCB
FEEDER
0.348 0.20 3C
11 TG MCC Stand by excitation Transformer 8.00
125A
MCCB
FEEDER
13.92 8.04 3C
12 TG MCC Feeder for AVR -
125A
MCCB
FEEDER
0 3C
Cable Size Length (Mtr.) Runs
3C x 2.5 Sq. mm Cu. 326 6 14 84
3C x 25 Sq. mm 160 4 20.5 82
3C x 10 Sq. mm 250 6 18 108
4C x 1.5 Sq. mm Cu. 403 9 13.5 121.5
395.5
Summary
M/s. JP MUKHERJI & ASSOCIATES PVT. LTD.,
ISGEC HEAVY ENGINEERING LIMITED
1 X 18 MW CO-GEN POWER PLANT
TG MCC
M/s. KWALE INTERNATIONAL SUGAR COMPAN
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
6/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE E FOR MCC OF MOTORISED
DOCUMENT ID
Sr No. FROM TO
Motor
Rating
(KW)
Starter
Type
IFL
(Amp.
1 MCC OF Mot. Valve Start -UP Vent Isolation 0.37 RDOL 0.64
LPBS
LS
2 MCC OF Mot. ValveStart -UP Vent Isolation valve
integral by pass0.06 RDOL 0.10
LPBS
LS
3 MCC OF Mot. Valve Main steam line stop valve - 1 2.80 RDOL 4.87
LPBS
LS
4 MCC OF Mot. Valve Main steam line stop valve - 2 2.80 RDOL 4.87
LPBS
LS
5 MCC OF Mot. Valve MSSV integral Bypass valve 0.06 RDOL 0.10
LPBS
LS
6 MCC OF Mot. Valve Intermittent blowdown valve 0.55 RDOL 0.96
LPBS
LS
7 MCC OF Mot. Valve Feed control station Bypass - 1 2.20 RDOL 3.83
LPBS
LS
8 MCC OF Mot. Valve Feed control station Bypass - 2 2.20 RDOL 3.83
LPBS
LS
9 MCC OF Mot. Valve Soot blower line drain 0.06 RDOL 0.10LPBS
LS
10 MCC OF Mot. Valve Continous blow down valve 0.55 RDOL 0.96
LPBS
LS
11 MCC OF Mot. ValveBoiler feed pump discharge
isolation valve - 10.37 RDOL 0.64
LPBS
LS
12 MCC OF Mot. ValveBoiler feed pump discharge
isolation valve - 20.37 RDOL 0.64
LPBS
LS
13 MCC OF Mot. Valve Boiler feed pump dischargeisolation valve - 3
0.37 RDOL 0.64
LPBS
LS
14 MCC OF Mot. ValveBoiler feed pump discharge
isolation valve - 40.37 RDOL 0.64
LPBS
LS
15 MCC OF Mot. ValveHP heater feed water inlet
isolation valve0.55 RDOL 0.96
LPBS
LS
16 MCC OF Mot. ValveHP heater feed water inlet
isolation valve0.55 RDOL 0.96
LPBSLS
17 MCC OF Mot. ValveHP heater feed water Outlet
isolation valve0.55 RDOL 0.96
ISGEC HEAVY ENGINEERIN
1 X 18 MW CO-GEN POWER P
M/s. KWALE INTERNATIONA
M/s. JP MUKHERJI & ASSOCI
MCC OF MOTORISED VALVES
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
7/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE E FOR MCC OF MOTORISED V
DOCUMENT ID
Sr No. FROM TO
Motor
Rating
(KW)
Starter
Type
IFL
(Amp.)
ISGEC HEAVY ENGINEERING
1 X 18 MW CO-GEN POWER P
M/s. KWALE INTERNATIONA
M/s. JP MUKHERJI & ASSOCIA
LS
22 MCC OF Mot. Valve MOV at 3.0Ata TG bleed line 0.55 RDOL 0.96
LPBS
LS
23 MCC OF Mot. Valve MOV at 3.0Ata TG bleed line 0.55 RDOL 0.96
LPBS
LS
24 MCC OF Mot. Valve MOV at 8.0Ata TG bleed line 0.55 RDOL 0.96
LPBS
LS
25 MCC OF Mot. ValveMOV at turbine HP heater bleed
line0.55 RDOL 0.96
LPBSLS
26 MCC OF Mot. ValveMOV at turbine bleed line for
deacrator steam0.55 RDOL 0.96
LPBS
LS
Cable Size Length (Mtr.) Runs
3C x 10 200 2 18 36
7C x 1.5 Sq. mm Cu. 5200 52 15.5 806
3C x 2.5 Sq. mm Cu. 2400 24 14 336
1178372
Summary
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
8/24
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
9/24
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
10/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE POW
DOCUMENT ID IKE
Sr No. FROM TO
M
R
(K
1 AHS MCCSubmerged Ash (Belt) Conveyor
SBC-1
LPBS
LS
Pull Cord
Belt
2 AHS MCC Belt Conveyor (ABC-2)
LPBS
LS
Pull Cord
Belt
3 AHS MCC Sector / Cam Shell Gate
LPBS
LS
Pull Cord
Belt
4 AHS MCC Common belt conveyor (CBC-1)
LPBS
LS
Pull Cord
Belt
5 AHS MCC Belt Conveyor (ABC-1)
LPBS
LS
Pull Cord
Belt
6 AHS MCC Screw Conveyor (SC-1)
LPBS
LS
Pull Cord
Belt
7 AHS MCC Screw Conveyor (SC-2)
LPBS
LS
Pull Cord
Belt
8 AHS MCC Screw Conveyor (SC-3)LPBS
LS
Pull Cord
Belt
9 AHS MCC Screw Conveyor (SC-4)
LPBS
LS
Pull Cord
Belt
10 AHS MCC Screw Conveyor (SC-5)
LPBS
LS
Pull Cord
Belt11 AHS MCC Screw Conveyor (SC-6)
LPBS
LS
M/s
ISG
1 X
AHS MCC
M/s
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
11/24
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
12/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE POWER CABLE SCHED
DOCUMENT ID IKE-KISC-ELE-000
Sr No. FROM TO
Motor
Rating
(KW)
Starter
Type
IF
(Am
1 ETP MCC Equalized effluent transfer pump 5.5 9.
LPBS
2 ETP MCC Equalized effluent transfer pump 5.5 9.
LPBS
3 ETP MCC Equalized effluent transfer pump 3.7 6.4
LPBS
4 ETP MCC Equalized effluent transfer pump 3.7 6.4
LPBS
5 ETP MCC Aeration tank feed pump 5.5 9.
LPBS
6 ETP MCC Aeration tank feed pump 5.5 9.
LPBS
7 ETP MCCAir blower for Equialisation and
areation tank (Diffusser)
75130
LPBS
8 ETP MCCAir blower for Equialisation and
areation tank (Diffusser)
75130
LPBS
9 ETP MCC DAP dosing pump 0.37 0.
LPBS
10 ETP MCC DAP dosing pump 0.37 0.
LPBS
11 ETP MCC Urea dosing pump 0.37 0.
LPBS
12 ETP MCC Urea dosing pump 0.37 0.
LPBS
13 ETP MCC Secondary clarifier mechanisim 0.75 1.
LPBS
14 ETP MCC Bio sludge transfer pump 5.5 9.LPBS
15 ETP MCC Bio sludge transfer pump 5.5 9.
LPBS
16 ETP MCC Filter feed pump 15 26
LPBS
17 ETP MCC Filter feed pump 15 26
LPBS
18 ETP MCC Filter back wash pump 18.5 32
LPBS
19 ETP MCC Filter back wash pump 18.5 32
LPBS
20 ETP MCC Air blower for filter 5.5 9.
LPBS
21 ETP MCC Air blower for filter 5.5 9.LPBS
22 ETP MCC Hypo dosing pump 0.37 0.
LPBS
23 ETP MCC Hypo dosing pump 0.37 0.
LPBS
24 ETP MCC Ph correction dosing pump 0.37 0.
LPBS
25 ETP MCC Ph correction dosing pump 0.37 0.
LPBS
26 ETP MCC Product water transfer pump 15 26
LPBS
27 ETP MCC Product water transfer pump 15 26
LPBS
Summary
M/s. JP MUKHERJI & A
ISGEC HEAVY ENGINE
1 X 18 MW CO-GEN POW
ETP MCC
M/s. KWALE INTERNAT
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
13/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE POWER CABLE
DOCUMENT ID IKE-KISC-ELE-0
Sr No. FROM TO
Motor
Rating
(KW)
Starter
Type
1 COOLING TOWER Cooling tower Fans 55.00 DOL
LPBS
2 COOLING TOWER Cooling tower Fans 55.00 DOL
LPBS3 COOLING TOWER Main CW pumps 160.00 S/D
LPBS
4 COOLING TOWER Aux. CW pumps 75.00 DOL
LPBS
5 COOLING TOWER Aux. CW pumps 75.00 DOL
LPBS
Cable Size Length (Mtr.) Runs
3C x 95 sq mm 425 4 33.5
3C x 70 sq mm 245 2 30
4C x 1.5 Sq. mm Cu 560 5 13.5
Summary
M/s. JP MUKHE
ISGEC HEAVY E
1 X 18 MW CO-G
COOLING TOWER
M/s. KWALE IN
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
14/24
CHEDULE FOR COGEN PCC
0
IFL
(Amp.)IPH (Amp.)
Cable Size
(Sq.mm)
No. of
Run
CABLE
CURRENT
(Amp.)
Derating
Factor
Applied (0.7)
Overall
Derated
Current
(Amp.)
Unit Cable
Length
(Mtr)
95.7 55.25 3C x 70 1 179 125.3 125.3 120
4C x 1.5 Cu. 1 120
95.7 55.25 3C x 70 1 179 125.3 125.3 125
4C x 1.5 Cu. 1 125278.4 160.74 3C x 95 2 257 179.9 179.9 110
4C x 1.5 Cu. 1 110
130.5 75.35 3C x 95 1 221 154.7 154.7 100
4C x 1.5 Cu. 1 100
130.5 75.35 3C x 95 1 221 154.7 154.7 105
4C x 1.5 Cu. 1 105
134
60
67.5
261.5
JI & ASSOCIATES PVT. LTD.,
NGINEERING LIMITED
EN POWER PLANT
ERNATIONAL SUGAR COMPANY LTD., KENYA
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
15/24
DATE : 17.09.12
REV 00
Total
Cable
Length
AC
Resistance
at 90C
(ohm/km)
'R'
AC
Reactance at
50 Hz
(ohm/km) 'X'
COS SIN R.COS+X.
SIN
Volt.
Drop
Cal.
% of Voltage
Drop
120 0.567 0.074 0.8 0.6 0.498 0.024 2.384
120
125 0.567 0.074 0.8 0.6 0.498 0.025 2.483
125220 0.41 0.0724 0.8 0.6 0.371 0.024 2.371
110
100 0.41 0.0724 0.8 0.6 0.371 0.020 2.021
100
105 0.41 0.0724 0.8 0.6 0.371 0.021 2.122
105
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
16/24
Cable Size Length (Mtr.) Runs
3C x 185 Cu 583 6 44.5 267
1C x 35 Cu 463 3 23.5 70.5
2C x 1.5 Cu. 2400 12 12.5 1502P x 1.5 598 3 13.5 40.5
2C x 2.5 Cu. 800 1 13.5 13.5
7C x 2.5 Cu. 197 1 16.5 16.5
10C x 1.5 Cu. 800 4 18.5 74
10C x 2.5 Cu. 383 3 21 63
12C x 1.5 Cu. 2070 9 19 171
4C x 1.5 Cu. 576 39 13.5 526.5
3C x 1.5 Cu. 748 6 13 78
3C x 2.5 Cu. 4148 31 14 434
1904.5
Cable Size Length (Mtr.) Runs
3.5C x 240 220 4
3C x 95 1190 17
3C x 50 850 17
3C x 16 500 10
Cable Size Length (Mtr.) Runs
3.5C x 240 1600 11
3C x 25 100 2
2C x 2.5 1125 9
Summary
Summary ACDB,PDB & WORKSHOP
Summary DG Set , Sugar Eme, DCDB
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
17/24
583
463
2400598
800
197
800
383
2070
576
748
4148
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
18/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE
DOCUMENT ID IKE-KISC-ELE-000
Sr No. FROM TO
Motor
Rating
(KW)
Starter
Type
IFL
(Amp.)
1 AUXILIARY MCC Instrument Air Compressor 132.00 DOL 229.68
2 AUXILIARY MCC Instrument Air Compressor 132.00 DOL 229.68
3 AUXILIARY MCC Service air Compressor 15.00 DOL 26.1
4 AUXILIARY MCC Service air Compressor 15.00 DOL 26.1
LPBS
5 AUXILIARY MCC AIR Driver 2.2032 A
MCCB3.828
6 AUXILIARY MCC EOT CRANE
160A
MCCB
Feeder
0
Cable Size Length (Mtr.) Runs
3C x 185 100 2 44.5 89
3C x 95 85 1 33.5 33.5
3C x 10 150 2 18 36
4C x 1.5 Cu. 75 1 13.5 13.5
3C x 2.5 Cu. 70 1 14 14
186
Summary
M/s. JP MUKHERJI & ASSO
ISGEC HEAVY ENGINEERI
1 X 18 MW CO-GEN POWE
AUXILIARY MCC
M/s. KWALE INTERNATIO
POWER CABLE SCHEDUL
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
19/24
IPH (Amp.)Cable Size
(Sq.mm)
No. of
Run
CABLE
CURRENT
(Amp.)
Derating
Factor
Applied
(0.7)
Overall
Derated
Current
(Amp.)
Unit
Cable
Length
(Mtr)
132.61 3C x 185 1 337 235.9 235.9 50
132.61 3C x 185 1 337 235.9 235.9 50
15.07 3C x 10 1 67 46.9 46.9 75
15.07 3C x 10 1 67 46.9 46.9 75
4C x 1.5 Cu. 1 75
2.21 3C x 2.5 Cu. 1 30 21 21 70
0 3C x 95 1 221 154.7 154.7 85
CIATES PVT. LTD.,
NG LIMITED
PLANT
AL SUGAR COMPANY LTD., KENYA
FOR AUXILIARY MCC
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
20/24
DATE : 17.09.12
REV 00
Total
Cable
Length
R.COS
+X.SIN
Volt.
Drop
Cal.
% of
Voltage
Drop
50 0.211 0.010 1.011
50 0.211 0.010 1.011
75 3.202 0.026 2.613
75 3.202 0.026 2.613
75
70 12.459 0.014 1.392
85 0.155 0.000 0.000
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
21/24
CLIENT
CONSULTANT
EPC CONTRACTOR
PROJECT
TITLE
DOCUMENT ID IKE-KISC-PCS-SUMMARY-001
Length (Mtr.)
Power Cable
1 3.5C x 240 Sq. mm 3810
120 sq mm
2 3.5C x 185 Sq. mm 1530
95 sq mm
3 3C x 185 Sq. mm 125
3C x 185 Sq. mm Cu. 583
4 3.5C x 150 Sq. mm 3390
70 sq mm5 3C x 150 Sq. mm 1583
6 3.5C x 120 Sq. mm 830
70 sq mm
7 3C x 120 Sq. mm 794
8 3.5C x 95 Sq. mm 360
50 sq mm
9 3C x 95 Sq. mm 2533
3C x 70 Sq. mm 245
3.5C x 50 Sq. mm 120
25 sq mm
3C x 50 Sq. mm 995
3.5C x 25 Sq. mm 90
16 sq mm
3C x 25 Sq. mm 695
3C x 16 Sq. mm 728
3C x 10 Sq. mm 1902
3C x 1.5 Sq. mm Cu. 748
3C x 2.5 Sq. mm Cu. 14675
12C x 1.5 Sq.mm Cu. 2070
10C x 1.5 Sq.mm Cu. 2304
10C x 2.5 Sq.mm Cu. 3837C x 1.5 Sq.mm Cu. 5531
7C x 2.5 Sq.mm Cu. 197
4C x 1.5 Sq. mm Cu. 11433
4C x 10 Sq. mm (Al. PVC
for Lighting)2000
2C x 2.5 Sq. mm Cu. 3925
2C x 1.5 Sq. mm Cu. Sc. 1504
M/s. KWALE INTERNATIONAL SUGAR COMPANY LTD., KENYA
M/s. JP MUKHERJI & ASSOCIATES PVT. LTD.,
M/s. ISGEC HEAVY ENGINEERING LTD. NOIDA,
1 X 18 MW CO-GEN POWER PLANT
SUMMARY OF CONTROL AND POWER CABLES (COGEN)
Sr. No. Cable Size
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
22/24
2C x 1.5 Sq. mm Cu. 7873
2P x 1.5 598
1C x 35 Cu. 463
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
23/24
Rev - 00
25.09.2012
25
8
3
6
15
24
6
8
9
33
2
4
2
2
16
14
33
6
188
9
22
356
1
220
12
10
18
Cable Run
-
7/27/2019 Cogen Power & Control Cable Schedule_KWALE on 20.10.12
24/24
63
3
3