CO2 cooling and IBL interface meeting

Tooling cooling line at PP1

Didier LaporteCNRS – LPNHE Paris

06 février 2014EDMS IN2P3 : I-036854 – V2

Assembling tooling

First cooling line

• Montage splitter box,• Début montage des lignes, soudure

6/8 lines on tools

Fitting stoppers

Ready to install

In the pit, on scaffolding

• LPSC table

Mainframe

Elcom 20x20

Z table (axis)

• Elcom

Final position

Same operation for the 6 lines

Final position

To do list :

• Update of the lines (6 / 8 ), LAPP• Design side A, LPNHE• Splitter box interface, LAPP• Escargot interface, LAPP• Protection for travel, LPNHE• Connection links at PP1 (for tests), LPNHE• Command to do (Elcom), LAPP/LPNHE