cma-3 support to standardisation 8 th cma plenary meeting in conjunction with norman and eaqc-wise...

15
CMA-3 CMA-3 Support to Standardisation Support to Standardisation 8 8 th th CMA Plenary Meeting CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE in conjunction with NORMAN and EAQC-WISE final meetings final meetings Paris, France, 21 Paris, France, 21 st st October 08 October 08 Ulrich Borchers, Peter Lepom, Ulrich Borchers, Peter Lepom, Bernd Gawlik Bernd Gawlik

Upload: gwen-horton

Post on 18-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

CMA-3 CMA-3

Support to StandardisationSupport to Standardisation

88thth CMA Plenary Meeting CMA Plenary Meetingin conjunction with NORMAN and EAQC-WISEin conjunction with NORMAN and EAQC-WISE

final meetingsfinal meetings

Paris, France, 21Paris, France, 21stst October 08 October 08

Ulrich Borchers, Peter Lepom, Ulrich Borchers, Peter Lepom, Bernd Gawlik Bernd Gawlik

Page 2: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

2

Agenda

Introduction

State of the Play of the Mandate to CEN TC 230 Projects 1st call for tender at CEN level Consortium forming meeting Finalisation of the proposal to DG ENTR via CEN CS

Next steps

Page 3: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

3

CMA 2007 – 2009 – Tasks and Deliverables

CMA-1Exchange of best practices

STRATEGIC CO-ORDINATION GROUP

PLENARY CMA(GW, SW/MW)

CMA-2QA_QC

CMA-3Standardisation

(CEN TC/230)

• Sharing best practices• Identification of gaps and needs• Analytical methods, sampling• Practical exercises• Sediment and biota

• Follow-up of COM decision• Discussion of common strategy (EAQC-WISE)

• Identification of standards• Follow-up of CEN work• Links with RTD

WG C or WG E(joint meetings)

WG E

Page 4: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

4

CMA-3 Core Activities

Identification and evaluation of standardisation needs and appropriate actions related to them Discussion on standardisation needs

related to WFD chemical monitoring Establishment of lists of

Existing standards fit for purpose Standards that need to be revised

Standards that need to be developed Proposal of

a) Existing standards for adoption b) Development of new standards mandated to CEN

Page 5: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

5

Agenda

Introduction

State of the Play of the Mandate to CEN TC 230 Projects 1st call for tender at CEN level Consortium forming meeting Finalisation of the proposal to DG ENTR via CEN CS

Next steps

Page 6: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

6

Edition of the Mandate to CEN

The mandate was edited on 7th April 2008 under the number M/424 Development or improvement of standards in

support of the WFD

Page 7: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

7

Projects Included in the Mandate

5 chemical parameters/groups 1) Organochlorine pesticides:

(incl. alachlor, endosulfan, hexachlorobenzene, hexachlorocyclohexane isomers, pentachlorobenzene, DDT and metabolites, aldrin, dieldrin, endrin, and isodrin)

2) Pentabromodiphenylethers: analysis of congeners representative for the

technical pentabromodiphenylether formulation (incl. BDE28, BDE47, BDE99, BDE100, BDE153, and BDE154)

Page 8: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

8

Projects Included in the Mandate

5 chemical parameters/groups 3) Tributyltin compounds

4) Chloroalkanes

5) Polycyclic Aromatic Hydrocarbons: analysis of PAHs (incl. anthracene, fluoranthene,

benzo(a)pyrene, benzo(k)fluoranthene, benzo(b)fluoran-thene, indeno(1,2,3-cd)pyrene and benzo(ghi)perylene

Page 9: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

9

Projects Included in the Mandate

3 biological items 1) Phytoplankton sampling (lake and marine)

2) Guidance on the estimation of algal biovolume (lake)

3) Fish sampling

Page 10: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

10

Adoption of the Mandate at CEN level

The mandate M424 was accepted by CEN TC 230 members after a formal enquiry

A respective resolution was taken at CEN BT

Meeting of CEN TC 230 / WG 1 in Hof (Bavaria) on 2008-05-28 Discussion of the 5 chemical projects in WG 1 Discussion of the 3 biological projects in WG 2 Common discussion about the structure and co-

ordination of the work Technical lead of projects by co-ordinators

Page 11: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

11

First call for tender at CEN level

CEN TC 230 has now to submit a concrete proposal on the work (DOW) to DG ENTR Description of the technical work Information on the draft consortium

Partners, tasks, duties Therefore a call for tender was launched at the

CEN webpage (deadline: 2008-09-05) Part 1: 8 work packages Part 2: co-ordinators for chemical and biological

projects Submitted proposals

About 20 competent proposals for chemical items Only 1 proposal for the biological items!

Page 12: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

12

Evaluation of the proposals

Evaluation group: Secretary and chair of CEN TC 230 DG ENV contacts (Quevauviller, Rodrigez-Romero) CMA representatives (Carere, Polesello) JRC representatives (Gawlik) ECOSTAT representatives (Pokainen)

Evaluation meeting on 22nd Sep. at DG ENV 5 Work package leaders are proposed Recommendation to re-launch the call for the 3

biological items (4 weeks)

Page 13: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

13

Consortium forming meeting

Invitation to all potential consortium partners Meeting at 14th November in Berlin

Aim of the meeting Discussion on details of the technical work

all 5 chemical projects Allocation of tasks to partners Building of 5 working teams

WP co-ordinator and 3 – 4 contributors Re-consideration of project budgets

Consortium for biological items will be identified until end of November

Initiation of a common final call

Page 14: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

14

Agenda

Introduction

State of the Play of the Mandate to CEN TC 230 Projects 1st call for tender at CEN level Consortium forming meeting Finalisation of the proposal to DG ENTR via CEN CS

Next steps

Page 15: CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich

15

Submission of a proposal to DG ENTR

Final proposal on the execution of the mandate will be submitted to DG ENTR until end of December 2008 Detailed decription of the work Time schedule Proposed consortium Budget

Submission of the proposal via CEN CS Negotiation period Kick-off hopefully in spring 2009 (?)