cma-3 support to standardisation 8 th cma plenary meeting in conjunction with norman and eaqc-wise...
TRANSCRIPT
CMA-3 CMA-3
Support to StandardisationSupport to Standardisation
88thth CMA Plenary Meeting CMA Plenary Meetingin conjunction with NORMAN and EAQC-WISEin conjunction with NORMAN and EAQC-WISE
final meetingsfinal meetings
Paris, France, 21Paris, France, 21stst October 08 October 08
Ulrich Borchers, Peter Lepom, Ulrich Borchers, Peter Lepom, Bernd Gawlik Bernd Gawlik
2
Agenda
Introduction
State of the Play of the Mandate to CEN TC 230 Projects 1st call for tender at CEN level Consortium forming meeting Finalisation of the proposal to DG ENTR via CEN CS
Next steps
3
CMA 2007 – 2009 – Tasks and Deliverables
CMA-1Exchange of best practices
STRATEGIC CO-ORDINATION GROUP
PLENARY CMA(GW, SW/MW)
CMA-2QA_QC
CMA-3Standardisation
(CEN TC/230)
• Sharing best practices• Identification of gaps and needs• Analytical methods, sampling• Practical exercises• Sediment and biota
• Follow-up of COM decision• Discussion of common strategy (EAQC-WISE)
• Identification of standards• Follow-up of CEN work• Links with RTD
WG C or WG E(joint meetings)
WG E
4
CMA-3 Core Activities
Identification and evaluation of standardisation needs and appropriate actions related to them Discussion on standardisation needs
related to WFD chemical monitoring Establishment of lists of
Existing standards fit for purpose Standards that need to be revised
Standards that need to be developed Proposal of
a) Existing standards for adoption b) Development of new standards mandated to CEN
5
Agenda
Introduction
State of the Play of the Mandate to CEN TC 230 Projects 1st call for tender at CEN level Consortium forming meeting Finalisation of the proposal to DG ENTR via CEN CS
Next steps
6
Edition of the Mandate to CEN
The mandate was edited on 7th April 2008 under the number M/424 Development or improvement of standards in
support of the WFD
7
Projects Included in the Mandate
5 chemical parameters/groups 1) Organochlorine pesticides:
(incl. alachlor, endosulfan, hexachlorobenzene, hexachlorocyclohexane isomers, pentachlorobenzene, DDT and metabolites, aldrin, dieldrin, endrin, and isodrin)
2) Pentabromodiphenylethers: analysis of congeners representative for the
technical pentabromodiphenylether formulation (incl. BDE28, BDE47, BDE99, BDE100, BDE153, and BDE154)
8
Projects Included in the Mandate
5 chemical parameters/groups 3) Tributyltin compounds
4) Chloroalkanes
5) Polycyclic Aromatic Hydrocarbons: analysis of PAHs (incl. anthracene, fluoranthene,
benzo(a)pyrene, benzo(k)fluoranthene, benzo(b)fluoran-thene, indeno(1,2,3-cd)pyrene and benzo(ghi)perylene
9
Projects Included in the Mandate
3 biological items 1) Phytoplankton sampling (lake and marine)
2) Guidance on the estimation of algal biovolume (lake)
3) Fish sampling
10
Adoption of the Mandate at CEN level
The mandate M424 was accepted by CEN TC 230 members after a formal enquiry
A respective resolution was taken at CEN BT
Meeting of CEN TC 230 / WG 1 in Hof (Bavaria) on 2008-05-28 Discussion of the 5 chemical projects in WG 1 Discussion of the 3 biological projects in WG 2 Common discussion about the structure and co-
ordination of the work Technical lead of projects by co-ordinators
11
First call for tender at CEN level
CEN TC 230 has now to submit a concrete proposal on the work (DOW) to DG ENTR Description of the technical work Information on the draft consortium
Partners, tasks, duties Therefore a call for tender was launched at the
CEN webpage (deadline: 2008-09-05) Part 1: 8 work packages Part 2: co-ordinators for chemical and biological
projects Submitted proposals
About 20 competent proposals for chemical items Only 1 proposal for the biological items!
12
Evaluation of the proposals
Evaluation group: Secretary and chair of CEN TC 230 DG ENV contacts (Quevauviller, Rodrigez-Romero) CMA representatives (Carere, Polesello) JRC representatives (Gawlik) ECOSTAT representatives (Pokainen)
Evaluation meeting on 22nd Sep. at DG ENV 5 Work package leaders are proposed Recommendation to re-launch the call for the 3
biological items (4 weeks)
13
Consortium forming meeting
Invitation to all potential consortium partners Meeting at 14th November in Berlin
Aim of the meeting Discussion on details of the technical work
all 5 chemical projects Allocation of tasks to partners Building of 5 working teams
WP co-ordinator and 3 – 4 contributors Re-consideration of project budgets
Consortium for biological items will be identified until end of November
Initiation of a common final call
14
Agenda
Introduction
State of the Play of the Mandate to CEN TC 230 Projects 1st call for tender at CEN level Consortium forming meeting Finalisation of the proposal to DG ENTR via CEN CS
Next steps
15
Submission of a proposal to DG ENTR
Final proposal on the execution of the mandate will be submitted to DG ENTR until end of December 2008 Detailed decription of the work Time schedule Proposed consortium Budget
Submission of the proposal via CEN CS Negotiation period Kick-off hopefully in spring 2009 (?)