cm4777-u - re-thinking your firm into revit-slides

Upload: jonanunson

Post on 06-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    1/67

    CM322-2U:

    Rethinking Your Firm into RevitJon AnunsonBIM Coordinator, URS Corporation

    Wednesday, November 30, 3:1

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    2/67

    CM322-2U:

    Rethinking Your Firm into RevitWelcome / Introductions :: 10 Minutes

    Orientation :: 15 Minutes

    Discussion :: 50 Minutes

    Conclusions? :: 15 Minutes

    1

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    3/67

    THINKINTRODUCTIONS

    1

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    4/67

    THINKORIENTATION

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    5/67

    THINKOrientation

    Workflow

    Collaboration

    Roles

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    6/67

    THINKOrientation

    W o r k f l o w

    Collaboration

    Roles

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    7/67

    Workflow :: New Order of Operations

    Plan Design Engineer Document

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    8/67

    Workflow :: New Order of Operations

    Plan Design Engineer Document

    Plan

    Design

    Engineer

    Document Construct

    Work in Parallel, Not in Sequence

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    9/67

    Workflow :: New Order of Operations

    Guess, Refine

    Be willing to start wrong.

    Plan

    Design

    Engineer

    Document Construct

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    10/67

    Workflow :: Iterations

    Initial

    Planning

    Planning

    Requirements Analysis & Design

    Implementation

    TestingEvaluation

    Deployment

    Plan

    Design

    Engineer

    Document Construct

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    11/67

    Refining the workflow through Iterative design

    Phase/Eff

    Way poinConta

    Data poin

    All-Handslimita

    Individual progr

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    12/67

    Refining the workflow through Iterative design

    Not more m

    informatio

    Not more d

    discussions

    More integrcontact redindividual ddisciplines

    potentially strategies.

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    13/67

    Refining the workflow through Iterative design

    Tighter focus should mean faster development times

    "In my profession you reallprogress based on how qudevelopment cycle is."

    Sergey Brin(Google)

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    14/67

    PD SD DD CD BC

    *Continued:Occupancy, Renovation, Reuse, Clo

    Demolition

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    15/67

    PD SD DD CD BC

    *Continued:Occupancy, Renovation, Reuse, Clo

    Demolition

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    16/67

    PD SD DD CD BC

    *Continued:Commissioning, Occupancy, Renovation,

    Reuse, Closing, Demolition

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    17/67

    PD SD DD CD BC

    *Continued:Commissioning, Occupancy, Renovation,

    Reuse, Closing, Demolition

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    18/67

    PD SD DD CD BC

    Cost of Chang

    Impact of Chang

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    19/67

    PD SD DD CD BC

    Cost of Chang

    Impact of ChangFocus decision- making earlier,when Impact is high and cost is low.

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    20/67

    Iterations within the Phase - Sprints

    Kickoff

    All Hands Define Parameters, Goals Define success for the phase

    Round1

    Team Requirements Design Goals Evaluate/Steer

    Round2

    Team Requirements Design Goals Evaluate/Steer

    Round3

    Team Requirements Design Goals Evaluate/Steer

    QC

    Team Requirements Design Goals Evaluate/Steer

    Closeout

    All Hands Prep for next phase

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    21/67

    THINKOrientation

    W o r k f l o w

    Collaboration

    Roles

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    22/67

    THINK

    Workflow

    C o l l a b o r a t i o n

    Roles

    Orientation

    W kfl M i

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    23/67

    Workflow :: Managing a new process

    Control Documents

    LOD Matrix

    BIM Plan Deliverables Statement

    Management Techniques

    Training

    Scrum

    http://../Support/_Standards/URS%20Technical%20Plan.pdf
  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    24/67

    Elements to be addressed in a complete Execution Plan1. Project Description

    2. Team List

    3. Deliverables List & Delivery Schedule

    4. Training Needs

    5. Modeling Guidelines

    6. File Setup

    7. File List

    8. File Coordination Plan

    9. Standards and Procedures

    10. 3D Coordination procedure & Schedule

    11. Cost Estimation Plan

    12. Model Progression, Level of Detail & Responsibility Matrix

    13. Client Submittal Requirements

    14. Model Sharing Agreement

    LOD / Responsibility

    http://../Support/_Standards/URS%20Technical%20Plan.pdf
  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    25/67

    LOD / Responsibility

    TRAINING

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    26/67

    TRAINING

    The actions that organizations seem to be performing bethat is, the actions utilized by over half of the executives

    included: Ensuring that learners are motivated to make the most of the learning e Building confidence in learners abilities to learn

    Linking new skills clearly to job requirements

    Providing opportunities to practice the skills and receive feedback

    Providing opportunities to apply these skills to their work

    Modeling appropriate behavior during the learning

    In contrast, the actions that are lacking, that is,

    utilized by less than half of the executives inclu Having learners set learning goals and reviewing them with

    Eliminating barriers to using the skills

    Linking new skills clearly to career opportunities

    Having learners and managers establish and review performimprovement expectations

    Implementing processes to prevent loss of new skills over ti

    Preparing managers to coach and support new skills

    MANAGEMENT TECHNIQUES

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    27/67

    MANAGEMENT TECHNIQUES

    Learner Readiness Motivation to learn

    Intent to use Career Goal Alignment

    Self-Efficacy

    LearningTransfer Design

    Practice andModeling

    Goal Setting Application Review

    OrganizationalAlignment Manager Support Peer Support Job Connection

    Learning Culture

    Managing a new process: SCRUM

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    28/67

    Managing a new process: SCRUM

    Collaboration

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    29/67

    Collaboration

    WeatherEnvelope /Site Analysis

    AutomatedLEED Scheduling

    Rapid Prototyping

    VRMLwalkthroughs

    Solar RadiationStudies

    Exterior CFDAirflow Analysis

    Interior CFD& Comfort Levels

    3D MassingAnd Analysis

    RenderingVisualization

    BIMRevit model

    Artificial Lighting AnalysisDaylighting Analysis

    2D Construction /Bid Documents

    Energy Analysis /PredictiveModeling

    Finite ElementAnalysis

    Acousticalstudies

    BIM :: PROCESS :: HOLISTIC :: PRE BIM

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    30/67

    Form

    al

    Inve

    stiga

    t

    ion

    Cons

    truc

    tio

    n Documen

    ts

    Light

    Leve

    ls

    Ana

    lys

    is

    Struc

    tura

    lVa

    lida

    tion

    3D

    Ren

    derings,

    Materia

    lStudies,

    Anima

    tions

    /Video

    Co

    de

    Comp

    liance

    /

    Des

    ign

    Inten

    t/Clien

    t

    Buy-In

    2DPlots/

    DWF/PDF

    Des

    ign

    Va

    lida

    tion,

    Co

    de

    Comp

    liance

    Des

    ign

    Inten

    t/

    Clien

    tBuy-In,

    Fun

    dra

    ising

    BIM :: PROCESS :: HOLISTIC :: PRE BIM

    Design/Study Model

    Draft/ ModelFiles

    LightingAnalysissoftware

    StructuralAnalysisModel

    VisualizationModel

    Com-ChecData

    BIM :: PROCESS :: HOLISTIC :: INFORMING THE PR

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    31/67

    Ideas/Sketches/Tests/Validation/Revisions/Refinem

    BIM :: PROCESS :: HOLISTIC :: INFORMING THE PR

    WeatherEnvelope /Site Analysis

    AutomatedLEED Scheduling

    Rapid Prototyping

    Energy AnalysisGreen Building Studio

    VRMLwalkthroughs

    Solar RadiationStudies

    Exterior CFDAirflow Analysis

    Finite Element

    Analysis

    Interior CFD& Comfort Levels

    Artificial Lighting Analysis

    Daylighting Analysis

    Constr& Schedulin

    Clash Detect& 3D Coordinat

    3D MassingAnd Analysis

    RenderingVisualization

    Laser Scanning

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    32/67

    THINK

    Workflow

    C o l l a b o r a t i o n

    Roles

    Orientation

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    33/67

    THINK

    Workflow

    Collaboration

    R o l e s

    Orientation

    Leadership Roles for BIM Management

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    34/67

    Leadership Roles for BIM Management

    Practicing

    Leading

    Managing

    ExecutiveIT Director, IT Leader, Software

    Administrator, BIM Council,Autodesk Program Manager

    BIM /CADD

    Coordinator

    BIM /CADDLeader

    ModelManager

    DisciplineModel

    Manager

    DisciplineModel

    Manager

    DisciplineModel

    Manager

    DiscipMod

    Manag

    ITCoordinator

    IT Manager

    (New) Roles in BIM

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    35/67

    (New) Roles in BIM

    Discipline Model Manager

    On Multi-Discipline projects 1 person should be named Model manager for e

    Specific model file to be maintained. Ensure that modeling requirements and LOD Matrix guidelines are being me

    Maintains Export Views and produces NavisWorks caches from the model.

    Export or ensure that exports are made of NavisWorks Geometry Cache file

    Revit.

    Ensure that clash report items are addressed in the model.

    Maintain and verify workset integrity Periodic Audits and Compression of the Central file.

    Periodic consistency checks, purges and cleanup.

    The person who will maintain all exports and imports.

    (New) Roles in BIM

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    36/67

    (New) Roles in BIM

    Project Model Manager One of the Discipline Model Managers. On small, or single-model projects, One

    roles. Single point of contact for all model-oriented questions.

    The person who will maintain the NavisWorks file and run clash detections.

    The person who will maintain uploads and downloads and otherwise manages information between modeling entities.

    Keeper of project-specific standards, graphic standards, Title Blocks and maintacommunication about style and standards conflicts between consultants.

    Maintainer of Title blocks, including issues/revisions, Project Revisions, Client -dinformation

    Implement any client-specific project/shared parameters and schedules.

    Preserve / Record previous versions of the models (or ensure that backups or Sversions are being maintained.

    (New) Roles in BIM

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    37/67

    ( )

    Clash/Coordination Manager

    This team member will work for the CM / GC / Designer(pick one) and maint

    coordination model and host clash review sessions. Manage collaborative Csessions

    Collect and combine Clash detection models from all participants.

    Document and distribute clash reports.

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    38/67

    DISCUSSION

    Contracts

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    39/67

    THINK

    Contracts

    Workflow

    Estimation

    Deliverables

    Bidding

    Contractors

    Scope

    The Venn Diagram of Need

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    40/67

    g

    Users

    ClientsBusiness

    Separate Needs, Separate Barriers to Success

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    41/67

    p p

    IdenPinc

    Success

    fulTrans

    ition

    Separate Needs, Separate Barriers to Success

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    42/67

    IdenPinc

    Success

    fulTrans

    ition

    Separate Needs, Separate Barriers to Success

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    43/67

    Identify the Pinch points:CostTraining

    ScheduleROIAttitudeLiability / Legal / ContractsWorkflowFundingComputer power

    Success

    fulTrans

    ition

    Contracts

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    44/67

    THINK

    W o r k f l o w

    Estimation

    Deliverables

    Bidding

    Contractors

    Scope

    Guess wrong and refine

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    45/67

    Engineering

    Budget

    Schedule

    Front Loade

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    46/67

    5%

    5%

    5%

    25%

    20%

    15%

    40%

    25%

    15%

    15%

    20%

    40%

    7%

    7%

    0% 10% 20% 30% 40% 50% 60% 70% 80%

    Ideal

    BIM

    Traditional

    PD SD DD CD Bids CA,

    Holist

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    47/67

    Collaborative

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    48/67

    48

    Collaborativer

    Coll

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    49/67

    Pair

    M

    E

    P

    w

    o r k

    49

    Collaborative

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    50/67

    PD SD DD CD BC

    Cost of Chang

    Impact of ChangFocus decision- making earlier,when Impact is high and cost is low.

    NOT CAD

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    51/67

    2D document revinto the model

    NOT CAD

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    52/67

    But you still need Standards.

    Different Standards

    C o n t r a c t s

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    53/67

    THINK

    Workflow

    Estimation

    Deliverables

    Bidding

    Contractors

    Scope

    Contracts

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    54/67

    NOT IPD

    http://../Support/_Standards/LOD%20Matrix%20Template%20sample.pdf
  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    55/67

    Shared Risk

    Collaborative Design

    Shared Reward Project Savings

    performance goals

    IPD = Integrated Project Delivery

    Leverage the benefits of BIM

    IS NOT BIM

    Owner /Op(distric

    Constructors(Contractor, CM,

    GC)

    IntegratContra

    Contracts

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    56/67

    THINK

    Workflow

    Estimation

    D e l i v e r a b l e s

    Bidding

    Contractors

    Scope

    Delivery

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    57/67

    PROJECT FOCUS: Design for Lifecycle, not for BID

    Viewed over a 30 year period, i

    costs account for approximatelytotal, while operations and mainequal 6%, and personnel costs

    Source: Sustainable Building Technical Manual / Joseph J. RoManagement, 1994.

    Construction, 2%

    Operations

    Staff

    Construction

    Operations

    Staff

    Delivery

    http://www.wbdg.org/ccb/browse_doc.php?d=8159http://www.wbdg.org/ccb/browse_doc.php?d=8159
  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    58/67

    COBIE Construction to Operations Building Information Exchange

    A Filing system for Building Documents Plans, drawings, details

    Warranty Documents

    Instruction Manuals

    Replacement Part Inventory

    BuildDesign

    Space, System &Equipment Layout

    Product Data,As-Built Layout, Tag/ Serial #,

    Warranties, Spares

    Delivery

    Fi i El

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    59/67

    Integrating Information from

    Consolidated Information = b

    WeatherEnvelope /Site Analysis

    Automated

    LEED Scheduling

    Rapid Prototyping

    VRMLwalkthroughs

    Solar RadiationStudies

    Exterior CFDAirflow Analysis

    Finite ElementAnalysis

    Interior CFD& Comfort Levels

    Constru& Schedul

    Clash D& 3D Coor

    3D MassingAnd Analysis

    RenderingVisualization

    BIMRevit model

    Artificial Lighting AnalysisDaylighting Analysis

    2D Construction /Bid Documents

    Energy AnalysisGreen Building Studio

    Contracts

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    60/67

    THINK

    Workflow

    Estimation

    Deliverables

    Bidding

    Contractors

    Scope

    THINKBuild Bottom Up

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    61/67

    New Services & deliverables

    Technique: Procedures, Training,Management

    Tools: Computer Hardware, Software

    THINKBuild Top Down

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    62/67

    Tools: Computer Hardware, Software

    Technique: Procedures, Training,Management

    New Services &deliverables

    Hardware

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    63/67

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    64/67

    THINKCONCLUSIONS

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    65/67

    Design is time well spent

    Thanks!Enjoy the rest of your time @ AU!

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    66/67

    Autodesk [and other] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, orholders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors thatAutodesk, Inc. All rights r eserved.

    Continue the DPleas

  • 8/3/2019 CM4777-U - Re-Thinking Your Firm Into Revit-Slides

    67/67

    Autodesk [and other] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, orholders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors thatAutodesk, Inc. All rights r eserved.

    THINK 2011