DKO Architecture (NSW) Pty Ltd 119 Redfern Street Redfern, NSW 2016 T +61 2 8346 4500 [email protected] www.DKO.com.au ABN: 81956706590 © DKO Architecture (NSW) Pty Ltd Except as allowed under copyright act, no part of this drawing may be reproduced or otherwise dealt with without written permission of DKO Architecture. Ckd By Description Date Rev. Scale Revision DA308 Drawing Number 11527 2-8 Free Settlers Drive, Kellyville, NSW 2155 Sections Project Name Gracewood Village Stg 3 Project Number Drawing Name Project Address Date Client BaptistCare NSW NSW: Nominated Architects Koos de Keijzer 5767 | David Randerson 8542 B 1:200@ A1, December 2017 Civil Wood & Grieve Engineers P_02 8484 7047 [email protected] DDA MGAC P_02 9692 9322 [email protected] Fire Engineering Affinity Fire Engineering P_02 9194 0590 [email protected] Landscape Architect Taylor Brammer P_02 9387 8855 [email protected] Structural Engineering Wood & Grieve Engineers P_02 8484 700 [email protected] Town Planner DFP Planning P_02 9980 6933 [email protected] Traffic TTPA P_02 9411 5660 [email protected] Arborist/Bushfire Travers Bushfire & Ecology M_0408 25 280 [email protected] BCA BM+G P_02 9211 7777 [email protected] BASIX Efficient Living P_02 9970 6181 [email protected] Waste Leigh Design P_03 8516 5393 [email protected] Combined Services Engineer Jones Nicholson P_02 9521 3088 [email protected] Rev. Date By Ckd Description P5 P6 P7 P8 P9 A - Prelim A B 9/27/2017 10/30/2017 10/30/2017 11/16/2017 11/24/2017 12/14/2017 12/15/2017 4/24/2018 PP PP PP/IL/ MR PP PP KL MR IL IL/MR IL/MR IL/MR IL Issue for Review - 88 Unit Scheme Client Meeting Client Meeting Issue for Review Issue for Coordination Issue for Development Application - Preliminary Issue for Development Application Issue for Section 75W RL +58.900 +60.000 +59.764 3.100 3.100 3.100 3.100 +60.500 +63.600 +66.700 +69.800 +72.900 +67.600 +70.700 +73.800 +76.900 +80.000 3.100 3.100 3.100 3.100 3.100 +64.500 RL +56.985 RL +60.900 RL +64.500 RL +62.500 2.900 2.875 4.940 12.018 13.338 10.800 0.8 2.0 2.1 0.700 Free Settlers Drive Rutherford Ave Cluster 4 Cluster 3 Cluster 2 16m Above NGL Garbage Truck Entry/Exit Car Park Car Park Site Boundary Site Boundary Level 1 Level 2 Level 3 Level 4 Roof Ground Extent of Existing Approval Extent of Existing Approval 16m Above NGL Natural Ground Line Communal Space Natural Ground Line Ramp 1:6.5 (15.4%) Ramp 1:16 (6.25%) Garbage Dock Ramp 1:16 (6.25%) 4.5m HRV HEADROOM 4.5m HRV HEADROOM Level 1 Level 2 Level 3 Level 4 Ground 2.900 RL +58.900 2.900 +67.600 +70.700 +73.800 +76.900 3.100 3.100 3.100 3.100 +64.500 3.100 3.100 3.100 3.100 +60.500 +63.600 +66.700 +69.800 +72.900 RL +56.900 RL +60.900 2.875 RL +64.500 RL +62.500 RL +60.500 17.804 19.324 19.892 21.412 15.284 17.572 1.8 0.5 0.7 1.9 1.7 Cluster 4 Cluster 3 Cluster 2 Free Settlers Drive Level 1 Level 2 Level 3 Level 4 Ground Rutherford Ave Site Boundary Site Boundary Extent of Existing Approval Extent of Existing Approval Extent of Existing Approval 16m Above NGL Car Park 16m Above NGL Car Park Car Park Natural Ground Line Gatehouse Gatehouse Communal Space Communal Space Skylight Skylight Level 1 Level 2 Level 3 Level 4 Ground CLUSTER 2 CLUSTER 3 CLUSTER 4 FREE SETTLERS DRIVE RUTHERFORD AVENUE &HUWLILFDWH QR $VVHVVRU 1DPH $FFUHGLWDWLRQ QR &HUWLILFDWH GDWH ZZZQDWKHUVJRYDX 'ZHOOLQJ $GGUHVV 0002295470 Tracey Cools VIC/BDAV/12/1473 5.7 15 December 2017 Free Settlers Drive Kellyville, NSW 2155 1 Section A 1:200 2 Section B 1:200 16/10/2017 PP IL Issue for Review - Revised Basement P7 27/10/2017 IL PP A A B B

Upload: others

Post on 22-Dec-2021

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cluster 4 Cluster 3 Cluster 2

DKO Architecture (NSW) Pty Ltd119 Redfern StreetRedfern, NSW 2016T +61 2 8346 [email protected]: 81956706590© DKO Architecture (NSW) Pty LtdExcept as allowed under copyright act, no part of thisdrawing may be reproduced or otherwise dealt withwithout written permission of DKO Architecture.

CkdBy DescriptionDateRev.

Scale

RevisionDA308Drawing Number

115272-8 Free Settlers Drive,Kellyville, NSW 2155

SectionsProject Name Gracewood Village Stg 3 Project Number

Drawing NameProject Address

Date

Client BaptistCare NSW

NSW: Nominated ArchitectsKoos de Keijzer 5767 | David Randerson 8542 B

1:200@ A1,December 2017

CivilWood & Grieve EngineersP_02 8484 [email protected]

DDAMGACP_02 9692 [email protected]

Fire EngineeringAffinity Fire EngineeringP_02 9194 [email protected]

Landscape ArchitectTaylor BrammerP_02 9387 [email protected]

Structural EngineeringWood & Grieve EngineersP_02 8484 [email protected]

Town PlannerDFP PlanningP_02 9980 [email protected]

TrafficTTPAP_02 9411 [email protected]

Arborist/BushfireTravers Bushfire & EcologyM_0408 25 [email protected]

BCABM+GP_02 9211 [email protected]

BASIXEfficient LivingP_02 9970 [email protected]

WasteLeigh DesignP_03 8516 [email protected]

Combined Services EngineerJones NicholsonP_02 9521 [email protected]

Rev. Date By Ckd DescriptionP5P6P7P8

P9

A - Prelim

AB

9/27/201710/30/201710/30/201711/16/2017

11/24/2017

12/14/2017

12/15/20174/24/2018

PP

PPPP/IL/MR

PP

PPKL

MR

IL

IL/MR

IL/MR

IL/MRIL

Issue for Review - 88 Unit SchemeClient MeetingClient MeetingIssue for Review

Issue for Coordination

Issue for Development Application -PreliminaryIssue for Development ApplicationIssue for Section 75W

RL +58.900+60.000 +59.764

3.10

03.

100

3.10

03.

100

+60.500

+63.600

+66.700

+69.800

+72.900

+67.600

+70.700

+73.800

+76.900

+80.000

3.10

03.

100

3.10

03.

100

3.10

0

+64.500

RL +56.985

RL +60.900

RL +64.500

RL +62.500

2.900

2.875

4.940

12.018

13.338

10.800

0.8

2.0

2.1

0.700

Free

Set

tlers

Driv

e

Ruth

erfo

rd A

ve

Cluster 4Cluster 3

Cluster 216m Above

NGL

Garbage TruckEntry/Exit

Car Park

Car Park

Sit

e B

ou

nd

ary

Sit

e B

ou

nd

ary

Level 1

Level 2

Level 3

Level 4

Roof

Ground

Extent of ExistingApproval

Extent of ExistingApproval

16m AboveNGL

NaturalGround Line

CommunalSpace

NaturalGround LineRamp

1:6.5(15.4%)Ramp

1:16(6.25%)

GarbageDock

Ramp1:16

(6.25%)

4.5m HRV HEADROOM

4.5m HRV HEADROOM

Level 1

Level 2

Level 3

Level 4

Ground

2.900

RL +58.900

2.900

+67.600

+70.700

+73.800

+76.900

3.10

03.

100

3.10

03.

100

+64.500

3.10

03.

100

3.10

03.

100

+60.500

+63.600

+66.700

+69.800

+72.900

RL +56.900

RL +60.900

2.875

RL +64.500

RL +62.500

RL +60.500

17.804

19.324

19.892

21.412

15.284

17.572

1.80.5

0.7

1.9

1.7

Cluster 4Cluster 3

Cluster 2

Free

Set

tlers

Driv

e

Level 1

Level 2

Level 3

Level 4

Ground

Ruth

erfo

rd A

ve

Sit

e B

ou

nd

ary

Sit

e B

ou

nd

ary

Extent of ExistingApproval

Extent of ExistingApproval

Extent of ExistingApproval

16m AboveNGL

Car Park

16m AboveNGL

Car Park

Car Park

NaturalGround Line

Gatehouse

Gatehouse

CommunalSpace

CommunalSpace

Skylight

Skylight

Level 1

Level 2

Level 3

Level 4

Ground

CLUSTER 2

CLUSTER 3

CLUSTER 4

FREE SETTLERS DRIVE

RUTHERFORD AVENUE

0002295470Tracey CoolsVIC/BDAV/12/14735.715 December 2017

Free Settlers DriveKellyville, NSW2155

1 Section A1:200

2 Section B1:200

16/10/2017 PP IL Issue for Review - Revised Basement

P7

27/10/2017 ILPP

A

A

B

B