Facts and figures
![Page 2: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/2.jpg)
Business scope
• Marketing of cost cutting solutions in assembly functions• Design and manufacture of innovative fasteners
Application scope
• Assembly of primary parts for equipment used in the ground transportation and made of
Metalsheet
Plastic CompositeDie cast
aluminium
![Page 3: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/3.jpg)
Automotive Railways Trucks Agriculture Heavy equipment .
Industries
1. Germany,2. Other CE countries,3. China,4. U.S.A.
70%Export turnover
![Page 4: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/4.jpg)
Location
FRANCE – Haute Savoie 74½ hour drive from GENEVA, CH2 hours from LYON, FR and TORINO, IT
Manufacturing technologies
Bar turning cold and warm forming
Additional technologies
- Fully automated secondary operations machinery- Mechanical & optical sorting- Heat treatment - Surface Treatment
![Page 5: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/5.jpg)
The LEANK Engineering,an obsessive focus on
significant cost cutting in assembly functions
![Page 6: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/6.jpg)
Process 80%
Product 20%
Product 20%
Process 80%
TOTAL COST
![Page 7: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/7.jpg)
Product 20%
Product 20%
TOTAL COST
![Page 8: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/8.jpg)
Process 80%Part preparation Handling nut setting
Handling Fastener setting Final assembly
Process 80%
TOTAL COST
![Page 9: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/9.jpg)
C
Process 80%
Focusing on the purchase price of the fasteners may only lead to a limited cost reduction
Product
14% Restricted savings
Product
14%
Saving 6%
![Page 10: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/10.jpg)
The LEANK Engineering process covers the total costproviding in any case significant savings
Process 65%
Product 15%
Saving 20%
Saving 45%
Product 35%
Process 20%
Maximum savings
thanks to process
simplification
![Page 11: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/11.jpg)
Factors of success The LEANK Engineering is a 3 steps method to cost efficiency,
Implemented by experienced, specialist process application engineers with a recognized expertise in mechanical fixing systems
thanks to innovative solutions
Because cost efficiency is a constant concern to our customers, CLUFIX, the LEANK Company, places an obsessive focus on providing highly significant product and process cost reduction in the assembly process together with an improved quality level
![Page 12: Clufix the leank company 2015 en](https://reader035.vdocuments.us/reader035/viewer/2022070320/55896662d8b42ac0738b45bd/html5/thumbnails/12.jpg)
The LEANK Engineering method
3 steps to cost efficiency
1 - Audit of current assembly process2 - Alternate solution recommendation3 - Validation and implementation
Leading to
1.
Significant Product –
Process cost reduction
2.
CAPEX reduction
3.
Shorter ROI
4.
Process simplified and
shortened
5.
Improved quality