INTRODUCTION All clubs should have a plan which guides the strategic direction of their club into the future.
The process of preparing a Club Development Plan (CDP) should be a collaborative effort
between the clubs committee and members. It is an opportunity to develop an agreed
direction for the club and shared responsibility to help steer the club in that direction. A CDP
has the potential to foster collective partnerships amongst committee members, participants
and other supporters and to generate renewed enthusiasm for the club.
Components of a club development plan A CDP has three main elements:
Analysis of current situation investigation and analysis of the current situation for
the club, including issues and potential opportunities.
Setting a strategic direction outline of the clubs vision for the future, including
specific goals and objectives the club seeks to achieve.
Developing an Action Plan a schedule detailing the actions required to be taken to
realise the clubs vision, goals and objectives.
-
Undertaking Club Development Planning 1. This template is intended to assist your club to develop a CDP. Preparation of a
CDP should involve three core steps: Background research - a preliminary meeting
(or two) of the committee and completion of sufficient research to understand the
clubs current situation (the club should have completed the Go Clubs Club Health
Check prior to the workshop).
2. Planning workshop - a full-day workshop attended by the club committee and other
club members to discuss the current situation, set a strategic direction and develop
an action plan.
3. Finalise plan - tidy up the draft plan, obtain feedback on the draft plan, and develop a
final plan for adoption by the committee.
This CDP is intended to be undertaken after clubs have completed the Club Health Check
which examines the status of the club and will be a great informant on some of the priority
areas for your club to focus on.
CDP Preparation Tips
In preparing a CDP your club should consider the following:
The plan should be developed collaboratively in a transparent and inclusive
process with other club officials and members. Dont allow the CDP to be
developed by a single individual who has the answers.
Encourage participation outside of your executive committee, inviting members,
parents, volunteers and other stakeholders to help build a plan for improvement of
your club.
Be prepared by undertaking research prior to your planning workshop:
o Complete the Go Clubs Club Health Check prior to embarking on your CDP
so you have a good understanding of your clubs status and areas needing
improvement.
o Your club may wish to conduct a brief survey of all members prior to preparing
your plan to gain an understanding of your members views on what is good
and bad about the club, what issues exist and what opportunities should be
explored. The results of this survey can be used as a foundation for your
current situation analysis, to be built upon in your workshop.
-
CDP Preparation Tips cont
o Analyse the clubs financial records, including financial position over the past
few years.
o Analyse the clubs membership figures to see if there are any trends over the
past few years such as an increase in overall participation, and changes to
age and gender groups.
Bring in an external person to facilitate your planning workshop. This
independent person may be from another club, from your regional or state
associations, or a professional facilitator. An external facilitator will be invaluable
in keeping your workshop on track, drawing out important issues for discussion,
summarising the information being discussed, and managing group dynamics
and personalities at the meeting.
Ask stakeholders outside of your club to provide feedback on your draft plan, e.g.
parent bodies, development officers, contacts at Council. Its always helpful to
get a second opinion to ensure an important issue or opportunity hasnt been
missed.
The CDP should be formally adopted by your club committee and displayed in
your club house and on your website.
Personalise the CDP. Add in your club logo, photos and reformat into your clubs
colours.
-
Instructional notes have been provided for each section throughout this template. Delete the
notes provided before you finalise your CDP. When you draft your CDP, remove these first
three pages from your document so your club development plan starts on the following page.
CDP Implementation Tips
The following should be considered in the implementation of your CDP:
The CDP should be prominently displayed in your clubhouse and on the clubs
website, and electronic copies distributed to all members who wish to obtain a
copy. Make sure key stakeholders outside of the club are aware of your CDP.
Provide copies to your local Councillor, peak body and sponsors to ensure all
potential supporters are aware of your clubs aspirations.
A committee member should be designated the responsibility of overseeing the
implementation on the CDP, with tasks shared amongst various committee
members, club officials and volunteers.
The CDP should feature prominently in regular club reporting. The officer
responsible for implementation of the CDP should frequently report on the
progress of implementation to the club committee (e.g. standing agenda item),
which should be recorded in minutes and communicated to members.
In order to give your club the greatest chance of successfully implementing the
CDP, the tasks outlined in the Action Plan should be incorporated into your
clubs annual budget, with funding applications submitted to supplement the
clubs main income streams accordingly.
The CDP should be reviewed annually in a formal way such as an annual
planning workshop, to check on progress and review priorities, making
adjustments to the Action Plan as required.
A brand new CDP should be prepared every five years to seek a fresh
perspective on the clubs future and involve current club members.
-
CLUB DEVELOPMENT PLAN
2013-2018
-
CLUB DEVELOPMENT PLAN
Acknowledgement:
Document control:
Key Milestones Date Milestone Achieved Signatories (two required)
Draft plan prepared
Final plan formally adopted
Annual review 1
Annual review 2
Annual review 3
Annual review 4
-
TABLE OF CONTENTS
CLUB DEVELOPMENT PLAN .............................................................................................. 1
INTRODUCTION ............................................................................................................... 1
Components of a club development plan ....................................................................................... 1
Undertaking Club Development Planning ....................................................................................... 2
Acknowledgement: ......................................................................................................................... 6
Document control: .......................................................................................................................... 6
TABLE OF CONTENTS .................................................................................................... 7
CURRENT SITUATION ..................................................................................................... 8
SWOT ANALYSIS ........................................................................................................... 10
KEY ISSUES TO BE ADDRESSED ................................................................................ 11
ISSUES AND OPPORTUNITIES ........................................................................................................ 12
STRATEGIC DIRECTION ............................................................................................... 13
VISION ........................................................................................................................................... 13
GOALS............................................................................................................................................ 13
OBJECTIVES ................................................................................................................................... 14
ACTION PLAN ................................................................................................................ 17
INSERT CLUB NAME> STRATEGIC PLAN 2013-2018: SUMMARY .............................. 22
-
CURRENT SITUATION
Club Overview
Club Status
-
Key Achievements
-
SWOT ANALYSIS
-
KEY ISSUES TO BE ADDRESSED
Development
Categories
Issues Opportunities
Facilities and
Equipment
Club facilities are ageing and in
poor condition.
Access state and local government
funding to upgrade facilities.
Membership E.g. Junior membership numbers
are in decline.
A new school is opening close to
the club. There is potential to
promote the club through the
school.
Volunteer
Management
The club constantly struggles to
attract and retain volunteers.
Access the resources of
Volunteering Queensland and
Volunteers FNQ to enhance
knowledge and networks.
-
ISSUES AND OPPORTUNITIES
Development Categories
Issues Opportunities
Administration and Finance
Sustainability
Strategic Planning
Facilities and Equipment
Membership
Volunteer Management
Sport/ Activity Development
Infrastructure Development
-
STRATEGIC DIRECTION
VISION
GOALS
Development
Categories Goals
Administration
and Finance
To demonstrate efficiency, effectiveness and accountability in the
administrative and financial management of the club.
Sustainability To manage the club in a way which ensure its viability into the future
and limits the clubs environmental impact.
Volunteer
Management
To create a club environment which attracts, retains and values
volunteers.
-
Development
Categories Goal
Administration
and Finance
Sustainability
Strategic
Planning
Facilities and
Equipment
Membership
Volunteer
Management
Sport/ Activity Development
Infrastructure Development
OBJECTIVES
-
Example:
Development
Categories Goals Objectives
Volunteer
Management
To create a club
environment which
attracts, retains and
values volunteers.
To increase the club volunteer pool to more
than 40 volunteers each season.
To retain at least 50% of volunteers from
each season to the next.
Development
Categories Goals Objectives
Administration
and Finance
Sustainability
Strategic
Planning
Facilities and
Equipment
Membership
-
Development
Categories Goals Objectives
Volunteer
Management
Sport/ Activity Development
Infrastructure
Development
-
ACTION PLAN
Club
Development
Category Goal Objectives Actions
Performance
Indicators
Resources +
Responsibility
Target
Completion
Date
Category Area Category area goal
Specific category area objectives
What action do you need to take? How will you know if you have achieved this?
Responsible person, resources needed
When will it be completed?
Administration
& Finance
Example:
To manage
the club in a
responsible,
accountable
and
sustainable
manner to
ensure its
viability into
To demonstrate
sound financial
management
To prepare and annual budget
Budget is
prepared and
adopted
annually
Treasurer,
management
committee
At the first
committee
meeting
following
the AGM
-
Club
Development
Category Goal Objectives Actions
Performance
Indicators
Resources +
Responsibility
Target
Completion
Date
Category Area Category area goal
Specific category area objectives
What action do you need to take? How will you know if you have achieved this?
Responsible person, resources needed
When will it be completed?
the future
Sustainability
Strategic
Planning
-
Club
Development
Category Goal Objectives Actions
Performance
Indicators
Resources +
Responsibility
Target
Completion
Date
Category Area Category area goal
Specific category area objectives
What action do you need to take? How will you know if you have achieved this?
Responsible person, resources needed
When will it be completed?
Facilities &
Equipment
Membership
-
Club
Development
Category Goal Objectives Actions
Performance
Indicators
Resources +
Responsibility
Target
Completion
Date
Category Area Category area goal
Specific category area objectives
What action do you need to take? How will you know if you have achieved this?
Responsible person, resources needed
When will it be completed?
Volunteer
Management
Sport/ Activity
-
Club
Development
Category Goal Objectives Actions
Performance
Indicators
Resources +
Responsibility
Target
Completion
Date
Category Area Category area goal
Specific category area objectives
What action do you need to take? How will you know if you have achieved this?
Responsible person, resources needed
When will it be completed?
Development
Infrastructure Development
-
INSERT CLUB NAME> STRATEGIC PLAN 2013-2018: SUMMARY
-
Club Development
Area
Goals
Administration and
Finance
Sustainability
Strategic Planning
Facilities and
Equipment
Membership
Volunteer Management
Sport/ Activity
Development
Infrastructure
Development
Administration and
-
Finance
Sustainability
Strategic Planning
Facilities and
Equipment
-
Membership
Volunteer
Management
Sport/ Activity
Development
-
Infrastructure
Development