clearcost presentation 2015 v7.2

35
ClearCost Introduction Version 7.2 About ClearCost 2 Supporting the Needs of the Business 1 Application Design 3 Dashboards & Analytics 4 Proof of Concept Trail Package 5 Pricing Matrix for the Enterprise 6

Upload: mark-s-mahre

Post on 18-Aug-2015

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ClearCost Presentation 2015 V7.2

ClearCost Introduction Version 7.2

About ClearCost 2

Supporting the Needs of the Business 1

Application Design 3

Dashboards & Analytics 4

Proof of Concept – Trail Package 5

Pricing Matrix for the Enterprise 6

Page 2: ClearCost Presentation 2015 V7.2

Why Does IT Exist?

To support the technology requirements of the Business

Page 3: ClearCost Presentation 2015 V7.2

Expansion of Infrastructure and Big Data

Application Dependencies

Provisioning Management Web Services

Application Modeling Network Security

Network Management Server Management Router Network

Makes it more difficult to manage complex and disparate Infrastructures

Page 4: ClearCost Presentation 2015 V7.2

Increase Demands in Data Protection

Place Security & Compliance initiatives in IT’s Top-10 priorities

Page 5: ClearCost Presentation 2015 V7.2

Challenges in Managing IT Costs

Business requires: • visibility to what is driving IT costs

• to understand what IT delivers and what it costs the business

• to know that IT leadership can control its costs

IT Leadership must: • understand the cost to deliver a service and what drives that cost

• cost transparency for delivery and support of services

• continually explore cost optimization opportunities

IT must deliver: • products that are disruptive ‘Lights-On’ anytime anywhere

• services with new capabilities and sustainability

• a cohesive and best in class solutions

Make it difficult for CIO’s to justify Budget Increases year after year

Page 6: ClearCost Presentation 2015 V7.2

Disparate Systems for IT Reporting

General Ledger

& Fixed

Assets Service

Management

Asset/CMDB system

Work/Time Management

Spreadsheets... and other reporting systems

Can often create reporting headaches within the Finance and IT Departments

Page 7: ClearCost Presentation 2015 V7.2

Costs Transparency for Business Leaders

General Ledger

& Fixed

Assets

Service Management

Asset/CMDB system

Work/Time Management

Bridge the GL (central point of truth) with Technology Services…

Provide the Stake-holders with a Centralized Activity Based Costing System

Page 8: ClearCost Presentation 2015 V7.2

• ClearCost Corporate • Open offices in Sydney and Gold Coast in 2001

• Is the #1 ITFM/TBM software product in Australia

• Was developed to help IT management “run IT like a business”

– Accurate information on cost of ‘services’ delivered, cost of demand, cost of capacity and forecasting

• ClearCost Consulting • Essential ‘how to’ capability supporting clients directly or

through partners

– Process & practice transition support for IT management/stakeholders

ClearCost Corporate

Page 9: ClearCost Presentation 2015 V7.2

APAC Industries We’re In

Federal Government

State Government

Territory/Local Government

Water/Electricity Utilities

Finance Sector

Universities

Research Institutes

Media Sector

Manufacturing

Customer Services

Environmental Services

Page 10: ClearCost Presentation 2015 V7.2

ClearCost Arriving in the US

Opening an Atlanta, GA office in Q4 2015 for the US Market

Installations Goals

• 2015 Two Proof of Concepts (References)

• 2016 Five POC’s (Q1/Q2)

• 2016 Five Enterprise Clients

Page 11: ClearCost Presentation 2015 V7.2

ClearCost Application Evolution

IT Budgeting

Enterprise Architecture & Benchmark modelling

Business Service Costing

Chargeback

Contract Management

Multi-currency/multi model consolidation

Formal Reforecasting

Utility Computing Infrastructure module

2nd (Technical) Service Catalog

CMDB Integration

Lifecycle Planning

General Ledger Integration

Predictive Demand & Budget Forecasting

10 Year Forecast Demand & Budgeting

Cloud Deployment model

Managed Services

Explorer (Management BI tool)

2001 2003 2005 2007

2009 2011 2014

Page 12: ClearCost Presentation 2015 V7.2

TECHNICAL SERVICE

CATALOG

CUSTOMER UNITS

ACTIVITIES & COST POOLS

ACTIVITY BASED

DRIVERS

CAPACITY BASED

DRIVERS

DEMAND BASED

DRIVERS

BUDGET & ACTUALS

GL CoA

BUSINESS SERVICE

CATALOG

CAPACITY & DEMAND

BASED DRIVERS

Framework

What we spend

What we do What we deliver

Who uses what

we deliver

Our Service building blocks

Every resource linked to

an activity

Every Activity

linked to a Technical

Service

Every Service

linked to a ‘Customer’

Every Technical

Service linked to an end-Service

ASSETS & CAPACITY

CONTRACT REGISTER

Page 13: ClearCost Presentation 2015 V7.2

Year One Year Two Year Three Year Four Year Five

Mat

uri

ty L

eve

l Iterative Approach

POC

Use Existing Tools

High Level

Standardize

Training

Governance

Phase 1 - POC

Phase 2 - Walk

Phase 4 - Sprint

Phase 3 - Run

Walk

Invest in Tools

Governance Tightens

Centralize

Build Repository

Run

Invest in Automation

Enhance Reporting

Complete Automation

Improve Disciplines

Sprint

Dashboard Reporting

Align MBO with Delivery

Complete Service Catalog

IT Financial Automation

Refine

Page 14: ClearCost Presentation 2015 V7.2

Business Unit Data Analytics

Business Management

IT Technical Managers

CIO & Executives

CFO & Finance

Service Managers

Page 15: ClearCost Presentation 2015 V7.2

ClearCost Explorer Product

BI on Reporting, Metrics and Data Analysis

HTTPS://ClearCost.us/Explorer

Page 16: ClearCost Presentation 2015 V7.2

ClearCost Explorer

Explorer View

Executive Dashboard…

Activities

Technical Services

Business Services

Business Unit Charges & Consumption

Data Analytics

Spend

Staff / What They Do

Financials

Lifecycle

Contracts

Budget

Metrics

Page 17: ClearCost Presentation 2015 V7.2

ClearCost Enterprise Product

Managing the Data and Meta Data Locally

Page 18: ClearCost Presentation 2015 V7.2

Enterprise Application View

ClearCost Enterprise

Operational User Dashboard…

Service Financials Expenses

Activity

Technical Services

Customer Services

Business Unit Usage

Information Analysis Reports

Charts

Data Warehouse

Trending

Operations Functions Assets Capacity

Contract Register

Administration User Authorities

Data Imports / Exports

Page 19: ClearCost Presentation 2015 V7.2

Dashboard View

Page 20: ClearCost Presentation 2015 V7.2

Business Services View “CRM”

• It costs $152 per Customer per mth to automate Customer Tracking management

• Almost 20% of the effort/cost is discretionary

• The General Ledger costs contributing to the CRM costs are profiled

• Most of the resources for this are outsourced

• Most of the cost is related to the application support and enhancement

• We can ‘see’ the technical dependencies from the CMDB that drive infrastructure costs

Page 21: ClearCost Presentation 2015 V7.2

Business Unit View “invoice details”

• Business Units ‘charges’ (usage) per month

• Individual or ‘rolled’ up Service billing

– All Workplace related Services

– Just Workplace Support Services

– Individual Email & Calendaring Service

• Consumption rate/charge basis of Services (volumetric data)

Page 22: ClearCost Presentation 2015 V7.2

Business Application Catalog View “services”

Page 23: ClearCost Presentation 2015 V7.2

Chargeback / Show-back View “invoice”

Page 24: ClearCost Presentation 2015 V7.2

Proof of Concept - estimates

Three Stages are required for the POC Implementation (7 – 10 Business Days)

OFFSITE (2 days)

Data Requests and Data Gathering* (including some phone conversations to clarify what we want)

Data Review & Prep

*Collect the ‘lists’, then a workshop with the list ‘owners’. This creates the relationships and cost allocation flows to produce required Due Diligence outputs (how much IT is used by Business Units an what exactly is used and what technologies are needed and which staff are required.

ONSITE (3 days)

Workshops to fill in core gaps, understand the Data Model requirements, then obtain allocation logic from Managers/Stakeholders

OFFSITE (2 days)

Clean up and obtain any outstanding critical data to complete the model to a reasonable level of credibility. Prepare and present Information Produced (via electronically) the analytics for POC usage.

2-Days

Data Gathering 3-Days

Workshop

2-Days

Clean Up / Validation

6-Months

POC Usage

Page 25: ClearCost Presentation 2015 V7.2

Data Gathering

Data Gathering (2 Days)

1. Budget details, included Staff and Contracts and Depreciation (if applicable):

2. Platform List (different server types i.e.; Solaris, Windows, ESX. Linux; databases – Oracle,

SQL Server, Postgres, etc…), plus asset details to a point

3. Application List (top 100 or whatever the target Business Units use)

4. Connect the dots, link platforms to Applications, link budget to platforms, link Services to

Business Units (ClearCost in a nutshell).

Page 26: ClearCost Presentation 2015 V7.2

On-Site Workshops

Data Model ‘Build’ Methodology (3 Days) A. Budget/Financial data

a. Budget (by Cost Centre & Account Code), Staff by Cost Centre b. Actuals per G/L for YTD c. Reforecast for remainder (optional) d. Contracts (dedicated to in scope BU or shared across many)

B. Technologies a. Platform List b. Application List c. Checklist of B(a) to B(b)

C. Business Units in scope counts a. Business Units b. Staff counts (for desktop & road warrior related services) c. PC counts/AD Accounts d. Map B(b) to C(a)

D. Assets a. If dedicated to C(a) b. If shared among BU’s c. Map B(a) to D(a & b)

E. Depreciation (assuming technology comes with the deal) a. Split by B(a) b. Project depreciation?

Page 27: ClearCost Presentation 2015 V7.2

Complete and Present the Model

Information Produced (2 Days) Total spend on IT translated:

1. How much each Business Unit consumes

2. What each Business Service costs to deliver and what

Technical Services they are dependent on

3. How much is spent on specific technology platforms,

applications, governance, management and project

activities

4. What staff and external contracts underpin which

Technical Services through to which Business Services

Page 28: ClearCost Presentation 2015 V7.2

POC Pricing Estimates

Estimated Cost

Remote request of information so we can work out gaps before coming onsite. Onsite we have concentration of workshops to flush out more detail or do the allocation/linking. Then we finalize the model and produce analytics. Pricing is based on POC Assumptions and any approved Change Management outlined in the following two slides.

7 days x2 consultants = $40,000

Plus any approved travel expenses from / to Atlanta

Page 29: ClearCost Presentation 2015 V7.2

License & Consulting Estimates

IT Budget $2m to $10m, with staff of 10-30

$50k scope, 10-30 days for installation & training

IT Budget $10m to $30m, with staff of 30-100

$90k scope, 45-60 days for installation & training

IT Budget $30m to $50m, with staff of 100-150

$120k scope, 60-90 days for installation & training

IT Budget $50 to $100m, with staff of 150-250

$160K scope, 90 days for installation & training

IT Budget $100-250m, with staff of 250-500

$200K scope, 90-120 days for installation & training

IT Budget $250m+, with staff of 500-1,000+

$300K+ scope, 120-150 days for installation & training

Page 30: ClearCost Presentation 2015 V7.2

Consulting Efforts Include

As Defined in the Scope:

IT operational (expense) budget

Anything else (IT costs outside of IT)?

Activity & Capacity model to be defined

Use our quick start industry standard model

IT Service Catalogue to be defined

Quick Start Technical Catalog (structure & content)

Business Catalog (structure)

Sustainability Framework

Advice/training to support this

Demand profile defined

Administrator Training

Page 31: ClearCost Presentation 2015 V7.2

Out-of-the-Box Analytics

Standard Outputs: Defensible cost budgets linking the cost of supply to meet the budgeted demand

Costed and priced Service Catalogues (including unit prices)

Performance/Benchmark metrics across the full Service spectrum

Infrastructure Capacity Rates - unit rates for Servers & Storage

Chargeback (or Show-back) to Business Units

Budget generation – multiple options (based on Demand, Current forecast, predictive forecast, cost trends etc…)

Contract Management, Lease management

Re-forecasting & variance analysis (from finance (GL) to demand)

Expense and demand Forecasting (up to 10 years)

Page 32: ClearCost Presentation 2015 V7.2

Scope of Work Assumptions

Assumptions

CLIENT will provide access to Subject Matter Experts (SMEs) and resources that are required for the IT assessment.

CLIENT will coordinate access to business stakeholders that are required for the interview phases of this assessment.

CLIENT will ensure requirements and other ClearCost deliverables are reviewed and signed-off in a timely manner by employees of the appropriate level.

CLIENT will provide ClearCost resources office space for staff as needed, including a phone and Internet connection (either LAN or phone line), conference rooms for meetings/workshops, and access to building areas necessary to complete this project.

CLIENT will provide ClearCost consultants with timely access to technical information and environments.

ClearCost is not responsible for any product that is not provided by or any task that is not performed by ClearCost consultants.

All Discovery and Planning work will be performed during normal business hours (8:00 am to 5:00 pm local time), Monday through Friday, except holidays. Time and half will be charged for work performed after 5:00 pm if needed and approved.

ClearCost shall commence work under this SOW on a mutually agreeable date after receipt of a fully executed SOW and PO, if required.

ClearCost reserves the right to use subcontractors in any role within the Service where ClearCost deems appropriate.

The tasks and deliverables described in this SOW will be deemed accepted by CLIENT upon delivery.

ClearCost reserves the right to terminate the contract with prior notice due to non-performance by CLIENT of responsibilities stated above. All services fees and expenses incurred to the date of termination will be invoiced as occurred.

If security clearances are required, CLIENT will coordinate all security clearances for ClearCost personnel prior to each project engagement.

In the event that Service is delayed, CLIENT will be responsible for payment of additional fees and out-of pocket costs incurred by ClearCost.

Page 33: ClearCost Presentation 2015 V7.2

Out of Scope Efforts

Change Control for Changes or Additions

Should project objectives or requirements exceed the defined deliverables identified in this Statement of Work, all parties will utilize the Change Control process to refine additional time, cost, and schedule impact to meet proposed workloads/deliverables and time frames. As such situations occur, each change will be documented, and if such change is deemed to alter the time required to complete the project or its cost, the change will be acknowledged by both parties, and the cost and or time estimates updated accordingly by both parties’ acceptance. All noted changes must be formally accepted prior to executing the change.

Requirements, working papers, project plan documents, and Change Management Requests will be kept in accessible electronic location for review.

Page 34: ClearCost Presentation 2015 V7.2

Steve Middeldorp Founder & CEO ClearCost Sydney Australia Phone +61.414.506.749 [email protected]

Page 35: ClearCost Presentation 2015 V7.2

Mark S. Mahre Managing Partner ClearCost US Atlanta Georgia Phone +1.678.641.0390 [email protected] @Mahre11