CLEAN JACKSONVILLE – General Overview2019

ALWAYS SAFE. ALWAYS READY.

Page 2: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

2 | 2019

Agenda

TOTE PROJECTS

How it works

GTT Video

Foss Innovation

Page 3: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

3 | 2019

LNG SAFETY

Regulations

– Coast Guard determines the suitability of a

waterway to transport LNG safely

– Federal Energy Regulatory Commission (FERC)

– U.S. Department of Transportation

– International Maritime Organization

– Class Societies (DNV/ABS/BV)

Industry Standards

– Internationally recognized standards ISO/EN

– SIGTTO & Society of Gas as a Marine Fuel

Design

– Design Basis- Approved by USCG

– International Gas Carrier Code

– Double-hulled & membrane dual-barrier

containment

– Leak detection technology, emergency

shutdown systems, fire protection

Page 4: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

4 | 2019

Fire and Safety Equipment

Fixed Gas DetectionFlame/Heat/Smoke DetectionFixed CO2 Protected Spaces

ESD System / TPSFire Pumps

Water Curtain / Water SprayNitrogen Smothering

Fixed Powder (350lbs) w/100ft HoseEmergency Anchor

Page 5: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

5 | 2019

TOTE’s LNG Projects

Marlin Class Ships: Jacksonville

LNG Bunker Barge: Jacksonville

Orca Class Ships: Tacoma

Page 6: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

6 | 2019

Why LNG?

Page 7: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

7 | 2019

LNG Bunkering Skid

• Requirement is to load about 250,000 LNG gallons from trucks in 5 hours while simultaneously discharging and loading container cargo.

• Applied Cryogenic Technologies (ACT) developed skid and built tanks.• Pivotal LNG supplies LNG from JAXLNG Facility and other• Genox provides safe trucking

Page 8: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

8 | 2019

LNG SUPPLY

Page 9: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

9 | 2019

VideoSpecial thanks to our friends at:

Page 10: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

10 | 2019 10

All-fast and connections made in 30 minutes

1,500 m3 LNG transferred in under 6 hours

Cool Down 45 minutes, Warm up 90 minutes

Page 11: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

11 | 2019

Page 12: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

12 | 2019

Page 13: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

13 | 2019

CLEAN JACKSONVILLE 101.

Pump

Vaporizer

Cryo-coolers

-160o CMethane is constantly boiling.

Vapor generated

Bunker Mast

Page 14: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

14 | 2019

LNG Team in Training

Page 15: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

15 | 2019

Barge Specific Simulator

Page 16: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

16 | 2019

Siemens CAMS Automation

Page 17: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

17 | 2019

Cryocooler System

Page 18: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

18 | 2019

.

The Barge – Bunker Mast:

Page 19: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

19 | 2019

Foss Innovation - Delta Mariner

Page 20: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

20 | 2019

Foss Innovation- Punta Lima Wind Farm

• Ocean Towing• Project Cargo & Logistics• Naval Architecture &

Marine Engineering

Page 21: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

21 | 2019

Foss Innovation- Bunkering & Emissions Control

• Foss transports 1.4 million barrels of fuel oil safely every month

• As barges are loaded, displaced vapors are pushed through a carbon absorption system to mitigate emissions

• Bunker & Petroleum Transportation

• Regional Towing• Project Management

Page 22: CLEAN JACKSONVILLE General Overview2019-la-long-beach.seaportcon.com/wp-content/uploads/... · 2019. 11. 6. · mzoretic@foss.com jhorst@foss.com General Manager, Atlantic VP Sales

22 | 2019

As part of the initial small-scale LNG bunkering infrastructure in the

United States, the TOTE and Foss teams have worked from design

through construction for the development of the vessel, the creation of a

vessel specific training program, and established the Foss team that will

operate the barge.

We have the strength of our ownership group, Saltchuk Resources, who

is the largest private employer in Washington State.

Let us know how Foss can serve you.