city and hackney commissioning strategy plan 2012/13 – 2015/16 date: 5 th december2011 city and...

20
City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Upload: benjamin-plante

Post on 14-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

City and Hackney Commissioning Strategy Plan

2012/13 – 2015/16

Date: 5th December2011

City and Hackney CCG

Page 2: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Background

• The Commissioning Strategy Plan (CSP) sets out our strategic priorities for improving the health and well-being of City and Hackney residents over the next 3 years (2012/13 – 2015/16).

• This is a refresh of the CSP from last year.

• In April 2011, two Clinical Commissioning Group (CCG) Pathfinders were approved - East London Integrated Care (ELIC) and KLEAR Healthcare Consortium.

• From October 2011, the two CCGs jointly took responsibility for commissioning acute, community and mental health services and prescribing.

• The two Pathfinders are working closely together to deliver their delegated responsibilities and are planning to apply for authorisation as one new CCG covering City & Hackney and including all GP practices, in 2012.

• The two CCGs have taken a lead role in the development of the CSP and have actively engaged practices and secondary care clinical colleagues.

2

Page 3: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Our Vision

Our StrategicAims

Our Vision for City and Hackney

3

1. Improve the health and well-being of our population, reducing the incidence and burden of ill-health to improve life expectancy and quality of life;

2. Work collaboratively with our local communities and partners to reduce health inequalities;

3. Deliver sustainable improvement in the quality, responsiveness and access to local healthcare services, reducing the use of secondary care where clinically appropriate;

4. Improve the patient experience, increasingly offer greater choice and continuity of care provided by a skilled workforce;

5. Improve productivity and efficiency across the health care system to ensure value for money;

To create a healthier future for the people of City and Hackney

Page 4: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Case for Change

i) Demographics and health needs

• City and Hackney faces significant health and wellbeing challenges; Hackney is the second most deprived borough in England and there are pockets of high deprivation in the City

• Number of pressing health needs in the locality eg: high levels of childhood obesity, prevalence of severe mental health conditions, late presentation for cancer and deaths from heart disease and stroke

• Challenges should be seen in the context of significant improvements in the last year

ii) Quality

• Currently underperforming against some key national targets eg: mixed sex wards, maternity and childhood immunisations

• Continued improvements need to be made in terms of access, clinical quality and patient experience

iii) Finance

• £8-10m savings required in 2012/13 to maintain financial balance and deliver a sustainable health service going forward

• Our planning has assumed we need to identify efficiencies of 3% to meet this challenge.

4

Page 5: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Improvement Priorities - Overview

5

Staying healthy Children and young people Adults Vulnerable groups

Improving primary care

GP Pharmacy Dental Optometry

Improving local health services

Planned care Urgent care Integrated care - children Integrated care - adults and older people Maternity Continuing care End of life Mental health Prescribing

Improving specialist health services

Working closely with the London Specialist Commissioning Group (LSCG) to review the finance and service implications of implementing the national definition/requirements of specialist services in April 2013

Page 6: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Staying Healthy – Children and Young PeopleDrivers for change:• Childhood immunisation coverage is second lowest in London• Rates of sexually transmitted infections are second highest in the country • 25% of Year 6 children are obese; 15% are overweight• Number of 3 year olds with tooth decay has risen

Overall objective: • Build on the progress made to date in tackling health inequalities; step up performance in areas

where significant need remains

6

Actions/changes proposed

• Provide support to GP practices with lowest childhood immunisations uptake• Communications plan to promote immunisation across City and Hackney

• Continue to make use of the London wide condom distribution scheme• Distribute evidence-based information on sex and relationships to all schools

• Extend the healthy start vitamins scheme to all pregnant and lactating women and children <4• Continue ‘growing project’ and ‘cook and eat’ programmes on deprived housing estates

• Implement fluoride varnish scheme

Outcomes

Health needs

• Increase childhood immunisation rates (Primary course 91% by age 1, MMR1 88% by age 2, MMR2 80% by age 5, HPV vaccine uptake 70%)• Screen 25% of 16-25s for chlamydia; maintain high positivity rates (>26/1000)• Reduce rates of dental decay

Finance Net savings of £224k in 12/13 (across all staying healthy initiatives)

Page 7: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Staying Healthy – Adults and Older PeopleDrivers for change:• Smoking prevalence is higher than the national average• Proportion of adults who are overweight/obese is above the national average• Uptake of cancer screening programmes remains lower than the national average• 1 in 11 people in City and Hackney have high blood pressure

Overall objective: • Build on the progress made to date in tackling health inequalities; step up performance in areas where

significant need remains

7

Actions/changes proposed

• Continue smoking cessation support services eg: at Homerton, Hackney council etc...• Tobacco Alliances to focus on preventing young people taking up smoking

• Continue ‘growing project’ and ‘cook and eat’ programmes on deprived housing estates

• Implement ‘small c’ campaign to raise awareness of cancer symptoms in targeted populations• Improve uptake of cancer screening, through working with GPs, list cleaning and providing information directly to residents

• Ensure NHS Health Checks are more widely available through GPs, pharmacies and the voluntary sector

Outcomes

Health needs

•Increase level of smoking quitters to >2000•Increase uptake of cancer screening programmes; breast screening 70%, bowel screening 43% and cervical screening 74%•20% of target group invited to NHS Health Checks programme

Finance Net savings of £224k in 12/13 (across all staying healthy initiatives)

Page 8: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Staying Healthy – Vulnerable GroupsDrivers for change:• 138 new diagnoses of HIV in 2009• Evidence that undiagnosed domestic violence results in additional use of health resources• Nationally, people with learning disabilities and mental health problems are more likely to

die of preventable diseases

Overall objective: • Build on the progress to date; step up performance in areas where significant need remains

8

Actions/changes proposed

• Continue to commission Open Doors Service to meet the needs of sex workers• Pilot innovative promotion re: early diagnosis of HIV eg: through working with Hackney African Forum• Finalise a randomised control trial of patient HIV testing in primary care

• Roll-out evidence-based primary care domestic violence programme (IRIS) to a further 12 practices

• Increase support to GPs to identify people with learning disabilities and refer them to services for appropriate support

• Improve flu immunisation amongst at risk groups

• Mental Health Prevention Strategy (see Mental Health)

Outcomes

Health needs

• Increase identification of, and support to, victims of domestic violence• Increase identification of, and support to, people with learning disabilities• Improve flu immunisation uptake – 75% for >65s, 75% for <65s in high risk groups

Finance Net savings of £224k in 12/13 (across all staying healthy initiatives)

Page 9: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Improving Primary Care (GP, Dental, Optometry & Pharmacy)

Drivers for change:• Significant variation between provider performance at practice level• Opportunity to build on strong CCG track record of quality improvement in primary care

Overall objective: • Continued improvement in the accessibility, quality and productivity of primary care services, through

enhanced performance management, contractual compliance and procurement/redesign of services in line with health needs

9

Actions/changes proposed

• Implement quality scorecards - General Practice, Dentistry, Optometry and Community Pharmacy• Improve urgent care access; improve interface between primary care, out of hours and urgent care. Improving access a central part of ‘111’ initiative (see Urgent Care)• Commission minor oral surgery service from primary care providers

• Review 8 PMS contracts; gain productivity benefits and standardise price/patient • Ensure GP lists are up to date and contain the correct information• Review Enhanced Services in General Practice, ensuring in line with core national offer• Complete audit of local eye care services with redesign of pathways as appropriate

• Secure new GP out of hours provision, in line with the urgent care strategy• Procure/re-procure: The Greenhouse, Allerton Road Surgery, Sorsby Health Centre, Out of Hours Emergency Dental Services and 2x Orthodontics contracts

Outcomes

Health needs • Secure additional provision in line with health needs

Quality • Improve access to primary care• Improve performance against quality indicators eg: screening and immunisations

Finance Net savings of £578k in 12/13

Page 10: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Planned CareDrivers for change:• Significant variation in provider performance across 3 main hospitals (Homerton, BLT and UCLH)• Opportunity to build on strong CCG track record of reducing outpatient activity, with

continued focus on reducing variation between practices

Overall objective: • Drive acute providers to performance within the top 25% in the country for consultant to consultant

referrals and new:follow-up rates in 2012/13, and to the top 10% by 2014/15

10

Actions/changes proposed

• Continue to review appropriateness of consultant to consultant referrals; focus on BLT and UCLH

• Reduce new:follow-up ratios at HUHT, BLT and UCLH across a range of specialties to national benchmark best practice

• Implement range of initiatives to address quality improvement priorities - patient experience, consultant review within 12 hours of admission, elective surgery cancellations and discharge letters

• Commission telephone clinics for test results (where appropriate) across HUHT, BLT and UCLH

• Continue to support practices to review their referral rates e.g. clinical audits and peer review

• Review options for tier 3 high intensity non-surgical weight management service as an alternative to bariatric surgery

Outcomes

Quality • Ensure patients get seen and treated in the right place, at the right time; • 0.5% reduction in first outpatient attendances; • Reduction of 36,000 follow ups at Homerton and reduction of follow ups at BLT and UCLH in a prioritised

group of specialties • Reduction in those referred for bariatric surgery

Finance Net savings of £3.09m in 12/13

Page 11: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Urgent Care

Drivers for change:• Existing urgent care system is complex with significant duplication across services• Current model often does not meet the needs of patient and is not provided in a cost effective way

Overall objective: • Improve outcomes through system redesign to create a system that is responsive, efficient and

supports people in managing their own condition wherever appropriate

11

Actions/changes proposed

•Improve primary care access (see Improving Primary care)

• Review walk-in centre provision in North East Hackney. These services will potentially be decommissioned from late 2012, subject to further stakeholder engagement and decision making

• Implement 111 as a single point of access supported by a comprehensive directory of service in early 2012/13, including all out of hours GP call handling

• Procure integrated 24/7 urgent care service in line with ‘phone first’ and primary care first model of care

Outcomes

Quality • Improve access to urgent healthcare services; ensure patients get seen and treated in the right place, at the right time, first time round

Finance Net savings of £825k in 12/13

Page 12: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Integrated Care – Children & Young People

Drivers for change:• Large young population – 27% residents <20• Increasing <5 population• Young people in City & Hackney have higher and more complex needs than national average

Overall objective: • Ensure the best start in life for all; strengthen services for vulnerable children and families by building

links between health and social care

12

Actions/changes proposed

• Continue to implement Healthy Lifestyle Programme – fitness, food skills and exercise initiatives for children and parents (see Staying Healthy)

• Develop local enhanced service; focus on improving identification of vulnerable children and families and pro-active co-ordination of services to best promote their care

•Expand and strengthen health visiting services in line with the requirements set out in the Department of Health’s “A Call to Action”

• Review and redesign asthma, epilepsy and sickle cell care pathways to promote and integrate care between primary and secondary services

Outcomes

Quality • Increase number of assessments and interventions offered by health visiting service• Reduce A&E and Urgent Care Centre attendances at 3 main local hospitals• Reduce ambulatory sensitive admissions

Finance Investment of £700k in 12/13

Page 13: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Integrated Care – Adults & Older People Drivers for change:• >65s represent 8% of total population• Premature deaths from coronary heart disease (CHD) higher than in London as a whole• Recorded prevalence of hypertension is increasing• Death rate from Chronic Obstructive Pulmonary Disease (COPD) in Hackney is high

Overall objective: • Improve integration of health and social care provision, supporting residents to remain healthy and

independent for as long as possible

13

Actions/changes proposed

• HUHT to deliver 2.5% efficiency requirement as part of the transfer of Community Health Services to HUHT

• Joint review of intermediate care and re-ablement services; inc exploration of a new integrated model with a single point of access

• Implement new pathways for asthma, heart failure, hypertension and tuberculosis in primary care

• Commission COPD Team to work with GPs in the management of patients following discharge from hospital

• Commission further consultant case reviews of diabetes patients with complex needs

• Continue to implement education programme to support GPs with management of patients with CHD

• Develop effective psychological intervention services and a “key worker” role for sickle cell patientsOutcomes

Quality • Timely discharge; reduce length of stay • Reduce admissions to residential/nursing home care• Reduce A&E attendances and short stays in hospital

Finance Net savings of £1.3m in 12/13

Page 14: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

MaternityDrivers for change:• Birth rate is higher than the national average• Underperforming against a number of key quality indicators eg: early booking, breastfeeding, and

caesarean section rates• Increase in variation in the cost of maternity pathways across 3 main local hospitals

Overall objective: • Improve the quality of maternity care, ensuring that women’s health needs and choices are appropriately

managed and met, reducing the need for antenatal admissions

14

Actions/changes proposed

• Review additional payments above PbR to HUHT to release efficiency savings

• Reduce antenatal attendances at Homerton in line with best practice guidance

• Ensure a consistent service offer; commission same care pathway across BLT, UCLH and Homerton

• Commission extension to consultant advice service to include closer links between obstetricians in secondary care and GPs• Review community midwifery service and working arrangements with GPs

• Deliver a social marketing initiative to facilitate early booking and contact with maternity services

Outcomes

Quality • 2% increase in number of women being offered choice of provider and delivery setting• 2% reduction in caesarean section rates at Homerton Hospital• Increase in proportion of women presenting within 12 weeks, 6 days• 5% improvement in patient experience, as measured by Care Quality Commission (CQC), Trust and Cluster surveys

Finance Net savings of £496k in 12/13

Page 15: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Continuing CareDrivers for change:• Continued implementation of the 2007 Department of Health directive which outlined a new

Continuing Care framework, introducing choice of placement for patients

Overall objective: • Ensure that all eligible patients are able to access high quality continuing care and are supported to

make choices about their placements

15

Actions/changes proposed

• Review provision in Mary Seacole and Cedar Lodge, with a view to moving Cedar Lodge continuing care patients into alternative care settings, following consultation with patients, families and carers

• Appraise Continuing Care at Home Team and explore options to enhance service offer and cost per case

• Improve continuing care pathways, particularly for fast track patients

Outcomes

Quality • Ensure access to high quality continuing healthcare for all eligible patients• Enable increased patient choice re: care placements• Reduce the number of complaints/appeals against continuing healthcare decisions

Finance Net savings of £400k in 12/13

Page 16: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

End of Life CareDrivers for change:• In 2010/11, 56% of deaths occurred in hospital; this is contrary to most people’s preference to be cared for at home• Local consultation indicates that a ‘good death’ is not a reality for everyone; some people experience physical, psychological, social and spiritual distress and many do not live out their final days in their preferred place of care

Overall objective: • Deliver high quality care to people at end of life, supporting them to live and die in their place of choice

16

Actions/changes proposed

• Explore development of a lead provider for end of life care across East London and the City

• Improve the co-ordination of care across service providers, through implementation of the end of life care register and multi-disciplinary meetings in the community

• Implement training to support practitioners to initiate difficult conversations, break bad news and support patients to identify their preferences for care

• Review availability of services in the community ie: psychology, out of hours nursing and pharmacy

• Review access to respite care

• Review end of life experience and provision for people with learning disabilities and/or mental health issues

Outcomes

Quality • Sustain 4% increase in the number of people who have been supported to die at home• 5% increase in quality of care provided to patients at the end of life

Page 17: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Mental HealthDrivers for change:• City & Hackney experiences one of the highest levels of mental health need in the UK• 2011/12 Whole Systems Review found significant opportunities for increasing quality and value for money

Overall objective: • Improve outcomes through system redesign; shift towards primary care based provision and a

strengthened approach to primary and secondary prevention

17

Actions/changes proposed

• City and Hackney CCG, in partnership with East London Foundation Trust (ELFT), to develop primary/secondary health and social care pathways

• Reshape prevention services, in conjunction with voluntary sector providers

• Implement findings and recommendations from dementia consultation and Whole Systems Review

• Review and reduce mental health contracts for out of borough provision

• Implement London-wide commissioning intentions, including introduction of Payment by Results, data requirements for psychological therapies services and CQUIN schemes

Outcomes

Quality • ELFT bed occupancy to be maintained <93%• Improve ELFT performance in CQC Community Patients Survey• Improve access to, and productivity of, secondary care psychological therapies services• Improve access to early intervention in psychosis

Finance Net savings of £1.6m in 12/13

Page 18: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Prescribing

Drivers for change:• Cost pressures from within the system eg: newly licensed drugs, new NICE guidance

and Individual Funding Requests (IFR)• City and Hackney has 3 red rated indicators on the NHS London Medicines dashboard for insulin

analogues, blood glucose monitoring and specialist drugs

Overall objective: • Support high quality, safe, evidence based prescribing, ensuring the prioritisation of drugs that will reduce

the costs of morbidity and mortality for patients

18

Actions/changes proposed

• Continue to support GP practices through educational sessions, medicines information service, audits, formulary development and monitoring of specialist drugs

• Continue to provide professional input unto the North East London Medicines Management Network. This group considers high cost, low volume medicines which are excluded from Payment by Results (PbR) and have not received formal guidance from NICE.

• Implement policy to use human NPH insulin as first line insulin choice in patients with type 2 diabetes

• Review use of self-monitoring of blood glucose in patients with type 2 diabetes

• Implement new guidelines on the appropriate management of vitamin D deficiency in primary care

Outcomes

Finance Net savings of £945k in 12/13

Page 19: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Summary of Financial Impact• As outlined in the case for change, City and Hackney needs to meet a financial gap of circa

£8m in 2012/13 and a cumulative gap of circa £18m by 2014/15.

• The initiatives within the Commissioning Strategy Plan exceed this, yielding savings of £8.8m in 2012/13 (see below), with a cumulative effect of £26.4m by 2014/15.  

19

Page 20: City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG

Next steps

November 2011 – January 2012:

•Stakeholder engagement – Overview and Scrutiny Committees (OSCs), Local Involvement Networks (LINKs)

•Any changes in response to NHS Operating Framework 2012/13

•On-going local development of the CSP – final deadline for submission of the CSP to NHS London is end of January 2012

January – March 2012:

•Development of implementation plans and preparation for negotiation of contracts with providers

April 2012 onwards:

•Implementation

•Continue to develop and review the CSP over the next 2-3 years to prioritise investment and explore areas where we can improve health, reduce inequalities, improve patient experience and deliver efficiencies.

20