cirrus - images3.loopnet.comimages3.loopnet.com/d2/5gifi8n04q-a9w-mmkcpwfilc3...edge technology...
TRANSCRIPT
Data ServicesCirrus
CIRRUS DATA SERVICES – VIEW 78 DATA CENTER IS DESIGNED TO MEET THE NEEDS OF HYPERSCALE AND WHOLESALE DATA CENTER TENANTS. This 32MW facility is the first of multiple phases and is designed to accommodate the most demanding data center tenants. This facility includes Tier III design elements and is engineered to meet tenant specific needs. This data center product meets leading edge technology requirements while addressing tenant’s operational and sustainability objectives; this includes specific emphasis in obtaining Total Cost of Ownership goals.
ANDREW LEWIS+1 801 456 [email protected]
WICK UDY+1 801 456 [email protected]
General
Completion Date 2019
Campus 10.9 acres (secured)
Total Building SF 227,600 SF
Total Data Hall SF 38,600 sf / DCM (154,528 sf (4) building total)- 32 MW total- Four 8 MW DCMs- Four 2 MW PODS/DCM
Office Space Dedicated “touchdown” work space for rent
Loading Dock One loading dock with dock leveler and dock seals to facilitate WB 67 (semi) truck access
Building Construction
Concrete slab-on-grade and structural steel
Structure Multi-tenant buildingWindowless, pre-cast/ tilt-up concrete walls
Storage Space available
Access 24 / 7 / 365
PUE PUE 1.2 or better
Design Tier III & Tier II Topology
Critical Power
Utility Power 32 MW IT Load
UPS 2 MW modules“2N” redundancy
Generators 3 MW diesel units“2N” redundancy
Distribution Dual “A” and “B” independent power systems
Power Metering Revenue-grade/transparentBranch-circuit level monitoringPod power redundancy
Data Center Cooling
System Hot aisle containment, Indirect Direct Evaporative Cooling (IDEC) system
Reliability N+1
Network Connectivity
Points of Entry Each building is provided with at least two separate point-of-presence (POP) rooms for the multiple, redundant services
Carrier Neutral Four entrances
Carriers Multiple
Meet-me-rooms Four MMRs
Sustainability
LEED Certification
Low Total Cost of Ownership (TCO)
Security & Compliance
Facility Perimeter Security fencing
Facility Access Card readers and/or biometric readers
Vehicle Entrance Motorized gates
On-site Security CCTV cameras
Compliance SOC 1SOC 2 PCI DSS HIPAA and HITECH
Fire Protection
Zones 15 kV feeders will be distributed to each building
Smoke Detection VESDA (Very Early Smoke Detection Apparatus)
Sprinkler System Dual interlock pre-action
Data Center SpecificationsData ServicesCirrus
©2018 Jones Lang LaSalle IP, Inc. All rights reserved.