Data Services Cirrus CIRRUS DATA SERVICES – VIEW 78 DATA CENTER IS DESIGNED TO MEET THE NEEDS OF HYPERSCALE AND WHOLESALE DATA CENTER TENANTS. This 32MW facility is the first of multiple phases and is designed to accommodate the most demanding data center tenants. This facility includes Tier III design elements and is engineered to meet tenant specific needs. This data center product meets leading edge technology requirements while addressing tenant’s operational and sustainability objectives; this includes specific emphasis in obtaining Total Cost of Ownership goals. ANDREW LEWIS +1 801 456 9531 [email protected] WICK UDY +1 801 456 9523 [email protected]

Upload: others

Post on 25-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Data ServicesCirrus

CIRRUS DATA SERVICES – VIEW 78 DATA CENTER IS DESIGNED TO MEET THE NEEDS OF HYPERSCALE AND WHOLESALE DATA CENTER TENANTS. This 32MW facility is the first of multiple phases and is designed to accommodate the most demanding data center tenants. This facility includes Tier III design elements and is engineered to meet tenant specific needs. This data center product meets leading edge technology requirements while addressing tenant’s operational and sustainability objectives; this includes specific emphasis in obtaining Total Cost of Ownership goals.

ANDREW LEWIS+1 801 456 [email protected]

WICK UDY+1 801 456 [email protected]

General

Completion Date 2019

Campus 10.9 acres (secured)

Total Building SF 227,600 SF

Total Data Hall SF 38,600 sf / DCM (154,528 sf (4) building total)- 32 MW total- Four 8 MW DCMs- Four 2 MW PODS/DCM

Office Space Dedicated “touchdown” work space for rent

Loading Dock One loading dock with dock leveler and dock seals to facilitate WB 67 (semi) truck access

Building Construction

Concrete slab-on-grade and structural steel

Structure Multi-tenant buildingWindowless, pre-cast/ tilt-up concrete walls

Storage Space available

Access 24 / 7 / 365

PUE PUE 1.2 or better

Design Tier III & Tier II Topology

Critical Power

Utility Power 32 MW IT Load

UPS 2 MW modules“2N” redundancy

Generators 3 MW diesel units“2N” redundancy

Distribution Dual “A” and “B” independent power systems

Power Metering Revenue-grade/transparentBranch-circuit level monitoringPod power redundancy

Data Center Cooling

System Hot aisle containment, Indirect Direct Evaporative Cooling (IDEC) system

Reliability N+1

Network Connectivity

Points of Entry Each building is provided with at least two separate point-of-presence (POP) rooms for the multiple, redundant services

Carrier Neutral Four entrances

Carriers Multiple

Meet-me-rooms Four MMRs

Sustainability

LEED Certification

Low Total Cost of Ownership (TCO)

Security & Compliance

Facility Perimeter Security fencing

Facility Access Card readers and/or biometric readers

Vehicle Entrance Motorized gates

On-site Security CCTV cameras

Compliance SOC 1SOC 2 PCI DSS HIPAA and HITECH

Fire Protection

Zones 15 kV feeders will be distributed to each building

Smoke Detection VESDA (Very Early Smoke Detection Apparatus)

Sprinkler System Dual interlock pre-action

Data Center SpecificationsData ServicesCirrus