“choc-o-block” melbourne conference -...

20
Managing Projects Michael W McLean FAICD, CMC (IMC), JM, BBus (UTS) : www.mclean-mc.com.au c “Choc-o-Block” Melbourne Conference 2:40pm 1 May 2013

Upload: ngotu

Post on 23-Mar-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Managing Projects

Michael W McLean FAICD, CMC (IMC), JM, BBus (UTS)

: www.mclean-mc.com.au c

“Choc-o-Block” Melbourne Conference

2:40pm 1 May 2013

Manage Projects : Various Courses

VIETGAZPROM and VIETSOVPETRO Vietnam. With Russian Alliance

Partners

Project management essentials Class code: 09PPM0243

Course description:

Whether you're introducing a new product or service, implementing the latest

initiative or even managing a corporate event, this introductory course will

provide you with the skills you need to plan and manage successfully. Using

a realistic case study, you'll learn how to balance time, cost, quality and

scope, and work through the stages of project initiation, planning,

scheduling and reporting

http://www.cce.usyd.edu.au/cce/course.do?id=000223&course=013675

Manage Projects : National Competencies

Australian National Competency Standards for “Manage Projects

BSBCMN419A”

Has 5 steps in the competencies that Project Managers should be

competent and demonstrate the evidence they have applied the

Project management theory to practices

Projects can go wrong

Manage Projects : “OPOMCI and L”

Manage Projects

Objective

Plan

Organise

Motivate Control

Innovate

Learning

Adapted from Henri Fayol’s

Management Tasks circa

1890’s

Manage Projects : A Typical Plan

Manage Projects : Tool Bag

Manage Projects

Objective

Plan

Organise

Motivate Control

Innovate

Learning

Project Scope; Stakeholders and Needs;

Stakeholder Matrix; ; Process Owner,

ISO9001, HACCP Processes; Suppliers

MS Project; Prince II,

PERT, CPM,

GANTT; DFMEA;

VA/VE, Time,

Quality Outcomes

People,

Engineering,

Logistics,

Budget,

Facilities,

Stores,

Suppliers, ICT,

Distribution

People - Competent,

Capable, Capacity, Team;

Recognition and Reward

Visual Management

Boards (Lean) ,ICT;

Tollgates, Process

Control Plans;

Process Audits

Resolve

Problems:

PDCA

(ISO9001),

PDSA, FORD

8D, DMAIC

(Six Sigma) ,

ISO9001

Corrective

Actions

ISO 9001; HACCP;

Processes, SO,

Preventive Action;

Project Review,

Lessons Learned,

Graphical Project

Plan to Actual

Process Cause & Effect Analysis

Manage Projects : Visual Management

American Society for Quality

American Society for Quality - Cost

of Quality (COQ Dr A

Feigenbaum 1954 and an

Australian Standard

http://asq.org/audit/109163/web.ht

ml?shl=109163

Learning Systems: ISO9001, HACCP ISO 9001:2008 “Determine processes, sequence and interaction,

criteria and methods to ensure operation and control of processes” .

Your QMS & HACCP structure should be as per the right NOT the

left. It should have “Manage Projects Process” & Procedures

ISO9001 HACCP ISO18001

Each Standard sample clauses

Business

Process

Description

4 7 4 6 4 8

2. Manage

Projects

8. Plan, provide

& maintain

People

14. Review and

improve

performance

ISO9001 HACCP ISO18001

ISO STD

Clause

Description

All

Clauses

All

Clauses

All

Clauses

5.6

Management

Review

6.2 Human

Resources

7.1 Planning of

Product

Realization

Manage Project Process in Framework - Risk

• www.apqc.org

Manage Projects : Success Factors (adapted

from Knoster)

Your Project: A or B? A. Build the tallest straw tower

Resources:

Plastic Straws

Dress making pins

1 Raw (Fresh) Egg

1 Marshmallow

People

Paper and Pen for the

Plan

Your timer

B. Drop an Egg from a chair

Resources:

Plastic Straws

Dress making pins

1 Raw (Fresh) Egg

4 Marshmallows

People

Paper and Pen for the

Plan

Your timer

How did we deliver our projects and not break

the Egg or eat the Marshmallows!

How did we deliver our projects and not break

the Egg or eat the Marshmallows!

Manage Projects

Objective

Plan

Organise

Motivate Control

Innovate

Learning

• Adapted from Henri

Fayol’s Management

Tasks circa 1890’s

Manage Projects : Review

MMC Pty Ltd Food, Drugs, Pharmaceutical and

Agriculture Sector experience since 1988 Abbott Medical NSW Aerowisata (Garuda) Flight Catering, Indonesia Allied Flour Mills NSW and QLD ANZPAC (McDonald's) NSW Australian Meat & Livestock Research

Development Corp’n - NSW, QLD, SA, WA, VIC Bartter Enterprises Chickens Griffith NSW BOC Special Gases NSW Bunge Foods VIC Buttercup Buns and Bread (McDonald's) Coffey Laboratories NSW and VIC Colorpak NSW Dairy Farmers NSW, VIC Edible Oils Industries NSW Golden Cockerel QLD Gunnedah Abattoir NSW Guyra Abattoir NSW Intercontinental Hotel NSW Kellogg's NSW Linde Gas NSW

Medtronics NSW Metro Meats VIC Mr Donuts VIC NSW Dept of Trade & Industry - Lolliland Pauls / Parmalat QLD Phillip Morris - Australia and USA Pfizer NSW Polarcup NSW Queensland Health Queensland Agricultural Colleges Queensland Meat Corporation Queensland Medical Laboratories ResMed NSW Reckitt and Coleman NSW Sunshine Breakfast Bars QLD Tip Top Bakeries NSW Uncle Bens NSW/VIC Unilever NSW Van Leer Plastics NSW VIP Packaging (Food)

MMC client RPC Technologies, finalist in 3 categories for the

Manufacturers Monthly Endeavour Awards

RPC is nominated for 3 Award categories Large Manufacturing,

New Product Introduction and the Enterprise Connect Sustainable

Continuous Improvement Program Award.

Subject: 2013 Endeavour Awards The four finalists for the Enterprise Connect Significant

Achievement Award as part of the Manufacturers’ Monthly

Endeavour Awards are:

•Baltimore Aircoil (Australia) Pty Ltd (NSW)

•Electra-Loom Pty Ltd (NSW)

•Ronson Gears Pty Ltd (VIC)

•RPC Technologies Pty Ltd (NSW) www.rpctechnologies.com

www.enterpriseconnect.gov.au

Managing Projects Dijana Green

Elevating Food Safety [email protected]

Ph 02 8090 7605

Michael W McLean MMC Pty Ltd (Est: 1988) Epping NSW

M: +61 419 225 996 P: +61 2 9706 8566

E:[email protected]

Just published an Executive Briefing

from “Fundamental Cost Reduction” by

Manufacturship http://manufacturship.com/fcr/