Quality Manual of RMC- Part I
Certification of
Ready-Mixed Concrete Production Facilities
Check List(Sixth revision, Feb 2008)
Ready Mixed Concrete Manufacturers Association, IndiaB-5, Ground Floor, Neel Shantiniketan Co-op. Housing Society, Manipada Road,
Opp. Mumbai University,Kalina, Santacruz (E), Mumbai 400 098,Tel.: 91-22-26654165, E-mail: [email protected] Web: rmcmaindia.org
Formatted: Italian (Italy)
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 2/41
1
INDEX
1. Preface 2
2. Acknowledgement 4
3. Expert Committee/Sub-committee members 5
4. Audit Procedures 6
5. Table 1: General Information of Ready
Mixed Concrete Facility 8
6. Table 2: General Information on
Concrete Production Facilities 9
7. Table 3: General Information
on Material Handling 10
8. Check List
Material Storage and Handling 11
Batching Equipment 15
Central Mixer 30
Ticketing System 31
Delivery Fleet Inspection 33
Laboratory Facilities 36
7. References 39
8. Notes 40
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 3/41
2
Preface
The concrete industry scenario in India has witnessed significant changes in the past
decade. Although concrete construction has traditionally been a labour-intensive activity,rapid economic growth with emphasis on the development of physical infrastructure ledto an increase in the demand for higher speed and improved quality of concreteconstruction for residential and commercial housing, flyovers, roads, etc., especially in
metropolitan and other big cities of the country. This necessitated increasing adoption of mechanized and semi-mechanized techniques of construction, which needed large
volumes of quality concrete, produced and placed speedily. This was conducive to thedevelopment and growth of ready-mixed concrete in India.
The first commercial RMC facility in India was set up in Pune in 1992 and was followed by establishment of similar facilities in Mumbai, Bangalore, Chennai, Delhi, and other places. After overcoming the initial teething troubles, the industry witnessed steady
growth, mainly in the urban area. It is estimated that in 2006-07, India producedapproximately 15-18 million m3
of ready-mixed concrete from around 350-400 RMCfacilities and the number has been growing continuously. Yet, the percentage of cementutilized through RMC route is meager — less than 5 % of the total cement produced inIndia. Thus, the prospects for growth are good. This is both a challenge and an
opportunity for the industry.
The spread of RMC facilities in urban India has brought in its wake certain challenges.
Since RMC is not a finished product and the quality of the final product is dependentupon a host of factors― some of which are beyond the control of the RMC producers― there is likelihood of a variation in the uniformity and quality of the final product. Yet,
the customer needs to be provided with some sort of assurance about the quality of the
concrete supplied. This highlights the need of developing a framework of quality schemefor RMC.
The Ready Mixed Concrete Manufacturers’ Association (RMCMA), India, which wasestablished in March 2002 and has been striving hard to bring the Indian RMC industry at
par with the industries in advanced countries, has taken up this challenge. After an in-depth study of the prevailing quality systems in different parts of world, the RMCMA has
decided to develop a self-regulatory framework of Quality Scheme involving certificationof RMC plants based on the third-party audit conducted on the basis the Check List of Production Facilities. The RMCMA formed a Sub-Committee of experienced quality personnel from member companies and this group was assigned with the task of
preparing a Check List of Production Facilities. After the draft Check List was prepared,various items were thoroughly discussed and numerous modifications were made in the
list. Further, the RMCMA established a National Experts Committee and based on theguidance of the committee, certain modifications were made in the regulatory framework.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 4/41
3
In addition, a number of mock audits based on the Check List were carried out, resultinginto further refinement of the Check List.
While developing the Check List, it was ensured that the provisions in the same meetmost of the stipulations in the Indian Standard on Ready Mixed Concrete, IS 49263
(second revision) and the other relevant codes on concrete such as IS 4561, IS 9103
2and
many others. In fact, the requirements of the Check List, in some cases, exceed those of
the codes. Thus, RMCMA certification through a third-party audit would provideassurance to the user that the production facilities of the certified plant conform to therequirements of the IS code.
However, it needs to be pointed out that availability of proper equipment is only one of the factors — although a very vital one — that controls quality of concrete. No claim is
made that certification of RMCMA will necessarily assure delivery of high qualityconcrete. The RMCMA certificate should therefore be accepted precisely for what it is — evidence that a certified production facility do possess capabilities to produce quality
concrete. The existence of these capabilities will reduce the likelihood of deficiencies inquality of final product.
In addition to third-party audit of production facilities, it was felt that this needs to be
supplemented by data on process control and properties of concrete and its ingredients.This could best be done by preparing a QA-QC Document by each RMC facility. For providing guidance in this respect, RMCMA has prepared QC Manual Part-II
“Guidelines on Quality Control & Quality Assurance of Concrete”. It is recommended
that each RMC facility should prepare its own QC Manual following the minimum benchmarks suggested in this document. Such document, which incidentally needsconstant updating, would demonstrate RMC producer’s commitment to quality concrete.
While successful clearance from third-party annual audit is mandatory for obtainingRMCMA certification, similar audits based on the guidelines suggested in QC Manual
Part-II would not be possible and hence not proposed.
RMCMA is indebted to the National Experts Committee and its Sub-Committee on
Quality for evolving the self-regulatory framework. We strongly believe that the self-regulatory quality framework initiated by RMCMA would go a long way in providing
assurance to the customers about the quality of concrete.
(Vijay R Kulkarni)
Principal Consultant, RMCMA
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 5/41
4
Acknowledgement
We are grateful to each member of the RMCMA’s Sub-Committee on Quality for
carefully scrutinizing different provisions in the document. The provisions were
thoroughly discussed in the meetings of the Sub-Committee and several modifications
were made after reaching broad consensus. The help rendered by Sub-Committee
members is highly appreciated and we are thankful to them for their involvement and
efforts.
We are also indebted to all members of the National Experts Committee who have
provided broad guidance on different aspects of the provisions. They not only carefully
scrutinized the provisions in the Manuals but also helped the RMCMA in finalizing itsapproach to the Quality Scheme by offering valuable suggestions. The RMCMA would
like to record its deep sense of gratitude towards the members of the Experts Committee
for their valuable guidance.
(Vijay R Kulkarni)
Principal Consultant, RMCMA
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 6/41
5
Members of National Experts Committee
• Dr. A. Ramakrishna- Advisor, Larsen & Toubro Ltd.
• Dr C. S. Viswanatha, Torsteel Research Foundation in India, Bangalore
• Mr. Jose Kurian- Chief Engineer, DT & TDC, New Delhi
• Mr. A. K. Jain- Technical Advisor, Grasim/ UltraTech
• Mr. P L Bongirwar- Former Dy. M.D., MSRDC, Mumbai
• Mr. C M Dordi- Vice- President ( Tech Services), Gujrat Ambuja
Members of RMCMA’s Sub-Committee on Quality
• Dr. P. Dinakar, ACC Ltd
• Mr. Harpal Singh Sehmi, ACC Ltd
• Mr. Anuj Maheshwari- Grasim Industries
• Mr. S. G. Bhat, Larsen & Toubro Ltd
• Mr. Hiren Joshi., Larsen & Toubro Ltd
• Mr. S. D. Govilkar, RMC Readymix (I) Pvt Ltd.
• Mr. Girish Bonde, RDC Concrete
• Mr. Awadhoot Sawant- Godrej & Boyce
• Mr. Bilal Baig, Godrej & Boyce
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 7/41
6
Audit Procedure for obtaining Certification
The broad steps involved in third-party audit are listed below.
1. Member of RMCMA or a producer intending to be a member approaches
RMCMA in writing for Certification of his particular production facilities.
2. The RMCMA replies back quickly requesting the RMC producer to furnishinformation about his production facilities in a standard format.(Tables 1, 2
and 3)
3. The RMCMA studies the inputs from producer and if the production facilitiesfulfill all statutory requirements (Table 1), includes their name in the list of
facilities to be audited. The RMCMA also assigns priority on first-come-first basis.
4. The RMC producer deposits the requisite fees of audit with the RMCMA.
5. RMCMA selects trained auditor from its own accredited pool of auditors anddirects him/her to undertake the audit of the said production facilities.
6. Auditor gives an undertaking stating that he has no business relationship at
personal level with the RMC producer, whose plant he would be auditing. He
also declares that he would abide by the provisions of the Check List.
7. The auditor audits the production facilities in accordance with the Check Listof RMCMA.
8. Any shortcoming in the facility is informed to the RMCMA in writing. The
producer is requested by RMCMA to rectify the shortcoming within a periodof two months.
9. The auditor revisits the RMC producer’s facility and satisfies himself/herself
about the rectifications made by the producer.
10. Once the auditor is satisfied that the all the necessary provisions in the facilityare in accordance with Check List, he/she puts his/her dated signature and
stamp on each page of the Check List.
11. The RMC producer simultaneously signs an undertaking stating that he wouldabide by the provisions in the Check List during the period of certification.
12. Once the RMCMA receives the duly signed Check List from the auditor andthe undertaking from the producer, certification is granted to the RMC
producer’s facility, after formal approval from the Managing Committee of RMCMA.
13. During the period of certification, any purchaser can verify as to whether the
provisions in the production facility are as per the certified Check List.
14. Before the expiry of certification, the producer will approach RMCMA for the
fresh audit of his facility.
15. Complaints: RMCMA would entertain complaints on failure to adhere to therequirements of the Check List. Any complaint in respect of product quality,
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 8/41
7
particularly shortcomings in achieving the fresh and hardened properties of concrete are not covered under the certification as this would be a part of the
contractual agreement between the RMC producer and his clinet.
16. In case the complaint provides information on specific non-performance of items in the Check List, the RMCMA would seek report from the auditor who
inspected the production facilities. Both the complaint and the auditor’s reportwould be placed before the National Committee of Experts and the Managing
Committee of RMCMA. If it is fond that the auditor did not conduct theinspection audit properly, he/she would be warned and may also loose theaccreditation to be RMCMA’s auditor.
17. If the complaint pertains to the failure on the part of the RMC producer tomaintain production facilities as per the Check List, the producer would beinformed accordingly and would be given a time of one month to rectify the
errors. Auditor would then visit the facility to verify whether the rectificationsare carried out and send report to the RMCMA. If the rectifications are not
carried out in the stipulated time, the RMCMA Committees may revoke thecertification of the facility.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 9/41
8
Table 1: General Information of Ready Mixed Concrete Facility
Company Name
Company Address(Register office)
Tel.Fax
Location of Plant
Address of Plant
Tel.Fax
Personnel information
• Plant-in-charge/Manager
• QC personnel
• Liaison personnel
NameTelephone
NameTelephone
NameTelephone
Material Testing
Facilities
Location and address
Name of lab in-charge
TelephoneStatutory Permissions* Certificate from Pollution Control Board
Yes No
Expiry date:
Approval from factory inspector
Yes No
Expiry date:
Approval from Local Authorities (Municipal/Corporation)
Yes No
Expiry date:
* It is essential to attach photocopies of all relevant statutory permissions andcertificates.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 10/41
9
Table 2: General Information on Concrete Production Facilities
Name of Plant Manufacturer
Type of Plant
Plant’s Rated capacity, m3/hour
Type of Mixer* Rotating-drum type Power mixer
Pan type , Pan-type with agitator
Single shaft , Twin shaft
Mixture batch size, m3
Storage Capacity
Cement, tonnes
Fly ash, tonnes
Slag, tonnes
Other cementitous material, tonnes
Coarse aggregates, tonnes
10-mm
20-mm
40-mmFine aggregates, tonnes
River sand
Manufactured sand
Crusher fines, tonnes
Water, litres
Chemical admixtures, litres
Plasticiser
Superplasticiser
Retarder
Any other
Others
Brief description of recycling facility, if any
Number of trucks with rated capacities
Name of drum and truck manufacturer 1
2
3
Additional information on Plant and Trucks,
if any
* Tick (√ ) in appropriate box.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 11/41
10
Table 3: General Information on Material Handling
Material Delivery to
Plant
Storage Storage to Mixer
Cement Bulk
Bags
Silo
Bins
Godown
Screw conveyor
Coarse aggregates Trucks Star pattern
In-line bins
compartments
Tall/pocket silos
Conveyor
Skip bucket
Bucket conveyor
Fine aggregates Trucks Star pattern
In-line bins
compartments
Tall/pocket silos
Conveyor
Skip bucket
Bucket conveyor
Fly ash Bulk
Bags
Silo
Bins
Screw conveyor
Manual
Slag Bulk
Bags
Silo
Bins
Screw conveyor
Manual
Micro silica Bags Silo
Bags
Screw conveyor
Manual
Other cementitiousmaterial (specify)
Bags Silo
Bags
Screw conveyor
Manual
Water Mun. mains
Wells
Ponds
Underground/over-
ground tank
Municipal Mains
Pumping/gravity flow
through pipe network
Chemical admixtures Drums
Tankers
Drums
Tanks
Dispenser
Special arrangementfor supplyingtemperature-controlled
concrete, if used
Use:
Occasional use Not used
Arrangement
1. Addition of ice slabs in mixing water tank
2. Addition of ice flakes in mixing drum
3. Chilling Plant
4. Combination of above (1/2/3)
* Tick (√ ) in appropriate box. If materials/ provisions not used, keep the boxes blank.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 12/41
11
Check List1.0 MATERIAL STORAGE AND HANDLING
1.1 CEMENTITIOUS MATERIALS
1.1.1 Cement 1.1.1.1. Are silos/bins and the cement feeding area weatherproof?
Yes
No
1.1.1.2. When cement is supplied in bags, is the storage facility weatherproof, damp-
proof, well ventilated and reasonably free from dust?Yes
No N.A.
1.1.1.3. When cement is supplied in bulk, is there reasonably dust-free flow of cement
into silo and further from silo to the mixer, indicating thereby that the loading and
handling system permits free flow and efficient discharge of cement??Yes
No N.A.
1.1.1.4. When cement is supplied in bags, does the bag splitting unit and pneumatic pump/vertical screw conveyor permit reasonably dust-free flow - of cement into silos and
further from silo to the mixer?
Yes No N.A.
1.1.1.5. Where storage is provided for different types of cement, is the storage of bagssufficiently isolated to prevent intermingling or contamination?
Yes No
N.A. 1.1.1.6. Are there sign boards to indicate storage of different types of cement?
Yes
No
1.1.2. Supplementary Cementitious Materials (SCMs))
1.1.2.1. Is there a separate storage system for different types of SCMs?Yes No
N.A.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 13/41
12
1.1.2.2. If more than one SCM is being used, is there is a separate storage system for different types of SCMs?
Yes No N.A.
1.1.2.3. Are silo/bag storage system for SCMs weatherproof?
Yes No N.A.
1.1.2.4. Is the SCM loading and handling system permitting reasonably dust-free flow of the material into silos and then further from silos to the mixer?
Yes
No N.A.
1.1.2.5. Are there sign boards to indicate storage of different types of cementitious
materials?Yes
No
1.1.3. Aggregates
1.1.3.1. Are there adequate provisions for separate storage for each size and type of aggregates so as to prevent mixing of different sizes and types?
Yes No
1.1.3.2. Are there sign boards to indicate different sizes of aggregates? Yes No
1.1.3.3. Are adequate precautions taken during unloading and building of stockpiles of aggregates so as to prevent harmful segregation and breakage?
Yes
No
1.1.3.4. Are adequate precautions taken to prevent intermixing of aggregates with dust,
mud, soil and other deleterious materials?Yes No
1.1.3.5. Are adequate precautions taken to prevent contamination of different sizes and
types of aggregates with each other?Yes No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 14/41
13
1.1.3.6. Are the aggregate storage bins and conveyance systems adequately covered toavoid direct exposure to Sun, rain, or snow, etc?
Yes No
1.1.3.7. Is there a provision of water sprinklers or other system (fog system) to bring
down the temperature of aggregates in hot weather?Water sprinkler
Other system (specify) N.A.
1.1.3.8. Is the water sprinkler/other system effectively maintained and used in practice? Yes No
1.1.4. Water
1.1.4.1. Is there adequate storage of water to satisfy the day-to-day needs?
Yes No
1.1.4.2. Has the water storage facility been protected to minimize the risk of
contamination of deleterious substances?Yes No
1.1.4.3. If recycled water is used in the production of concrete, are adequate precautionstaken to ensure that the overall limits on chloride/sulphate content, suspended particles, pH are not exceeding those given IS 4561?
Yes No N.A.
1.1.5. Chemical Admixtures
1.1.5.1. Are chemical admixtures stored properly to avoid contamination and degradation
on exposure to direct sunlight?Yes No
1.1.5.2. Is there a provision for providing agitation to liquid admixtures that are not stablesolutions?
Yes (Manually)
Yes (Mechanically) No N.A*. * (Not needed as per manufacturer’s instructions)
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 15/41
14
1.1.5.3. Is the storage and handling system adequately protected to prevent freezing of admixtures during winter season?
Yes No N.A.
1.1.5.4. Are adequate precautions taken to use admixtures before expiry date?Yes
No 1.1.5.5. Does each container of admixture legibly marked with supplier’s information asgiven in Clause 10.1 of IS 91032?
Yes No N.A.
1.1.5.6. If supplied in tanks, has the admixture manufacturer given information as givenin Clause 10.1 of IS 91032? Is such information readily available with the RMC facility?
Yes
No N.A.
1.1.5.7. Does additional printed information provided by supplier as per clause 10.2 of IS9103
2available with the RMC facility?
Yes No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 16/41
15
2. BATCHING and MIXING CONTROL EQUIPMENT
There has been considerable technological advancement in batching equipment. For
the sake of convenience and easy identification, the Check List of batching
equipment is divided into two broad categories, namely, Latest-generation Batching
and Mixing Control Equipment and Old-generation Batching and Mixing Control
Equipment. The former category mainly comprises of: micro-processor-based load
cell for ensuring accuracy in weighing system, accurate admixture dosing system,efficient power mixer for assuring efficient blending of cementitious materials, and
computerised control of the entire batching, mixing and delivery ticketing processes.
All these features are essential for categorising the plants to be Latest-generation
Batching and Mixing Control Equipments. Plants lacking in any of these features
would be categorised as Old-generation Batching and Mixing Control Equipment.
Depending upon the facilities available, the auditor can choose the Check List items
either in 2-A or 2-B category. He/she cannot use selective items from both the
categories simultaneously.
2-A. LATEST-GENERATION BATCHING AND MIXING CONTROL
EQUIPMENTS
2-A.1. SCALES
2-A.1.1Each scale comprised of a suitable system of load cells which will weigh
consistently with loads indicated by means of a digital read-out or display. For all typesof batching systems, is the batch operator able to read the load indicating devices fromhis normal station?
Yes
No 2-A.1.2. Have the preset controls been calibrated in increments not exceeding 5 kg or lesseach for cement and mineral admixtures, 10 kg or less for aggregates and 2 kg or less for
water? (Clause E-1 (c) of Annex E of IS 49263)
Yes No
2-A.1.3. For continuous mixer plants, has the calibration been done in increments notexceeding 10 kg/m3 each for cement and mineral admixtures, 25 kg/m3 for aggregatesand 10 lit/m3 for water? (Clause E-1 (d) of Annex E of IS 49263)
Yes No
2-A.1.4. Do the digital read-outs have a scale increment not exceeding 2 kg eachfor cement and mineral admixtures, 10 kg for aggregate and 1 litre for water? (Clause E-1
(e) of Annex E of IS 49263)Yes No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 17/41
16
2-A.1.5. Does the records show that at east 1000 kg of suitable calibrated and stampedtest weights have been used for checking accuracy of scales.
Yes No
2-A.1.6. Does a systematic recheck of scales carried out frequently (at least once every 3
months for electrical load cell system)? (Clause E-1 (j) of Annex E of IS 49263)
Yes
No 2-A.1.7. Is prompt recalibration done and correction carried out if the plant is moved or non-compliance is indicated in the 3-month rechecking?
Yes
No N.A.
2-A.1.8. Is a systematic record of calibration of weighing and measuring systemavailable?
Yes
No
2-A.1.9. Are adequate permanent facilities provided for the application of test
weights to the weighing hopper or system? (Clause E-1 (j) of Annex E of IS 49263).
[These facilities may consist of anchor /suspension points, or trays, or platform, or hangers or other equipment as required.]
Yes
No 2-A.1.10. Have the load-cell scales been arranged to transmit load to one or more cells,directly in such a way that the cell system registers the entire load accurately on the load-indicating device?
Yes
No
2-A.1.11. Have the load cells been protected to avoid ingress of moisture?
Yes
No N.A. (in-built system)
2-A.1.12. Are the personnel involved in the work of calibration of weighing equipmentscompetent and fully trained? (Clause E-1 (p) of Annex E of IS 49263)
Yes No
2-A.2. WEIGH BATCHERS (Clause 9.1.2 and 9.1.3 of IS 49263)
2-A.2.1. Have the hoppers for weighing cement, aggregates, and also water andadmixtures (if measured by weight) consist of suitable containers freely suspended from ascale, and are they equipped with necessary charging and discharging mechanisms?
Yes
No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 18/41
17
2-A.2.2. Are the scales and weigh hoppers used for cement and other cementitiousmaterials independent of scales and weigh hoppers used for non-cementitious
ingredients?Yes No
2-A.2.3. In cumulative weighing of cementitious materials, is the Portland cementweighed before the supplementary cementitious materials?
Yes No
2-A.2.4. Are the hoppers capable of receiving maximum rated load without contact of the
weighed material with the charging mechanism?Yes No
2-A.2.5. Are cement batchers provided with dust seal between charging mechanism andhopper, installed in such a way as not to affect weighing accuracy?
Yes
No 2-A.2.6. Are weigh hoppers vented to permit escape of air without emission of cement
dust?Yes
No 2-A.2.7. Are hoppers self-cleaning and fitted with means to assure complete discharge?
Yes No
2-A.2.8. Is the hopper charging mechanism capable of stopping flow of material within batching tolerances specified in para 2-A.5.1 and preventing loss of material whenclosed?
Yes No
2-A.2.9. Are vibrators or other equipment installed in such a way as not to affectaccuracy of weighing?
Yes No
N.A. 2-A.2.10. Is wind/weather protection sufficient to prevent interference with weighingaccuracy?
Yes No
N.A.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 19/41
18
2-A.3. BATCHING DEVICES FOR WATER
2-A.3.1. Water is measured by:Volume Weight
2-A.3.2. Are water meters/weigh batchers equipped with a cut-off device capable of stopping the flow within the tolerances specified in 2-A.5.1?
Yes No
2-A.3.3. Is cutoff device free from leaks when closed?
Yes No
2-A.3.4. If measured volumetrically, are water meters equipped with a volume-settingdevice capable of being set to increments at least as small as 5 litres or a register capable
of being read to, 5 litres or both?Yes No
N.A.
2-A.3.5. Is the system capable of providing an indication, visible to the batch operator , of the volume/weight batched at any point in the metering/weighing operation?
Yes
No
2-A.4. DISPENSERS FOR LIQUID ADMIXTURES (Clause 9.1.2 and 9.1.3 of IS
49263)
Chemical admixtures (either by weight or volume) shall be added to the concrete mixture
with the help of a dispenser — a device for batching of liquid admixtures. Admixtures
shall not be administered with manual method.
2-A.4.1. Liquid admixtures are measured by:
Volume Weight
2-A.4.2. Is there a separate dispenser for each liquid admixture in regular use?Yes
No 2-A.4.3. If more than one admixture is being used through a single dispenser without
flushing of the dispenser with water after each cycle, do the plant personnel ascertain thatthe admixtures in actual use are compatible with each other and that the mixing of admixtures prior to introduction in to the concrete is not detrimental?
Yes No N.A.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 20/41
19
2-A.4.4. When using a single dispenser, if the admixtures are not compatible with eachother, is the dispenser flushed with water after each cycle?
Yes No N.A.
2-A.4.5. Are the pipes carrying admixture free from leakage and are they properly calvedto prevent backflow or siphoning so as to ensure that the measured amount is discharged?
Yes No
2-A.4.6. Is each dispenser of liquid admixture provided with an accurately calibratedcontainer (if measured by volume) in which the admixture can be collected when it isdesired to check the accuracy of measurement as indicated in 2-A.5.1?
Yes No N.A.
2-A.4.7. Do the admixture dispensers have scale increments which enable materials to be batched within a tolerance of 3% of the scale reading?
Yes No
2-A.4.8. Do dispensers of liquid admixtures provide visible indication of thequantity batched or interlock cut-off when liquid admixture supply is not available to thedispenser? (This is to prevent dispensing air instead of admixture).
Yes
No N.A.
2-A.5. ACCURACY OF PLANT BATCHING (Clause E-1 of Annex E of IS 49263)
{Note: For weighed ingredients, accuracy of batching shall be determined by comparison
between the desired weight (as indicated by the batch operator and corrected for aggregate moisture, if required) and the actual scale reading.}
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 21/41
20
2-A.5.1. The accuracy, sensitivity and arrangement of weighing devices shall be such asto enable the materials to be batched within the following tolerances:
Cement and mineral admixtures: Within ± 2 percent of the quantity of constituents being measured
Yes No
Aggregate, chemical admixture and water : Within ± 3 percent of the quantity of constituent being measured
Yes
No 2-A.5.2. Is there an appropriate system of finding aggregate moisture either manually or automatically to provide aggregate of fairly consistent moisture content to the batcher and
to detect changes of 1 percent in the moisture content of aggregate?Yes No
2-A.5.3. Are appropriate procedures followed for adjustment of aggregate batch weights
for changes in their moisture content?Yes
No 2-A.6. BATCHING SYSTEMS
2-A.6.1. Definitions and Requirements of Component Individual Batcher Controls.
Batching controls are the part of the batching equipment that provides means for
operating the batching device for an individual material. They may bemechanical, hydraulic, pneumatic, electrical, etc. or a combination of thesemeans. A batching system is a combination of batching devices and batchingcontrols necessary for the accurate and consistent batching of concrete ingredients
in the desired proportions. Normally, a batching system would include batchingdevices and controls for cementitious materials, aggregates, water, and
admixtures.
2-A.6.1.1. Weigh Batcher Controls (Cementitious materials and aggregates must be
batched by weight; water and admixtures may be batched in a weigh batcher or byvolume)
Automatic Control – When actuated by a single starting signal, an automatic weigh-
batcher control shall start the weighing operation of cementitious materials, aggregate,water, or admixture, and stop the flow automatically when the designated weight has been reached. It shall be interlocked to assure that:
(a) The charging gate or valve cannot be opened until the scale hasreturned to zero balance within ±0.3% of the scale capacity;
Yes
No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 22/41
21
(b) The charging gate or valve cannot be opened if the dischargemechanism is open;
Yes No
(c) The discharge mechanism cannot be actuated if the charging gate or
valve is open; andYes
No (d) The discharge mechanism cannot be actuated until the weight of material is within the tolerance specified in 2-A.5.1.
Yes No
2-A.6.2. System Requirements
2-A.6.2.1. Automatic System: A combination of the necessary individual weigh- batchers and volumetric batching devices (if water or admixture is measured
volumetrically in the plant), the controls of which are all automatic (in accordance with2-A.6.1.1) and meet the following automatic-system requirements:
(a) All batching equipment activated by a single starting mechanism, except that a
separate starting mechanism is permitted for volumetric batching of water and/or admixture not batched at the time of weighing the other ingredients.
Yes No
N.A. (b) The discharge of any weighed ingredient in the system may not start unless batching controls for all weigh batchers have been cleared of the previous batch,
with scales returning to zero tolerance, and until all weighed ingredients have been weighed within the required tolerances.
Yes No
N.A. (c) Volumetric admixture dispenser controls (if any) interlocked with volumetric
water batching controls or the controls of at least one weigh batcher to prevent thedischarge of both admixture and the interlocked ingredient(s) unless both theadmixture dispenser and the interlocked batching device(s) have been cleared of
the previous batch.Yes No
N.A.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 23/41
22
2-A.7. Recorders:2-A.7.1. Devices that provide a permanent record of the quantity of cementitious
materials, aggregate, water or admixture measured into a particular batch of concrete.
Cementitious Aggregate Water Admixture
Graphical chart recorder provides indication of
material beingweighed/measured. Agraphical recorder shall
register scale readings within± 2 percent of total scalecapacity
Yes
No
Yes
No
Yes
No
Yes
No
OR
Digital recorder provides a printed record of material being weighed/measured. A
digital recorder shallreproduce the scale readingwithin ± 1 percent of scale
accuracy for cement,admixtures and water and ±
3% for aggregates
Yes No
Yes No
Yes No
Yes No
2-A.7.2 Recorders shall be:
Cementitious Aggregate Water Admixture
Properly protected, that is, provided with effective
security to prevent tampering
with records
Yes
No
Yes
No
Yes
No
Yes
No
Provide traceability of the
particular batch with thecorresponding delivery ticket.
Yes No
Yes No
Yes
No
Yes No
Register empty balance or tareto within 0.3% of scalecapacity for weighed
ingredients.
Yes No
Yes No
Yes No
Yes No
Register the quantity of
ingredients batched. Yes No
Yes No
Yes No
Yes No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 24/41
23
2-B. OLD-GENERATION BATCHING AND MIXING CONTROL EQUIPMENTS
2B.1. SCALES 2-B.1.1. Each scale comprised of a suitable system of knife-edge mechanicallevers whichwill weigh consistently with loads indicated either by means of a full-reading dial or a
digital read-out or display. For all types of batching systems, either dial or digital display,is the batch operator able to read the load indicating devices from his normal station?
Yes No
2-B.1.2. Do analogue scales have increments not exceeding 5 kg each for cement and
mineral admixtures, 25 kg for aggregates and 2 kg for water? (Clause E-1 (b) of Annex Eof IS 49263)
Yes
No
2-B.1.3. Have the system of knife-edge mechanical levers been calibrated in increments
not exceeding 5 kg or less each for cement and mineral admixtures, 10 kg or less for aggregates and 2 kg or less for water? (Clause E-1 (c) of Annex E of IS 49263)
Yes No
2-B.1.4. Does the records show that at east 1000 kg of suitable calibrated and stampedtest weights have been used for checking accuracy of scales.
Yes No
2-B.1.5. Does a systematic recheck of scales carried out frequently (at least once every 2 months for mechanical/knife-edge system)? (Clause E-1 (j) of Annex E of IS 49263)
Yes No
2-B.1.6. Is prompt recalibration done and correction carried out if the plant is moved or non-compliance is indicated in the 2-month rechecking?
Yes No
2-B.1.7. Is a systematic record of calibration of weighing and measuring systemavailable?
Yes No
2-B.1.8. Are adequate permanent facilities provided for the application of test weights tothe weighing hopper or system? (Clause E-1 (j) of Annex E of IS 49263). [These facilities
may consist of anchor /suspension points, or trays, or platform, or hangers or other equipment as required.]
Yes
No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 25/41
24
2-B.1.9. Are the personnel involved in the work of calibration of weighing equipmentscompetent and fully trained? (Clause E-1 (p) of Annex E of IS 49263)
Yes No
2-B.1.10 Beam-Indicating Scales
2-B.1.10.1 Have the beam-indicating scales been provided with zero balance beam,
balance indicator, and separate weighing beam for each ingredient of a batch to beweighed on the same scale?
Yes No
2-B.1.11. Dial-Indicating Scales 2-B.1.11.1. Is the dial head mechanism enclosed adequately so as to be dust tight?
Yes No
N.A
2-B.1.11.2 Does dials indicate load in batch continuously from zero balance to full
weighing capacity of the scale?Yes No
2-B.1.11.3. Are the dial-indicating scales equipped with a digital indicator and display
protected from dust with numbers large enough for good readability?Yes No N.A.
2-B.2. WEIGH BATCHERS (Clause 9.1.2 and 9.1.3 of IS 49263)
2-B.2.1. Have the hoppers for weighing cement, aggregates, and also water andadmixtures (if measured by weight) consist of suitable containers freely suspended from a
knife-edge mechanical lever/scale, and are they equipped with necessary charging anddischarging mechanisms?
Yes
No 2-B.2.2. Are the hoppers capable of receiving maximum rated load without contact of the
weighed material with the charging mechanism?Yes No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 26/41
25
2-B.2.3. Is the hopper charging mechanism capable of stopping flow of material within batching tolerances specified in para 2-B.5.1 and preventing loss of material when
closed?Yes No
2-B.2.4. Is wind/weather protection sufficient to prevent interference with weighingaccuracy?
Yes No
2-B.3. BATCHING DEVICES FOR WATER
2-B.3.1. Water is measured by:
Volume Weight
2-B.3.2. Are water meters/weigh batchers equipped with a cut-off device capable of
stopping the flow within the tolerances specified in 2-B.5.1?Yes No
2-B.3.3. Is cutoff device free from leaks when closed?
Yes No
2-B.3.4. If measured volumetrically, are water meters equipped with a volume-setting
device capable of being set to increments at least as small as 5 litres or a register capableof being read to, 5 litres or both?
Yes No
2-B.3.5. Is the system capable of providing an indication, visible to the batch operator , of the volume/weight batched at any point in the metering/weighing operation?
Yes
No
Volumetric Tank Water Batchers:
2-B.3.6. Are tank water batchers equipped with necessary filling and discharge
valves that are leak-free when closed and is the fill valve capable of stopping flow withinthe tolerance specified in Section 2-B.5.1?
Yes
No
2-B.3.7. Is there a gauge or other device that clearly indicates to the batch operator the volume of water in the tank from the zero point to capacity of the batcher and whichcan be read to 5 litres?
Yes
No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 27/41
26
2-B.3.8. Is the tank equipped with an overflow pipe at batcher capacity level if it is lessthan tank capacity?
Yes No
2.B.3.9. Is the tank water batcher equipped with a valve to remove overloads?
Yes
No
2-B.4. DISPENSERS FOR LIQUID ADMIXTURES (Clause 9.1.2 and 9.1.3 of IS
49263)
Chemical admixtures (either by weight or volume) shall be added to the concrete mixturewith the help of a dispenser — a device for batching of liquid admixtures. Admixtures
shall not be administered with manual method.
2-B.4.1. Liquid admixtures are measured by:
Volume Weight
2-B.4.2. Is there a separate dispenser for each liquid admixture in regular use?
Yes No
2-B.4.3. If more than one admixture is being used through a single dispenser withoutflushing of the dispenser with water after each cycle, do the plant personnel ascertain thatthe admixtures in actual use are compatible with each other and that the mixing of
admixtures prior to introduction in to the concrete is not detrimental?Yes No N.A.
2-B.4.4. When using a single dispenser, if the admixtures are not compatible with eachother, is the dispenser flushed with water after each cycle?
Yes
No
N.A. 2-B.4.5. Are the pipes carrying admixture free from leakage and are they properly valved
to prevent backflow or siphoning so as to ensure that the measured amount is discharged?Yes
No 2-B.4.6. Is each dispenser of liquid admixture provided with an accurately calibratedcontainer (if measured by volume) in which the admixture can be collected when it is
desired to check the accuracy of measurement as indicated in 2-B.5.1?Yes No
N.A. 2-B.4.7. Do the admixture dispensers have scale increments which enable materials to be batched within a tolerance of 3% of the scale reading?
Yes
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 28/41
27
No 2-B.4.8. Do dispensers of liquid admixtures provide visible indication of the quantity
batched or interlock cut-off when liquid admixture supply is not available to thedispenser? (This is to prevent dispensing air).
Yes
No N.A.
2-B.5. ACCURACY OF PLANT BATCHING (Clause E-1 of Annex E of IS 49263)
{Note: For weighed ingredients, accuracy of batching shall be determined by comparison
between the desired weight (as indicated by the batch operator and corrected for aggregate moisture, if required) and the actual scale reading. In case water and admixtureare added by volume, the accuracy of volumetric measurement shall be determined by
checking the discharged quantity either by weight on a scale or by volume in anaccurately calibrated container.}
2-B.5.1. The accuracy, sensitivity and arrangement of weighing devices shall be such asto enable the materials to be batched within the following tolerances:
Cement and mineral admixtures: Within ± 2 percent of the quantity of constituents being measured
Yes No
Aggregate, chemical admixture and water : Within ± 3 percent of the quantity of constituent being measured
Yes No -
2-B.5.2. Is there an appropriate system of finding aggregate moisture either manually or
automatically to provide aggregate of fairly consistent moisture content to the batcher andto detect changes of 1 percent in the moisture content of aggregate?
Yes
No
2-B.5.3. Are appropriate procedures followed for adjustment of aggregate batch weightsfor changes in their moisture content?
Yes No
2-B.6. BATCHING SYSTEMS
2-B.6.1. Definitions and Requirements of Component Individual Batcher Controls.
Batching controls are the part of the batching equipment that provides means for operating the batching device for an individual material. They may be
mechanical, hydraulic, pneumatic, electrical, etc. or a combination of these
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 29/41
28
means. A batching system is a combination of batching devices and batchingcontrols necessary for the accurate and consistent batching of concrete ingredients
in the desired proportions. Normally a batching system would include batchingdevices and controls for cementitious materials, aggregates, water, andadmixtures.
2-B.6.1.1. Weigh Batcher Controls (Cementitious materials and aggregates must be
batched by weight; water and admixtures may be batched in a weigh batcher or byvolume in a volumetric device.)
Automatic Control – When actuated by a single starting signal, an automatic weigh- batcher control shall start the weighing operation of cementitious materials, aggregate,water, or admixture, and stop the flow automatically when the designated weight has
been reached. It shall be interlocked to assure that:
(a) The charging gate or valve cannot be opened until the scale has
returned to zero balance within ±0.3% of the scale capacity;Yes
No (b) The charging gate or valve cannot be opened if the discharge
mechanism is open;Yes No
(c) The discharge mechanism cannot be actuated if the charging gate or
valve is open; andYes No
(d) The discharge mechanism cannot be actuated until the weight of material is within the tolerance specified in 2.B.5.1.
Yes No
2-B.6.1.2. Volumetric Batching Device Controls (This pertains to the controls usedfor measurement of admixtures in a volumetric admixture dispenser or the measurement
of water with a water meter or a volumetric batcher tank.)
Automatic Control – When actuated by a single starting signal, an automatic volumetric
control shall start the measuring operation and stop the flow automatically when thedesignated volume has been reached.
2-B.6.2. System Requirements
2-B.6.2.1. Automatic System: A combination of the necessary individual weigh-
batchers and volumetric batching devices (if water or admixture is measuredvolumetrically in the plant), the controls of which are all automatic (in accordance with2.6.1.1 and meet the following automatic-system requirements:
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 30/41
29
(a) All batching equipment activated by a single starting mechanism, except that aseparate starting mechanism is permitted for volumetric batching of water and/or
admixture not batched at the time of weighing the other ingredients.Yes No
N.A. (b) The discharge of any weighed ingredient in the system may not start unless
batching controls for all weigh batchers have been cleared of the previous batch,with scales returning to zero tolerance, and until all weighed ingredients have been weighed within the required tolerances.
Yes No N.A.
(c) Volumetric admixture dispenser controls (if any) interlocked with volumetricwater batching controls or the controls of at least one weigh batcher to prevent thedischarge of both admixture and the interlocked ingredient(s) unless both the
admixture dispenser and the interlocked batching device(s) have been cleared of the previous batch.
Yes No
N.A.
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 31/41
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 32/41
31
4. TICKETING SYSTEM (As per Annex G of IS 4926)3
The Delivery Ticket should contain the following information
1 Name of the ready mixed concrete Company Yes
No
2 Plant designation if Company operates more than one plant Yes No
3 Serial No. of ticket Yes No
3 Delivery date Yes
No
4 Truck No. Yes No
5 Name of the Purchaser Yes No
6 Name& location of the site Yes No
7 Grade of concrete or mix description of the concrete Yes No
8 Specified target workability Yes No
9 Minimum cement content ( if specified) Yes No
10 Type of cement and grade ( if specified) Yes No
11 Maximum free water-cement ratio ( if specified) Yes No
12 Nominal maximum size of aggregate Yes
No
13 Generic type or name of chemical admixtures included Yes
No
14 Generic type or name of mineral admixtures included Yes
No 14 Quantity of concrete in m3 Yes
No
15 Time of loading Yes No
16 Signature of authorized person Yes No
17 A statement warning the purchaser of the precautions neededto be taken when working with cement and wet concrete.
Yes No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 33/41
32
On site information
1 Time of arrival at site Yes No
2 Time when discharge was completed Yes No
3 Any water/ admixture added by the supplier to meet the
specified workability
Yes
No 4 Any extra water/ admixture added at request of the purchaser
of the concrete, or his representative and his signature.
Yes
No
5 Pour location (if informed by client) Yes
No
6 Signature of the purchaser or his representative confirming
discharge of the load
Yes
No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 34/41
33
5. DELIVERY FLEET INSPECTION
It is the responsibility of RMC producer to ensure that each truck mixer is inspected toconfirm compliance with various requirements given in this section. The RMC facility
will maintain a register of such inspection, which would be made available to the third- party auditor. The auditor is free to choose any one or more truck mixers from register for his audit. It is recommended that the RMC facility may maintain the register in the format
included in section 5.8. It is suggested that the auditor should audit around 10% of thetruck mixers from the register. Certification will be granted only if all the audited truck mixers are found acceptable as per criteria listed in this section.
5.1. Hardened concrete built up in mixer drum and on blades Are the truck mixers maintained in an efficient and clean condition? Is there an
appreciable accumulation of hardened concrete in the mixer drum and on the mixer blades?
Yes
No
5.2. Mixer Blade wears
The wear of mixer blade shall be checked at the point of maximum drum diameter nearest to the drum head. The blade is considered excessively worn if height of the blade
at this point, measured from the drum shell, is less than 2/3rd of the original radial height.Are the blades free of excessive wear?
Yes No
5.3. Charging hopper
5.3.1. Is the surface of charging hopper clean and smooth?Yes
No
5.3.2. Is the charging hopper free from appreciable accumulation of concrete?
Yes No
5.4. Discharging opening, hopper and chute
5.4.1. Is the surface of discharging opening, hopper and chute clean and smooth?
Yes No
5.4.2. Are the discharging opening, hopper and chute free from appreciable accumulationof concrete?
Yes No
5.5. Speed of agitation
The recommended operating speed for agitation (in rpm) shall be as per the
recommendation of the manufacturer. The speed of the drum should generally be in the
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 35/41
34
range of 4 rpm to 14 rpm. Minimum and maximum operating speed shall be visuallyverified. Is the agitating mixer capable of operating at mixing speed in the range of 4 to
14 rpm?Yes No
5. 6. Water tank, meter and pump system
5.6.1. Is the gauge/meter on water tank fitted to the truck mixer clean and legibly
graduated?Yes No
5.6.2. Is the water pump / injection system in good working condition?Yes
No
5.6.3. Is there any leakage of water from the nozzle into the mixer?Yes
No
5.6.4. Check on calibration of water meter does not show variation beyond 2%?Yes
No N.A.
5.7. General
5.7.1 Are all documents of truck mixer (registration book, insurance receipt, etc) as per
statutory requirements?Yes
No
5.7.2. Is first aid box provided in the cabin of truck mixer?Yes
No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 36/41
35
5.8. Inspection record of Truck Mixers
Company: City:
Truck No.__________________ Rated Capacity: ______________________
Name of manufacturer and make:_____________________________________________ Date of previous inspection: ________________________________________________
Date of current inspection: __________________________________________________
5.9. Inspection record of Truck Mixers: (For the use of RMC producer)
(Each truck mixer’s inspection to be entered in a separate table)
Items in Check List Compliance
5.1 Yes/ No
5.2 Yes/ No
5.3.1 Yes/ No
5.3.2 Yes/ No
5.4.1 Yes/ No
5.4.2 Yes/ No
5.5 Yes/ No
5.6.1 Yes/ No 5.6.2 Yes/ No
5.6.3 Yes/ No
5.6.4 Yes/ No
5.7.1 Yes/ No
5.7.2 Yes/ No
5.9 Summery of Inspection Record of Truck Mixer (For the Use of Auditor)
Truck No.
Date of previous
inspection by
producer
Name of Manufacturer
and make
RatedCapacity
Date of Inspection
Compliance
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Total no. of truck mixers available for use:Total number of trucks inspected by producer ____________
No. of truck mixers checked and found acceptable:
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 37/41
36
6. LABORATORY
6.1. General
6.1.1. Does the RMC production facility have an attached testing laboratory?Yes No
6.1.2. If no, where does the routine testing been carried out?Central lab of Company Third-party lab
N.A. 6.1.3. Has the central lab of Company or third-party lab been audited recently?
Yes No N.A.
( Note: If the RMC facility does not have in-house testing laboratory and the testing iscarried out in the central lab of Company, it is essential to ensure that the central lab isaudited and that the validity of the audit has not expired)
6.1.4. If the answer to question 6.1.3 is ‘yes’, mention the name of auditor, date of
certification and its validity. Name of Auditor
Date of certification Validity of certification
N.A.
6.2. Test facilities
6.2.1. Plant laboratory/central laboratory/third-party laboratory has facilities to carry outthe following test:
Cement Standard consistency (conforming to IS)10
Initial and final setting time (conforming to IS) 10
Compressive strength (conforming to IS)
10
Aggregates Sampling (conforming to IS 2430)
5
Moisture content (conforming to IS 2386-PartIII)6
Silt content
Bulk density
Sieve analysis (conforming to IS 2386-Part-I)7
Water pH
Chlorides
Sulphates
Admixture Specific gravity
Concrete Slump (conforming to IS 1199)8
Unit weight (conforming to IS 1199)8
Strength (conforming to IS 516)9
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 38/41
37
6.2.2. Are the equipments used for different tests mentioned in 6.2.1 in conformity with
the requirements specified in different codes?Yes No
6.2.3. If the answer to the question in 6.2.2 is ‘No’, mention the major shortcomings intests (add separate sheet, if necessary)
6.2.4. Are the tools and equipment used for carrying various tests mentioned in 6.2.1maintained in neat and clean condition?
Yes No
6.2.4. Are the measuring and testing equipments (weighing balance, weights, sieves,
proving ring of compression testing machine, etc.) calibrated regularly?Yes
No 6.2.5. Mention the frequency of calibration and the date till which current calibration can be considered valid for each of the following apparatus:
Frequency Validity
Weighing balance
Weights
Proving ring
Measure for unit weight
6.2.6. Is a proper record of calibration kept in the laboratory?Yes No
6.2.7. Are the dimensions of cube and beam moulds within the code-specified tolerancesafter repeated use?
Yes No
6.2.8. Does the curing tank have the facility of maintaining temperature of curing water at27 ± 2 0C?
Yes No
6.2.9. Type of mixer used in laboratory
Tilting drum Pan-type Other (describe)
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 39/41
38
6.9.10. Is the laboratory mixer kept in clean condition?Yes
No 6.2.10. Is there appreciable built-up of materials on mixer blades or inside face of mixer?
Yes
No
6.3. Testing procedures6.3.1. Are the minimum testing frequencies specified in IS 49263 and other relevant codesfollowed for the conduct of tests mentioned in 6.2.1?
Yes No
6.3.2. Are well documented test procedures available in the laboratory?
Yes No
6.3.3. Are the well-documented test procedures displayed in laboratory for the guidance
of operators/supervisors?Yes No
6.3.4. Are the test procedures given in relevant codes or equipment manufacturer’s
manual followed meticulously in day-to-day practice?Yes No
( Note: This can be ensured by witnessing some of the tests being carried out in the lab
and/or by asking relevant questions to the operators/supervisors).
6.3.5. Are original or certified copies of relevant codes available in the laboratory?Yes No
6.4. Personnel
6.4.1 Are lab technicians adequately trained and qualified to carry out day-to-day routine
testing on ingredients and concrete?Yes
No 6.4.2. If yes, record the details of in-house and external training undergone by thetechnicians during the past one year in the following format.(use separate sheet if needed)
Name of technician Training topic Date of training Agency name
6.4.3. Are the duties and responsibilities of lab technicians clearly defined and welldocumented?
Yes
No
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 40/41
39
Bureau of Indian Standards referred in Checklist
1. Plain and Reinforced Concrete- Code of Practice ( Third Revision) IS 456 : 2000( Reaffirmed 2005), p. 100.
2. Concrete Admixtures- Specifications (First Revision),IS 9103:1999 ( Reaffirmed
2004), p.14.3. Ready-Mixed Concrete- Code of Practice (Second Revision), IS 4926: 2003, p.
18.4. Methods for Testing Performance of Batch-type Concrete Mixers ( First Revision)
IS 4634: 1991(Reaffirmed 2005), p.3.
5. Methods for Sampling of Aggregates for Concrete ( First Revision) IS 2430 :1986 ( Reaffirmed 2005), p.12.
6. Methods for Test for Aggregates for Concrete Part 3 : Specific Gravity , Density,
Voids, Absorption and Bulking. IS 2386 Part 3 : 1963 ( Reaffirmed 2007 ), p. 177. Methods of Test for Aggregates for Concrete Part 1: Particle Size and Shape. IS
2386 :Part 1:1963 ( Reaffirmed 2007), p. 188. Methods of Sampling and Analysis of Concrete. IS 1199 : 1959( Reaffirmed
2004), p.44.
9. Method of Test for Strength of Concrete. IS 516: 1959 (Reaffirmed 2004), p. 24.10. Specification for 53 Grade Ordinary Portland Cement. IS 12269 :1987
(Reaffirmed2004), p 11
7/27/2019 Check List for Audit
http://slidepdf.com/reader/full/check-list-for-audit 41/41
40
Notes