CMPDI EIA/EMP OF CLUSTER - XI IV-1 CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 INTRODUCTION The impacts (both beneficial and adverse) of mining and its allied activities of the project have been assessed and presented in respect of air, water, noise, blasting vibration, socio-economic profile, flora & fauna, land resource, traffic movement and visual/aesthetic aspect in this chapter. The control measures to mitigate various environmental impacts are also highlighted in this chapter for carrying out mining operation in an environmentally compatible manner. Further, all provisions of Coal Mines Regulations and Directives shall be followed in this project. 4.2 IMPACT ASSESSMENT & POLLUTION CONTROL MEASURES FOR AIR The impact assessment has been carried out. Appropriate air pollution control measures will be taken to contain the air pollution for maintaining the ambient air quality within the stipulated standards besides making the mining operation eco- friendly in this project. All provisions of Coal Mines Regulations and Directives shall be followed. Sources of Dust Pollution Coal dust is generally course and a significant portion of dust generated due to mining activities settles down within a short distance. Only very fine coal dust generated from grinding of fallen coal on coal transport roads under the wheels of heavy vehicles as well as at crushers in coal handling plants can become airborne and be carried longer distances by wind. Vehicular exhaust from dumpers ferrying coal from the mine to the railway siding is another reason for air pollution. These exhausts contain CO, SO X , NO X and small quantities of un-burnt

Upload: others

Post on 25-Jun-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-1

CHAPTER-IV

ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES

4.1 INTRODUCTION

The impacts (both beneficial and adverse) of mining and its allied activities of the

project have been assessed and presented in respect of air, water, noise,

blasting vibration, socio-economic profile, flora & fauna, land resource, traffic

movement and visual/aesthetic aspect in this chapter.

The control measures to mitigate various environmental impacts are also

highlighted in this chapter for carrying out mining operation in an environmentally

compatible manner. Further, all provisions of Coal Mines Regulations and

Directives shall be followed in this project.

4.2 IMPACT ASSESSMENT & POLLUTION CONTROL MEASURES FOR AIR

The impact assessment has been carried out. Appropriate air pollution control

measures will be taken to contain the air pollution for maintaining the ambient air

quality within the stipulated standards besides making the mining operation eco-

friendly in this project. All provisions of Coal Mines Regulations and Directives

shall be followed.

Sources of Dust Pollution

Coal dust is generally course and a significant portion of dust generated due to

mining activities settles down within a short distance. Only very fine coal dust

generated from grinding of fallen coal on coal transport roads under the wheels

of heavy vehicles as well as at crushers in coal handling plants can become

airborne and be carried longer distances by wind. Vehicular exhaust from

dumpers ferrying coal from the mine to the railway siding is another reason for air

pollution. These exhausts contain CO, SOX, NOX and small quantities of un-burnt

Page 2: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-2

fuel apart from some heavy metals like lead, nickel and arsenic. Air pollution due

to coal transportation can be controlled to a great extent by regular sprinkling on

roads by mobile water sprinklers. Wetting of coal before transportation and

transportation of coal by covered trucks will help prevent spillage, thereby,

reducing the quantum of dust. Dumpers employed for coal transportation require

good maintenance. Several such provisions have been suggested to keep the

ambient air quality much within the permissible limits.

Coal Flow on Surface

For UG Mines

The coal raised to surface through the mineshaft or incline in mine cars is tippled

directly into tippers which ferry the coal directly to the railway siding where it is

unloaded and then loaded onto wagons by payloaders.

For proposed OC Mines

The blasted coal will be loaded into 35 te dumpers and will be brought to surface

depot by haul road where it will be unloaded and subsequently loaded into 15 te

dumpers for transport to railway siding where it will be loaded onto wagons by

payloaders. Alternatively, the coal may be loaded into 15 te dumpers at the coal

face itself and transported directly to the railway siding. The latter will be true for

the small patches proposed (< 10 Ha).

A coal flow chart along is given as Plate – 18.

Production and Dispatch

Since all the mines in the cluster are UG mines, the only major activity

contributing to air pollution is transport of coal from the mines to various Railway

Sidings by road. Present production & despatch of coal from all mines taken

together is around 0.748 MTY & 2267 TPD. However, it is proposed to augment

the production from the UG mines to 4.21 MTY (normative) and 4.78 MTY

(peak). Further, 4 OC patches are proposed to be operated which will yield a

normative production of 6.0 MTY and a peak production of 7.45 MTY. However,

the life of these OC mines is around 2 to 8 years after which there will be coal

Page 3: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-3

production from UG mines only. The production and despatch figures from the

various mines within the cluster after considering the various scenarios are

shown below –

Present Scenario (Only UG mines operating at present production levels, ie actual for 2011 - 12)

Future Scenario – 1 (after adding production from OC patches to A)

Future Scenario – 2 (OC patches are exhausted and UG mines producing at envisaged capacity

A B C

Actual 2013 – 14* Normative Peak* Normative Peak*

0.748 MT 6.748 MTY 8.198 MTY 4.21 MTY 4.78 MTY

2267 TPD 22267 TPD 27100 TPD 12757 TPD 14485 TPD

*Air Quality Impact Prediction Exercise done for these scenarios

Page 4: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-4

Rationalisation of Road transport of Coal

At present, coal from the mines is being transported to Andal, Bahula and Bankola Railway Sidings. In future, it is

proposed to transport coal from all the mines to Bahula Railway Siding as shown below:

Sl No.

Name of the Mine Railway siding to which coal is presently being transported

Distance of Railway siding

from mine (Kms)

(A)

Railway siding to which coal is proposed to be transported as per Env Plan (after commissioning of proposed railway siding)

Distance of Railway

siding from mine (Kms)

Change in Distance (Kms)

During period of operation of proposed OC Patches

(B)

After Exhaustion of OC patches

(C)

1 Krishnanagar UG - - Bahula 6.0 - (+) 6.0

2 Haripur UG Bahula 9.0 Bahula 9.0 0.0 0.0

3 Chora Block Incline UG Bahula 1.5 Bahula 1.5 0.0 0.0

Chora 7, 9 & 10 Pit UG Bahula 3.5 Bahula 3.5 0.0 0.0

4 Bonbahal OC Patch (25ha) OC

- - Bahula 4.5 (+) 4.5 -

5 Shankarpur / CL Jambad OC Patch/mine (52 Ha) OC

Exhausted and backfilling is under process

6 New Kenda UG Andal 15.0 Bahula 3.0 (-) 12.0 (-) 12.0

7 W Kenda OC Patch/Mine (49 ha)

- - Bahula 4.5 (+) 4.5 -

8 New Kenda OC Mine (240 ha) - - Bahula 3.0 (+) 3.0 -

9 Lower Kenda UG Bahula 1.0 Bahula 1.0 0.0 0.0

10 Bahula UG Bahula 0.5 Bahula 0.5 0.0 0.0

11 C L Jambad UG Bahula 8.0 Bahula 8.0 0.0 0.0

12 Siduli UGP Bahula 11.0 Bahula 11.0 0.0 0.0

13 Khandra UG Bankola 5.0 Bahula 11.0 (+) 6.0 (+) 6.0

14 Shankarpur UG Bankola 7.0 Bahula 10.0 (+) 3.0 (+) 3.0

15 Shankarpur OC Patch/mine (42 ha)*

- - Bahula 10.5 (+) 10.5 -

Total 61.5 87.0 (+) 19.5 (+) 3.0

Total Increment / Decrement in Distance of transportation (in %) (+) 4.87

The present and proposed dispatch routes are shown in Plate – 19.

Page 5: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-5

Air quality modeling

Air Quality Model

The quantum of SPM at the receptors is influenced by concentration of pollutants and

their dispersion in the atmosphere. Air quality modeling is an important tool for

prediction, planning and evaluation of air pollution control activities besides identifying

the requirements for emission control to meet the regulatory standards. The efficient

management of air quality requires the use of modeling techniques to analyze the

patterns of pollutant concentrations from many individual sources of air pollutants

operating simultaneously.

Models for regional concentration patterns are based on "emission inventory" data for

the region, and on standard meteorological observations assumed to be representative

of the entire region.

Various attempts have been made to establish empirical relations to predict the dust

emission characteristics for mining operations. These relations may give only a rough

estimate of the total dust emission and provide no information about the contour of the

dust distribution. The generation rate of the contaminant for most mining operations

cannot be precisely determined by empirical relations because there is a high degree of

variance in the way such operations are conducted in different mines. Nevertheless, the

empirical relations provide the first hand information to the health workers,

administrators, planners, and engineers for the development of dust control strategies.

The dust emission levels from mining operations for the purpose of this modelling have

been based on USEPA publications and paper on emission factors written by Prof SP

Banerjee and published in Minetech Magazine.

Air Quality Prediction

The Air Quality Impact Prediction has been done by using the FDM version 90121 Air

Quality Model of USEPA. Estimation for increase in TSP, NOX and SO2 at the Baseline

Ambient Air Quality Stations has been done with the help of the above model. The

model was run to predict the incremental TSP concentrations from future mining

activities. The contribution of TSP from the present mining activities is already included

in the baseline data generated at the stations. The quantum of such contribution from

the present mining activities was determined by running the model for the present

Page 6: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-6

scenario only (Scenario A). The model was run again for predicting contribution from

proposed mining activities (Scenarios B & C separately). The difference between the

contributions from the present and proposed mining activities is the incremental impact.

The increment over and above the baseline concentrations found at the AAQ stations is

the likely level of future TSP concentrations taking into account all the activities.

The following stations were chosen for baseline data generation for ambient air quality –

SI.No. Location Name Location Code Remarks

Core Zone

1. Krishnanagar, Mine Office A2 500 m from Mine Pit top

2. New Kenda, Mine Office A3 -do-

3. Lower Kenda, Sub. Office A4 -do-

4. Chora Pit Mine Office A5 -do-

5. Haripur, Sub. Office A6 -do-

6. Bahula, Mine Office A7 -do-

7. Chora UG, Mine Office A8 -do-

8. C.L. Jambad UG, Mine Office

A9 -do-

9. Siduli, Agent Office A10 -do-

10. Shankarpur UG, Mine Office A11 -do-

11. Khandra, Mine Office A12 -do-

Buffer Zone

12. Chinchuria A1 Kept as Control Station Habitation at a distance of 3.0 km towards NE of operating mine area

13. Beniyadidanga A13 Habitation at a distance of 4.0 km distance from the mine towards SW direction

Identification of sources of TSPM and Gaseous pollutants

The main sources of air pollution for the purpose of estimation of increase in TSPM,

SO2 and NOX were identified as-

1) Coal handling activities at Pit top /OC Mine (Peak Output).

2) Coal transportation from CHP to different Railway Sidings by dumpers

3) Storage and Wagon loading of coal at the Railway Sidings by payloaders

Emission Standards

Page 7: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-7

The USEPA Emission Factor Equation, 1988 and paper on emission factors written by

Prof SP Banerjee and published in Minetech Magazine have been used to calculate the

emission factors for the various sources as explained below.

Emission Factors for Suspended Particulate Matter from Various Mining Operations

have been given below:

Underground Mining

Source Material TSPM Emission Factor Unit

Loading in dumper Coal 0.084 Kg/te

Loading in wagons Coal 0.084 Kg/te

Transportation on metaled road

Coal 0.225 Kg / VKT

Coal unloading Coal 0.029 Kg / te

Loading point of conveyor belt

Unloading point of conveyor belt

Coal 0.029 Kg / te

Wind erosion at Coal stockyard

Coal 2.33 Kg/ha/d

Opencast Mining

Source Material TSPM Emission Factor Unit

Top soil removal Soil 0.029 Kg/te

Overburden removal

Drilling O.B. 0.59 Kg/hole

*Blasting O.B. 0.00022(A) 1.5 , A = area being blasted in sq. m.

Kg/day

Dumper loading by shovel O.B. 0.018 Kg / te

Transportation in haul road O.B. 2.25 Kg/vkt

Unloading O.B. 0.001 Kg / te

Coal Extraction

Drilling Coal 0.10

*Blasting Coal 0.00022(A)1.5 , A = area being blasted in sq. m.

Kg/day

Loading in dumper Coal 0.084 Kg/te

Loading in wagons Coal 0.084 Kg/te

Transportation in haul road Coal 2.25 Kg / te

Transportation on metaled road Coal 0.225 Kg / te

Coal unloading Coal 0.029 Kg / te

OB dumps(Wind erosion when active)

O.B. 2.33 Kg/ha/d

Page 8: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-8

Emission from Vehicles

SO2 emission factor = 17 kg per 1000 litres of diesel burnt in litres ( Source USEPA

1998).

NOX emission factor = 35.7 kg per 1000 litres of diesel burnt in litres ( Source USEPA

1998).

Control Factors

The various control factors for dust suppression have been summarized below and

have been used to calculate the estimated emission from the sources.

Table – 4.4

Operation / Activity Control method and emission reduction

% of dust settling down within a short distance of few meters

Transporting 50 % for metalled road (Water spraying @ 2 litres/m

2/h)

90 %

Dust generation at the conveyor point

> 95 % for enclosures and dust extraction system with water spraying

-

Dust generation at unloading point

> 95 % for enclosures and dust extraction system with water spraying

-

Dust generation due to truck loading/ unloading

50 % with water spraying 90%

Estimation of TSPM generation

Based on the emission factors from various activities after using appropriate control as

mentioned above, the contributions of dust from different sources with respect to each

mine and railway siding for each of the scenarios – A, B & C given below were

estimated –

Scenario A – Present Status of production (2013-14) and present scheme of road

transport.

Scenario B – Future Status of production during the operation of OC mine and OC

patches at peak capacities and UG mine producing simultaneously at the current

production level.

Scenario C – Future Status of production after exhaustion of OC patches and UG mines

producing at envisaged peak production levels.

Page 9: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-9

Sl No.

Name of Mine Contribution of dust from activities in Kg / day

Pit – top Coal Handling & Dispatch

Activities inside OC mines / patches

Road transportation of Coal

A B C A B C A B C

1 Krishnanagar UG - - 6.45 - - - - - 10.227

2 Haripur UG 1.20 1.20 16.78 - - - 2.227 2.227 31.023

3 Chora Block Incline UG

1.22 1.22

21.3

- - - 0.486 0.486

19.688

4 Chora 7, 9 & 10 Pit UG

2.30 2.30 - - - 2.128 2.128

5 Bonbahal OC Patch (25ha) OC

- - - - 788.83 - - 12.784

-

6 New Kenda UG

0.79 0.79 3.01 - - - 0.631

0.631

2.386

7 W Kenda OC Patch/Mine (49 ha)

- - - - 1740.247 - -

19.176

-

8 New Kenda OC Mine (240 ha)

- - - - 35776.1 - - 66.477

-

9 Lower Kenda UG 1.09 1.09 3.65 - - - 0.290 0.290 0.966

10 Bahula UG 3.52 3.52 6.67 - - - 0.466 0.466 0.881

11 C L Jambad UG 0.96 0.96 1.50 - - - 2.045 2.045 3.182

12 Siduli UGP 0.62 0.62 6.45 - - - 1.813 1.813 18.750

13 Khandra UG 1.85 1.85 8.39 - - - 2.443 2.443 11.080

14 Shankarpur UG 2.49 2.49 28.6 - - - 4.614 4.614 52.898

15 Shankarpur OC Patch/mine (42 ha)*

- - - - 4468.413 - - 98.011

-

Total 16.04 16.04 102.80 - 42773.59 - 17.14 213.59 151.08

Page 10: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-10

Contribution of dust from activities at Railway Sidings in Kg / day

Sl

No.

Name of Railway Siding Handling of coal in t / day Contribution of dust from activities in Kg / day

A B C A B C

1 Andal 112 - - 0.79 - -

2 Bahula 1655 24842 14485 11.74 176.38 102.84

3 Bankola 612 - - 4.34 - -

Page 11: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-11

Run of the Model

The model was run thrice for the three scenarios A, B & C as discussed above and the

run of the models for the three scenarios as above are shown below –

RUN TITLE:

AIR QUALITY IMPACT PREDICTION FOR CLUSTER 11 PRESENT SCENARIO

INPUT FILE NAME: prsn11.IN

OUTPUT FILE NAME: prsn11.OUT

PLOT OUTPUT WRITTEN TO FILE NAME: prsn11.DAT

CONVERGENCE OPTION 1=OFF, 2=ON 1

MET OPTION SWITCH, 1=CARDS, 2=PREPROCESSED 1

PLOT FILE OUTPUT, 1=NO, 2=YES 2

MET DATA PRINT SWITCH, 1=NO, 2=YES 1

POST-PROCESSOR OUTPUT, 1=NO, 2=YES 1

DEP. VEL./GRAV. SETL. VEL., 1=DEFAULT, 2=USER 1

PRINT 1-HOUR AVERAGE CONCEN, 1=NO, 2=YES 2

PRINT 3-HOUR AVERAGE CONCEN, 1=NO, 2=YES 1

PRINT 8-HOUR AVERAGE CONCEN, 1=NO, 2=YES 1

PRINT 24-HOUR AVERAGE CONCEN, 1=NO, 2=YES 2

PRINT LONG-TERM AVERAGE CONCEN, 1=NO, 2=YES 1

NUMBER OF SOURCES PROCESSED 42

NUMBER OF RECEPTORS PROCESSED 13

NUMBER OF PARTICLE SIZE CLASSES 5

NUMBER OF HOURS OF MET DATA PROCESSED 24

LENGTH IN MINUTES OF 1-HOUR OF MET DATA 60.

ROUGHNESS LENGTH IN CM 1.00

SCALING FACTOR FOR SOURCE AND RECPTORS 1.0000

PARTICLE DENSITY IN G/CM**3 2.20

GENERAL PARTICLE SIZE CLASS INFORMATION

GRAV. FRACTION

PARTICLE CHAR. SETTLING DEPOSITION IN EACH

Page 12: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-12

SIZE DIA. VELOCITY VELOCITY SIZE

CLASS (UM) (M/SEC) (M/SEC) CLASS

----- --------- -------- ---------- --------

1 1.0000000 ** ** 0.0300

2 6.2000000 ** ** 0.1800

3 12.5000000 ** ** 0.1200

4 21.1000000 ** ** 0.2200

5 65.0000000 ** ** 0.4500

----------

** COMPUTED BY FDM

1

RECEPTOR COORDINATES (X,Y,Z)

( 21671., 16540., 0.) ( 14565., 12950., 0.) ( 15796., 11177., 0.)

( 18803., 10751., 0.) ( 20933., 11366., 0.) ( 22377., 13021., 0.)

( 21123., 9143., 0.) ( 24484., 10775., 0.) ( 22614., 8505., 0.)

( 24910., 8836., 0.) ( 27941., 10254., 0.) ( 27729., 5939., 0.)

( 16034., 6389., 0.) (

1

SOURCE INFORMATION

ENTERED EMIS. TOTAL

RATE (G/SEC, EMISSION WIND

G/SEC/M OR RATE SPEED X1 Y1 X2 Y2 HEIGHT WIDTH

TYPE G/SEC/M**2) (G/SEC) FAC. (M) (M) (M) (M) (M) (M)

---- --------------- ---------- ------ ------- -------- ------- -------- ------- -------

2 0.000003680 0.00901 0.000 24600. 16819. 25384. 14499. 0.50 10.00

2 0.000022900 0.01633 0.000 25384. 14499. 25858. 13966. 0.50 10.00

2 0.000022900 0.07475 0.000 23858. 13966. 20594. 13918. 0.50 10.00

2 0.000022900 0.05576 0.000 20594. 13918. 20654. 11484. 0.50 10.00

2 0.000003350 0.00647 0.000 19635. 13387. 19889. 11473. 0.50 10.00

2 0.000003350 0.00256 0.000 19889. 11473. 20654. 11484. 0.50 10.00

2 0.000013200 0.01509 0.000 19804. 10719. 20654. 11484. 0.50 10.00

2 0.000002430 0.00544 0.000 18169. 9188. 19804. 10719. 0.50 10.00

2 0.000010700 0.01119 0.000 20769. 10317. 19804. 10719. 0.50 10.00

Page 13: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-13

2 0.000002430 0.00664 0.000 15873. 10668. 18169. 9188. 0.50 10.00

2 0.000002430 0.00187 0.000 15325. 10125. 15873. 10668. 0.50 10.00

2 0.000008610 0.01471 0.000 27315. 13784. 25847. 14659. 0.50 10.00

2 0.000003740 0.00766 0.000 25949. 12258. 27315. 13784. 0.50 10.00

2 0.000004860 0.01890 0.000 29822. 10811. 27315. 13784. 0.50 10.00

2 0.000004860 0.02196 0.000 26746. 7502. 29822. 10811. 0.50 10.00

2 0.000002950 0.00594 0.000 24986. 8478. 26746. 7502. 0.50 10.00

2 0.000002950 0.00551 0.000 24361. 6717. 24986. 8478. 0.50 10.00

2 0.000001900 0.00132 0.000 27179. 6962. 26746. 7502. 0.50 10.00

2 0.000001900 0.00117 0.000 26710. 6566. 27179. 6962. 0.50 10.00

2 0.000001900 0.00475 0.000 28359. 4687. 26710. 6566. 0.50 10.00

2 0.000001900 0.00093 0.000 28756. 4970. 28359. 4687. 0.50 10.00

2 0.000001900 0.00156 0.000 28257. 4316. 28756. 4970. 0.50 10.00

2 0.000007620 0.01522 0.000 30807. 8405. 32446. 7263. 0.50 10.00

2 0.000005650 0.01400 0.000 33405. 4978. 32446. 7263. 0.50 10.00

2 0.000005650 0.01595 0.000 31590. 2816. 33405. 4978. 0.50 10.00

2 0.000011300 0.01709 0.000 32446. 7263. 33588. 8255. 0.50 10.00

2 0.000008610 0.00422 0.000 25847. 14659. 25384. 14499. 0.50 10.00

2 0.000007030 0.00198 0.000 22195. 12080. 22246. 11803. 0.50 10.00

2 0.000007030 0.01159 0.000 22246. 11803. 20638. 12168. 0.50 10.00

2 0.000019300 0.01320 0.000 20638. 12168. 20654. 11484. 0.50 10.00

3 0.000001390 0.01390 0.000 24600. 16819. 100. 100. 5.00 0.00

3 0.000000921 0.00921 0.000 15325. 10125. 100. 100. 5.00 0.00

3 0.000001260 0.01260 0.000 19635. 13387. 100. 100. 5.00 0.00

3 0.000001410 0.01410 0.000 25949. 12258. 100. 100. 5.00 0.00

3 0.000002660 0.02660 0.000 22195. 12080. 100. 100. 5.00 0.00

3 0.000004080 0.04080 0.000 20769. 10317. 100. 100. 5.00 0.00

3 0.000001120 0.01120 0.000 24361. 6717. 100. 100. 5.00 0.00

3 0.000000722 0.00722 0.000 28257. 4316. 100. 100. 5.00 0.00

3 0.000002140 0.02140 0.000 31590. 2816. 100. 100. 5.00 0.00

3 0.000002880 0.02880 0.000 30807. 8405. 100. 100. 5.00 0.00

3 0.000013500 1.35000 0.000 20654. 11484. 1000. 100. 5.00 0.00

3 0.000005030 0.50300 0.000 33588. 8255. 1000. 100. 5.00 0.00

===========

TOTAL EMISSIONS 2.42161

1

1 HOUR AVERAGE FOR HOUR ENDING 1

Page 14: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-14

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 33.381) ( 22377., 13021., 0.096)

( 21123., 9143., 2.137) ( 24484., 10775., 0.034) ( 22614., 8505., 0.574)

( 24910., 8836., 0.024) ( 27941., 10254., 0.032) ( 27729., 5939., 0.023)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 1

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 0.971) ( 22377., 13021., 0.001)

( 21123., 9143., 0.025) ( 24484., 10775., 0.000) ( 22614., 8505., 0.006)

( 24910., 8836., 0.000) ( 27941., 10254., 0.000) ( 27729., 5939., 0.000)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 2

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 22.400) ( 22377., 13021., 0.033)

( 21123., 9143., 0.506) ( 24484., 10775., 0.007) ( 22614., 8505., 0.201)

( 24910., 8836., 0.005) ( 27941., 10254., 0.007) ( 27729., 5939., 0.009)

( 16034., 6389., 0.001) (

1

1 HOUR AVERAGE FOR HOUR ENDING 2

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 1.988) ( 22377., 13021., 0.001)

( 21123., 9143., 0.028) ( 24484., 10775., 0.000) ( 22614., 8505., 0.011)

( 24910., 8836., 0.000) ( 27941., 10254., 0.000) ( 27729., 5939., 0.000)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 3

CONCENTRATIONS IN MICROGRAMS/M**3

Page 15: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-15

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 25.895) ( 22377., 13021., 0.030)

( 21123., 9143., 0.014) ( 24484., 10775., 0.011) ( 22614., 8505., 0.168)

( 24910., 8836., 0.069) ( 27941., 10254., 0.009) ( 27729., 5939., 0.067)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 3

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 2.589) ( 22377., 13021., 0.002)

( 21123., 9143., 0.001) ( 24484., 10775., 0.001) ( 22614., 8505., 0.013)

( 24910., 8836., 0.005) ( 27941., 10254., 0.001) ( 27729., 5939., 0.006)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 4

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 33.016) ( 22377., 13021., 0.044)

( 21123., 9143., 0.009) ( 24484., 10775., 0.014) ( 22614., 8505., 0.233)

( 24910., 8836., 0.069) ( 27941., 10254., 0.018) ( 27729., 5939., 0.083)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 4

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 3.262) ( 22377., 13021., 0.002)

( 21123., 9143., 0.000) ( 24484., 10775., 0.000) ( 22614., 8505., 0.008)

( 24910., 8836., 0.002) ( 27941., 10254., 0.001) ( 27729., 5939., 0.002)

( 16034., 6389., 0.000) (

1

24 HOUR AVERAGE FOR HOUR ENDING 24

CONCENTRATIONS IN MICROGRAMS/M**3

Page 16: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-16

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.001)

( 18803., 10751., 0.050) ( 20933., 11366., 28.495) ( 22377., 13021., 0.200)

( 21123., 9143., 0.155) ( 24484., 10775., 0.134) ( 22614., 8505., 0.091)

( 24910., 8836., 0.028) ( 27941., 10254., 0.022) ( 27729., 5939., 0.024)

( 16034., 6389., 0.423) (

1

24 HOUR AVERAGE FOR HOUR ENDING 24

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.001) ( 20933., 11366., 1.354) ( 22377., 13021., 0.009)

( 21123., 9143., 0.003) ( 24484., 10775., 0.002) ( 22614., 8505., 0.002)

( 24910., 8836., 0.001) ( 27941., 10254., 0.001) ( 27729., 5939., 0.001)

( 16034., 6389., 0.003) (

RUN TITLE:

AIR QUALITY IMPACT PREDICTION FOR CLUSTER 11 FUTURE A SCENARIO

INPUT FILE NAME: futre111.IN

OUTPUT FILE NAME: futre111.OUT

PLOT OUTPUT WRITTEN TO FILE NAME: futre111.DAT

CONVERGENCE OPTION 1=OFF, 2=ON 1

MET OPTION SWITCH, 1=CARDS, 2=PREPROCESSED 1

PLOT FILE OUTPUT, 1=NO, 2=YES 2

MET DATA PRINT SWITCH, 1=NO, 2=YES 1

POST-PROCESSOR OUTPUT, 1=NO, 2=YES 1

DEP. VEL./GRAV. SETL. VEL., 1=DEFAULT, 2=USER 1

PRINT 1-HOUR AVERAGE CONCEN, 1=NO, 2=YES 2

PRINT 3-HOUR AVERAGE CONCEN, 1=NO, 2=YES 1

PRINT 8-HOUR AVERAGE CONCEN, 1=NO, 2=YES 1

PRINT 24-HOUR AVERAGE CONCEN, 1=NO, 2=YES 2

PRINT LONG-TERM AVERAGE CONCEN, 1=NO, 2=YES 1

NUMBER OF SOURCES PROCESSED 52

NUMBER OF RECEPTORS PROCESSED 13

NUMBER OF PARTICLE SIZE CLASSES 5

Page 17: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-17

NUMBER OF HOURS OF MET DATA PROCESSED 24

LENGTH IN MINUTES OF 1-HOUR OF MET DATA 60.

ROUGHNESS LENGTH IN CM 1.00

SCALING FACTOR FOR SOURCE AND RECPTORS 1.0000

PARTICLE DENSITY IN G/CM**3 2.20

GENERAL PARTICLE SIZE CLASS INFORMATION

GRAV. FRACTION

PARTICLE CHAR. SETTLING DEPOSITION IN EACH

SIZE DIA. VELOCITY VELOCITY SIZE

CLASS (UM) (M/SEC) (M/SEC) CLASS

----- --------- -------- ---------- --------

1 1.0000000 ** ** 0.0300

2 6.2000000 ** ** 0.1800

3 12.5000000 ** ** 0.1200

4 21.1000000 ** ** 0.2200

5 65.0000000 ** ** 0.4500

----------

** COMPUTED BY FDM

1

RECEPTOR COORDINATES (X,Y,Z)

( 21671., 16540., 0.) ( 14565., 12950., 0.) ( 15796., 11177., 0.)

( 18803., 10751., 0.) ( 20933., 11366., 0.) ( 22377., 13021., 0.)

( 21123., 9143., 0.) ( 24484., 10775., 0.) ( 22614., 8505., 0.)

( 24910., 8836., 0.) ( 27941., 10254., 0.) ( 27729., 5939., 0.)

( 16034., 6389., 0.) (

1

SOURCE INFORMATION

ENTERED EMIS. TOTAL

RATE (G/SEC, EMISSION WIND

G/SEC/M OR RATE SPEED X1 Y1 X2 Y2 HEIGHT WIDTH

Page 18: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-18

TYPE G/SEC/M**2) (G/SEC) FAC. (M) (M) (M) (M) (M) (M)

---- --------------- ---------- ------ ------- -------- ------- -------- ------- -------

2 0.000003680 0.00901 0.000 24600. 16819. 25384. 14499. 0.50 10.00

2 0.000020400 0.01455 0.000 25384. 14499. 25858. 13966. 0.50 10.00

2 0.000020400 0.06659 0.000 23858. 13966. 20594. 13918. 0.50 10.00

2 0.000020400 0.04967 0.000 20594. 13918. 20654. 11484. 0.50 10.00

2 0.000003350 0.00647 0.000 19635. 13387. 19889. 11473. 0.50 10.00

2 0.000003350 0.00256 0.000 19889. 11473. 20654. 11484. 0.50 10.00

2 0.000028900 0.03305 0.000 19804. 10719. 20654. 11484. 0.50 10.00

2 0.000002780 0.00623 0.000 18169. 9188. 19804. 10719. 0.50 10.00

2 0.000010700 0.01119 0.000 20769. 10317. 19804. 10719. 0.50 10.00

2 0.000002780 0.00759 0.000 15873. 10668. 18169. 9188. 0.50 10.00

2 0.000002780 0.00214 0.000 15325. 10125. 15873. 10668. 0.50 10.00

2 0.000016700 0.02854 0.000 27315. 13784. 25847. 14659. 0.50 10.00

2 0.000003740 0.00766 0.000 25949. 12258. 27315. 13784. 0.50 10.00

2 0.000001630 0.00634 0.000 29822. 10811. 27315. 13784. 0.50 10.00

2 0.000004860 0.02196 0.000 26746. 7502. 29822. 10811. 0.50 10.00

2 0.000002950 0.00594 0.000 24986. 8478. 26746. 7502. 0.50 10.00

2 0.000002950 0.00551 0.000 24361. 6717. 24986. 8478. 0.50 10.00

2 0.000001900 0.00132 0.000 27179. 6962. 26746. 7502. 0.50 10.00

2 0.000001900 0.00117 0.000 26710. 6566. 27179. 6962. 0.50 10.00

2 0.000001900 0.00475 0.000 28359. 4687. 26710. 6566. 0.50 10.00

2 0.000001900 0.00093 0.000 28756. 4970. 28359. 4687. 0.50 10.00

2 0.000001900 0.00156 0.000 28257. 4316. 28756. 4970. 0.50 10.00

2 0.000007620 0.01981 0.000 30807. 8405. 29822. 10811. 0.50 10.00

2 0.000032800 0.01540 0.000 29448. 14171. 29276. 13734. 0.50 10.00

2 0.000005650 0.02011 0.000 31590. 2816. 28756. 4970. 0.50 10.00

2 0.000001510 0.00125 0.000 30651. 10772. 29822. 10811. 0.50 10.00

2 0.000020000 0.00980 0.000 25847. 14659. 25384. 14499. 0.50 10.00

2 0.000070300 0.01980 0.000 22195. 12080. 22246. 11803. 0.50 10.00

2 0.000070300 0.11592 0.000 22246. 11803. 20638. 12168. 0.50 10.00

2 0.000052200 0.03571 0.000 20638. 12168. 20654. 11484. 0.50 10.00

2 0.000002560 0.00260 0.000 13036. 10323. 13722. 9572. 0.50 10.00

2 0.000003080 0.00522 0.000 13722. 9572. 15325. 10125. 0.50 10.00

2 0.000049300 0.09341 0.000 10025. 7901. 11509. 9079. 0.50 10.00

2 0.000049300 0.10589 0.000 11509. 9079. 13654. 8968. 0.50 10.00

2 0.000049300 0.02997 0.000 13654. 8968. 13722. 9572. 0.50 10.00

Page 19: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-19

2 0.000032800 0.08802 0.000 29276. 13734. 26891. 14964. 0.50 10.00

2 0.000032800 0.03567 0.000 26891. 14964. 25847. 14659. 0.50 10.00

3 0.000001390 0.01390 0.000 24600. 16819. 100. 100. 5.00 0.00

3 0.000000921 0.00921 0.000 15325. 10125. 100. 100. 5.00 0.00

3 0.000001260 0.01260 0.000 19635. 13387. 100. 100. 5.00 0.00

3 0.000001410 0.01410 0.000 25949. 12258. 100. 100. 5.00 0.00

3 0.000002660 0.02660 0.000 22195. 12080. 100. 100. 5.00 0.00

3 0.000004080 0.04080 0.000 20769. 10317. 100. 100. 5.00 0.00

3 0.000001120 0.01120 0.000 24361. 6717. 100. 100. 5.00 0.00

3 0.000000722 0.00722 0.000 28257. 4316. 100. 100. 5.00 0.00

3 0.000002140 0.02140 0.000 31590. 2816. 100. 100. 5.00 0.00

3 0.000002880 0.02880 0.000 30807. 8405. 100. 100. 5.00 0.00

3 0.000002040 0.20400 0.000 20654. 11484. 1000. 100. 5.00 0.00

3 0.000018200 4.55000 0.000 29448. 14171. 500. 500. 5.00 0.00

3 0.000026800 13.13200 0.000 10025. 7901. 700. 700. 5.00 0.00

3 0.000106000 254.40000 0.000 13036. 10323. 4000. 600. 5.00 0.00

3 0.000022400 9.40800 0.000 30651. 10772. 700. 600. 5.00 0.00

===========

TOTAL EMISSIONS 282.77310

1

1 HOUR AVERAGE FOR HOUR ENDING 1

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 5.920) ( 22377., 13021., 0.085)

( 21123., 9143., 0.735) ( 24484., 10775., 0.031) ( 22614., 8505., 0.243)

( 24910., 8836., 0.021) ( 27941., 10254., 0.074) ( 27729., 5939., 0.023)

( 16034., 6389., 100.902) (

1

1 HOUR AVERAGE FOR HOUR ENDING 1

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 0.156) ( 22377., 13021., 0.001)

( 21123., 9143., 0.009) ( 24484., 10775., 0.000) ( 22614., 8505., 0.002)

( 24910., 8836., 0.000) ( 27941., 10254., 0.001) ( 27729., 5939., 0.000)

( 16034., 6389., 1.046) (

Page 20: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-20

1

1 HOUR AVERAGE FOR HOUR ENDING 2

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 3.686) ( 22377., 13021., 0.029)

( 21123., 9143., 0.182) ( 24484., 10775., 0.006) ( 22614., 8505., 0.062)

( 24910., 8836., 0.005) ( 27941., 10254., 0.014) ( 27729., 5939., 0.010)

( 16034., 6389., 16.786) (

1

1 HOUR AVERAGE FOR HOUR ENDING 2

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 0.313) ( 22377., 13021., 0.001)

( 21123., 9143., 0.010) ( 24484., 10775., 0.000) ( 22614., 8505., 0.003)

( 24910., 8836., 0.000) ( 27941., 10254., 0.001) ( 27729., 5939., 0.000)

( 16034., 6389., 0.922) (

1

1 HOUR AVERAGE FOR HOUR ENDING 3

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 4.256) ( 22377., 13021., 0.027)

( 21123., 9143., 0.012) ( 24484., 10775., 0.013) ( 22614., 8505., 0.055)

( 24910., 8836., 0.037) ( 27941., 10254., 0.009) ( 27729., 5939., 0.033)

( 16034., 6389., 14.828) (

1

1 HOUR AVERAGE FOR HOUR ENDING 3

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 0.413) ( 22377., 13021., 0.002)

( 21123., 9143., 0.001) ( 24484., 10775., 0.001) ( 22614., 8505., 0.004)

( 24910., 8836., 0.003) ( 27941., 10254., 0.001) ( 27729., 5939., 0.003)

( 16034., 6389., 1.154) (

1

Page 21: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-21

1 HOUR AVERAGE FOR HOUR ENDING 4

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 5.431) ( 22377., 13021., 0.039)

( 21123., 9143., 0.012) ( 24484., 10775., 0.013) ( 22614., 8505., 0.093)

( 24910., 8836., 0.064) ( 27941., 10254., 0.017) ( 27729., 5939., 0.041)

( 16034., 6389., 27.899) (

1

1 HOUR AVERAGE FOR HOUR ENDING 4

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 0.511) ( 22377., 13021., 0.001)

( 21123., 9143., 0.000) ( 24484., 10775., 0.000) ( 22614., 8505., 0.003)

( 24910., 8836., 0.002) ( 27941., 10254., 0.001) ( 27729., 5939., 0.001)

( 16034., 6389., 0.897) (

1

24 HOUR AVERAGE FOR HOUR ENDING 24

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 5.171) ( 15796., 11177., 11.913)

( 18803., 10751., 9.119) ( 20933., 11366., 60.581) ( 22377., 13021., 1.149)

( 21123., 9143., 1.727) ( 24484., 10775., 3.680) ( 22614., 8505., 0.923)

( 24910., 8836., 1.377) ( 27941., 10254., 2.649) ( 27729., 5939., 0.587)

( 16034., 6389., 12.955) (

1

24 HOUR AVERAGE FOR HOUR ENDING 24

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.130) ( 14565., 12950., 0.353) ( 15796., 11177., 0.735)

( 18803., 10751., 0.290) ( 20933., 11366., 0.277) ( 22377., 13021., 0.007)

( 21123., 9143., 0.060) ( 24484., 10775., 0.097) ( 22614., 8505., 0.033)

( 24910., 8836., 0.037) ( 27941., 10254., 0.067) ( 27729., 5939., 0.026)

( 16034., 6389., 0.286) (

RUN TITLE:

Page 22: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-22

AIR QUALITY IMPACT PREDICTION FOR CLUSTER 11 FUTURE B SCENARIO

INPUT FILE NAME: futre112.IN

OUTPUT FILE NAME: futre112.OUT

PLOT OUTPUT WRITTEN TO FILE NAME: futre112.DAT

CONVERGENCE OPTION 1=OFF, 2=ON 1

MET OPTION SWITCH, 1=CARDS, 2=PREPROCESSED 1

PLOT FILE OUTPUT, 1=NO, 2=YES 2

MET DATA PRINT SWITCH, 1=NO, 2=YES 1

POST-PROCESSOR OUTPUT, 1=NO, 2=YES 1

DEP. VEL./GRAV. SETL. VEL., 1=DEFAULT, 2=USER 1

PRINT 1-HOUR AVERAGE CONCEN, 1=NO, 2=YES 2

PRINT 3-HOUR AVERAGE CONCEN, 1=NO, 2=YES 1

PRINT 8-HOUR AVERAGE CONCEN, 1=NO, 2=YES 1

PRINT 24-HOUR AVERAGE CONCEN, 1=NO, 2=YES 2

PRINT LONG-TERM AVERAGE CONCEN, 1=NO, 2=YES 1

NUMBER OF SOURCES PROCESSED 40

NUMBER OF RECEPTORS PROCESSED 13

NUMBER OF PARTICLE SIZE CLASSES 5

NUMBER OF HOURS OF MET DATA PROCESSED 24

LENGTH IN MINUTES OF 1-HOUR OF MET DATA 60.

ROUGHNESS LENGTH IN CM 1.00

SCALING FACTOR FOR SOURCE AND RECPTORS 1.0000

PARTICLE DENSITY IN G/CM**3 2.20

GENERAL PARTICLE SIZE CLASS INFORMATION

GRAV. FRACTION

PARTICLE CHAR. SETTLING DEPOSITION IN EACH

SIZE DIA. VELOCITY VELOCITY SIZE

CLASS (UM) (M/SEC) (M/SEC) CLASS

----- --------- -------- ---------- --------

1 1.0000000 ** ** 0.0300

2 6.2000000 ** ** 0.1800

Page 23: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-23

3 12.5000000 ** ** 0.1200

4 21.1000000 ** ** 0.2200

5 65.0000000 ** ** 0.4500

----------

** COMPUTED BY FDM

1

RECEPTOR COORDINATES (X,Y,Z)

( 21671., 16540., 0.) ( 14565., 12950., 0.) ( 15796., 11177., 0.)

( 18803., 10751., 0.) ( 20933., 11366., 0.) ( 22377., 13021., 0.)

( 21123., 9143., 0.) ( 24484., 10775., 0.) ( 22614., 8505., 0.)

( 24910., 8836., 0.) ( 27941., 10254., 0.) ( 27729., 5939., 0.)

( 16034., 6389., 0.) (

1

SOURCE INFORMATION

ENTERED EMIS. TOTAL

RATE (G/SEC, EMISSION WIND

G/SEC/M OR RATE SPEED X1 Y1 X2 Y2 HEIGHT WIDTH

TYPE G/SEC/M**2) (G/SEC) FAC. (M) (M) (M) (M) (M) (M)

---- --------------- ---------- ------ ------- -------- ------- -------- ------- -------

2 0.000051200 0.12538 0.000 24600. 16819. 25384. 14499. 0.50 10.00

2 0.000145000 0.10343 0.000 25384. 14499. 25858. 13966. 0.50 10.00

2 0.000145000 0.47333 0.000 23858. 13966. 20594. 13918. 0.50 10.00

2 0.000145000 0.35304 0.000 20594. 13918. 20654. 11484. 0.50 10.00

2 0.000011100 0.02143 0.000 19635. 13387. 19889. 11473. 0.50 10.00

2 0.000011100 0.00849 0.000 19889. 11473. 20654. 11484. 0.50 10.00

2 0.000029500 0.03373 0.000 19804. 10719. 20654. 11484. 0.50 10.00

2 0.000009200 0.02061 0.000 18169. 9188. 19804. 10719. 0.50 10.00

2 0.000020300 0.02122 0.000 20769. 10317. 19804. 10719. 0.50 10.00

2 0.000009200 0.02513 0.000 15873. 10668. 18169. 9188. 0.50 10.00

2 0.000009200 0.00710 0.000 15325. 10125. 15873. 10668. 0.50 10.00

2 0.000093900 0.16047 0.000 27315. 13784. 25847. 14659. 0.50 10.00

2 0.000134000 0.52112 0.000 29822. 10811. 27315. 13784. 0.50 10.00

2 0.000047100 0.21279 0.000 26746. 7502. 29822. 10811. 0.50 10.00

Page 24: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-24

2 0.000001740 0.00350 0.000 24986. 8478. 26746. 7502. 0.50 10.00

2 0.000001740 0.00325 0.000 24361. 6717. 24986. 8478. 0.50 10.00

2 0.000045300 0.03135 0.000 27179. 6962. 26746. 7502. 0.50 10.00

2 0.000045300 0.02781 0.000 26710. 6566. 27179. 6962. 0.50 10.00

2 0.000045300 0.11325 0.000 28359. 4687. 26710. 6566. 0.50 10.00

2 0.000045300 0.02209 0.000 28756. 4970. 28359. 4687. 0.50 10.00

2 0.000019700 0.01621 0.000 28257. 4316. 28756. 4970. 0.50 10.00

2 0.000087400 0.17459 0.000 30807. 8405. 32446. 7263. 0.50 10.00

2 0.000025600 0.09113 0.000 31590. 2816. 28756. 4970. 0.50 10.00

2 0.000093900 0.04600 0.000 25847. 14659. 25384. 14499. 0.50 10.00

2 0.000065100 0.01834 0.000 22195. 12080. 22246. 11803. 0.50 10.00

2 0.000065100 0.10734 0.000 22246. 11803. 20638. 12168. 0.50 10.00

2 0.000210000 0.14409 0.000 20639. 12170. 20654. 11484. 0.50 10.00

2 0.000019700 0.03079 0.000 15292. 15694. 14850. 14195. 0.50 10.00

2 0.000019700 0.11329 0.000 14850. 14195. 20594. 13918. 0.50 10.00

3 0.000019400 0.19400 0.000 24600. 16819. 100. 100. 5.00 0.00

3 0.000003480 0.03480 0.000 15325. 10125. 100. 100. 5.00 0.00

3 0.000004230 0.04230 0.000 19635. 13387. 100. 100. 5.00 0.00

3 0.000024600 0.24600 0.000 22195. 12080. 100. 100. 5.00 0.00

3 0.000007710 0.07710 0.000 20769. 10317. 100. 100. 5.00 0.00

3 0.000001740 0.01740 0.000 24361. 6717. 100. 100. 5.00 0.00

3 0.000007470 0.07470 0.000 28257. 4316. 100. 100. 5.00 0.00

3 0.000009710 0.09710 0.000 31590. 2816. 100. 100. 5.00 0.00

3 0.000033100 0.33100 0.000 30807. 8405. 100. 100. 5.00 0.00

3 0.000007470 0.07470 0.000 15292. 15694. 100. 100. 5.00 0.00

3 0.000011900 1.19000 0.000 20654. 11484. 1000. 100. 5.00 0.00

===========

TOTAL EMISSIONS 5.40940

1

1 HOUR AVERAGE FOR HOUR ENDING 1

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.009)

( 18803., 10751., 0.029) ( 20933., 11366., 33.361) ( 22377., 13021., 0.607)

( 21123., 9143., 2.425) ( 24484., 10775., 0.217) ( 22614., 8505., 0.932)

( 24910., 8836., 0.151) ( 27941., 10254., 0.290) ( 27729., 5939., 0.244)

( 16034., 6389., 0.001) (

Page 25: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-25

1

1 HOUR AVERAGE FOR HOUR ENDING 1

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 0.899) ( 22377., 13021., 0.006)

( 21123., 9143., 0.029) ( 24484., 10775., 0.002) ( 22614., 8505., 0.009)

( 24910., 8836., 0.001) ( 27941., 10254., 0.002) ( 27729., 5939., 0.002)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 2

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.007)

( 18803., 10751., 0.009) ( 20933., 11366., 21.034) ( 22377., 13021., 0.208)

( 21123., 9143., 0.609) ( 24484., 10775., 0.043) ( 22614., 8505., 0.270)

( 24910., 8836., 0.033) ( 27941., 10254., 0.060) ( 27729., 5939., 0.098)

( 16034., 6389., 0.004) (

1

1 HOUR AVERAGE FOR HOUR ENDING 2

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 1.808) ( 22377., 13021., 0.009)

( 21123., 9143., 0.033) ( 24484., 10775., 0.002) ( 22614., 8505., 0.014)

( 24910., 8836., 0.002) ( 27941., 10254., 0.003) ( 27729., 5939., 0.005)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 3

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.010) ( 20933., 11366., 24.457) ( 22377., 13021., 0.190)

( 21123., 9143., 0.033) ( 24484., 10775., 0.079) ( 22614., 8505., 0.200)

( 24910., 8836., 0.151) ( 27941., 10254., 0.021) ( 27729., 5939., 0.185)

( 16034., 6389., 0.000) (

1

Page 26: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-26

1 HOUR AVERAGE FOR HOUR ENDING 3

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.001) ( 20933., 11366., 2.387) ( 22377., 13021., 0.013)

( 21123., 9143., 0.002) ( 24484., 10775., 0.006) ( 22614., 8505., 0.015)

( 24910., 8836., 0.011) ( 27941., 10254., 0.001) ( 27729., 5939., 0.014)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 4

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.017) ( 20933., 11366., 31.226) ( 22377., 13021., 0.278)

( 21123., 9143., 0.036) ( 24484., 10775., 0.092) ( 22614., 8505., 0.290)

( 24910., 8836., 0.228) ( 27941., 10254., 0.022) ( 27729., 5939., 0.228)

( 16034., 6389., 0.000) (

1

1 HOUR AVERAGE FOR HOUR ENDING 4

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.000) ( 20933., 11366., 2.964) ( 22377., 13021., 0.010)

( 21123., 9143., 0.001) ( 24484., 10775., 0.003) ( 22614., 8505., 0.010)

( 24910., 8836., 0.007) ( 27941., 10254., 0.001) ( 27729., 5939., 0.007)

( 16034., 6389., 0.000) (

1

24 HOUR AVERAGE FOR HOUR ENDING 24

CONCENTRATIONS IN MICROGRAMS/M**3

( 21671., 16540., 0.000) ( 14565., 12950., 0.025) ( 15796., 11177., 0.015)

( 18803., 10751., 0.326) ( 20933., 11366., 32.149) ( 22377., 13021., 0.949)

( 21123., 9143., 1.572) ( 24484., 10775., 3.546) ( 22614., 8505., 0.162)

( 24910., 8836., 0.120) ( 27941., 10254., 0.167) (27729., 5939., 0.165)

( 16034., 6389., 0.502) (

1

24 HOUR AVERAGE FOR HOUR ENDING 24

Page 27: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-27

DEPOSITION RATE IN MICROGRAMS/M**2/SEC

( 21671., 16540., 0.000) ( 14565., 12950., 0.000) ( 15796., 11177., 0.000)

( 18803., 10751., 0.003) ( 20933., 11366., 1.222) ( 22377., 13021., 0.015)

( 21123., 9143., 0.004) ( 24484., 10775., 0.004) ( 22614., 8505., 0.003)

( 24910., 8836., 0.003) ( 27941., 10254., 0.002) ( 27729., 5939., 0.007)

( 16034., 6389., 0.004) (

Page 28: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-28

4.1.6 Comparison of TSP Concentrations at defined Receptors (baseline

stations) for the three Scenarios

The contribution of TSPM and PM10 (considering 35% of TSPM as PM10) at the

receptors from mining activities as brought out by the modeling exercises for the three

scenarios as above are tabulated and compared as under –

SI.No.

Location Name Locati

on Code

Remarks A B C

TSPM PM10 TSPM PM10 TSPM PM10

Core Zone

1. Krishnanagar, Mine Office

A2 500 m from Mine Pit top 0.00 0.00 5.17 1.81 0.03 0.01

2. New Kenda, Mine Office

A3 -do- 0.00 0.00 11.91 4.17 0.02 0.01

3. Lower Kenda, Sub. Office

A4 -do- 0.05 0.02 9.12 3.19 0.33 0.11

4. Chora Pit Mine Office

A5 -do- 28.50 9.97 60.58 21.20 32.15 11.25

5. Haripur, Sub. Office

A6 -do- 0.20 0.07 1.15 0.40 0.57 0.20

6. Bahula, Mine Office

A7 -do- 0.16 0.05 1.73 0.60 0.22 0.08

7. Chora UG, Mine Office

A8 -do- 0.13 0.05 3.68 1.29 0.15 0.05

8. C.L. Jambad UG, Mine Office

A9 -do- 0.09 0.03 0.92 0.32 0.16 0.06

9. Siduli, Agent Office

A10 -do- 0.03 0.01 1.38 0.48 0.12 0.04

10. Shankarpur UG, Mine Office

A11 -do- 0.02 0.01 2.65 0.93 0.17 0.06

11. Khandra, Mine Office

A12 -do- 0.02 0.01 0.59 0.21 0.17 0.06

Buffer Zone

12. Chinchuria A1

Kept as Control Station Habitation at a distance of 3.0 km towards NE of operating mine area

0.00 0.00 0.00 0.00 0.00 0.00

13. Beniyadidanga A13

Habitation at a distance of 4.0 km distance from the mine towards SW direction

0.42 0.15 12.96 4.35 0.50 0.18

The above receptors (baseline stations) have been shown in Plate – 8.

Page 29: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

CMPDI EIA/EMP OF CLUSTER - XI

IV-29

Predicted impact of mining activities on ambient air quality (PM10 Concentrations) at

the receptors are tabulated as below –

Name of Station

Category Existing PM10 Concentrations

(98th Percentile)

Incremental PM10 Concentrations

Resultant PM10 Concentrations

MoEF Standards (GSR 742 (E)) for old coalfields

During operation

of OC patches

After exhaustion

of OC patches

During operation

of OC patches

After exhaustion

of OC patches

Core Zone

300

Krishnanagar, Mine Office

I 94.0

1.81 0.01 95.81 94.01

New Kenda, Mine Office

I 120.5

4.17 0.01 124.67 120.51

Lower Kenda, Sub. Office

I 121.2

3.17 0.09 124.37 121.29

Chora Pit Mine Office

I 121.2

11.23 1.28 132.43 122.48

Haripur, Sub. Office

I 121.2

0.33 0.13 121.53 121.33

Bahula, Mine Office

I 121.2

0.55 0.03 121.75 121.23

Chora UG, Mine Office

I 121.2

1.24 0.00 122.44 121.2

C.L. Jambad UG, Mine Office

I 121.2

0.29 0.03 121.49 121.23

Siduli, Agent Office

I 119.0

0.47 0.03 119.47 119.03

Shankarpur UG, Mine Office

I 119.6

0.92 0.05 120.52 119.65

Khandra, Mine Office

I 122.0

0.20 0.05 122.2 122.05

Buffer Zone

100 Chinchuria R 88.8 0.00 0.00 88.8 88.8

Beniyadidanga R 91.8 0.05 1.52 91.85 93.32

4.1.7 Observations from the Impact Prediction Exercise

It can be observed that the present mining activities have an almost insignificant

contribution to the pollution load of the cluster. However, as anticipated, there will be an

appreciable impact at some of the industrial category locations during the operation of

Page 30: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-30

CMPDI EIA/EMP OF CLUSTER - XI

the OC patches at peak capacity for a brief period. Nevertheless, after exhaustion of

these patches, the contribution of air pollutants from UG mining activities will be less

and the level of pollutants well below the permissible limits although production from the

mines is expected to be at much higher level than present although the final coal

transportation distance will increase by around 3.0 km (4.87%) from the present

distance. This increase is mainly due to commencement in operation of Krishnanagar

UG, a closed mine.

4.1.8 Air Pollution Control Measures

For Road Transport of Coal

The following measures will be taken:

Surfacing of all service roads/permanent roads by asphalt.

The metalled roads shall be kept free of potholes, etc.

Regular maintenance of trucks and payloaders to limit emission of harmful

exhaust fumes.

Water will be sprayed on coal transport road at regular intervals. Water mixed with

suitable binders available for the purpose will be sprayed at the rate of 2 litres /

sqm of road, twice a day. Total road area for the coal transport route is 87 Ha

(87000 m X 5 m) during operation of OC patches. Thus, 435 KL water / day will be

required for spraying and, accordingly, 1 to 3 nos. of 10 KL mobile water

sprinklers will be provided at each mine depending on the number of OC patches

to be operated.

Physical removal of dust from the roads.

Avenue plantation along roads will be 15 m wide and raised in three tier fashion.

Wetting of coal before transport.

Transportation of coal from mini CHP to Railway Siding by covered trucks.

For Coal handling at mini CHP and Railway Siding

The following control measures will be adopted during coal handling:

Suppression of coal dust generated during coal loading and unloading operations

at mine and Railway Siding by fine nozzle mounted fixed sprinklers. The

Page 31: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-31

CMPDI EIA/EMP OF CLUSTER - XI

sprinklers will be mist – type such that the diameter of the droplets is equal to the

diameter of the dust particles for effective dust control. One such sprinkler will be

installed at the truck loading point of each of the mine and two nos. for the

ground stockpile. Ten more sprinklers spaced 100m apart would be required at

the railway siding.

Minimization of the height of coal-fall at transfer points to reduce the dust

generation.

Improved maintenance of plant and machinery.

Green belt in 3 tier fashion will be raised around the railway siding to prevent

propagation of dust and noise.

For Fires

(a) At coal stockyards

Limiting the amount of stock by giving close attention to marketing besides

following the "first-in and first-out" sequence.

Attention to the following while stacking of coal:

Proper dimensions of stack (height to be limited to not more than 8m).

Dozing/compaction to make the stock semi-consolidated.

Regular and strict supervision of stacks.

Provision of fire fighting arrangement with supply of adequate quantity of

water at sufficient pressure.

Infusion of nitrogen along with new fire fighting chemicals like 'Soil-

Cement', through perforated pipes laid in the grooves made on the ground

to delay spontaneous heating by reducing/preventing ingress of oxygen or

air into the stack.

(b) At workshops and stores

Proper ventilation system in at workshops and stores.

Fire-fighting equipment

4.3 IMPACT ASSESSMENT & CONTROL MEASURES FOR WATER

Mining is a dynamic phenomenon. The mining activity creates disequilibrium in

environmental scenario of the area and disturbs the groundwater

Page 32: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-32

CMPDI EIA/EMP OF CLUSTER - XI

conditions/regime in particular. The impact on water regime due to mining activity

can be broadly classified as under:

Impact on topography

Impact on surface water and quality

Impact on groundwater and quality

4.3.1 IMPACT ON TOPOGRAPHY

Cluster-XI group of mines of ECL is a group of eleven mines re-organised in

seven groups in the Raniganj Coalfield of the Eastern Coalfield Limited in the

Burdwan District of West Bengal state. Five opencast patches/mines have also

been proposed to extract coal from coal pillars at shallow depth for a limited

period. Pre-mining surface R.L. of the area varies from 90 m to 122 m in the

Cluster-11 core zone.

a) Underground mining: There will be minimum changes in topography during

the underground mining activities for exploitation of coal seams in the study area.

During development, only the topography and soil lying in the immediate vicinity

of mine mouth get affected. Depillaring with caving method may cause some land

degradation and alter the land use pattern of the area but depillaring with

hydraulic sand stowing causes no impact on topography.

The present method of mining is development by Bord & Pillar and depillaring

with hydraulic sand stowing in almost all the underground mines. Depillaring with

caving has not been proposed in any of the underground mines. Subsidence

does not occur during depillaring with hydraulic sand stowing operation. The

depth of depillaring will vary from 100 m (Shankarpur UG) to 266 m (New Kenda

UG) from the surface. Except the vicinity of mine mouth (i.e. Shaft /inclines),

post-mining elevation of the surface will be remained same at the time of mine

closure.

Page 33: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-33

CMPDI EIA/EMP OF CLUSTER - XI

The topography of the area has already been affected during the extraction of

upper seam. No further areas will be brought under subsidence. After completion

of mining activities, the subsided areas, if any, will be graded and planted upon.

Regular monitoring of subsidence movement on the surface over and around the

working area and its impact on natural drainage pattern, water bodies,

vegetation, structures, roads, railways, and surroundings will be continued till

movement ceases completely. If any subsidence is noticed, necessary remedial

measure will be taken up without any delay. Cracks and potholes will be

effectively plugged tightly with soil, mud and non-carbonaceous debris and

regularly dozed so that the topography does not change substantially and

artificial water bodies are not created. Necessary mitigation measures like

levelling and grading of surface are to be taken up. The subsided area will be

brought back to the original land use pattern to the maximum extent possible.

The reclamation of subsided area and subsequent afforestation /Agricultural

activity will be carried out. Effective control measures will be taken so as to

minimize land degradation.

B) Opencast Mining:

A local change in ground topography has already been taken place due to

opencast mining activities in the study area. There are 16 numbers of opencast

OC voids in the lease hold area of New Kenda (9 nos.), Bahula (3 nos.), Siduli (1

no.), Shankarpur (1 no.) and Chora (2 nos) Cluster-11 area created by opencast

mining during pre-nationalization and post-nationalisation periods. The total area

of excavation is 122 Ha. Most of the quarries/voids are very small and are

presently waterlogged and meeting the water requirements of the local

population. It is proposed that the above old voids (abandoned quarries) will be

partly filled up with available OB in the old external dumps and backfilled will be

reclaimed with plantation. The old external dump area after re-handling will be

brought under plantation.

Page 34: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-34

CMPDI EIA/EMP OF CLUSTER - XI

A total of five opencast patches/mines of Cluster-11 i.e. Banbahal OC,

Shankarpur/CL Jambad OC, West Kenda OC, New Kenda OC and Shankarpur

OC due to mining operation such as open pit, embankment, dumps of

overburden and coal, etc. Detail of opencast patches is shown in Table No-4.2.

Table No-4.2 : Details of Opencast patches to be worked in Cluster-XI Area

These opencast mines will further be responsible for changing the topography of

the area. Within the core zone area, cracks and loosening of soils would be

resulted due to mining and associated activities such as drilling, blasting, etc

thereby physical/textural changes would occur in soil/formation. This mine

induced process increases the rate of infiltration and recharge. On the other

hand, soil is more susceptible for changes due to erosion, leaching phenomena/

process, etc. Further the fine dust particles of coal and overburden may

adversely affect the porosity of soils.

The environmental impact will be for a short period only as most of the opencast

patches will be operated for two to four years only except New Kenda OC patch

Sl No

Name of Mine

Area (Ha)

Mineable Reserves

(MT)

Volume of OB to be

generated

(Million M3

)

Peak Capacity

(MTY)

Life in years

1 W Kenda OC Patch/ Mine

49 1.18 7.65 0.75 2

2 New Kenda OC Patch/ Mine

240 22 211 3.90 8

3 Bonbahal OC Patch/ Mine

25 1.1 6.27 0.50 3

4 Shankarpur/CL Jambad OC Patch/ Mine

52 Exhausted and being backfilled

5 Shankarpur OC Patch/mine

42 7.85 34 2.30 4

Total 408 32.13 258.92 7.45

Page 35: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-35

CMPDI EIA/EMP OF CLUSTER - XI

which will run for 8 years. Opencast mining activities will be restricted in 408 Ha

areas out of total leasehold area of 4218 Ha of Cluster-11. This opencast

mine/patch to be operated will be completely filled-up after exhaustion of

reserves and reclaimed with plantation. Total 258.92 Million m3 of overburden

(OB) will be generated from four proposed opencast patches during the life of the

mines. The total OB of the opencast patch/mine is to be dumped internally over

the de-coaled area. The opencast mining area is about 6 to 7 1% of the total

leasehold area of the Cluster-11. Top soil removed from the excavated areas will

be kept in a top-soil dump. After exhaustion of the coal reserves available in

these mines/patches, the quarried out area will be backfilled and the top-soil

enriched with good soil and manure and biologically reclaimed with plantation.

The back-filled area of the opencast patch/mine will be biologically reclaimed with

the help of experts and there will be no further external OB dump.

The back-filled may be a good media for high groundwater recharge due to high

permeability. It may be appropriate to highlight the fact that temporary

groundwater loss/deficit created during active mining stage would be

compensated by these different means in the post mining stage so that the initial

groundwater levels are regained to normalcy at the earliest for utility of the area.

The ground elevation of the Cluster-11 mines ranges from 90 m to 122 m. above

mean sea level (MSL) before mining. Post mining elevation of the surface will be

remained same.

Afforestation and Plantation:

The subsided area developed during underground mining, if any, will be brought

back to the original land use pattern to the maximum extent possible. The

reclamation of subsided area and subsequent afforestation /plantation activity

Page 36: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-36

CMPDI EIA/EMP OF CLUSTER - XI

would be carried out. Effective control measures would be taken so as to

minimize land degradation.

The OB dump will be used to fill up the voids and merged to surrounding

landscape and can be further developed to restore them for agricultural use. The

original land profile can be maintained for post mining land use which can be

restored for agricultural use.

Finally, after the cessation of underground mining activity within the Cluster-11

area, the entire surface land will again be surveyed and any patch of surface

cracks/subsided land, if detected, would be replenished in such a manner that

the entire area attains the natural topography of the area as far as possible. It

would also be ensured that the entire subsided land is afforested by selecting

appropriate species in consultation with State Authorities.

The final voids of opencast mine/patch will be backfilled and biologically

reclaimed. The original land profile can be maintained for post mining land use.

The present plantation area is 170.40 Ha. After the closing of mining activities,

the plantation will be done in the area covering the external waste dump (55

Ha) and Quarry/Excavation area (40 Ha). Plantation will also be done in colliery

infrastructure and built-up area.

Besides above, the Danga land and other areas suitable for plantation shall also

be brought under green cover.

Thus, in this way the final

4.3.2 IMPACT ON SURFACE WATER AND ITS QUALITY

There is no effect in water bodies and the drainage system or run-off in the

underground mining area since the mining activities are taking place at depth

(100 m to 266 m) and also due to exploitation of coal through depillaring with

Page 37: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-37

CMPDI EIA/EMP OF CLUSTER - XI

hydraulic sand stowing to avoid subsidence. Underground mining is being carried

out as per statutes under the streams/nalas flowing within the lease hold

boundary.

A number of ponds, most of which are shallow water reservoirs, are scattered

over the area of Cluster-11. The area is drained by Singaran nala and Tumni

nala and their tributaries. The mining activities will not have any impact on the

drainage system or any surface water bodies in the study area.

The mining area of Cluster-11 is located in the Singaran nala watershed as well

as Tumni nala watershed. Out of total mining area of 42.18 sq. km of this cluster,

27.23 sq. km. mining area falls within Singaran nala watershed and rest of the

mining area (14.95 sq. km) is located in the Tumni nala Watershed. The

watershed /catchments area of Singaran nala and Tumni nala are 169.00 sq. km

and 180.12 sq. km respectively. Special care is to be taken up (sand stowing in

UG mines, Garland drains around OC and Toe-wall around Overburden) to

minimize the impact of mining on watershed. Depillaring operation is being done

with hydraulic sand stowing so that there will be no impact on any type of surface

water bodies. Care is to be taken up during mining activity to leave enough pillars

in underground as barriers below main drainage/water body to avoid any

damage.

Subsidence due to total extraction of coal causes changes in topography and

drainage by developing micro basins, subsidence features, ridges, pot holes etc.

This alters the drainage of the area in micro level. As depillaring with hydraulic

sand stowing is being done in all the mines, so there will be minimum chance of

alteration of drainage in the area.

As mentioned earlier, there would be change in the ground topography,

infiltration capacity or rate of soil formation/erosion and sediment load in

Jore/Nalas due to mining operation resulting in some local change in drainage

Page 38: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-38

CMPDI EIA/EMP OF CLUSTER - XI

pattern and surface run-off in core zone of opencast mine. But opencast mining

activities are restricted in an area of 408 Ha under the leasehold area (4218 Ha)

of Cluster-11. There is no diversion of any nala required in this Cluster of mines.

Mine water is to be collected and passed through sedimentation tank/pond to

arrest the silt. This treated mine water will be utilised for industrial and domestic

requirement of villages and colonies of the mine area and rest of the water after

treatment discharged into local tanks/mine voids to recharge the groundwater

system and for irrigation. The surface run-off from the mine area will be free from

suspended particles and its mixing may not induce any change in the surface

water quality. The surface water quality in the area is satisfactory and its mixing

with surface water may not affect the quality adversely. Thus it will not have any

significant impact on the hydrogeology of the area.

Water pollution may be caused from effluent coming out from the industrial area

due to washing of mining equipments, workshop and fire fighting. The total

industrial effluent will be treated first in grease & oil trap and then in

sedimentation ponds to get the suspended particles settled. Water thus regained

will be re-circulated for its use for industrial purpose. It would be a closed water

circuit; there will not be any industrial effluent discharge from the mine.

No acid mine drainage has been reported in the area. This is proven by pH of the

mine water. Normally, the coal mining activity does not induce any unwanted

chemical or elements into the groundwater affecting the water chemistry except

for total suspended solids (TSS); no serious pollutant has been observed in the

mine water discharge. The analytical results of mine pumping water and surface

water from the Cluster-11 mining area are well within the MOEF standards and

IS: 2296, 1982 for Inland surface water (Class C) respectively.

Page 39: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-39

CMPDI EIA/EMP OF CLUSTER - XI

4.3.3 IMPACT ON GROUNDWATER SYSTEM

Mining is associated with groundwater problems, particularly when it is below

water table. The impact of mining on groundwater is mainly dependent on

parameters of mines and aquifers, groundwater recharge-discharge processes

etc. In both the underground and opencast mining, the unconfined aquifer and

the semi-confined aquifers are get affected due to continuous gravity drainage

and conventional sump pumping or advance dewatering schemes for efficient

and safe working. Cluster-11 consists of eleven underground mines and five

opencast patches.

Impact on aquifer due to caving: With the presence of low permeable beds

such as clay/shale and younger coal seams in the formation laying above the

working seams the water level in the phreatic/top unconfined aquifer has not

been much affected during the development in all the underground mines. The

topography of the area has already been affected during the extraction of upper

seams. No further areas will be brought under subsidence. Presently, depillaring

with hydraulic sand stowing is being done in all the underground mines.

Therefore, subsidence is not expected in the mining area of Cluster-11. As a

result both the phreatic and semi-confined aquifers get least affected except the

mine mouth due to sinking Shaft or inclines. If subsidence (caving) takes place

during mine operation, both the phreatic and semi-confined aquifers get affected.

No further depillaring is to be done through caving method in any of the mines of

this cluster. As there will be no further subsidence in the study area, it is

expected that there will be no depletion of water table.

Impact on aquifer due to mine pumping: Cluster-11 consists of operating

eleven underground mines and five opencast patches, the impact of mining

activity on aquifer is/ will be there due to mine inflow and subsequently mine

pumping.

Page 40: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-40

CMPDI EIA/EMP OF CLUSTER - XI

In both the underground and opencast mines, the different aquifers overlying the

working coal seam would be contributing ground water to the mine by gravity

drainage since they are punctured at the mine. The anticipated average

groundwater inflow of all the mines of Cluster-11 is about 16010 m3/day. As such

due to this pumping /gravity drainage, cone of depression would be formed. The

shape and extent of the cone would depend mainly on hydraulic conductivity and

specific yield of the aquifers, mine depth, area etc. Generally steep drawdown

cone would be formed in low potential aquifers thereby the area of influence is

small distance and reverse is established in respect of aquifers with high

hydraulic conductivity. The individual permeable beds develop individual

drawdown cones and the impact is usually limited to few hundred meters.

However, the Radius of Mine Influence area has been estimated for Cluster-11

mines by using Sichardt‟s formula (R=C×(h-hw)×√k). Based on the aquifer and

mine parameters the radius of mine influence works out considering average

hydraulic conductivity value of 0.01 (semi-confined aquifer) to 0.42 m/day

(unconfined aquifer) at final mine depth is given in Table No- 4.3

Table No-4.3 : Radius of Mine Influence Area

Project/Mine Name

Max. Mine depth (m)

Maximum Mine Inflow (m3/day)

Maximum probable drawdown (m)

Radius of influence (m)

Krishnanagar UG 120 1150 26 240

Haripur UG 240 1350 26 310

Chora Block Incline 180 850 21 190

Chora 7, 9 and 10 pits

240 1200

20 250

New Kenda UG 266 1800 19 225

Lower Kenda UG + OC

220 1300 26 290

Bahula UG 160 1300 20 210

CL Jambad UG 110 850 22 200

Siduli UG 200 1500 23 260

Khandra UG 180 1600 26 280

Shankarpur UG + OC

100 1660 23 200

However the present mine flow of Cluster-11 mines is 11150 m3/day( Table

No.27). Pre-monsoon water level in the core zone varies from 2.90 m to 10.05 m

Page 41: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-41

CMPDI EIA/EMP OF CLUSTER - XI

with an average value of 5.78 m below ground level (b.g.l) in 2013 and post-

monsoon water level varies from 2.25 m to 9.25 m with an average value of 3.90

m (b.g.l) in 2012. It indicates that there is little / no impact on water level noticed

in the core zone at present. It is to be noted that all the mines of these cluster are

being operated for more than 30 to 40 years. The aquifers are getting recharged

by artificial recharge and re-circulated mine discharged water.

It may be appropriate to mention here that the presence of prominent

boundaries/water bodies, faults and also inter-fingering of sandstone and shale

beds may restrict the propagation of drawdown cone. Due to presence of Tumni

nala in the northeast of the cluster and Singaran nala in the southeast of the

cluster, the radius of influence will not be propagating across the river/nala/jore.

With the variation in aquifer/mine geometry, multi-aquifer system, return flow

from mine discharge, abundant recharge, the zone of disturbance will be

reduced. Thus, the propagation of drawdown cone will be limited to a small

distance for a temporary period. Mine induced effect will be noticed near the

mine in the down-dip side and becomes milder/insignificant thereafter. However

the effect is limited or negligible in the up-dip side of the incrop zone due to

shallow mine depth of the area. Only unconfined aquifer is going to be affected

for mining activity to the immediate vicinity of the mine area as the semi-confined

aquifer below is continuously recharged from above unconfined aquifer.

Therefore the drawdown is restricted only within the unconfined aquifer.

The ground water chemistry indicates that the ground water in the area is potable

and does not contain any toxic elements. The underground and opencast mining

activity in the area does not induce any unwanted chemical or elements into the

ground water affecting the water chemistry. The analytical results of ground

water from the Cluster-11 mining are well within the IS: 10500 standards of

drinking water.

Page 42: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-42

CMPDI EIA/EMP OF CLUSTER - XI

4.3.4 WATER HARVESTING & ARTIFICIAL RECHARGE

Coal mining is the major industrial activity in the area. Ground water pumping is

an integral part of coal mining. Besides this, groundwater utilization is mainly for

domestic and irrigation use in the study area.

To minimize the impact of mining on ground water system, the project/mine

authority has been adopting all possible measure to increase the ground water

recharge potential.

The stage of ground water development in the buffer zone (10 km from the

periphery of the core zone) of Cluster-11 comes to about 30.71%. As per the

data collected from the Central Ground Water Board, Kolkata, the stage of

ground water development in the Jamuria Block, Andal-Pandaveswar Block and

Raniganj Block are 4.73%, 3.57% and 5.97% respectively in which Cluster-11

mines and its buffer zone located and the region falls within the “Safe” category.

So, artificial recharge is not urgently required in the buffer zone of the Cluster-11.

However, artificial recharge may be done for more use of ground water for

irrigation augmentation in the study area when the source of water is easily

available for recharging.

Groundwater inflow (16010 m3/day) and mine influence area (maximum 310 m

from the mine edge) have been estimated and the groundwater monitoring would

be undertaken as corrective measure to avoid adverse effects. After meeting the

both industrial and domestic demand of the mines of Cluster-11, the surplus mine

water 2210 m3/day will be supplied to near by villages/Colliery for use of

domestic, irrigation and artificial recharge. Dug wells NKS-3 (Bijpur village), NKS-

4 (Balanpur village), NKS-6A (Ikra village), NKS-46 (Sankarpur), NKS-64

(Madhusudanpur) and many other wells are being recharged by mine water

through pipeline. Out of 2210 m3/day surplus mine water, 550 m3/day, 1180

m3/day and 480 m3/day are being supplied for domestic use of peripheral

Page 43: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-43

CMPDI EIA/EMP OF CLUSTER - XI

villages, irrigation and artificial recharges to the ground water system

respectively. Besides this, domestic waste water of 4100 m3/day is also being

recharged to the Ground water system. Utilization of mine water for irrigation use

is also enhancing the ground water recharge potential through artificial recharge

in the area.

The artificial recharge by water conservation structures in the outside mine

influence areas will check water level lowering. But within the mine influence area

it may not be a viable solution because of the reason that recharged water would

drain into the mine at a faster rate due to the steep hydraulic gradients resulted in

the mining activity. However, artificial recharge will be taken up for improving the

quality of ground water.

The impact on ground water level is being minimized by artificial recharge by

spreading of pumped out water, creation and filling of ponds with mine water and

construction of rainwater harvesting structure.

Rain Water Harvesting is a deliberate collection and storage of rain water that

runs off on natural and man-made catchments area. The amount of water

Harvested depends on the frequency and intensity of the rainfall and

characteristics of the catchments to allow the precipitate to infiltrate through the

sub-soil and percolate down to recharge aquifers.

In the monsoon season the garland drain channels the surface run-off from the

mine area without any contamination and is accumulated in earthen water pool

developed in Haripur, New Kenda, Bahula, Siduli and Shankarpur villages which

will not only be helpful in re-charging the ground water of the area but will fulfil

the non-drinking water demand of near by inhabitants also.

In the monsoon season the garland drain channels the surface run-off from the

mine area without any contamination and will be discharged into Tumni nala/

Page 44: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-44

CMPDI EIA/EMP OF CLUSTER - XI

Singaran nala Jore. Roof-top rainwater Harvesting will be taken up in the project

area using the administrative buildings if required. Rainwater Harvesting and

artificial recharge will also take place through abandoned dug-wells and final

voids of old mines for increasing ground water potential and check water level

lowering.

After mine closure, void of opencast and underground workings will be

waterlogged. This will help in maintaining the water table in the surrounding

areas and may become a source of water supply to the community.

The abandoned underground mine workings and old quarry behave as huge

ground water reservoirs and contain groundwater runoff (i.e. planned recharge).

The pond, tanks, stop dams etc constructed in the rehabilitated and affected

villages also augment the groundwater recharge.

Creation of awareness among workers and local peoples about rain water

Harvesting and artificial recharge will be given priority. This aspect is usually

covered during the Environmental Week celebrated every year (5th to 12th June).

4.3.5 CONSERVATION MEASURES

The mine discharge will be effectively utilize to meet the mine‟s domestic

and industrial needs. Almost, the entire industrial and part of domestic

water demand of the Cluster-11 project has been met from treated mine

water.

After cessation of mining, with plenty rainfall and abundant ground water

recharge, the water levels will recoup and attain normalcy. Thus, the

impact of mining on groundwater system may be considered as a

temporary phenomenon. The abandoned mine workings (underground

and opencast) also behave as water pool and improve the resources

availability in the area.

Page 45: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-45

CMPDI EIA/EMP OF CLUSTER - XI

To increase the source availability, Hand pumps and in some places piped

water supply will be provided nearby villages.

The treated mine water from is being supplied to nearby villages for their

irrigation and domestic use. From Haripur UG to Haripur village & colony,

New Kenda UG to New Kenda village & colony, Chora UG to Gaighata

village & colony, Bahula UG to Bahula village & colony, CL Jambad to

Jambad colony, Siduli UG to Siduli village and Shankarpur UG to Shankar

village and Area Complex. Thereby the mine water, from the existing

mines in the area, is a resource for local villages.

The excess mine water can be used to recharge groundwater system

through connecting pipeline to abandoned dug wells (NKS-3, NKS-4,

NKS-6A, NKS-46, NKS-64 etc).

Regular plantation will be taken up during the life of the mine to create

green barrier. The plant species will be selected in consultation with State

Forest Department.

4.3.6 FUTURE STRATEGY

To assess the impact on local water levels, in time and space coordinates, a

monitoring network in the zone of influence will be established and the water

levels will be monitored quarterly.

To create the water resources and to increase groundwater recharge in the

nearby villages, under community development, Hand pumps and tanks/ponds

will be constructed or strengthened.

To meet the acute shortage of drinking water in peripheral villages of ECL, action

has also been taken to supply water Tankers mounted on Tractor Chassis.

Utilization of mine water for irrigation use will also enhance the ground water

recharge potential through artificial recharge in the area.

Increase vegetative cover by plantation in the mine area under land amelioration

measures. This will contain the surface run-off and increase the ground water

recharge.

Page 46: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-46

CMPDI EIA/EMP OF CLUSTER - XI

The impact on ground water level will be minimized by artificial recharge by

spreading of pumped out water, creation and filling of ponds with mine water and

construction of rainwater Harvesting structure. Creation of awareness among

workers and local peoples about Rain water Harvesting and artificial recharge will

be given priority. This aspect is usually covered during the Environmental Week

celebrated every year (5th to 12th June).

Rain water along with surplus mine pumping water will be discharge into surface

reservoirs/tank/pond/mine voids after passing through the settling tank.

Necessary earthen check dams will be made in the nala for recharging ground

water aquifer. Rainwater Harvesting and artificial recharge will also take place

through abandoned dug-wells and final voids of opencast mines for increasing

ground water potential and check water level lowering.

Utilization of treated mine water discharge by both industry and local people in

the mine influence area.

Monitoring of water quality of mine water discharge, local River/nala and

domestic water source (dug well/Hand pump wells) will be continued under

routine monitoring (February, May, August & November).

During course of operation, area received considerable impact, suitable control

and remedial measures would be adopted by the mine authorities.

Any other measures recommended by the regulatory agencies.

4.4 IMPACT ASSESSMENT & CONTROL MEASURES FOR NOISE & BLASTING

The sources of noise will be:

Drilling operation in coal and OB.

Blasting for coal & overburden

Operation of HEMMs like shovels, dumpers, dozers, graders, front-end

loaders, etc

Operation of equipment in workshop, etc.

The noise associated with mining activities may be classified into three

types

Page 47: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-47

CMPDI EIA/EMP OF CLUSTER - XI

Continuous

Intermittent

Impulse

The workmen associated with the operation of HEMMs, etc. will experience a

noise level above stipulated 90 dB (A) [DGMS Circular, No.18 (Tech.) of 1975]

for more than 4-4.5 hours per shift. Unless suitable mitigatory measures are

taken, high noise pollution will have impact on the workmen. It is worthwhile to

mention that intermittent and impulse noises are considered to be less

dangerous than continuous noise due to the short exposure duration except

under the situation when the level exceeds 115 dB (A).

4.4.1 Impact of noise nuisance & blasting

The ambient noise level of the project will be monitored regularly. Noise levels

are likely to remain within the limits of the prescribed standard. So the noise

produced from this project will not have auditory, non-auditory, masking effects,

etc. as suitable mitigation measures shall be taken in the project.

Controlled blasting technique will be adopted in the project. So, there will be no

adverse effects on life, property and ambient noise.

4.4.2 Acceptable noise levels and peak particle velocity

Assessment of impact of noise nuisance of a workplace can be achieved by

comparing the level with TLV prescribed by the DGMS. There are also standards

relating exposure time with noise levels from the International Standard

Organization (ISO) and American Conference of Governmental Industrial

Hygienists (ACGIH). These standards may also be used to assess the impact of

noise in workplaces.

The acceptable noise levels for residential, commercial and other institutional

areas prescribed by the Central Pollution Control Board are given in Chapter III.

4.4.3 Noise pollution control measures

Page 48: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-48

CMPDI EIA/EMP OF CLUSTER - XI

The following measures shall be taken :

Proper designing of plant & machinery by providing in-built mechanisms like

silencers, mufflers and enclosures for noise generating parts and shock

absorbing pads at the foundation of vibrating equipment.

Routine maintenance of equipment.

Rational deployment of noise generating plant and machinery.

Greenbelts around the quarry, infrastructure sites and service building area

besides avenue plantation on both sides of the roads

To maintain noise level at night time within the limit for the inhabited localities

situated at a very close proximity.

HEMMs with sound proof cabins.

Personal protective devices to all the persons working in high noise areas.

Regular monitoring of noise levels at various points.

4.4.4 Blasting vibration control measures

Measures for safe blasting

Due attention will be given to the following factors:

(a) All provisions of Coal Mines Regulations will be followed.

(b) Quantity of explosive

The quantity of explosive will be decided as per condition imposed by DGMS.

(c) Stemming material

Stemming material to be used is sand. However, the drill cuttings and chips of

triangular shape can be used as an effective stemming material with proper

packing.

(d) Delay system

Use of millisecond delay detonators that are initiated by shock tube initiation

system, between rows and between holes in the same row.

(e) Blasting time

Blasting will be done in day time during the shift change over period as per

requirement. However, the frequency of blasting will depend upon the availability

Page 49: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-49

CMPDI EIA/EMP OF CLUSTER - XI

of land (tenancy in particular), DGMS permission for use of explosive,

meteorological condition, geo-mining condition and method of mining.

(f) Warning

Before blasting is done, warning sound shall be given and placards/flags will be

displayed so that people can move to safe places.

4.4.5 Vibration control

Proper conformation to measures for safe blasting as mentioned above, to

avoid damage to any structure or annoyance to the people in the adjoining areas.

Proper design factor will be taken while constructing various structures for

stability against vibration.

A safe blasting zone will be kept around the periphery of the quarry. This zone

is kept free from village habitation and community infrastructure and thus impact

of vibration after blasting on the surface structures is avoided.

Controlled blasting will be done near built-up areas and surface features, as

and when required.

4.5 IMPACT ON LAND RESOURCE AND ITS MANAGEMENT

4.5.1 Impact on land use pattern

The impact of opencast coal mine and underground mine on land is the change

in land use pattern. The changes in this project are due to the following:

Quarrying and external dumping

Construction of infrastructure.

Subsidence

The alteration in land use pattern due to infrastructure is not to be considered as

true degradation as these facilities can be utilized for some other purposes after

the mining operation is over. The change in land use pattern due to activities of

quarrying may be considered as true change in land use pattern. Hence, land

Page 50: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-50

CMPDI EIA/EMP OF CLUSTER - XI

rehabilitation scheme is planned for reclaiming the excavation area of this

project.

Operational stage land use plan

Fig. 4.1shows the present land use details of the Cluster-XI. Fig. 4.2 highlights

the land use details at end of mine operation of Cluster-XI.

The land use details of the Cluster-XI are given below in Table 4.4 which shows

the impact on land use due to mining operation within the leasehold area

S.No Type Land Use Present Mining

Land Use during Mining ( ha) Post- mining Land

Land Use ( ha)

Use (ha)

1 Running quarry 40 356

To be backfilled and planted

Backfilled

40(inlcuded in sl. 10 under Plantation)

Not Backfilled

2 External OB dump 55

142.34(55 Ha current OB dump will reclaimed & planted upon)

To be reclaimed and planted

3 Service building/ 142.37 152.37 100.37

mine infrastructure

4 Rail & Road 99.77 101.27 101.27

5 Habitation (total) 203.8 163.95 163.95

Unstable habitations

6 Other built-up areas 133.17 133.17 133.17

7 Agriculture land 1412.57 1222.57 1222.57

9 Forest land

10 Plantation / Natural Vegetation

170.4 295.25 845.59

11 River/nallah/pond 250.18 240.18 240.18

12 Barren land 599.83 556.34 556.34

13 Govt Land 89.33 78.35 78.35

14 ECL Land 1021.58

776.21 (leftover is included in sl. 1, 2 & 3)

776.21

Total 4218 4218 4218

Page 51: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-51

CMPDI EIA/EMP OF CLUSTER - XI

The Post-mining land use of core zone with environment management in table

prepared by MoEF is given in the following table -

S No.

Description Land-use (Ha)

Plantation Water Body

Public use

Undisturbed Total

1 Top-soil Dump 2.34 2.34

2 External Waste Dump 140 140

3 Excavation 356 356

4 Rail /Road 101.27 101.27

5 Built-up 0

6 Mine Infrastructure 52 100.37 152.37

7 Forest Land 0

8 Afforestation / Natural vegetation

265.4 265.4

9 Subsided 0

10 Water bodies 240.18 240.18

11 Cultivable 1222.57 1222.57

12 Vacant Land for public purposes

0

13 Others 133.17 133.17

14 Habitation Villages 163.95 163.95

Unstable 29.85 29.85

15 Barren Land 556.34 556.34

16 Govt Vaacant land 78.35 78.35

17 ECL Land 776.21 776.21

Total 845.59 101.27 3271.14 4218

*for the cluster

The requirement of trees in table prepared by MoEF is given in the following table -

Ecology: Stage Wise Cumulative Plantation REQUIREMENT OF PLANTS FOR AFFORESTATION/ RECLAMATION*

Year

Subsided Area Old External Waste Dump

Reclaimed Quarry Area

Others Total

Area (Ha)

Trees Area (Ha)

Trees Area (Ha)

Trees Area (Ha)

Trees Area (Ha)

Trees

Existing 170.4 272640 170.4 272640

Natural Vegetation

0 – 5 years

29.85 47760 55 88000 96 153600 180.85 289360

6 – 10 years

100.34 160544 165 264000 265.34 424544

11 – 15 years

42.34 67744 135 216000 51.66 82656 229 366400

Total 29.85 197.68 396 222.06 845.59 1352944

Page 52: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-52

CMPDI EIA/EMP OF CLUSTER - XI

4.6 RANIGANJ COALFIELD MASTER PLAN

Raniganj Action/Master Plan for Dealing with Fire, Subsidence & Rehabilitation

The cluster of mines will be dovetailed with the approved Raniganj Action Plan

for dealing with fire, subsidence and rehabilitation of people. Master Plan for

dealing with fire, subsidence and rehabilitation within the leasehold area of ECL

has already been approved by Govt. of West Bengal & Govt. of India. A

comprehensive Master Plan to deal with the problem of fire, rehabilitation and

stabilization was prepared by CMPDI, Asansol in February,1999 for Raniganj

Coalfield based on the following findings –

Due to UG mining at shallow covers during the pre-nationalisation

period, several areas have gradually become unstable and likely to

subside. Many of these localities are thickly populated.

Page 53: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-53

CMPDI EIA/EMP OF CLUSTER - XI

Due to unavailability of drawings of UG layouts, efforts of ECL for

stabilisation of the unstable areas by hydraulic sand stowing have met

with little success.

As such there is no option but to shift the settlements over the unstable

areas to safe locations. This is a corporate social responsibility although

ECL has no programme of future mining in several of these localities.

The Masterplan for Raniganj Coalfield has been further revised in 2003, 2006

and 2008 and approved by Govt. of India. An amount of Rs 2661 Cr has been

earmarked for this project. Salient features of the Master Plan include –

Table-4.5

Salient features of the Masterplan

Execution of the Master Plan

To be completed in two phases, each of five years duration.

Unstable Areas

Action Plan for Implementation

The State government approved the Master Plan subject to the following conditions: i) Provision for cost escalation due to inflation ii) Provision for offsite infrastructure development cost iii) Provision for sinking fund for future maintenance of civil and

social infrastructure created in resettlement site. iv) Allotment of land at resettlement site should be proportionate to

the present homestead land with minimum being 100 sq. mtr.

Page 54: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-54

CMPDI EIA/EMP OF CLUSTER - XI

v) Provision of financial support for cattle/working shed in R&R package.

Asansol-Durgapur Development Authority (ADDA) would co-ordinate the rehabilitation on behalf of the State Govt.

Out of the 13 relocation sites, six locations in Burdwan district would be considered initially as future resettlement sites and a joint survey would be undertaken to identify more suitable locations in non-coal bearing areas as resettlement sites.

Shifting would be undertaken in phases with each township having 2000-5000 people. Demographic and socio economic survey of unstable locations would start immediately with the cut – off date as September 2, 2007.

State Govt. would form a committee at the State level having representatives from organizations like CIL, ECL, DGMS, Railways, NHAI and departments of the state Govt. concerned to oversee and guide the rehabilitation cell to be formed at the level of ADDA.

District Magistrate, Burdwan will issue instructions prohibiting any new construction and/or any extension/modification in the existing building in identified unstable areas.

Rehabilitation Cost: The rehabilitation cost has been worked out as per the following parameters –

Table-4.6

Sl No.

Type of Compensation Rate Amount Total for RCF(Rs Lakh)

1 Compensation for Land 63.66 lakh /ha 59275.91

2 Compensation for Houses

Pucca – 5.95 lakh/house Kuttcha – 2.10 lakh/house

116697.22

3 Provision of Land at resettlement site

100 sqm / house @ 16.5 lakh / ha

15971.92

4 Compensation for Loss of income due to displacement/shifting

Rs 113.00 / day for 500 days for each HH

19693.53

5 Infrastructural cost for development of resettlement sites

32019.97

6 Arrangement for power 12189.57

Page 55: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-55

CMPDI EIA/EMP OF CLUSTER - XI

supply

7 Shifting Allowance Rs 10000.00 per HH 3485.58

The cost of rehabilitation per household works out as follows –

Table-4.7

Sl. No.

Particulars Amount (Rs. Lakhs)

Compensation per house

A Compensation for land 1.7856

B Compensation for structures 3.5154

G Shifting allowance 0.1050

D Compensation for loss of income due to displacement / shifting

0.5933

Sub-Total 5.999

Other costs of resettlement per house

C Cost of land at resettlement sites 0.4811

E Cost of Infrastructural development at resettlement sites

0.9646

F Arrangement of power at resettlement sites 0.3672

H Demographic survey 0.0028

Sub-Total 1.816

Grand Total 7.815

The funds have been estimated tentatively based on the civil cost index and in-

house data. However, the detail implementation plan for resettlement of Non-

ECL people will be prepared by the implementing agency of the State Govt. i.e.

Asansol Durgapur Development Authority (ADDA)

Funding arrangement:

Funding arrangement for implementation of Master Plan (both for Raniganj &

Jharia Coalfields) will be as below:

Cess under Coal Conservation and Development Act (CCDA) increased

from Rs. 3.50 to Rs. 10.00 generating about Rs. 350 Cr. per annum for an

average annual production of 550 million tonnes during implementation

period

CIL contribution about Rs. 200 Crs. per annum as indicated by CIL

Page 56: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-56

CMPDI EIA/EMP OF CLUSTER - XI

Total fund generation to the tune of Rs. 550 Crs. per annum.

Total approved fund required for implementation is 2661.73 Cr as of 2009

Major Proposals in Raniganj Coalfields Master Plan:

Execution of the Master Plan proposed to be completed in two phases each of

five years duration.

146 locations, considered as unstable areas comprising of 139 locations for

rehabilitation and 7 unstable locations consisting of part of railway line, road and

IOC pipeline considered for diversion.

In addition, 7 surface fire areas considered for bio-reclamation.

SUMMARY OF MASTER PLAN Table – 4.8

Master Plan’99 Master Plan’03

Master Plan’06

Master Plan (cost updated

in April’08)

Stabilization 59 43 NIL NIL

Rehabilitation 80 91

139 (including on-

going & completed)

139 (including on-

going & completed)

Fire areas 7 7 7 7

Diversion 7 7 7 7

Total 153 148* 153** 153

* Excluding five completed stabilization schemes.

** Sanctoria site was considered for both stabilization & rehabilitation in the Master

Plan‟03. Now it has been merged into one site.

Page 57: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-57

CMPDI EIA/EMP OF CLUSTER - XI

SUMMARY OF REHABILITATION Table – 4.9

Master Plan’99

Master Plan’03

Master Plan’06 Master Plan

(cost updated in April’08)

No. of locations 80 92 139 139

Estimated affected

population 47376 86735 180263 180263

Estimated affected house

owner 8891 15461 33196 33196

Estimated affected area

272.12 Ha 796.68 Ha 862.16 Ha 862.16 Ha

Estimated cost of rehabilitation

Rs. 708.61 Crores

1317.19 Crores

Rs.2256.82 Crores

Rs.2610.10 Crores

(PHYSICAL & FINANCIAL PHASING) REHABILITATION Table – 4.10

Phasing No. of location

Affected area (Ha)

Estimated houses

Cost (Rs.Crs)

Population covered

1st five year 53 519.09 18136 1424.84 94697

2nd five year 86 343.07 15060 1185.26 85566

Total 139 862.16 33196 2610.10 180263

4.7 Unstable Localities and Masterplan for Raniganj Coalfield

Due to underground mining at shallow depths during the pre-nationalisation

period, some unstable localities are present within this cluster affecting a total

population of about 46387. As per Masterplan of Raniganj coalfields, this

Page 58: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-58

CMPDI EIA/EMP OF CLUSTER - XI

population is to be shifted to alternate sites on non-coal bearing areas already

identified for the purpose. Restorative works have been taken up which includes

stabilization of the areas by sand stowing. EIA/EMP for the cluster will include

restoration of such sites. Unstable locations of Cluster-XI are shown in Plate 16.

The rehabilitation sites are shown in Plate 17.

Several unstable localities are present within Cluster No. 11 affecting a total

population of about 9000. As per Masterplan of Raniganj coalfields, this

population is to be shifted to alternate sites on non-coal bearing areas already

identified for the purpose. Restoration works have also been taken up which

includes stabilization of the areas by sand stowing. However, such restoration

works have been successful in controlling subsidence only to a small degree.

The details of unstable locations in Cluster 11 are as follows in Table 4.11:

Table 4.11 : Unstable locations in Cluster 11

# Mine Unstable Location Area (Ha)

Affected Population

1 Krishnanagar Dhasal Bastee & Part of Dhasal village

3.00 800

2 Haripur Haripur vill., Market, ECL Qtrs. Etc.

5.00 700

3 New Kenda Kenda Village 3.00 5000

4 New Kenda near 2&3 pits ECL buildings, Office, staff Qrts. Etc.

1.35 300

5 Shankarpur Shankarpur Vill./ Bauripara 1.00 50

6 Krishnanagar (Pure Kenda Unit)

Bastees 1.00 100

7 Chora ( Jote Dhemo Unit ) Part of Bonbahal Vill. 0.70 100

8 New Kenda(South Kenda unit)

3 Nos. bustees 1.80 250

9 Siduli (Khas Jambad Unit) ECL Building, Stadium & Primary School

8.00 380

10 Bahula Bahula Moti Bazar & DB Road

5.00 900

Total 29.85 8580

4.8 Reclamation of dumps & Slope stability

Page 59: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-59

CMPDI EIA/EMP OF CLUSTER - XI

The environmental impact will be for a short period only as the OC patchs will run

from 2 to 4 years and 8 years only in New Kenda OC patch. Backfilling in

Shankarpur/CL Jambad OC Patch/ Mine is being done. Moreover, the opencast

mining activities will be restricted in a very small patch. Opencast mining

activities will be restricted in 408 Ha out of total leasehold area of 4218 Ha of

Cluster-XI. This opencast mine/patch to be operated will be completely filled-up

after exhaustion of reserves and reclaimed with plantation. Total 258.92 Million

m3 of overburden (OB) will be generated from the all opencast patches. The total

OB of the opencast patch/mine is to be dumped internally over the de-coaled

area. The opencast mining area is about < 10% of the total leasehold area of the

Cluster-XI. Top soil removed from the excavated areas will be kept in a top-soil

dump. After exhaustion of the coal reserves available in these mines/patches, the

quarried out area will be backfilled and the top-soil enriched with good soil and

manure and biologically reclaimed with plantation. The back-filled area of the

opencast patch/mine will be biologically reclaimed with the help of experts and

there will be no further external OB dump.

4.8.1 Stages of Land Reclamation

This is carried out in two district phases:

Physical/technical reclamation.

Biological reclamation.

a) Physical / technical reclamation

During the process, the geometrical shape of the internal dumps is altered to

make it amenable to effective biological reclamation and also to provide safety

and stability.

Backfilling & reshaping of internal dumps

Page 60: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-60

CMPDI EIA/EMP OF CLUSTER - XI

The OC quarry will be backfilled with overburden. The backfilling will be carried

out in a phased manner. Once the backfilling has reached a certain

predetermined reduced level, the plots will be levelled, graded and cleared of

large stone pieces lying on the surface. The slope of the ground will be made

very gentle as far as possible (preferably less than 2%). The graded and levelled

area will be divided into small sectors and small check bunds will be constructed

to retain moisture and humus in the soil. The outer slope of each bench will be

kept at the natural angle of repose of the spoil material and at overall slope angle

of 20o considering all benches.

The drainage arrangements for precipitation run-off are as follows :

During working stage, the run-off will be collected from internal dump by foot

drain for diverting to sump on mine floor for pumping.

In the post-mining period, the drainage pattern of the reclaimed area will be

such that the run-off will be diverted to final void of the quarry.

Topsoil management

Topsoil from unbroken excavation areas will be scraped for progressive and

concurrent utilization during physical/technical reclamation of backfilled area,

thus obviating the necessity of large storage area of topsoil separately.

b) Biological reclamation

For successful biological reclamation of the reclaimed area, preference will be

given to endemic species and mixed culture. The species will be selected

carefully from the following groups for quick reclamation :

Nitrogen fixing tree species for fuel wood, timber and fodder

Fruit bearing tree species

Tree species with dense foliage for shade

Flowering and ornamental tree species.

Page 61: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-61

CMPDI EIA/EMP OF CLUSTER - XI

The list of the species recommended for afforestation on the overburden of

mined out areas is as given below:

4.8.2 List of Species Suggested For Afforestation

Trees

Delbergia Sisso

Accacia auriculiformis

Leucaena leucocephala

Gmelina arborea

Acacia auriculiformis

Pongamia pinnata

Cassia siamia

Shrubs,Grasses & Herbs

Adhatoda vesika

Calotropes gigantean

Ziziphus oenoplia Mill.

Bambusa arundinaceae Willd.

Cyperus rotendus L

Andropogon esiculatus Retz.

Clirodendron viscosum Vent.

Boerhaavia repensis

The above list is indicative and will only be finalized in consultation with Forest

Department. During the life of mine efforts will be made for plantation of trees in

all possible places e.g. OB dumps, road side, reclaimed area etc. These are

expected to become habitat suitable for wild life.

4.9 Impact on land use pattern

Page 62: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-62

CMPDI EIA/EMP OF CLUSTER - XI

The impact of opencast coal mine on land is the change in land use pattern. The

changes in this project are due to the following:

Quarrying and external dumping

Construction of infrastructure.

The alteration in land use pattern due to infrastructure is not to be considered as

true degradation as these facilities can be utilized for some other purposes after

the mining operation is over. The change in land use pattern due to activities of

quarrying may be considered as true change in land use pattern. Hence, land

rehabilitation scheme is planned for reclaiming the excavation area of this

project.

4.9.1 Operational stage land use plan

Table No. 4.12 shows the present and post mining land use plan.

Table 4.12 : Present and Post mining land use plan

Sl No Land-use Present Land Use

(Ha)

Post Mining Land Use

(Ha)

1 Cultivable/Fallow 1412.57 1412.57

2 Village/Basti 203.80 203.80

3 Tanks/ Water Bodies 250.18 250.18

4 Danga/ Wasteland 599.83 0.00

5 Road & Railway 99.77 99.77

6 Plantation/Vegetation 170.40 1529.18

7 Vacant Govt Land 89.33 89.33

8 Built-up Area 133.17 33.17

9 Quarry 40 0.00

10 OB Dump 55 0.00

11 ECL land 1021.58 500.00

12 Colliery Infrastructure/Others 142.37 100.00

Total 4218 4218

Page 63: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-63

CMPDI EIA/EMP OF CLUSTER - XI

4.9.2 Post-operational stage land use plan

a) Dumping strategy

Opencast mining activities will be restricted in 408 Ha areas out of total leasehold

area of 4218 Ha of Cluster-11. This opencast mine/patch to be operated will be

completely filled-up after exhaustion of reserves and reclaimed with plantation.

Total 258.92 Million m3 of overburden (OB) will be generated from four proposed

opencast patches during the life of the mines. The total OB of the opencast

patch/mine is to be dumped internally over the de-coaled area. Top soil removed

from the excavated areas will be kept in a top-soil dump. After exhaustion of the

coal reserves available in these mines/patches, the quarried out area will be

backfilled and the top-soil enriched with good soil and manure and biologically

reclaimed with plantation. The back-filled area of the opencast patch/mine will be

biologically reclaimed with the help of experts and there will be no further

external OB dump.

b) Land use

There are several options available for land use pattern of the reclaimed land.

The following factors have been considered for selection of appropriate land use

pattern

Pre-mining land use pattern

Topsoil/sub-soil quality

Socio-economic parameters of the area

Availability of technology for land reclamation

Climatic conditions of the area

Local flora.

Page 64: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-64

CMPDI EIA/EMP OF CLUSTER - XI

The alternatives available for utilising the reclaimed land are :

Agricultural use

Afforestation

It is suggested to utilise the reclaimed land for afforestation purpose which will

help improve the soil status i.e texture and nutrient levels, etc.

c) Progressive Green Belt and Afforestation Plan

Altogether 1529.18 Ha of plantation is proposed in the post-mining closure plan.

Plantation on 170.40 Ha has already been carried out. Plantation on the rest

1358.78 Ha will be carried out in the phase wise manner during the life of the

mines in the cluster.

4.9.3 Impact of Subsidence

4.9.3.1 Subsidence Prediction

The subsidence prediction model based on Influence Function method,

developed in CMPDI, has been used for estimation of likely subsidence over the

mining area. Subsidence prediction has been done for the panels as proposed to

be extracted by caving method in underground plans of seam R-VIII (Top and

bottom) and seam R-VII. As per project report, thickness of extraction has been

considered for the seam R-VIII (Top section) 4.8m, seam R-VIII (Bottom section)

4.8m and seam R-VII 4.0 to 4.3m. Input data used for subsidence prediction,

such as mining parameters, geology, panels dimension, sequence of extraction

of panels and surface features have been collected from summarized plan and

project report sent by Colliery/CMPDI, RI-I.

Details of panel layout, surface contours, surface features and other relevant

features have been digitised from underground working plans of each seam and

Page 65: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-65

CMPDI EIA/EMP OF CLUSTER - XI

surface plan. The digitised data have been used as input parameters for

subsidence prediction model.

Since no measured data are available regarding the subsidence parameters of

the mine and of nearby mines, (only angle of draw 280 provided for single seam

extraction), the values of subsidence factor and angle of draw for multiple seams

extraction have been taken considering the rock mass factor, geo-mining

conditions and subsidence data observed in nearby coalfields having similar geo-

mining conditions. For subsidence prediction, the overlying rock mass has been

considered disturbed due to extraction of upper seam R-IX. The parameters

taken for subsidence prediction are as follows :

i) Subsidence factor : 0.45 for seam R-VIII (Top), 0.48 for

seam R-VIII (Bottom) and 0.51 for seam R-VII

ii) Angle of draw : 300 for multiple seam extraction

iii) Anticipated percentage : 70% of extraction in panels

iv) Depth : Average depth for each panel

v) Thickness of extraction : 4.8m for each section of the seam R-VIII and in seam R-VII average thickness of the seam for each panel.

Before subsidence prediction, the prediction model has been calibrated

according to the above mentioned subsidence parameters. For subsidence

calculation, underground extraction area has been divided into 20 x 20m grid

blocks as individual elements. The numerical procedure followed for prediction

involves estimation of subsidence at the grid points of each element and

subsequent integration to arrive at resultant values and the final area influenced

by ground movement. Subsidence has been calculated over 12,200 points.

Subsidence prediction has been done after extraction of each seam (After

extraction of seam R-VIII Top and Bottom and seam R-VII individually) and

after extraction of both the seams.

Page 66: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-66

CMPDI EIA/EMP OF CLUSTER - XI

4.9.3.2 SUBSIDENCE PREDICTION RESULTS :

Maximum subsidence, subsidence contours and profile

The anticipated maximum possible subsidence likely to occur over the mining

area after extraction of seam R-VIII (top and bottom sections) is 4.464m, which is

likely to take place over panel F. The anticipated maximum subsidence due to

extraction of seam R-VII only is 2.193m and after extraction of both the seams

(seams R-VIII and R-VII) is 6.657m, which is likely to take place over the panels

8F/7A. From the estimated subsidence at each grid point, subsidence contours

are drawn after extraction of seams R-VIII and R-VII individually and after

extraction of both the seams. Subsidence contours are shown alternately in violet

and green colours. Final subsidence profile along line AA‟, passing through the

maximum subsidence point, has also been drawn.

Effect of subsidence on surface topography and surface features

along with mitigative measures

Since the upper seam R-IX has already been extracted and the exact surface

topography after extraction of seam IX is not available, so the change in

topography after extraction of seams R-VIII and R-VII has been considered from

the topography before mining. Surface topography before mining and after

extraction of seam R-VIII. For a comparative assessment of ground condition

before and after mining, 3D views of surface before and after extraction of seams

R-VIII and R-VII. By comparing the above two views, it is observed that there is

moderate change in surface topography.

The topography of the mining area is plain terrain with gentle undulation. The

ground elevation of the area ranges from 91 to 114m, i.e. a difference of

Page 67: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-67

CMPDI EIA/EMP OF CLUSTER - XI

elevation of 23m. For such terrain, the maximum anticipated subsidence of

6.657m is unlikely to extensively affect the drainage pattern in the area.

However, subsidence may result in the formation of pools over the centre of the

panels and cracks at the zones of high tensile strain such as along the boundary

and barriers. These pools and cracks need to be filled up regularly to achieve

original drainage pattern of the area and prevent the ingress of air and water into

the goaf. Earth cutting/drain making should also be done over the subsided area

so that the pool water would flow down easily as well as to guide the water away

from the subsided area.

For estimating the affects of subsidence on surface features, panel wise

anticipated maximum possible subsidence, slope and tensile strain have been

calculated after extraction of seam R-VIII and seam R-VII individually and

cumulatively, which are shown in Tables 1, 2 and 3. Tables 1 and 2 show the

anticipated maximum possible subsidence, slope and tensile strain likely to occur

over mining area after extraction of seam R-VIII and seam R-VII respectively.

After extraction of seam R-VIII the estimated maximum possible subsidence over

mining area is 4.464m which is likely to take place over the panel F. The

maximum possible slope and tensile strain likely to occur are 85.85 and 42.92

mm/m respectively over the same panel. Due to extraction of lower seam R-VII

only, the estimated maximum possible subsidence likely to occur over the mining

area is 2.193m, which is likely to take place over the panel S7A. The maximum

possible slope and tensile strain likely to occur are 24.37 and 12.18 mm/m

respectively over the same panel S7A. Table 3 shows the anticipated maximum

possible subsidence, slope and tensile strain likely to occur over the mining area

after extraction of both the seams R-VIII and R-VII. The estimated maximum

possible subsidence of 6.657m is likely to occur over the panels S8F/S7A. The

estimated maximum possible slope and tensile strain likely to occur are 73.97

and 36.98 mm/m respectively over the panel S8F/S7A. Strain developed due to

subsidence is the prime cause of damage to the surface structures. Thus, values

of tensile strain likely to occur near important surface features have been

Page 68: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-68

CMPDI EIA/EMP OF CLUSTER - XI

estimated to know the extent of damages to the surface features which are

explained in the following sections.

Impact of subsidence on Khandra village

Khandra village existing over the property is unlikely to be affected by

subsidence because it is away from the subsidence influence zone.

Impact of subsidence on basti

A small portion of basti near the pits is likely to be affected by a maximum

amount of 0.109m subsidence and 0.606 mm/m tensile strain. Such small

amounts of subsidence and tensile strain are unlikely to cause any damaging

effect to the surface structures in the basti. However, to bring the basti

completely out of subsidence influence area, depillaring in panels A and B of

seam R-VII should be restricted one pillar before the proposed extent (towards

the main line side) of the panels.

A small basti over the panel „H „ of saem R-VIII and panel „B‟ of seam R-VII is

likely to be affected by a maximum amount of 2.922m subsidence and 20.29

mm/m tensile strain. For such amounts of subsidence and tensile strain surface

structures in the basti are likely to be damaged by cracks and slope. Thus, to

protect the basti from subsidence damages, the panel „H‟ of seam R-VIII should

be depillared with stowing and in the panel „B‟ of seam R-VII coal pillars are to be

left un-extracted vertically below and within the subsidence influence area.

Impact of subsidence on school

A school existing over the property between Khandra village and pits is unlikely

to be affected by subsidence because it is away from the subsidence influence

area.

Impact of subsidence on temple

Page 69: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-69

CMPDI EIA/EMP OF CLUSTER - XI

A small temple existing over the panel „E‟ of seam R-VIII and panel „B‟ of seam

R-VII is likely to be affected by a maximum amount of 4.464m subsidence and

21.69 mm/m tensile strain. Such amounts of subsidence and tensile strain are

likely to damage the temple. Thus, to protect the temple from subsidence

damages, coal pillars are to be left un-extracted in the above mentioned panels

vertically below and within the subsidence influence area.

Impact of subsidence on workshop

Workshop existing over the mining area is unlikely to be affected by subsidence

because it is away from the subsidence influence zone.

Impact of subsidence on water plant

Water plant existing over the property is unlikely to be affected by

subsidence because it is away from the subsidence influence zone.

Impact of subsidence on office and quarters

The office existing over the property is unlikely to be affected by subsidence. A

few quarters near panels „E‟ and „H‟ of seam R-VIII are likely to be affected by a

maximum amount of 0.297m subsidence and 1.569 mm/m tensile strain. Such

amounts of subsidence and tensile strain will not cause any significant damage

to the quarters, i.e. fine cracks may develop in walls and plaster. However, to

bring the quarters completely out of subsidence influence area, one row of coal

pillars near the quarters may be left un-extracted in the panels „E‟ and „H” of

seam R-VIII and panel „B‟ of seam R-VII.

Impact of subsidence on roads

Page 70: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-70

CMPDI EIA/EMP OF CLUSTER - XI

An Andal-Ukhra road running over the property is unlikely to be affected by subsidence. A small stretch of a road to Siduli passing close to the panel „A‟ of seam R-VII is likely to be affected by a maximum amount of 0.775m subsidence and 4.194 mm/m tensile strain. The stretch of the road is likely to be damaged by development of cracks and change in road profile. Considering the importance of the road it should be either protected by restricting the extraction in panel „A‟ of seam R-VII (leaving coal pillars un-extracted vertically below and within the subsidence influence area) or should be repaired and re-graded, wherever necessary.

Impact of subsidence on nalla

A nalla flowing on the western side of the property is likely to be affected by a

maximum amount of 0.750m subsidence and 4.167 mm/m tensile strain at its

beginning. Hence, it needs to be protected by leaving coal pillars un-extracted

vertically below and within the subsidence influence area.

Impact of subsidence on ponds

There are three ponds existing over the panels „A‟ and „B‟ of seam VII are likely

to be affected by subsidence. Out of three, the larger pond is likely to be affected

by a maximum amount of 2.294m subsidence and 10.720 mm/m tensile strain.

The remaining two ponds are also likely to be affected by a maximum amount of

1.313 and 0.713m subsidence. The tensile strains likely to occur are 6.131 and

3.961 mm/m respectively. These ponds need to be dried and filled up before

depillaring is made in the area or should be protected by leaving coal pillars un-

extracted vertically below and within the subsidence influence area.

Impact of subsidence on HT line

The HT line over the property is likely to be affected by a maximum amount of

4.612m subsidence and 25.622 mm/m tensile strain. The impact of subsidence

on the pylons of HT line will depend on the nature of construction of pylons.

However, pylons are likely to be tilted or dislodged. Thus, HT line should be

either diverted from the subsidence area or its pylons should be protected by

leaving coal pillars un-extracted vertically below and within the subsidence

influence area. Fig 4.1 to Fig. 4.13 relate to subsidence study.

Page 71: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-71

CMPDI EIA/EMP OF CLUSTER - XI

4.9.3.3 SUBSIDENCE MANAGEMENT :

Considering the impact of subsidence on surface topography and surface

features, as explained in earlier chapters, the following subsidence management

steps are required to be undertaken to minimise adverse effects.

i) Due to subsidence, surface cracks are likely to occur over the mining area which

need to be filled up properly and regularly by clay and stone chips and thereafter

with a 0.3m high clay heap over the cracks. It will help in achieving original

drainage pattern over the mining area, improve water retention capacity of the

soil and avoid the chances of underground inundation and spontaneous heating.

ii) Subsidence may result into depression on the surface with accumulation of water

during the rains. These water bodies need to be filled up or drained out by

cutting drains.

iii) Surface drains should be made outside of the subsidence area to prevent the

surface water of adjoining area to coming into active subsidence area.

iv) It is suggested that the mine management should form a team that will be

responsible for the proper and regular filling of surface cracks formed due to

subsidence. The team will also maintain record of the development and filling of

surface cracks. Adequate supply of filling materials should be arranged by mine

management at the site.

v) A small basti over the panel „H‟ of seam R-VIII and panel „B‟ of seam R-VII is

likely to be affected by subsidence. Thus, to protect it from subsidence damages,

panel „H‟ of seam R-VIII should be depillared with stowing and in the panel „B‟ of

seam R-VII coal pillars should be left un-extracted vertically below and within the

subsidence influence area.

vi) A small temple over the panel „E‟ of seam R-VIII and panel „B‟ of seam R-VII is

likely to be affected by subsidence. Thus, the temple should be protected by

Page 72: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-72

CMPDI EIA/EMP OF CLUSTER - XI

leaving coal pillars un-extracted vertically below and within the subsidence

influence area in the above mentioned panels.

vii) A small stretch of a road to Siduli running over the property is likely to be

damaged due to subsidence. Considering the importance of the road, the stretch

of the road should be either repaired and re-graded, wherever necessary, or

should be protected by leaving coal pillars un-extracted in the panel „A‟ of seam

R-VII vertically below and within the subsidence influence area.

viii) Three ponds existing over the panels „A‟ and „B‟ of seam R-VII are likely to be

affected by subsidence. Considering the importance of the ponds, these should

be dried and filled up before depillaring is made in the area or should be

protected by leaving coal pillars un-extracted vertically below and within the

subsidence influence area.

ix) The HT line over the property is likely to be affected by subsidence. Thus, pylons

of HT lines should be either diverted from the subsidence influence area or

protected by leaving coal pillars un-extracted vertically below and within the

subsidence influence area.

The impact of subsidence on different surface features along with the degrees of

damage are provided in Annexure I for reference, i.e. the “Subsidence Impact

Matrix”. The Subsidence Impact Matrix (SIM) shown therein was developed

under a Ministry of Coal funded S&T project.

4.9.3.4 CONCLUSION :

i) Due to extraction of upper seam, i.e. seam R-VIII (Top and bottom); the

estimated maximum possible subsidence likely to occur over the mining area is

4.464m. The anticipated maximum possible slope and tensile strain likely to

occur are 85.85 and 42.92 mm/m respectively.

Page 73: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-73

CMPDI EIA/EMP OF CLUSTER - XI

ii) Due to extraction of lower seam R-VII only, the estimated maximum possible

subsidence likely to occur over the mining area is 2.198m. The anticipated

maximum possible slope and tensile strain likely to occur are 24.37 and 12.18

mm/m respectively.

iii) After extraction of both the seams, i.e. seam R-VIII (Top and bottom) and seam

R-VII, the anticipated maximum possible subsidence likely to occur over the

mining area is 6.657m (over the panels S8F and S7A). The estimated maximum

slope and tensile strain likely to occur are 73.97 and 36.98 mm/m respectively

over the same panels.

iv) The topography of the mining area is plain terrain with gentle undulation. The

ground elevation ranges from 91 to 114m, i.e. a difference of elevation of 23m.

For such terrain, the maximum anticipated subsidence of 6.657m is unlikely to

extensively affect the drainage pattern in the area. However, subsidence may

result in the formation of depressions over the centre of the panels where water

may accumulate during rains and cause danger to the mine. These water bodies

need to be filled up or drained out by cutting drains.

v) Khandra village, Andal-Ukhra road running over the property, school, workshop,

office and water plant existing over the property are unlikely to be affected by

subsidence.

vi) A small basti over the panels „H‟ of seam R-VIII and „B‟ of seam R-VII is likely to

be affected by a maximum amount of 2.922m subsidence and 20.29 mm/m

tensile strain. Thus, it needs be protected by leaving coal pillars un-extracted

vertically below and within the subsidence influence area in the panel „B‟ of seam

R-VII and panel „H‟ of seam R-VIII should be depillared with stowing.

vii) A small temple existing over the panels „E‟ of seam R-VIII and „B‟ of seam R-VII

is likely to be affected by a maximum amount of 4.464m subsidence and 21.69

mm/m tensile strain. Thus, it needs to be protected by leaving coal pillars un-

Page 74: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-74

CMPDI EIA/EMP OF CLUSTER - XI

extracted vertically below and within the subsidence influence area in the above

mentioned panels.

viii) A small stretch of a road to Siduli running over the property is likely to be

affected by a maximum amount of 0.775m subsidence and 4.194 mm/m tensile

strain. Thus, the stretch of the road needs to be repaired and re-graded,

wherever necessary or considering the importance of the road it should be

protected by leaving coal pillars un-extracted in the panel „A‟ of seam R-VII

vertically below and within the subsidence influence area.

ix) The HT line over the mining area is likely to be affected by a maximum amount

of 4.612m subsidence and 25.622 mm/m tensile strain. Thus, it should be either

diverted from the subsidence influence area or its pylons should be protected by

leaving coal pillars un-extracted vertically below and within the subsidence

influence area.

x) A few quarters near the panels „E‟ and „H‟ of seam R-VIII are likely to be affected

by a maximum amount of 0.297m subsidence and 1.569 mm/m tensile strain.

Such amounts of subsidence and tensile strain are unlikely to cause any

significant damage to the quarters, only fine cracks may develop in the walls and

plaster. However, to bring the quarters completely out of subsidence influence

zone, one row of coal pillars near the quarters need to be left un-extracted in the

panels „E‟ and „H‟ of seam R-VIII and panel „B‟ of seam R-VII.

xi) Three ponds existing over the panels „A‟ and „B‟ of seam R-VII are likely to be

affected by a maximum amount of 2.294m subsidence and 10.720 mm/m tensile

strain. Thus, these ponds need to be either protected by leaving coal pillars un-

extracted vertically below and within the subsidence influence area or dried and

filled up before depillaring is made in the area.

It is recommended that while carrying out extraction in the panels, close

subsidence monitoring should be done over some initial panels and over the area

Page 75: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-75

CMPDI EIA/EMP OF CLUSTER - XI

near important surface features. On the basis of observed data, necessary

correction in subsidence prediction may be done, if required.

Page 76: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-76

CMPDI EIA/EMP OF CLUSTER - XI

NKJ UNIT OF KHANDRA COLLIERY, ECL

Table 4.13 :Anticipated maximum possible subsidence, slope and tensile strain

over the mining area after extraction of seam R-VIII (Top and Bottom)

Panel

No.

Av.

Width

Av.

Depth

Extraction

Thickness

Maximum

subsidence

Maximum

slope

Maximum

Tensile

strain

(m) (m) (m) (mm) (mm/m) (mm/m)

S8A 156 114 4.8 + 4.8 3473 60.92 30.46

S8B 140 123 4.8 + 4.8 2961 45.36 22.68

S8C 64 114 4.8 + 4.8 2371 41.58 20.79

S8D 128 129 4.8 + 4.8 3436 53.26 26.63

S8E 160 140 4.8 + 4.8 3580 51.12 25.56

S8F 160 104 4.8 + 4.8 4464 85.85 42.92

S8G 132 125 4.8 + 4.8 3939 63.02 31.51

S8H 128 144 4.8 + 4.8 2974 41.31 20.65

Table 4.14: Anticipated maximum possible subsidence, slope and tensile strain

over mining area after extraction of lower seam R-VII only.

Panel

No.

Av.

Width

Av.

Depth

Extraction

Thickness

Maximum

subsidence

Maximum

slope

Maximum

Tensile

strain

(m) (m) (m) (mm) (mm/m) (mm/m)

S7A 400 180 4.3 2193 24.37 12.18

S7B 160 214 4.0 1401 13.09 6.55

Table 4.15: Anticipated maximum possible subsidence, slope and tensile strain over

mining area after extraction of seams R-VIII (Top and Bottom) and R-VII

Panel No. Av.

Depth

Maximum

subsidence

Maximum

slope

Maximum

Tensile strain

(m) (mm) (mm/m) (mm/m)

8A and S7A 180 5346 59.40 29.70

S8B, S7A and S7B 180 3703 41.14 20.57

S8C and S7A 180 4564 50.71 25.36

S8D, S7A and S7B 180 4358 48.42 24.21

S8E and S7B 214 4724 44.15 22.07

S8F and S7A 180 6657 73.97 36.98

S8G, S7A and S7B 214 5154 48.17 24.08

S8H and S7B 214 3549 33.17 16.58

Page 77: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-77

CMPDI EIA/EMP OF CLUSTER - XI

4.10 MINE CLOSURE PLAN

Post-mining Land Use Planning

The mine closure planning with regard to mines of Cluster-XI of ECL will broadly

involve the following aspects:

1. Technical Aspects

2 Environmental Aspects

3. Social Aspects

4. Financial Aspects

1. Technical Aspects

The following technical aspects would be reviewed in the final mine closure

planning :

a) Safety hazards including management of fire and subsidence

In the mine closure plan, action for control of likely fire areas of the mines will be

discussed. Action will also be suggested to cover all the safety aspects.

b) Management of Pit Slopes

The final quarry slopes shall be so designed and then subsequently developed

that after the closure of the mine, there is no likelihood of any slope failure. The

final slope of the quarry has been designed with above consideration. However,

strict compliance with the proposed final slope of quarry would be made as given

in Quarry & Surface Layout Plan and subsequent slope stability studies.

c) Management of hydrology and hydro-geology

Page 78: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-78

CMPDI EIA/EMP OF CLUSTER - XI

In the mine closure plan, the surface flow pattern of precipitation and mine water

would be clearly developed and water channel suitably laid down so that it does

not disturb the general hydrology of the area.

d) Details of decommissioning of the infrastructures

The decommissioning of the various infrastructures developed for the mine like

roads, pipelines and transmission line etc. shall be planned in details so that the

land occupied by these infrastructures are released. However, before such

decommissioning, the possibility of re-use of these infrastructures for the

neighboring mines shall be explored.

e) Closure of entry to the opencast and underground mines

All entries to the mines must be planned to be effectively closed so that illegal

mining from these openings and safety hazards by way of entry of fire and water

etc. will be prevented in the abandoned mines.

2. Environmental Aspects: This would include the following

a) Management of final voids

In the mine closure plan, voids due to mining are to be dealt and the final land

use plan will include filling of the voids for land reclamation where possible and

for hydro reclamation where feasible.

The study on slope study will be made by some scientific agency and in final

closure plan their suggestions will be incorporated.

b) Reclamation of forests/vegetation

It is to be ensured that in the final land use plan, all vacant land acquired for the

project is afforested

c) Channelisation of available water

Page 79: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-79

CMPDI EIA/EMP OF CLUSTER - XI

If the mine is having sufficient water and if on closure, the mine water flows into

the surface water courses, channelising this water for surrounding community for

their irrigational/domestic uses may be taken up. This can be planned by

providing structures involving one time costing

d) Management of Recharge Areas

The pre-mining and post mining scenario on the hydro-geological recharge

system would be included in the closure plan.

e) Acceptable Surface and Ground Water Flows

In the final closure plan of the mine, wherever the mine water is likely to flow out

to surface and meet the surface water sources; the quality of water from such

mines would be assessed and flow pattern designed in the final plan.

f) Land Use Pattern

Pre-mining vs. post-mining land use

Table 4.16.: Pre-mining vs. post-mining land use of the Cluster-XI

Sl No Land-use Present Land Use

(Ha)

Post Mining Land Use

(Ha)

1 Cultivable/Fallow 1412.57 1412.57

2 Village/Basti 203.80 203.80

3 Tanks/ Water Bodies 250.18 250.18

4 Danga/ Wasteland 599.83 0.00

5 Road & Railway 99.77 99.77

6 Plantation/Vegetation 170.40 1529.18

7 Vacant Govt Land 89.33 89.33

8 Built-up Area 133.17 33.17

9 Quarry 40 0.00

10 OB Dump 55 0.00

11 ECL land 1021.58 500.00

Page 80: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-80

CMPDI EIA/EMP OF CLUSTER - XI

12 Colliery Infrastructure/Others 142.37 100.00

Total 4218 4218

Alternative use of land

For internal OB dump, vegetation and afforestation has been planned as a final

land use. However, for areas other than OB dumps and voids, the alternative

land use would be deliberated in the closure plan. While agriculture is the best

land use if it is supported by some irrigation facilities, vegetation will be second

utility of the land which can be planned.

3. Social Aspects

The social aspects of land use planning relating to mine closure would include

the following:

a) Re-deployment of Workforce

The company employees will be gainfully engaged in the neighbouring projects

after cessation of mining activities.

b) Management of Community Facilities

In view of the short life of the project no new community facility will be created.

However, the existing facilities of adjoining areas will be strengthened.

c) Closure Action Plan

Following steps have to be undertaken in relation to Mine Closure Planning:

(i) Prior to the surface demolition/restoration, a surface survey should be

undertaken of all surface structures, spoil heaps, lagoons, etc. to access

whether there are any hazardous materials that could cause problems viz;

explosives, chemicals etc. A list of surface assets should be prepared and

made available to potential purchasers, prospective purchasers could be

Page 81: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-81

CMPDI EIA/EMP OF CLUSTER - XI

invited and asked to submit sealed bids, this could ensure that the sale of

assets give better financial gain.

(ii) The void of the mine can be proposed as a water resource to be utilized

for aquaculture. Keeping in view the hard rock structure, the ground

stability in the periphery of the mine boundary is not likely to be disturbed.

This will also keep open the option of further deepening even after

exhausting reserves up to proposed limits.

(iii ) Work force on roll of ECL will be redeployed for their gainful utilization.

The work force on the roll of the contractor are also likely to be deployed

in other outsourcing projects.

(iv) As a detailed component of the Closure Plan, a Decommissioning Plan is

to be developed.

Alternative use of land

For internal OB dump, vegetation and afforestation has been planned as a final

land use. However, for areas other than OB dumps and voids, the alternative

land use would be deliberated in the closure plan. While agriculture is the best

land use if it is supported by some irrigation facilities, vegetation will be second

utility of the land which can be planned.

4. Financial Aspects

Closure Cost

Table – 4.17

Page 82: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-82

CMPDI EIA/EMP OF CLUSTER - XI

4.11 IMPACT ON FLORA AND FAUNA

4.11.1 OBSERVATION

The floristic component of the study area does not include any rare or

endangered species. Thus, impact on rare and endangered species of flora is

over ruled.

However, it is reported that animals like Langur, Lomdi, Jackal, etc. enter into the

agricultural field of the villages and needs conservation.

Common Species of Flora & Fauna observed in the study area are as follows:

Table - 4.18

FLORA LOCAL NAME

Sl. No.

Name of Mine Lease Hold Area (Ha)

Closure Cost based on WPI of August 2009 ( 129.6 ) in Rs. lakhs

Closure Cost based on WPI of October 2013 ( 180.3 ) in Rs. lakhs

1 Krishnanagar (1 UG Mine)

772.00 772.00 1073.08

2 Haripur Group of mines (2 OC Patches 77 Ha + 2 UG Mines)

853.00 1228.00 1720.82

3 New Kenda Group of mines ( 1 UG Mine + 2 OC Patches 289 Ha)

742.00 2187.00 3039.93

4 Bahula Group of mines ( 3 UG Mines)

676.00 676.00 939.64

5 Siduli UG ( 1 UG Mine)

335.00 335.00 465.65

6 Khandra UG ( 1 UG Mine)

388.00 388.00 539.32

7 Shankarpur Project ( 1 OC Patch 42 Ha + 1 UG Mine)

452.00 662.00 920.18

Total 4218 6248.00 8698.62

Page 83: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-83

CMPDI EIA/EMP OF CLUSTER - XI

AGRICULTURAL CROPS

CEREALS Dhan ,Gehun, Makka

PULSES Arhar, Chana

COMMERCIAL CROPS

VEGETABLES Baigan, Tomato, Bean, Jhinga, Kohra, Bhindi

OIL YIELDING PLANTS Sarson, Castor plant

SPICES Mirch and Dhania, Adrak, Lahsun etc.

FRUITS Aam, Amrudh, Jamun, Papita, Kathal, Ber etc.

NATURAL VEGETATION

HERBS Bantulsi

SHRUBS Dhatura, Putus, Dhudhi etc.

TREES Sal, Sisam, Neem, Peepal, Mahua etc.

GRASSES Bamboo, Doob, etc.

Table – 4.19

SL. NO. COMMON NAME SCHEDULE

01. House Rat V

02. Jackal V

03. Jungle Cat II

04. Fulvous Fruit Bat V

05. Common crow V

06. Common Langur II

4.11.2 FLORA AND FAUNA CONSERVATION PLAN FOR CLUSTER-XI AREA

The forest type of the project area may be classified as –

1. Tropical dry deciduous vegetation

2. Tropical moist deciduous vegetation

3. Temperate deciduous forest

Conservation plan for Flora & Fauna

The important animal species from conservation point of view in the study area

which falls under schedule IV, schedule II part II and part I of “The wildlife

(protection) Act, 1972 are Fox, Jungle cat and Common lizards, Common

Page 84: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-84

CMPDI EIA/EMP OF CLUSTER - XI

mongoose, Cobra, Langur. These species are important to us from conservation

point of view therefore, it is proposed that ECL will take following conservation

measures for the protection and improvement of the ecology in the study area.

Fauna of the area

The following fauna are reported to be moving in core and buffer zone, which

need attention for their conservation.

Table – 4.20

Sl. No.

Local Name Zoological Name Status in wild life protection act

Schedule Part

1. Siyar Canis aureus II II

2. Lomdi Vulpes spp. II II

3. Nag Naja naja kauthua II II

4. Neola Herpestes edwardsi iv II

5. Jangli billi Felis chaus II -

6. Langur Presbytis spp. II I

7. Common Lizards

Varanus species II II

Jackal and Common Fox in the near past, when listed under Schedule-V,

were being killed for trade in their fur. Langur, similarly were captured to tame

for show in public place as a source of livelihood by “Madaries”.

All the fauna mentioned above are beneficial to us in many ways hence, need

sincere attention for conservation and protection. M/s ECL will take the

following measures for their protection:

1] Protection Measures

With the help of local people and employees, monitoring will be kept on

hunting of these animals. Forest and Police Department will be informed if

such incident happens to take action against the offenders. If necessary,

with that help of forest department, the stranded Jackal will be shifted to a

safer place.

Page 85: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-85

CMPDI EIA/EMP OF CLUSTER - XI

As per present practice, ECL shall continue providing funds for fencing the

forest falling in the Core Zone. This will further strengthen the attempts

towards conservation of above indicated animals.

2] Strengthening of Water Bodies

Through community development work in the villages of Buffer Zone,

existing water sources particularly the village tanks will be strengthened to

provide potable water to the local community so that biotic pressure on

water resources of the forest areas owing to use by wild fauna is gradually

reduced.

3] Tree Planting

The geo-climatic conditions of the area will favour growth of the following

tree species.

(i) Mahua (Madhuca indica) – A shady tree.

(ii) Jamun (Syzigium cumini) – For Monkey, a shady tree.

(iii) Aonla (Emblica officinalis) – For the people of the area, a shady tree.

(iv) Aam (Mangifera indica) – For Monkey etc. and a shady tree.

(v) Sehtoot (Morus alba) – For different animals and the local people.

(vi) Guava (Psidium guajava) – For different animals and the local

people.

(vii) Banyan (Ficus benjalensis) – For other animals, a shady tree.

(viii) Peepal (Ficus religioso) – For other animals, a shady tree.

(ix) Imli (Tamarindus indica) – For many animals, the people and shady

tree.

4] Control of forest fire, fire in coal seam and coal stock

Fire can destroy the entire habitats (micro and macro) and its life supporting

potential in the forest area. Fire does not spare fauna also. ECL will

implement the existing DGMS stipulated fire protection norms on coal

Page 86: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-86

CMPDI EIA/EMP OF CLUSTER - XI

seams and coal stock. This will ensure that a congenial atmosphere is

created and fire does not affect the fauna and flora as well. ECL will also

encourage its employees and villagers to report forest fires (if any) to

Forest/Police department. ECL will also extend its fire fighting capabilities

whenever needed to forest department for fighting forest fires.

Conservation Measures

1.0 Monitoring of the area on regular intervals. Adopt/prescribe

mitigation measures wherever/whenever detected.

2.0 Subsidence problem due to underground mining may be mitigated

by caving process on surrounding mine objects.

3.0 Greeting of peripheral areas will be done. There is need for creating

green belt of at least 30-40 m width to provide an effective dust,

noise and sight curtain in the periphery of mining area. The trees to

be planted in the green belt area shall act as buffer and shock

absorber against dust, noise and stone flying. Trees in the green

belt should be tall, wind firm, broad leaved and evergreen.

4.0 A green belt of 20-30 m wide in triple storey fashion should be

raised on either side of the haul road to prevent migration of dust

and noise far off places. Besides, along the link road, access road,

colony road, 3-4 rows of evergreen and dust resistant plants should

be raised in triple storey fashion.

5.0 With the help of the local people and employees monitoring will be

done to stop hunting/killing of these animals. Forest and police

department will be informed if such incident happens, to take action

against the offenders. If necessary, help of forest department will

be taken to shift any such stranded animals to a safer place.

6.0 Awareness measures about preservation of wild life and

biodiversity in neighborhood villages will be brought through

Page 87: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-87

CMPDI EIA/EMP OF CLUSTER - XI

painted signboards and slogans etc. Awareness programmes in

local schools will be arranged every year during Environment week,

Wild life week and Van Mahotsava.

4.11.3 CONCLUSION AND RECOMMENDATION

CONCLUSION

The floristic component of the study area does not include any rare or

endangered species. Thus, impact on rare and endangered species of

flora is over ruled.

The proposed project does not envisage destruction or displacement of

any fauna species. Thus, indirect impact on fauna due to loss of habitat is

not foreseen.

RECOMMENDATION

Some exotic plant spp. should be planted nearby the area of open cast

and underground mines. The trees act as absorber against dust, noise

and stone flying etc.

4.12 CSR Activities: ECL has taken up a number of CSR (Corporate Social Responsibility) activities in

and around the 13 clusters of Raniganj Coalfield with the objective of inclusive

growth. The expenditure incurred for CSR activities in past for Cluster-XI is

tabulated below:

Table-4.21: CSR Activities Undertaken for Cluster-XI

INITIATIVES UNDERTAKEN

EXP. INCURRED IN LAKHS

2008-09

2009-10 2010-11 2011-12 2012-13

Page 88: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-88

CMPDI EIA/EMP OF CLUSTER - XI

INFRASTRUCTURE 2.23 2.94 7.13 1.50 2.00

WATER-SUPPLY 2.23 2.94 0 5.46 4.21

EDUCATION 2.23 2.94 1.16 1.53 10.09

OTHER DEVELOPMENTAL WORKS

2.23 2.94

0.88 11.46 14.34

Medical 2.23 2.94 0 0.32 1.74

HEALTH 2.23 2.94

1.03 1.53 -

SPORTS 2.23 2.94 0 0.25 5.52

TOTAL 15.59 20.58 10.2 22.05 37.9

Proposed CSR Action Plan

Normative Capacity of the Cluster-XI is 9.10 MTPA. An amount equivalent to 5%

of the retained earning of the previous year subject to minimum of Rs. 5 per

tonne of coal production of the previous year will be provided for Corporate

Social Responsibility (CSR). A minimum amount to the tune of Rs. 455.00 lakhs

will be used for the CSR works per year for Cluster-XI.

This expenditure will be done under the activities mentioned in the Scope of

CSR above .

Table-4.22: Proposed CSR Activities

S.N. HEAD OF WORKS CSR expenditure to be done per year in Rs. Lakhs

2013-14 2014-15 2015-16 2016-17 2017-18

1 Education facilities including grant of schools, providing education kits, running of schools etc. 130.00 130.00 130.00 130.00 130.00

2 Water Supply and rain water harvesting works, wells, ponds, hand pumps and tube wells 90.00 90.00 90.00 90.00 90.00

3 Health Care and vaccination, 70.00 70.00 70.00 70.00 70.00

Page 89: CHAPTER-IV ANTICIPATED ENVIRONMENTAL IMPACTS AND

IV-89

CMPDI EIA/EMP OF CLUSTER - XI

S.N. HEAD OF WORKS CSR expenditure to be done per year in Rs. Lakhs

2013-14 2014-15 2015-16 2016-17 2017-18

awareness camp, mobile medical camp, Immunisation, medicine etc.

4 Environnent Protection i.e plantation etc. 30.00 30.00 30.00 30.00 30.00

5 Social Empowerment like Community centre, Literacy drive, shopping complex. 30.00 30.00 30.00 30.00 30.00

6 Infrastructure Development like road, bridge, repairing of school, drains, electric line etc. 70.00 70.00 70.00 70.00 70.00

7 Sports Culture like village stadium village stadium, grant to village sports body, organizing sports meet 25.00 25.00 25.00 25.00 25.00

8 Community specific miscellaneous welfare work identified time to time for their betterment. 10.00 10.00 10.00 10.00 10.00

TOTAL 455.00 455.00 455.00 455.00 455.00

The schemes under the CSR heads will be identified after interaction with Gram Panchayat, Local Government and ECL.