Chapter 1. Manufacturing Planningand Control. 0. The Context for MPC. Globalization/Internationalization Even small firms have customers around the world, and many have foreign sources of supply as well, not to mention large firms such as Dell, Solectron, Wal-Mart, etc. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Chapter 1. Manufacturing Planningand Control

Chapter 1. Manufacturing Planning and Control

Page 2: Chapter 1. Manufacturing Planningand Control

0. The Context for MPC

A. Globalization/Internationalization Even small firms have customers around the world,

and many have foreign sources of supply as well, not to mention large firms such as Dell, Solectron, Wal-Mart, etc.

B. The Role of the Customer— from mass production to mass customization

The need for product and process flexibility (and MPC flexibility) to meet the relentless push for product differentiation, faster response, lower inventory and transaction costs.

Page 3: Chapter 1. Manufacturing Planningand Control

0. The Context for MPC

C. The Impact of Information Technology ERP systems provide the means for linking

functionally disparate, geographically dispersed, and culturally different organizational units into a coherent system.

Lean production →Lean organization →Lean enterprise →Lean supply chains

Page 4: Chapter 1. Manufacturing Planningand Control

1. MPC System Defined

MPC system concerns planning and controlling the manufacturing process (including materials, machines, people, and suppliers). Tasks to perform:

Plan capacity requirements and availability Plan for materials to arrive on time, right quantity Ensure utilization of capital equipment Maintain appropriate inventory Schedule production activities…

Cost and benefits: like all investments, costs could be high and payoffs could be quite handsome as well.

Page 5: Chapter 1. Manufacturing Planningand Control

2. An MPC System Framework

The need to match MPC with firm’s layout/ environments:

Job shop Cellular manufacturing Flexible manufacturing systems Assembly line Just in time …

A 3-phase model: Fig. 1.1

Page 6: Chapter 1. Manufacturing Planningand Control

Resourceplanning

Sales and operationsplanning

Demandmanagement

Master productionscheduling

Detailed capacityplanning

Detailed materialplanning

Material andcapacity plans

Shop-floorsystems

Suppliersystems

Enterprise R

esource Planning (E

RP

) System

Front End

Engine

Back End

Manufacturing Planning and Control System

Page 7: Chapter 1. Manufacturing Planningand Control

An MPC System Framework

Front

End

•Activities and systems for overall direction setting

Engine

•Systems for detailed material and capacity planning

Back

End

•MPC execution systems

Page 8: Chapter 1. Manufacturing Planningand Control

Choosing a layout type

Process (functional) layout Product (line/flow) layout Hybrid (combination) layout (e.g., one work

multiple machines (OWMM), group technology/cellular manufacturing (GT/CM), flexible manufacturing systems (FMS)

Fixed-position layout

Layout selection = f (positioning strategy)

Page 9: Chapter 1. Manufacturing Planningand Control

MPC Classification Schema (Fig.1.2)

Repetitive

Just-in-time

MRP

Project

Num

ber

of s

ubpa

rts

Seconds Minutes Days Weeks Months

Time between successive units

Flow

Page 10: Chapter 1. Manufacturing Planningand Control

MPC Classification Schema

• Flow (continuous production–chemical plants, food, etc.)

• Repetitive (longer production cycles–automobiles)

• Just-in-Time (shorter production cycles–TVs, personal computers)

• MRP (management of complicated parts product–airplanes)

• Project (unique, long duration–ships).

Page 11: Chapter 1. Manufacturing Planningand Control

MPC Classification Schema

• Product complexity: number of subparts• Process complexity: nature of repetitiveness

(time between successive units)

What are the two factors in the classification?

All MPC systems are not the same. What affects the complexity/design of an MPC?

Product and process complexity. e.g., in flow type of production, materials management is simple.

Page 12: Chapter 1. Manufacturing Planningand Control

3. Evolution of MPC Systems

• Evolution of competitive priority/strategy: cost, quality, time, flexibility

• The MPC system must adapt to meet changing company needs

• Periodic MPC system audits compare system responses to the requirements of the marketplace

Page 13: Chapter 1. Manufacturing Planningand Control

Concluding Principles

• The framework for the MPC is general, and all 3 phases must be performed, but specific applications must reflect particular firm conditions and objectives.

• In supply chain environments, the MPC must coordinate the planning and control efforts.

• MPC systems should support the strategy and tactics pursued by the company.

• Different manufacturing processes dictate the need for different MPC designs.

Page 14: Chapter 1. Manufacturing Planningand Control

Concluding Principles

• The MPC should evolve to meet changing requirements in the market, technology, products, and processes.

• The MPC should be comprehensive in supporting the management of all manufacturing resources.

• An effective MPC can contribute to competitive performance by lowering costs and providing greater responsiveness to the market.

• In firms that have an integrated ERP system and database, the MPC system should integrate with and support cross-functional planning through the ERP system.

Page 15: Chapter 1. Manufacturing Planningand Control

Quiz – Chapter 1• In the MPC process, capacity decisions (equipment,

facilities, suppliers, etc.) are most likely to occur in what time horizon?

• In the MPC process, detailed scheduling decisions are most likely to occur in what time horizon?

• Master Production Scheduling (MPS) and Resource Planning are a part of which MPC phase?

• Measurement and Control are a part of which MPC phase?

• Products that are part of a one-time production process (e.g. bridges or aircraft carriers) would most likely use which form of MPC?