changes to specifications changes to … · date of issue: 2018-03-23 to: ... changes to...
TRANSCRIPT
ADDENDUM #5
TO
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
Grady Health System
Periop Hybrid OR
HDR: 10057610 Grady: F2017002
DATE OF ISSUE: 2018-03-23
TO: PROSPECTIVE BIDDERS AND OTHER INTERESTED PARTIES
THE CONTRACT DOCUMENTS AND SPECIFICATIONS, INCLUDING THE CONTRACT
DRAWINGS, ARE HEREBY MODIFIED BY THE FOLLOWING ITEMS:
CHANGES TO SPECIFICATIONS
A. None
CHANGES TO DRAWINGS
A. For all changes to the drawings refer to file named “Grady Hybrid OR_2018-03-23-
Add#5_Drawings”
a. Sheet G-106P
i. Revised NEC (National Electrical Code) code version to be 2017,
instead of 2014.
ii. Added the IBC construction type corresponding to the NFPA
construction type previously listed.
B. Note: All sheets in the following series of drawings have been revised to show the exact
wording of “ISSUED FOR CONSTRUCTION” in the titleblock. These revised sheets
have not been included in this addendum as this change has no effect on the scope of
work for this project and is solely meant to address a requirement of the City of Atlanta’s
plan review.
a. General
b. Architecture
c. Interiors
d. Structural
e. Plumbing
f. Mechanical
g. Electrical
C. Note: The changes described here were made in preparation for the City of Atlanta’s plan
review of this project and are an attempt to limit the amount of questions from the City.
CHANGES TO EQUIPMENT LIST
A. None
CHANGES TO INFORMATIONAL DOCUMENTS
A. None
ALL ITEMS IN CONFLICT WITH THIS ADDENDUM ARE HEREBY DELETED.
THIS ADDENDUM IS MADE PART OF THE CONTRACT DOCUMENTS.
HDR Architecture, Inc.
S S S
S S S
S S S
S S S
S S S
SS
S
SS
SS
SS
SS
SS
SS
SS
SS
S
S
SS
SS
S
SS
SS
SS
SS
S S S S
SS
SS S
SS
S
S S
SS
SS
SS
SS
SSSSS
SS
S S
SSS
SS
SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
SS
SS
SS
SS
S
S
SS
S
SS
SS
SS
SS
SS
S S S S S S S S S S S S S S S S S S S
S S S S S S S S S
S S S S S S S S S
SS
SS
SS
SS
SS
SS
SS
S
S
SS
S
S
SS
SS
S S S S S S S
LIFE SAFETY SYMBOLS:
PATH OF TRAVEL TO EXIT(REFER TO SCHEDULE FOR DISTANCE)
EXIT
ID
SUITE
EXIT CAPACITY INFORMATION(O.L. = OCCUPANT LOAD)
SMOKE COMPARTMENT BOUNDARY
FIRE EXTINGUISHER
EXIT STAIRWELL
PRIMARY CONSTRUCTION AREA
PATH OF TRAVEL TO SMOKE BARRIER DOOR (REFER TO SCHEDULE FOR DISTANCE)
ID
ACTUAL O.L. O.L. CAPACITYFACTOR
200
DOOR (40" CLEAR)
100 0.2
PULL STATIONPS
FE
FIRE EXTINGUISHER IN CABINETFEC
SMOKE PARTITION (NOT RATED)
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE / SMOKE BARRIER
1 HOUR FIRE / SMOKE BARRIER
PARTITION RATING GRAPHIC DESIGNATIONPRIORITY
2
1 HIGHEST
NOT RATED 5 LOWEST
30 MINUTE FIRE / SMOKE BARRIER 3
4
1
H H
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
F F
E E
D D
C CB B
A.8 A.8
A.6A.6
A.5A.5
A.3A.3
AA
A.2 A.2
99 SFGAS STOR.
223 SF
ANESTHCLEAN WORK
122 SFANES. DECON
118 SFANES. OFF.
490 SFCORRIDOR
40 SFHSK
30 SFHCT
325 SFANES. STOR.
161 SFUTIL.
60 SFS.U.
79 SFLNGE.
50 SFCOM.
71 SFELEC.
112 SFEXAM
100 SFEXAM
31 SFLAB
91 SF
NURSESTATION
101 SFEXAM
136 SFC.U.
28 SFHCT
28 SFHCT
74 SFS.U.
30 SFHCT
26 SFH.D.
85 SFCHART
233 SFLOCKERS
115 SFPAT. HOLD
301 SF
PATIENTDISCHARGE
LOUNGE 75 SFOFF.
84 SFRECPT.
610 SF
AMB. SURG.WAITING
90 SFTRIAGE
28 SFHCT
27 SFHCT
91 SFEXAM
129 SFEXAM
370 SFCORRIDOR
287 SFCORRIDOR
155 SFSTAIR 14
1,235 SFPASSAGE
589 SFSPECIAL O.R.
563 SF
OPEN HEARTO.R.
92 SFWORK
136 SFPUMP ROOM
82 SFSCRUB
398 SFO.R. 12
57 SFELEC.
246 SFSTER.
79 SFSCRUB
402 SFO.R. 11
68 SFUTIL.
943 SF
STERILEWORK
556 SFTRAUMA O.R.
584 SFTRAUMA O.R.
181
SF
CO
RR
IDO
R
1,302 SFCORRIDOR
51 S
FR
ES
P. E
QU
IP.
414 SFO.R. 2
24 SFTLT.
1,079 SFCORRIDOR
404 SFO.R. 3
439 SFO.R. 4
390 SFO.R. 5
418 SFO.R. 6
371 SFO.R. 7
21 SFTLT
370 SFCYSTO O.R. 8
497 SFO.R. 9
98 SFSCRUB
160 SFSTOR.
420 SFO.R. 10
150 SFSTER.
429 SF
STERILEWORK
102 SFSCRUB
400 SFO.R. 1
173 SFELEV LOBBY
610 SFPASSAGE
116 SFCHART
57 SFS.U.
108 SFSUPV.
108 SFCHART
79 SFS.U.
48 SFHCT
1,057 SFPASSAGE
175 SFCHART
209 SFCORRIDOR
54 SFHSK
242 SFBOOTING
103 SFCONTROL
67 SFELEC.
50 SFCOM.
179 SFPHARM
284
SF
CO
RR
IDO
R
167 SF
CONF /REPORT
158 SFSTAIR 15
254 SFC.U.
90 SFPACU 24
100 SFPACU 23
86 SFPACU 22
88 SFPACU 21
88 SFPACU 20
84 SFPACU 19
89 SFPACU 18
89 SFPACU 17
91 SFPACU 16
127 SFPACU 15
104 SFPACU 14
77 SFPACU 11
94 SFPREP/REC G
91 SFPREP/REC F
93 SFPREP/REC E
93 SFPREP/REC D
89 SFPREP/REC C
98 SFPREP/REC B
78 SFPREP/REC A
131 SFSTORAGE
890 SFHYBRID OR
285 SF
CONTROLROOM
28 S
FH
YB
RID
EQ
141 SFPACU 12 ISO 68 SF
ANTE ROOM
153 SFPACU 13 ISO
86 SFOR STORAGE
186 SF
EQUIPMENTALCOVE
101 SF
RADIOLOGYOFFICE
90 SFPACU M
90 SFPACU L
87 SFPACU K
104 SFPACU J
95 SFPACU I
95 SFPACU H
109 SFPACU 1 89 SF
PACU 294 SF
PACU 489 SF
PACU 5106 SF
PACU 6
43 SF
NON BIOTRASH
HOLDING RM
225 SFSTER.
394 SFSTORAGE
105 SFSOLACE
30 SFA.V. STOR
196 SFACCESSIONING
177 SF
FEMALESTAFF
152 SFTOILET/SHOWER
148 SFTOILET/SHOWER222 SF
STORE
193 SF
FEMALESTAFF
756 SFCORRIDOR
295 SFELEV LOBBY
198 SFCORRIDOR
641 SFCORRIDOR
220 SFCORRIDOR
592 SF
STAFFLOUNGE
462 SF
PHYS.LOUNGE
250 SFELEV LOBBY 21
9 S
FC
OR
RID
OR 180 SF
STAIR 13
552 SFCORRIDOR
33 SFUPS
S4
S6
S5
S3
2,254 SF
ATRIUM OPENTO LOBBY
237 SFELEVATORS
237 SFELEVATORS
254 SFELEVATORS
128 SFSHAFT
197 SFSHAFT
105 SFELEVATOR
133 SFSHAFT
34 SFSHAFT
34 SFLIFT
7,829 SF
S.C. - 6.5
19,530 SF
S.C. - 6.4
19,530 SF
S.C. - 6.4
6,005 SF
S.C. - 6.33,768 SF
S.C. - 6.6
6.5 SB
6.5E
6.4E
6.4 SB
1
11
ACTUAL O.L. O.L. CAPACITYFACTOR
205
DOOR (41" CLEAR)
59 0.2
ACTUAL O.L. O.L. CAPACITYFACTOR
205
DOOR (41" CLEAR)
59 0.2
ACTUAL O.L. O.L. CAPACITYFACTOR
133
STAIR (40" CLEAR)
59 0.3
ACTUAL O.L. O.L. CAPACITYFACTOR
133
STAIR (40" CLEAR)
59 0.3
13.
13.
14
14
16
16
17.2
17.2
18.2
18.2
PS
FEC
FEC
FE
FE
FE
PS
PS
FEC
FE
FEC
PS
PS
FE
FEC
6.3E
6.3 SB
6.4 SB
FEC
FEC
ACTUAL O.L. O.L. CAPACITYFACTOR
205
DOOR (41" CLEAR)
59 0.2
ACTUAL O.L. O.L. CAPACITYFACTOR
133
STAIR (40" CLEAR)
59 0.3
FEC 2
2
94 SFPACU 3
SUITE INFORMATION
SUITE ID AREASLEEPING / NON-SLEEPING
NUMBER OF INTERVENING ROOMS
EXITS PROVIDED DISTANCE TO EXIT ACCESS DOOR
NFPA 101 (2012) CHAPTER 19PATIENT CARE NON-SLEEPING SUITE REQUIREMENTS:• SUITES GREATER THAN 2,500 SF SHALL HAVE AT LEAST 2 EXIT ACCESS DOORS, REMOTELY LOCATED.• SUITES SHALL NOT EXCEED 10,000 SF.• TRAVEL DISTANCE TO AN EXIT ACCESS DOOR SHALL NOT EXCEED 100 FEET.
S3
S4 (NOT IN PROJECT)
S5 (NOT IN PROJECT)
S6
4,934
4,723
5,645
3,660
NON-SLEEPING
NON-SLEEPING
NON-SLEEPING
NON-SLEEPING
1
1
1
1
3
2
2
2
87'
57'
39'
62'
EXISTING CEILINGS IN CORRIDORS ARE ARCHITECTURAL, EXPOSED, SUSPENDED-GRID ACOUSTICAL TILE CEILING. THEREFORE THE REQUIREMENTS OF NFPA 101 CHAPTER 19 FOR SUITE SEPARATION AND CONSTRUCTION OF CORRIDOR WALLS ARE MET. REFERENCE 19.2.5.7.1.2 & 19.3.6.2.4 WITH EXPLANATORY MATERIAL IN ANNEX A.
1
2VERIFY ENTIRE LENGTH OF SMOKE BARRIER TO ENSURE COMPLIANCE WITH NFPA 101 CHAPTER 18 (INCLUDING BUT NOT LIMITED TO 1 HOUR FIRE RATING)
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
Project Number
Original Issue
Sheet Number
Sheet Name
Project Status
Scale
Strategic Hospital Resources2325 Log Cabin Drive SESuite 108Atlanta, GA 30339
SEE ABOVE
ISSUED
FOR
CONSTRUCTION
C:\rvt\2017\10057610-A-CENTRAL_ZAMES.rvt
3/22
/201
8 5:
06:4
0 P
M
As indicated
G-106P
6TH FLOOR -PROPOSED LIFESAFETY PLAN
Grady Health SystemGrady Periop Hybrid OR
CONSTRUCTION DOCUMENTS
80 Jesse Hill Jr Dr SE,Atlanta, GA 30303
HDR Architecture Inc
10057610
1100 Peachtree StSuite 400Atlanta, GA 30309
APPLICABLE CODES
GEORGIA STATE MINIMUM STANDARD BUILDING CODES (EFFECTIVE JANUARY 1, 2014):INTERNATIONAL BUILDING CODE (IBC), 2012 EDITION WITH GEORGIA STATE AMENDMENTSINTERNATIONAL PLUMBING CODE (IPC), 2012 EDITION WITH GEORGIA STATE AMENDMENTSINTERNATIONAL MECHANICAL CODE (IMC), 2012 EDITION WITH GEORGIA STATE AMENDMENTSINTERNATIONAL FUEL GAS CODE (IFGC), 2012 EDITION WITH GEORGIA STATE AMENDMENTSINTERNATIONAL ENERGY CONSERVATION CODE (IECC), 2009 EDITION WITH GEORGIA STATE SUPPLEMENTS AND AMENDMENTS.INTERNATIONAL FIRE CODE (IFC), 2012 EDITION WITH GEORGIA FIRE MARSHAL AMENDMENTS.NATIONAL ELECTRICAL CODE (NEC), 2017 EDITION.
RULES AND REGULATIONS OF THE INSURANCE AND FIRE SAFETY COMMISSIONER:RULES AND REGULATIONS OF THE INSURANCE & FIRE SAFETY COMMISSIONER: STATE MINIMUM FIRE SAFETY STANDARDS - CHAPTER 120-3-3 AS MODIFIED BY SECTION 120-3-3-.04(1) STATE MINIMUM FIRE SAFETY STANDARDS WITH MODIFICATIONS.
RULES OF THE COMPTROLLER GENERAL SAFETY FIRE COMMISSIONER, CHAPTER 120-3-11: RULES AND REGULATIONS FOR FLAMMABLE AND COMBUSTIBLE LIQUIDS.
ACCESSIBILITY:- GEORGIA ACCESSIBILITY CODE (GAC) 120-3-20- U.S. DEPARTMENT OF JUSTICE A.D.A. STANDARDS FOR ACCESSIBLE DESIGN (ADA) - 2010 EDITION
CLIENT: GRADY HEALTH SYSTEM
PROJECT ADDRESS:80 Jesse Hill Jr Dr SE,Atlanta, GA 30303
SCOPE OF WORK NARRATIVE:
THE PROJECT INCLUDES RENOVATIONS TO PORTIONS OF THE 6TH FLOOR OF GRADY HOSPITAL. PRIMARY FUNCTIONS INCLUDE SURGERY AND RECOVERY. THE PROJECT SCOPE INCLUDES RENOVATION OF 14 PACU STATIONS, A HYBRID OPERATING ROOM, AND ASSOCIATED SUPPORT SPACES.
PROJECT INFORMATION
NFPA CODES:NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITIONNFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2013 EDITIONNFPA 55 - COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, 2013 EDITIONNFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, 2013 EDITIONNFPA 90A - STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2012 EDITIONNFPA 90B - STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS, 2012 EDITIONNFPA 99 - HEALTH CARE FACILITIES CODENFPA 101 - LIFE SAFETY CODE, 2012 EDITIONNFPA 110 - STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2013 EDITION
LIFE SAFETY CODE:LIFE SAFETY CODE: NFPA 101, 2012 EDITION*Reference: Georgia State Amendments to the International Fire Code (2012), effective January 1, 2014Georgia State Amendments of the Georgia State Minimum Standard Building Code (International Fire Code with Georgia State Amendments), the table titled 102.13 ‘CODES REFERENCE GUIDE’ identify the Life Safety Code, as the primary code to establish Occupancy classification. Chapter 120-3-3, Rules and Regulations for the State Minimum Fire Safety Standards, Section 120-3-3.04(3)(q)(69), adopts the 2012 Edition of NFPA 101, as the Life Safety Code, with noted modifications. Thus NFPA 101, 2012 Edition is the adopted Life Safety Code to be followed. The “Codes Reference Guide” table, identifies the International Building Code (IBC), as adopted by State of Georgia as the Supplement code to the Life Safety Code for occupancy classification.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR CONDITIONING ENGINEERS (ASHRAE):ASHRAE STANDARD 15-2010 SAFETY STANDARD FOR REFRIGERATION SYSTEMSASHRAE STANDARD 62.1-2010 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITYASHRAE STANDARD 90.1-2007 ENERGY STANDARD FOR BUILDING EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
UNDERWRITERS LABORATORIES, INC. (UL): ALL MATERIALS AND EQUIPMENT SHALL BE LISTED, LABELED OR CERTIFIED BY UNDERWRITERS LABORATORIES, INC., WHERE SUCH STANDARDS HAVE BEEN ESTABLISHED. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) - REFER TO THE STRUCTURAL NARRATIVE FOR ADDITIONAL INFORMATION.AMERICAN CONCRETE INSTITUTE (ACI) AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)ASSOCIATED AIR BALANCE COUNCIL (AABC)SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION (SMACNA)
FACILITIES GUIDELINES INSTITUTE (FGI) GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT FACILITIES (2014) (2018)
CODE SUMMARY
OCCUPANCY CLASSIFICATION: • EXISTING HEALTHCARE OCCUPANCY / GROUP I-2 (NFPA 101, CHAPTER 19), (IBC SECTION 308).
A. OCCUPANCY NOTES:• THE EXISTING 6TH FLOOR AREAS AFFECTED BY THIS PROJECT ARE USED FOR SURGERY AND RECOVERY. THE OCCUPANCY / USE IS NOT CHANGING.• THE PRIMARY AREA OF WORK INCLUDES APPROXIMATELY 5,000 SQUARE FEET IN THREE SEPARATE SMOKE COMPARTMENTS. PER NFPA 101 (2012)
SECTION 18.1.1.4.3/19.1.1.4.3 THIS PROJECT IS CLASSIFIED AS "MINOR REHABILITATION." PER NFPA 101 CHAPTER 43 BUILDING REHABILITATION THE PROJECT IS CLASSIFIED AS “RECONSTRUCTION.”
CONSTRUCTION TYPE: TYPE II - 222 (NFPA), TYPE 1B (IBC) FOR THE BUILDING AREAS AFFECTED. REFER TO THE EXISTING LIFE SAFETY PLAN FOR THE CONSTRUCTION TYPE OF ADJACENT AREAS. CONSTRUCTION CONSISTS OF NON-COMBUSTIBLE CONSTRUCTION MATERIALS.
B. TYPE OF CONSTRUCTION:
THIS FACILITY IS FULLY SPRINKLERED.
• ORDINARY HAZARD.
CLASSIFICATION OF HAZARD CONTENT (NFPA 101, 6.2):
SMOKE COMPARTMENT & OCCUPANT LOAD SCHEDULE
COMPARTMENTID AREA
SF PEROCCUPANT
OCCUPANCYLOAD AREA USE COMMENTS
6.3 6,005 SF 240 SF 25 NFPA_Health Care Use:Inpatient treatment departments
6.4 19,530 SF 240 SF 81 NFPA_Health Care Use:Inpatient treatment departments
6.5 7,829 SF 240 SF 33 NFPA_Health Care Use:Inpatient treatment departments
6.6 3,768 SF 100 SF 38 NFPA_Business Use: General Use
TOTALS: 37,132 SF 177
N
APPLICABLE STANDARDS
SCHEDULES
EGRESS TRAVEL DISTANCES TO SMOKE BARRIER
PATH ID (SEE PLAN) TRAVEL DISTANCE (MAX. 200 FT.)
6.3 SB 102'
6.4 SB 164'
6.5 SB 119'
EGRESS TRAVEL DISTANCES TO EXIT
PATH ID (SEE PLAN) TRAVEL DISTANCE (MAX 200 FT.)
6.3E 88'
6.4E 188'
6.5E 85'
NOTES: • THIS PROJECT DOES NOT MODIFY THE EXISTING EXIT DOORS.• THIS PROJECT DOES NOT INCREASE THE OCCUPANT LOAD.
SHEET SPECIFIC NOTES
NFPA 101: • MAX. SMOKE COMPARTMENT SIZE IS 22,500 SF.
1
1
MARK DATE DESCRIPTION
2018-02-28 Construction Documents
1 2018-03-23 Addendum #5