環境 cr 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 mcdc 2014 1 2016 12 mcdc dma dma:...

61

Upload: others

Post on 18-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 2: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 3: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

66.5% 4

60 90 2

6

5.7

35.3%

95

5

3

MCDC

2014 1 2016 12

MCDC

DMA DMA: District Metering Area DMA

MCDC

Page 4: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

1

MCDC

BPS No.7

BPS No.7 3 MCDC

BPSNo.7 2 5

MCDC

MCDC 1) 2)

3)

[ 1] MCDC

[ 2] MCDC

[ 3] MCDC

Page 5: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

*1

MCDC

*1 DMA 2

4 5 6 10 DMA

Page 6: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

D-1 1 1 1

D-2 ( 1 4 4

1 1 1

-1C/P

1 4 42 4 8

-2 1 3 3 2 3 6

-3 1 1 1

20 1 20

MCDC 13

5 DMAs 1

2

14 34

2)

-1 1 2 2

9 2 18

MCDC

4 5 DMAs

1

-2 1 3 3 9 3 27

-3 1 2 2 9 2 18

7 63

3)

1 5 5 9 5 45

5 45

4)

1 2 2 2 2 4

2 4

5)

Page 7: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

-1 1 2 2 9 2 18

-2 1 1 1 20 1 20

-1 1 1 1

-2 1 1 1

5 38

1 1 1

34 18 4

1)

D-1 1 ×1 1

D-2( )

1 ×4 4

1 1 ×1 1

2)

-1 C/P 1 ×5 52 ×5 10

-2 1 ×5 5 2 ×5 10

16 20

3) -

-1C/P TS

1 ×7 75 ×7 35

5

-2 5 1 ×5 5 5 ×5 25

4)

-1 1 ×6 6 5 ×6 30

1 ×1 1

19 90

2 1 ×1 1

5)

-1 1 ×10 10 5 ×10 50

11 50

6)

1 2 2 2 2 4

2

2 4

7)

-1 1 ×2 2 2 ×2 4

-2 1 ×1 1 2 ×1 2

-1 1 ×1 1

-2 1 ×1 1

5 6

1 ×1 1

54 17 0

Page 8: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

1)

D-1 1 ×1 1

D-2 ( ) 1 ×4 4

1 1 ×1 1

2)

-1 1 ×1 1

10 ×1 10

MCDC

8

-2 1 ×1 1 10 ×1 10

-3 1 ×1 1 10 ×1 10

-4 1 ×1 1 10 ×1 10

-5 1 ×1 1 10 ×1 10

11 50

3)

-1 1 ×2 2 10 ×2 20

-2 1 ×2 2 10 ×2 20

4 40

4)

-1 1 ×2 2 2 ×2 4

2 4

5)

-1 1 ×2 2 2 ×2 4

-2 1 ×1 1 2 ×1 2

-1 1 ×1 1

-2 1 ×1 1

5 6

1 ×1 1

23 100

MCDC

[ 1]

[ 2]

[ 3]

MS-Excel MS-Word

1 3

Page 9: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

MCDC MCDC

MCDC

1

1

MCDC

Page 10: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

1

Page 11: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

DMA

2 4 5 6 10 DMA

MCDC MCDC

MCDC

OJT

34 5×1 5 29×1 29

0.25MM

1.45MM

0.25MM×1 0.25MM

(5 /20 0.25MM

1.45MM×1 1.45MM

(29 /20=1.45 MM)

2 1

MCDC 2

MCDC 2

1 1 2

2 MCDC

MCDC

54 5×1 5 49×1 49

0.25MM

2.45MM

(1.50+0.95)

0.25MM×1 0.25MM

(5 /20 0.25MM

1 1.50MM×1 1.50MM

(30 /20=1.50MM)

Page 12: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

2 0.90MM×1 0.90MM

(19 /20=0.95MM)

23 5×1 5 18×1 18

0.25MM

0.90MM

0.25MM×1 0.25MM

5 /20 0.25MM

0.90MM×1 0.90MM

(18 /20=0.90MM)

Page 13: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 14: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 15: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

5.55M/M

4.55

5.07

5.83

15.45

MCDC

1. MCDC

2.

3.

4.

MCDC

BPS No.7

MCDC

MCDC

Page 16: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

MCDC

MCDC

MCDC

Page 17: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

US$=103.17

0.25 M /M 205,000

0.25 M /M 205,000

0.25 M /M 205,000

0.75 M /M 615,000

1.45 M /M 1,189,000

2.45 M /M 2,009,000

0.90 M /M 738,000

4.80 M /M 3,936,000

5.55 M /M 4,551,000 4,551,000

30 114,000

13 44,460 31

30 114,000

15 51,300 31

28 106,400

27 102,600

532,760

30 348,000

12 125,280 31

30 348,000

14 146,160 31

27 313,200

26 301,600

1,582,240

2 354,696

2 10,520

4 440

2 439,016

2 10,520

4 440

814,752 880

1.37 3,221.88

1.43 3,362.99

0.87 2,046.01

0.83 1,951.94

1190.00 1,273.00

11,855.83

1.45 866.00

2.45 1,464.00

0.90 537.00

4.50 1,792.00

4,659.00

1 2,500

300 3,321.00

2,500 3,321.00

2,932,252 20,715.83 5,069,504

4,095,900 1x90%

1,729,380 (1+ )x20%

5,825,280 5,825,280

13,308,532 20,715.83 15,445,784

*

Page 18: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 19: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 20: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 21: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 22: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 23: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 24: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 25: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 26: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 27: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 28: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 29: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 30: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 31: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 32: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 33: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 34: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 35: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 36: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 37: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 38: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 39: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 40: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 41: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 42: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 43: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 44: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

Screening Format

Screening Format (1st Draft: 26th June 2014 ver.)

Name of Proposed Project:

The Project for Urgent Improvement of Water Supply System in Mandalay City

Project Proponent:

Mandalay City Development Committee (MCDC)

Name, Address, Organization, and Contact Point of a Responsible Officer:

Name: U Tint Lwin

Title: Head of Department, Water and Sanitation Department

Address: Corner of 26 th & 72nd Street, Mandalay, Republic of the Union of Myanmar

Organization: Mandalay City Development Committee (MCDC)

Tel: (+95) 2-35928

Fax: (+95) 2-36170

E-Mail: [email protected]

Date:

Signature:

Check Items

Please write “to be advised (TBA)” when the details of a project are yet to be determined.

Question 1: Address of project site

See the figure below.

Location map

Page 45: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

Question 2: Scale and contents of the project

2-1. Project profile

1) Installation of disinfection equipment at 9 groundwater reservoir systems

2) Construction of water supply system in Pyi Gyi Tagon Township (Max. Q; 9,000 m3/d):

Intake well, transmission pipe line, reservoir tank, disinfection equipment, booster pump sets

and distribution pipe network.

2-2. How was the necessity of the project confirmed?

Is the project consistent with the higher program/policy?

NO

2-3. Did the proponent consider alternatives before this request?

NO

2-4. Did the proponent implement meetings with the related stakeholders before this

request?

If implemented, please mark the following stakeholders.

Administrative body (Divisional Secretariats of relevant divisions)

Local residents

Others (ADB)

Question 3: Is the project a new one or an ongoing one? In the case of an ongoing project, have you

received strong complaints or other comments from local residents?

New Ongoing (with complaints) Ongoing (without complaints)

Other

Question 4: Is an Environmental Impact Assessment (EIA), including an Initial Environmental

Examination (IEE) required for the project according to a law or guidelines of a host

country? If yes, is EIA implemented or planned? If necessary, please fill in the reason

why EIA is required.

Page 46: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

(Reason why EIA is required: )

Other (The Government has not yet established own EIA/IEE system.)

Question 5:

In the case that steps were taken for an EIA, was the EIA approved by the relevant laws of the host

country? If yes, please note the date of approval and the competent authority.

Approved without asupplementary condition

Approved with asupplementary condition

Under appraisal

(Date of approval: )

Appraisal process not yet started

Question 6:

If the project requires a certificate regarding the environment and society other than an EIA, please

indicate the title of said certificate. Was it approved?

Requires a certificate but not yet approved

Title of the certificate: (Permission of the land use for well drilling. )

Question 7:

Are any of the following areas present either inside or surrounding the project site?

If yes, please mark the corresponding items.

(coastline, wetlands, reserved

area for ethnic or indigenous people, cultural heritage)

international treaties

Page 47: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

with special social value

Question 8:

Does the project include any of the following items?

If yes, please mark the appropriate items.

Groundwater pumping (scale: 9,000m3/day)

Not calculated yet.

Question 9:

Please mark related adverse environmental and social impacts, and describe their outlines.

Noise and vibrations

Outline of related impact:

Noise and vibrations:

Noise and vibration will be foreseen since heavy machineries will be operated during construction phase.

However, the duration is just limited.

Question 10:

In the case of a loan project such as a two-step loan or a sector loan, can sub-projects be specified at

the present time?

Page 48: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

Question 11:

Regarding information disclosure and meetings with stakeholders, if JICA’s environmental and

social considerations are required, does the proponent agree to information disclosure and meetings

with stakeholders through these guidelines?

Page 49: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 50: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 51: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 52: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 53: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 54: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 55: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 56: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 57: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 58: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 59: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 60: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC
Page 61: 環境 CR 15058 本文 · 66.5% 4 60 90 2 6 5.7 35.3% 95 5 3 MCDC 2014 1 2016 12 MCDC DMA DMA: District MeteringArea DMA MCDC

Attendees List of Stakeholder Meeting

NO. NAME POSITION AFFILIATION

1 U TUN KYI Committee Member(1) MCDC

2 U HAN SOE Committee Menber(3) MCDC

3 U TIN WAN Committee Member(4) MCDC

4 Dr.TWIN KYAW KYAW Committee Member(5) MCDC

5 U THIT LWIN Head of Department MCDC

6 U HTAY WIN Assistant Director MCDC

7 DAW KHIN MAY HTAY Head of Department MCDC

8 U KHIN MG MYINT Head of Department MCDC

9 U NAY WIN MYINT Head of Department MCDC

10 U KHIN MG NYUIT Assistant Engineer MCDC(STREET &Bridge)

11 DAW THAN THAN SWE Assistant Engineer MCDC(STREET &Bridge)

12 DAW THAN THAN SINT Assistant Engineer MCDC(STREET &Bridge)

13 U YE TUN Assistant Director MCDC(BUILDING)

14 U THIN MG WIN Assistant Director MCDC(BUILDING)

15 U HTET AUNG Ecusective Officer PYIGYITAGON TOWNSHIP

16 DAW NUN NUN TUN Assistant Director MCDC(BUILDING)

17 DAW LEI LEI KHAING Assistant Engineer MCDC(BUILDING)

18 U THAN OO Assistant Engineer MCDC(WATER&ClEAN)

19 DAW THAN MYAT OO Assistant Engineer MCDC(WATER&ClEAN)

20 U YE KYAW SWA Ecusective Officer MCDC

21 U ZAW WIN NAING Ecusective Officer MCDC

22 DAW TIN MG KYAW Assistant Director MCDC

23 DAW SAN DAR MON Assistant Director MCDC

24 U AUNG NAING Assistant Engineer (Elec.Power) MCDC

25 DAW EI EI PHYO Assistant Engineer (Civil) MCDC

26 U SOE MG HLA Assistant Engineer (Mech) MCDC

27 U OHN KYAW Assistant Engineer MCDC

28 U ZAY YA Assistant Director MCDC

29 U HTUN LIN SAW Ecusective Officer MCDC

30 U MYO SAW WIN MCDC

31 U TAUNG MYINT ADB ADB

32 U KIN MG WIN MCDC

33 DAW KHIN THIDA AUNG Sub Assistant Engineer MCDC

34 DAW LYDIA NAUNT NATUN Sub Assistant Engineer MCDC

35 DAW THU ZAR AUNG OFFICE SAFF MCDC

36 U MG MG LAY WARD OFFICER WARD

37 U TUN WARD STAFF WARD

38 U PAW THEIN WARD RESIDENT WARD

39 U MG MG AUNG WARD RESIDENT WARD

40 U THAN SWE WARD STAFF WARD

41 U BO WIN WARD STAFF WARD

42 U TIN HLAING TOWNSHIP OFFICER STAFF WARD

43 U MYA TWAE WARD STAFF WARD

44 U MYINT MIN WARD STAFF WARD

45 U PAN NEW WARD.4 WARD.4 COMMITTEE LEADER

46 U HTAY AUND WARD.4 WARD.4

47 U WIN BO WARD.4 WARD.4

48 U THAN THU AUNG WARD.4 WARD.4

49 U ZAW LIN OO WARD.4 WARD.4

50 U TIN MG AYE WARD.4 WARD.4

51 U MG MG MYINT WARD.4 WARD.4

52 U YE WIN WARD.4 WARD.4

53 U KYAW MIN SECRETARIAT WARD.4

54 U NYO LONE TOWNSHIP OFFICER PYIGYITAGON TOWNSHIP

55 U MIN MIN TUN SECRETARIAT PYIGYITAGON TOWNSHIP

56 U NAING LIN WARD OFFICER PYIGYITAGON TOWNSHIP

57 DAW SAGAR WAR SWE TOWNSHIP OFFICER WARD AND TOWNSHIP DEVELOPMET

58 U SOE AYE STAFF WARD 10

59 U THEIN SOE WARD OFFICER WARD 10

60 U MYINT OO WARD RESIDENT WARD 10

61 U THEIN NWET WARD RESIDENT WARD 10

62 U MG KYAW SOE WARD 2 OFFICER WARD 6

63 U KHIN MG MYINT WARD OFFICE STAFF WARD 6

64 U HLA NAING WARD OFFICE STAFF WARD 6

65 U MYO MYINT ZAW WARD OFFICE STAFF WARD 6

66 U WIN THEIN WARD OFFICE STAFF WARD6

67 U KYAW AYE WARD OFFICE STAFF WARD 6

68 U SOE LWIN WARD OFFICER WARD 5

69 U WIN MAW SECRETARIAT WARD 5

70 U MG SAN WARD STAFF WARD 5

71 U KYAW SOE WARD STAFF WARD 5

72 U AYE MIN TUN WARD STAFF PYIGYITAGON TOWNSHIP

73 U MIN KO WARD STAFF WARD 5

74 U MYAT THU VICE WARD OFFICER WARD AND TOWNSHIP DEVELOPMET

75 U CHUN WAERD STAFF WARD 5